This is a Post Award Schedule document for GSA Leasing Portal solicitation 6ME0095, a Request for Lease Proposals (RLP) #26NAT01 for office space in the Portland/South Portland, Maine area. The General Services Administration's Public Buildings Service is seeking a 15-year lease with an 8-year amortization term for contiguous office or flex space totaling 2,305 to 2,397 ABOA square feet. The space must include 13 reserved surface parking spaces and be located on the ground floor when possible within the specified delineated area boundaries. Additional restrictions require the offered space to be positioned no less than 400 feet from schools, licensed daycare facilities, playgrounds, public parks, or places of worship, measured from the nearest property lines.
The Government will provide a Tenant Improvement Allowance of $71.54 per ABOA square foot for new leased space and Building Specific Amortized Capital (BSAC) of $25.00 per ABOA square foot for new leased space. Award will be made to the lowest-priced, technically acceptable offer without negotiations. Offerors are encouraged to submit rates for all terms available through the AAAP RLP to be considered for future requirements. Interested parties should access the complete RLP and submit proposals through the GSA Leasing Portal at https://leasing.gsa.gov/leasing/s/ViewRLP.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ME-Portland TF Delineated Area.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AAAP Project Specific Advertisement (PSA) Attachment: Post-Award Schedule
This attachment details the post-award schedule for this project. It hereby replaces the Attachment referenced in section 1.05 of the RLP (R100) and should be used when reviewing section 4.01 of the Lease (L100).
The below post-award schedule commences within 5 working days of lease award. The time frames below apply to the management of the design and construction process, concluding at the date of acceptance for the space.
| Activity |
| Working Days |
| Lessor-Provided Design Intent Drawings |
| 30 |
Government (GSA and Client) Review and Approval of Lessor Provided Design Intent Drawings
| Lessor Preparation and Submission of Construction Documents |
| 20 |
| Government Review of Construction Drawings |
| 20 |
| Lessor Preparation and Submission of the TI and BSAC Price Proposal |
| 20 |
| Government Reviews and Approves Pricing |
| 30 |
| Government Issues Notice to Proceed with Construction |
| 10 |
| Lessor Completes Construction of TIs and Completion of Other Required Construction Work |
| 60 |
| Government Inspects and Accepts Finished Space |
| 10 |
| Total Work Days from Lease Award to Government Acceptance |
| 245 |
| AAAP POST-AWARD SCHEDULE, PAGE 1 OF 1 | PSA VERSION - REV (04/26) |