Post_Award_Justification_PR15875301_DST_Innovation_Uganda.pdf

PDF 281 KB Posted

Attached to
Post-Award Justification Notice – Sole-Source Award to DST innovation GmbH for Mobile Laboratory Capability – U. S. MILGP Kampala, Uganda
Solicitation number
19GE5026P0134
Issued by

About this file

This is a Justification for Other Than Full and Open Competition document for a sole-source contract award by the U.S. Department of State.

The Department seeks to award a Firm-Fixed-Price (FFP) contract to DST innovation GmbH (located in Buchen, Germany) for an estimated value of $1,875,960.00 to supply two complete integrated mobile biological diagnostic laboratory systems on behalf of U.S. Embassy MILGP Kampala, Uganda. The contracting activity is the Regional Procurement Support Office (RPSO) Frankfurt. The requirement includes two complete mobile laboratory setups, each with approximately 32 square meters of usable workspace subdivided into functional laboratory sections; a mobile glovebox and sample-handling system capable of providing biosafety-level-3-equivalent containment in field conditions; sample collection and transportation equipment; sample preparation devices including laboratory centrifuges and mixers; instrumentation for PCR and ELISA analysis and light microscopy; transportable IT equipment; personal protective equipment (PPE); a mobile solar-based power unit with batteries; project management and pre-shipment services including configuration, quality assurance, export licensing, and customs clearance; international shipping and insured DDP-equivalent delivery to Kampala; orientation courses at the contractor's Germany facility for up to five full working days of instruction plus travel for up to three designated end-user personnel; and in-country training courses at Uganda post consisting of at least twelve full working days of tailored instruction covering mobile laboratory orientation, lab setup and operation, biosafety and biosecurity, PPE use and waste management, specimen reception and workflow, sample processing, molecular and diagnostic testing, data management, team coordination, simulation exercises, and field deployment and demobilization drills. The statutory authority permitting other than full and open competition is 41 U.S. Code 1901 as implemented by FAR 12.000 and FAR 12.102(b).

The Government determined that DST innovation GmbH is the sole responsible source because the requirement demands a uniquely integrated, configuration-specific mobile laboratory concept combining proprietary foldable glovebox technology meeting European standards (DIN EN 12469), inflatable tent systems, weight-constrained packaging, vacuum-insulated boxes for cold-chain logistics, and specialized training tailored to this specific configuration. The solution has been operationally validated in high-stakes, low-infrastructure scenarios, including deployment during the West African Ebola outbreak and previous Crimean-Congo hemorrhagic fever response. The integration with an existing identical deployment in Zambia is critical to ensure interoperability, standardized standard operating procedures (SOPs), common training curricula, and shared logistics across three regional posts (Zambia, Uganda, and Kenya). The physical, structural, and mechanical designs are proprietary military technology because the Institute functions as Germany's core competence center for medical biodefense; exact hardware dimensions, engineering blueprints, and physical security layouts are classified or restricted. The Contracting Officer determined the anticipated cost is fair and reasonable based on comparison to the prior Zambia acquisition, an independent government estimate (IGE) breaking out major cost elements, and consistency with commercial market prices for similar high-reliability laboratory and biosafety equipment. The Government published a Notice of Intent to Award on a Sole-Source Basis (Notice No. 19GE5026Q0129) with a response deadline of August 15, 2026, 23:59 CEST. Three capability statements were received: AmeriCare LLC challenged the sole-source determination and requested competitive solicitation; Lasec International (Pty) Ltd requested a supporting/complementary role and did not contest the award; and Easy Biz Solutions LLC submitted a late response (August 16, one day after the deadline) proposing an alternative team and challenging the NAICS/PSC classification. The Contracting Officer and the requiring activity's technical authority (HQ U.S. AFRICOM, Office of the Command Surgeon) evaluated each submission and determined that none altered the Government's determination that DST innovation GmbH remains the only responsible source capable of meeting the Department's minimum needs for this integrated, interoperable capability. For future, separately competed follow-on requirements such as in-country calibration, maintenance, or consumables resupply, the Department may consider regional firms such as Lasec.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION

SECTION 1: IDENTIFICATION OF THE AGENCY AND THE CONTRACTING

ACTIVITY

Department of State Contracting Activity

Acquisition Management – Regional Procurement Support Office (RPSO Frankfurt)

Requiring Activities U.S. MILGP Kampala, Uganda

SECTION 2: NATURE AND/OR DESCRIPTION OF THE ACTION BEING

APPROVED

MILGP Kampala, Uganda.

