This is an addendum to a bituminous sidewalk resurfacing project issued by the Town of Simsbury, Connecticut. Addendum 1 establishes the prevailing wage rates applicable to the Powder Forest Drive sidewalk resurfacing project scheduled for 2026. The addendum contains detailed wage rate schedules presented in tabular format across multiple images, specifying hourly compensation requirements for various trade classifications required to complete the work. These prevailing wage rates must be observed by all bidders and the selected contractor throughout the project duration to ensure compliance with Connecticut prevailing wage regulations.
The prevailing wage rates outlined in this addendum apply to all workers engaged in the project, as the contract exceeds the $100,000 threshold requiring such compliance. Contractors must incorporate these established wage rates into their bid proposals and budget planning. The wage schedules cover all labor categories necessary for the bituminous sidewalk resurfacing, driveway apron reconstruction, and ADA-compliant ramp installation work on approximately 3,600 linear feet of sidewalk. This addendum serves as a binding amendment to the original solicitation and must be referenced and adhered to by all parties responding to the October 15, 2026 bid deadline.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOWN OF SIMSBURY
933 HOPMEADOW STREET
SIMSBURY, CT 06070
BITUMINOUS SIDEWALK RESURFACING, POWDER FOREST DR, SIMSBURY 2026
ADDENDUM 1
Prevailing Wage Rates