These are technical as-built drawings for a Swisslog Translogic Computerized Pneumatic Tube Delivery System being installed at the Stratton VA Medical Center in Albany, New York. The drawings (Job #004530, CTS-630 TL-2009) provide detailed schematics for the pneumatic tube system's installation, including floor plans, station configurations, technical specifications, power requirements, and installation details across multiple floors. The drawings include precise engineering diagrams showing tube station placements, routing, mounting details, electrical connections, and specific installation requirements for integrating the pneumatic tube system into the medical center's infrastructure.

The drawings appear to be part of a federal contract (Solicitation Number 36C24225Q0701) for modifying and expanding the existing pneumatic tube system, specifically involving relocating a receiving station in the 2C Operating Room Suite and connecting it to the existing 3B Lab pneumatic station. The project scope involves selective demolition, installation of new framing and wall systems, mounting of the pneumatic tube receiving station, and system commissioning, with work to be completed within 180 days of the Notice to Proceed. Approximately 75% of the work is to be performed on a designated weekend behind containment barriers, with testing and minor work completed during normal business hours.

View the file

Other files

File Type Posted
36C24225Q0701 0001.docx DOCX document
WD Albany.docx DOCX document
36C24225Q0701_1.docx DOCX document
Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JDavi Line

JDavi Line

JDavi Line

JDavi Line

JDavi Line

JDavi Callout This portion of work was removed from the contract. materials were transmitted to the owner

JDavi Line

JDavi Callout Work stopped here

JDavi Callout This portion of work was removed from the contract. materials were transmitted to the owner