SECTION 3: DESCRIPTION OF SUPPLIES/SERVICES REQUIRED TO MEET THE

AGENCY’S NEEDS

-containment diagnostic -affected environments.

Reconnaissance & Verification department defined three core requirements for the field

- Low logistical effort

- Minimal space and infrastructure requirements

Why This Combination Is Unique processing risk group 4 pathogens -- and achieving low logistical effort -- with minimal space and infrastructure. Risk group 4 pathogens —

-4) containment — ks, etc.). -4- -

— -facility-grade containment into port equipment.

so it qualifies for commercial airline transport within 48 hours.

- -chain logistics —

- -sensitive reagents in transit, a detail that reflects how deeply the "minimal infrastructure" requirement was engineered into every aspect of the system.

Demonstrated Real-World Necessity

-stakes, low-

- - hemorrhagic .

project.

Bottom Line -4-and logistics profile normally associated with far lower-risk field kits. Few institutions ecause the Institute warfare and high-ricted. ifferent design lay

- tion hardware relies heavily on standard, high-end commercial-off-the-

- -generation sequencers) rugge the field.

support host-nation partner

Two (2) complete mobile laboratory setups each providing o An air-o - -level- -equivalent containment in field conditions.

o Sample collection and transportation equipment and an initial package of o -air hoods or equivalent enclosures.

o o o -purifying respirators o -

Project management and pre-shipment services, including configuration and adaptation of the equipment to the end-users’ requirements; procurement and quality

-site origin; and packing for air shipment -- International shipping and in-country delivery:

Uganda -

4. Orientation courses at the contractor’s facility in Germany to introduce the delivered systems.

-user personnel.

Round-trip economy airfare, local ground transport, and hotel lodging for

Training courses delivered in-country at post (Uganda), consisting of a tailored curriculum delivered on site after equipment delivery. course will run over a three-registration, and workflow; sample processing; molecular and other diagnostic testing;

$ , inclusive of all supplies, services, shipping, and training.

SECTION 4: IDENTIFICATION OF THE STATUTORY AUTHORITY PERMITTING

OTHER THAN FULL AND OPEN COMPETITION

SECTION 5: DEMONSTRATION THAT THE PROPOSED CONTRACTOR’S

UNIQUE QUALIFICATIONS OR THE NATURE OF THE ACQUISITION REQUIRES

USE OF THE AUTHORITY CITED

for the Uganda deployment

a. Integrated, configuration-specific mobile lab concept not available as a generic product equipment, information technology, power supply, packaging, and training into a single, field-off-the-shelf components.

b. Proven, fielded configuration identical to an existing U.S.-funded deployment (Zambia).

is

For Uganda, the procedures (SOPs), shared training curricula, and consistent logistics and maintenance across posts.

ment already uses elsewhere.

Replicating the configuration with a different contractor would require new engineering and

c. Need for compatibility, common training, and shared SOPs across all three deployments (Z , Uganda, Kenya) each configuration;

common logistical approach; and Personnel trained on one system can effectively support or deploy with another without another post Procuring from a different source would almost certainly result in a materially different configuration, requiring new SOP development and validation, new training design and materials, and separate logistics and

d. Integrated training program tailored to this specific configuration

A multi-diagnostics, data management, team coordination, and scenario-vendor could not deliver an equivalent training program without designing a different common training and procedures across posts.

-specific training and logistics support. For these reasons, the use of the cited authority for other than full and open competition is appropriate for this acquisition.

