Addendum 2 Q.A Powder Forest Sidewalk.pdf
PDF 680 KB Posted
- Solicitation number
- 39262
- Issued by
- Hartford County, Connecticut
About this file
This Addendum 2 document provides clarifications and responses to bidder questions for the Town of Simsbury's bituminous sidewalk resurfacing project on Powder Forest Drive in Connecticut. The project scope encompasses approximately 3,600 linear feet of bituminous sidewalk resurfacing, reconstruction of approximately 1,400 square feet of driveway aprons, and installation of five ADA-compliant ramps. The Invitation to Bid was issued October 1, 2026, with an optional pre-bid conference scheduled for October 8, 2026. Sealed bids are due October 15, 2026 at 10:00 a.m., and the contractor must commence work within ten calendar days of the Notice to Proceed. Project completion is required within five weeks of the Notice to Proceed, with the Notice to Proceed anticipated to issue within ten days of bid opening. The contractor shall submit a detailed work schedule for Town approval prior to contract execution and provide bi-weekly updates throughout construction.
The Town of Simsbury has clarified that alternate bids will be accepted in addition to the original scope of work, including methods such as leave-in-place reclaim and repave strategies. Contractors submitting alternate bids must bid both the original ITB scope and their proposed alternate method, clearly labeling the proposed process, construction methodology, all associated fees, and underlying assumptions on the bid sheet. The contract is awarded on a lump-sum basis, and all materials must be new and of best quality with one-year guarantees on materials and workmanship from substantial completion. Work must conform to Connecticut Department of Transportation standards, and Connecticut prevailing wage rates apply. Performance and payment bonds equal to the contract price are required within ten days of award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOWN OF SIMSBURY
933 HOPMEADOW STREET
SIMSBURY, CT 06070
BITUMINOUS SIDEWALK RESURFACING, POWDER FOREST DR, SIMSBURY 2026
ADDENDUM 2: Bidder Questions and Responses
Question: What is the required completion date for this project?
Response: We are requiring that the project be completed within 5 weeks of the Notice to Proceed. We anticipate the Notice to Proceed to be issued within 10 days of the bid opening.
Amended schedule which includes Project Completion; to be part of ITB:
2. Key Event Dates:
InvitaƟon to Bid Issued October 1, 2026
Pre-Bid Conference (opƟonal) October 8, 2026
Bids Due October 15, 2026 @ 10:00 am
Commencement of Work Within ten (10) calendar days of NoƟce to Proceed
Project CompleƟon Within 5 weeks of NoƟce to Proceed
Project CompleƟon:
The contractor is advised that Ɵme is of the essence for this project. The Contractor shall provide a detailed work schedule for approval by the Town prior to execuƟon of the Contract.
The work schedule shall be updated and provided to the Town bi-weekly for the duraƟon of the construcƟon.
Question: The InvitaƟon to Bid idenƟfies a specific scope of work. Will you accept alternate bids?
Specifically, reclaiming exisƟng asphalt, to use as a base for full repaving.
Response: Yes, we will accept alternate bids including, but not limited to, leave-in-place reclaim and repave. In the case of an alternate bid, contractors should bid both ways (original ITB scope plus an alternate method). If you choose to present an alternate bid, write-in your alternate bid in the bid sheet provided. Please clearly label your proposed process and method of construcƟon you are proposing indicaƟng all fees and assumpƟons.
End of Addendum