This document is an addendum to a plumbing specification for the Assabet Valley Collaborative's REACH Evolution Tenancy 2 project located at 28 Lord Road in Marlborough, Massachusetts. The addendum provides detailed notes and specifications for the installation of a suspended electric water heater, including requirements for the water heater's factory settings, startup, warranty, temperature and pressure relief valve, and vacuum breaker relief valve. It also includes a plumbing fixture schedule with specifications for various fixtures such as water closets, lavatories, a kitchen sink, and a washing machine outlet box. Additionally, the document contains a hot water circulation pump schedule with details on the pump's manufacturer, model, flow, head, and electrical requirements.
The document does not provide any information about the overall project, such as the contract opportunity, response dates, award dates, or contract term. There are also no details on pricing, set asides, incumbents, funding sources, or other salient business information.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTES:
1. WATER SHALL BE PRODUCED AT MANUFACTURERS FACTORY SETTING
2. PROVIDE STARTUP BY FACTORY CERTIFIED TECHNICIAN AND STANDARD MANUFACTURERS WARRANTY.
3. WATER HEATER SHALL COME COMPLETE WITH TEMPERATURE AND PRESSURE RELIEF VALVE AND TANK DRAIN VALVE.
4. PROVIDE VACUUM BREAKER RELIEF VALVE(S) AS REQUIRED BY THE STATE PLUMBING CODE. INSTALL IN MULTIPLES IS REQUIRED.
5. ALL DOMESTIC WATER HEATING COMPONENTS SHALL COME ASME APPROVED.
HOT WATER HEATER SCHEDULE
TAG LOCATION MANUFACTURER MODEL TYPE RECOVERY LOAD
STORAGE
(GAL)
ELECTRICAL
COMMENTS
VOLT PH hZ
HWH ABOVE WASHING
MACHINE IN CEILING RHEEM POINT OF USE
EGSP20 ELECTRIC 15 GPH @ 80*F RISE 3.0 KW 20 208 1 60 120*F OUTPUT. WATER SHALL BE PRODUCED AT MANUFACTURERS
FACTORY SETTING
SUSPENDED ELECTRIC WATER HEATER DETAIL
NOT TO SCALE
HWH
1"
NOTES :
1. ELECTRIC WATER HEATER SHALL BE INSTALLED ON PLATFORM, ABOVE
JANITORS CLOSET. PROVIDE SUPPORT STRUCTURE AS REQUIRED.
2. PROVIDE 3 4" CD PLYWOOD UNDERNEATH SAFE WASTE PAN.
3. COORDINATE WATER DETECTION SYSTEM WITH ELECTRICAL CONTRACTOR.
4. IF HARD CEILING IS TO BE INSTALLED, COORDINATE ACCESS PANEL SIZE &
LOCATION IN FIELD WITH GENERAL CONTRACTOR & OWNER.
FLOOR
MOP BASIN
4"DRAIN TO MOP BASIN
3"S
SEE FLOOR PLAN
2"V
SEE FLOOR PLAN
AIR BREAK
2"DEEP GALVANIZED STEEL SAFE PAN
WITH 1"DRAIN TAP. PAN TO HAVE MIN
2"CLEARANCE ALL AROUND HWH
T&P RELIEF VALVE
CW SUPPLY
HW SUPPLY
T
AQUASTAT
HOT WATER RECIRCULATION
PUMP (HWCP)
CHECK VALVE (TYPICAL)
HWR FROM SYSTEM
EXPANSION TANK
AMTROL ST-5C
VACUUM RELIEF VALVE
WATER SENSOR
UNISTRUT STEEL FRAMING.
FABRICATE IN FIELD
BALL VALVE (TYP)
UNION (TYP)
WIRE TO WALL OUTLET
WIRE FROM WATER SENSOR
WIRE TO WATER HEATER
FLOODSAFE CONTROL UNIT
DRAIN
SECURE EACH TIE ROD SUPPORT TO BUILDING
STEEL. COORDINATE IN FIELD TEMPERATURE GAUGE
TYPICAL WASHING MACHINE BOX
NOT TO SCALE
BRACKET TO STUD
2" SANITARY OUTLET
3-1/2"
43" TO FL.
TOP OF MACHINE
TOP OF BOX
2" SANITARY TEE FITTING
2" P-TRAP
2"
SCREW MOUNTING
WOOD OR STEEL
FRAMING STUD
SANITARY RISER. SEE PLANS FOR SIZES
SANITARY TEE FITTING
2" VENT
SANITARY RISER. SEE PLANS FOR SIZES
1/2" HW & CW SUPPLIES
SHOCK ABSORBER INTEGRAL
WITH WASHING MACHINE BOX
WATER VALVE BOX
HW & CW HOSE CONNECTIONS
WITH INTEGRAL SHUT OFFS
1. THE WASHING MACHINE BOX WITH DRAIN AND WATER SUPPLY WITH MINI-ARRESTORS SHALL BE BY SIOUX CHIEF
PLUMBING FIXTURE SCHEDULE
TAG DESIGNATION
FIXTURE TRIM CONNECTIONS
REMARKS
MANUFACTURER MODEL MANUFACTURER MODEL COLD WATER HOT WATER SANITARY VENT
P-1 WATER CLOSET TOTO CT705ELNG TOTO ECOPOWER TET1LA32#CP
TOTO SEAT SC534 1" - 4" 2" COTTON, FLOOR MOUNTED, ADA COMPLIANT TOILET WITH CeFiONtect CERAMIC GLAZE. 1.28 GPF
ECOPOWER SENSOR ACTIVATED FLUSHOMETER
P-2 LAVATORY KOHLER K-12638-L-0 KOHLER K-103K37-SANA-CP 1
2" 1
2" 2" 2"
COTTON, VITREOUS CHINA SINK WITH K-13885 OFFSET DRAIN, OVERFLOW
CHROME, KINESIS SENSOR ACTIVATED FAUCET, AND BOBRICK (B-848) SOAP DISPENSER
P-3 KITCHEN SINK ELKAY ECTSRAD25226TBG ELKAY LK800GN08T6 1
2" 1
2" 2" 2" STAINLESS STEEL, 4 HOLE, SINGLE BOWL SINK WITH BOTTOM GRID (CTXBG2115), OFFSET TAILPIECE
(LKAD35), AND 8"ARC TUBE SPOUT FAUCET WITH WRIST BLADE HANDLES
P-4 WASHING MACHINE OUTLET
BOX WATTS A2C-WB-M1 - - 1
2" 1
2" 2" 2" MAX PRESSURE RATING OF 150PSI. MAX TEMP RATING OF 180°F WITH ABS BOX.
NOTES:
1. PLUMBING CONTRACTOR SHALL COORDINATE ALL FIXTURE INSTALLATION DIMENSIONS WITH THE ARCHITECTURAL DETAILS ON THE ARCHITECTURAL DRAWINGS.
2. ALL PLUMBING FIXTURE, FAUCETS, AND FLUSH VALVES SHALL BE FIELD ADJUSTED TO ENSURE PROPER CODE COMPLIANT OPERATION FOR TEMPERATURE AND FLOW.
3. ALL HANDWASHING FIXTURES SHALL BE FIELD ADJUSTED TO LIMIT THE HOT WATER TEMPERATURE TO 110°F.
4. PROVIDE SERVICE STOPS FOR ALL FIXTURES. ALL EXPOSED WATER & WASTE PIPING ASSOCIATED WITH FIXTURES SHALL BE CHROME FINISH. PROVIDE ALL SUPPLIES, SERVICE STOPS, TAILPIECES, AND TRAPS FOR FIXTURES AS REQUIRED. PROVIDE ALL FINAL CONNECTIONS.
5. PROVIDE CONCEALED WALL CARRIERS FOR ALL WALL MOUNTED FIXTURES. CARRIERS SHALL BE BY WADE OR APPROVED EQUAL.
6. PROVIDE PRE-MOLDED INSULATION KITS ON ALL WASTE & WATER PIPING, VALVES & FITTINGS DIRECTLY BELOW ACCESSIBLE FIXTURES. INSULATION KIT TO BE BY TRUBRO.
CEILING
COUNTERTOP
FINISH FLOOR
TYPICAL KITCHEN SINK & DISHWASHER DETAIL
NOT TO SCALE
DISHWASHER
BY OTHERS
SINK
CLIP DISHWASHER WASTE
AS HIGH AS POSSIBLE
BELOW COUNTER
WATER HAMMER
ARRESTOR
2"
2"
HOT WATER CIRCULATION PUMP SCHEDULE
TAG LOCATION MANUFACTURER MODEL TYPE
FLOW
(GPM)
HEAD
(FT)
ELECTRICAL
COMMENTS
VOLT HP PHASE hZ
HWCP HOT WATER HEATER GRUNDFOS MAGNA IN-LINE 2 7 115 0.5 1 60 DOMESTIC WATER RECIRCULATING WITH IMMERSION AQUASTAT
S t a m p :
S h e e t :
Date:
7th March 2022
Scale:
4" = 1'-0"
Project No.:
2021.AVC_Reach
As sa be t V al le y Co lla bo ra tiv e:
R
EA
CH
E vo lu tio n te na nc y
L or d Ro ad M ar lb or ou gh M
A
G l e n n R
D a v i s
A .I
.A
W oo dr ow S tr ee t H ud so n, M
A . 0
8.
2.
e .d av is gm co m ca st
.n et
V isi t o ur n ew w eb sit e a t w w w
.g le nn da vi sa rc hi te ct s.
co m
D A
V I
S
R C
H I
T E
C T
S
O ur
9t h Ye ar
(2
2-se rv in g ou r c lie nt ele
Addendum No.2 : 29th March 2022
P.002
PL
U
M
BI
N G
Le ge nd , N ot es
S pe ci fic at io ns
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DRAIN BOX
AutoCAD SHX Text
W.
Dryer
2"CW
2"HW
2"HW
2"CW
2"CW
2"HW
1"CW
HWH
1"CW, MAKE CONNECTION TO EXISTING CW,
EXACT LOCATION TDIF.
CONNECT DISHWASHER TO
KITCHEN SINK HW
4"HW
4"CW
2"
4"
2"
S t a m p :
S h e e t :
Date:
7th March 2022
Scale:
4" = 1'-0"
Project No.:
2021.AVC_Reach
As sa be t V al le y Co lla bo ra tiv e:
R
EA
CH
E vo lu tio n te na nc y
L or d Ro ad M ar lb or ou gh M
A
G l e n n R
D a v i s
.I
.A
W oo dr ow S tr ee t H ud so n, M
A . 0
8.
2.
e .d av is gm co m ca st
.n et
V isi t o ur n ew w eb sit e a t w w w
.g le nn da vi sa rc hi te ct s.
co m
D A
V I
S
R C
H I
T E
C T
S
O ur
9t h Ye ar
(2
2-se rv in g ou r c lie nt ele
Addendum No.2 : 29th March 2022
P.101
PL
U
M
BI
N G
Se co nd F lo or
D om es tic
N ew
W or k Pl an
File details come from the government source that posted it. Updated .