SECTION 6. DESCRIPTION OF EFFORTS TO ENSURE THAT OFFERS WERE

SOLICITED FROM AS MANY POTENTIAL SOURCES AS IS PRACTICABLE,

INCLUDING WHETHER A NOTICE WAS OR WILL BE PUBLICIZED AS

REQUIRED BY FAR SUBPART 5.1 AND, IF NOT, WHICH EXCEPTION UNDER

FAR 5.101(B) APPLIES

Intent to Award on a Sole- a Uganda ved in response to,

— challenging the sole-source determination outright and requesting a competitive solicitation.

— a South Africa-challenging the sole-source award itself.

Kenya, in-

SECTION 7. DETERMINATION BY THE CONTRACTING OFFICER THAT THE

ANTICIPATED COST TO THE GOVERNMENT IS FAIR AND REASONABLE

Comparison to prior Department acquisition of the same configuration now Uganda).

five -week training configuration previously procured current market conditions.

Independent Government Estimate (IGE).

e is

Commerciality and market context.

commercial-off-the- -level values for key components are consistent with market prices for similar high-technical training of this scope and duration.

SECTION 8. DESCRIPTION OF THE MARKET RESEARCH CONDUCTED (SEE

PART 10) AND THE RESULTS OR A STATEMENT OF THE REASON A MARKET

RESEARCH WAS NOT CONDUCTED

Prior acquisition and operational experience.

field-

Assessment of the Uganda requirement for compatibility.

training curricula, shared logistics, and cross-

Knowledge of DST’s integrated configuration as a unique concept.

activity is not aware of other vendors offering the same integrated configuration as a

SECTION 9. ANY OTHER FACTS SUPPORTING THE USE OF OTHER

THAN FULL AND OPEN COMPETITION

Several additional considerations support the use of other than full and open competition for

Bio-threat and outbreak response readiness.

Uganda faces recurring risks from emerging and re-emerging infectious diseases and

-nation counterparts require a field- Using a proven

Integrated logistics, export, and customs handling.

-goods handling, and delivery-duty-paid– -country transport and insured delivery to the end-to-end logistics chain for the same type of configuration and has proposed to

Using a different vendor would introduce

Financing and project-security arrangements.

-security arrangements tailored to providers and hedge currency risks.

4. Two-stage training concept integrated with configuration and delivery.

—linked to inspection and acceptance of the configured

— -week tailored training in Uganda, provides a coherent training pathway that is fully integrated with the specific equipment configuration and deployment plan.

program.

-of-

SECTION 10. LISTING OF SOURCES, IF ANY, THAT EXPRESSED A WRITTEN

INTEREST IN THE ACQUISITION

Source Date Nature of Response

-source determination;

requested competitive solicitation

Lasec International (Pty) Ltd

Requested a supporting/ source award stated deadline) Proposed alternative team as a second

Response to Capability Statement Challenging Sole-Source Intent. In response to a

-the-shelf the Government cancel its sole-source intent in favor of a competitive solicitation.

innova validated, cohesive platform;

al directly, whereas alternative vendors would introduce disjointed diagnostic thresholds, (including containment transitions, waste management, and emergency decontamination) i

International (Pty) Ltd, a South Africa-contest the sole-source determination. Rather, Lasec

- lished service presence in Uganda, complementary local support role (e.g., in-resupply), it does not requiring activity may consider Lasec, or similarly positioned regional firms, for future, separately competed follow-on requirements such as in-

-region delivery and installation partner, and Optima services), arguing that the requirement is properly an equipment acquisition and should en classified under an equipment-and determined that, notwithstanding its containment-equipment credentials (ISO

-derived

SECTION 11. STATEMENT OF THE ACTIONS, IF ANY, THE AGENCY MAY TAKE

TO REMOVE OR OVERCOME ANY BARRIERS TO COMPETITION BEFORE ANY

SUBSEQUENT ACQUISITION FOR THE SUPPLIES OR SERVICES REQUIRED

particular acquisition feasi

File details come from the government source that posted it. Updated .