This document is a manufacturer's technical drawing for an 85' Round Concrete Pole, prepared by Hughes Supply, Inc. for the Kissimmee Utility Authority (KUA) for the Michigan Avenue Line Relocation project. The detailed engineering drawing provides comprehensive specifications for a utility pole, including grounding connector details, drilling data, pole information, and strand details. The drawing specifies a 26-pole quantity requirement, with key technical specifications such as a ground line design moment of 491 kip-ft, a pole taper of 0.216 ⁄/ft, concrete strength of 8500 PSI, and an initial pull capacity of 45,000 lbs. The document was approved on June 9, 1989 by the Plug & Eng. Department and is marked as Drawing #1 of 2, with a job P.O. number K4308.
The technical drawing provides extensive technical details including precise measurements for drilling locations, strand placement, wall thickness at different pole sections, and specific grounding connector configurations. The pole is designed for utility line relocation, with detailed instructions for installation, including notes about compression connections, strand placement, and specific drilling requirements for various pole heights ranging from 6'-0" to 49'-6". The drawing includes circular diagrams showing strand details viewed from different angles, drilling data tables, and precise geometric specifications for pole construction and installation. The document appears to be a critical technical specification for a utility infrastructure project, providing engineers and construction teams with precise manufacturing and installation guidelines.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .