This is a playground equipment specifications document created for Fontana Unified School District, detailing design drawings and installation requirements for five distinct playground areas (Areas A through E) located in Fontana, California. The specifications include comprehensive equipment layouts, component lists, color palettes, accessibility requirements, and safety compliance standards for all playground installations. Area A features 12 elevated play components with a 60-inch critical fall height and includes items such as the Nuvo Transfer Station, Nuvo Double Slide, Silo Climber, and various climbing structures with 2,717 square feet of poured-in-place rubber surfacing. Area B contains 7 elevated play components with a 90-inch critical fall height and incorporates equipment from Playworld Systems and Northern Lights manufacturers with 2,940 square feet of poured-in-place rubber surfacing. Areas D and E feature additional elevated and ground-level play components with critical fall heights of 48 inches and 96 inches respectively, along with various surfacing materials including artificial turf, engineered wood fiber, and concrete ramps. All structures are designed by Brittany Bourbonnais and conform to ASTM F1487 standards and CPSC guidelines. The Fontana Unified School District bid (No. 25/26-0019) seeks contractor submissions by April 21, 2026, at 2:00 p.m., with questions due by April 3, 2026, at 2:00 p.m. through the e-procurement portal.

The contract is a public works project subject to California prevailing wage requirements, with all contractors and subcontractors required to register with the Department of Industrial Relations before bidding. The District will provide all playground equipment, surfacing, and materials, while the contractor must furnish all labor, installation hardware, incidentals, and related services on a unit-price basis. The resulting contract will be for one year with options to renew for up to five additional years at the District's discretion, allowing for work to be issued districtwide on an as-needed basis via purchase orders. Scope of work includes installation of new playground equipment and shade structures as well as repairs and overlays to existing equipment and surfacing, with specific variations by school site.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COLOR PALETTE: MANUFACTURERS: DESIGNED BY:

BRITTANY BOURBONNAIS

JULY 2, 2025

DRAWING # C25243CHR1

PROJECT # 25004463

Fontana Area A Fontana , CA

PROJECT: DESIGNED FOR:

JULY 2, 2025

DRAWING # C25243CHR1

PROJECT # 25004463

Fontana Area A Fontana, CA

JULY 2, 2025

DRAWING # C25243CHR1

PROJECT # 25004463

Fontana Area A

JULY 2, 2025

DRAWING # C25243CHR1

PROJECT # 25004463

Fontana Area A

JULY 2, 2025

DRAWING # C25243CHR1

PROJECT # 25004463

Fontana Area A

SELECTED COLORS

POST: BLUE

COMPONENT 1: YELLOW

COMPONENT 2: YELLOW

COMPONENT 3: N/A

COMPONENT 4: N/A

ROTOMOLDED PLASTIC 1: BLUE

ROTOMOLDED PLASTIC 2: YELLOW

ROTOMOLDED PLASTIC 3: N/A

SHEET PLASTIC 1: BLUE

SHEET PLASTIC 2: YELLOW

2-TONE PLASTIC: BLUE/YELLOW

ROPE: BLUE

SHADE: BLUE

ECO-ARMOR: BLUE

KODA 1: N/A

KODA 2: N/A

KODA 3: N/A

KODA 4: N/A

KODA 5: N/A

KODA 6: N/A

KODA 7: N/A

MODIFIED COLORS LISTED BELOW

BOULDER: DESERT SAND

COLOR PALETTE: MANUFACTURERS: DESIGNED BY:

BRITTANY BOURBONNAIS

JULY 2, 2025

DRAWING # C25243CHR1

PROJECT # 25004463

Fontana Area A

TOTAL ELEVATED PLAY COMPONENTS: 12

TOTAL ELEVATED PLAY COMPONENTS ACCESSIBLE BY RAMP: 0 REQUIRED: 0

TOTAL ELEVATED PLAY COMPONENTS ACCESSIBLE BY TRANSFER: 12 REQUIRED: 6

TOTAL ACCESSIBLE GROUND LEVEL COMPONENTS SHOWN: 4 REQUIRED: 4

TOTAL ACCESSIBLE GROUND LEVEL COMPONENTS OF DIFFERENT TYPES: 3 REQUIRED: 3

* APPLICABLE ONLY WITH ADA COMPLIANT SURFACING.

0 5' 10'

55'-9"

POURED IN PLACE

RUBBER SURFACING

2717 SQ FT

SANDBOX

RISK

MANAGEMENT

SIGN W/ 5-12

STICKER

36"

36"

42"

48"

60"

NUVO

TRANSFER

STATION

ACCESS

GATES

PICNIC

BOULDER

NUVO

DOUBLE

SLIDE

NUVO

CONSTRUCTION

PANEL

SILO

CLIMBER

CATWALK

CLIMBING

SQUARES

CRAZY

BONES

BRIDGE

(12" RISE)

CLIFF

HANGER

ROPE

LADDER

DYNAMIC

DESCENT

SLIDE

118 SQ FT

SHADE HAT

GLIDE

SLIDE

CLOUDWALK

70'

118 SQ FT

SHADE HAT

NEW CURB

56 LIN FT

POST

MOUNT

SCAVENGER

HUNT PANEL

2) BELLS

WHEEL

Fontana Area A Fontana, CA

PLAY STRUCTURE AND LAYOUT OF THE COMPONENTS CONFORM TO

ASTM F1487-21 AND CPSC #325 GUIDELINES AND CCR TITLE 22,

DIVISION 4 CHAPTER 22.

CRITICAL FALL HEIGHT OF OVERALL PLAY AREA: 60"

BRITTANY BOURBONNAIS

JULY 1, 2025

DRAWING # C25243CHR1

PROJECT # 25004463

COLOR PALETTE: MANUFACTURERS:

FONTANA AREA B

Fontana , CA

PROJECT: DESIGNED BY:

BRITTANY BOURBONNAIS

NOVEMBER 02, 2023

DRAWING #

C23438CH

DESIGNED FOR:

Fontana, CA

PROJECT: DESIGNED BY:

BRITTANY BOURBONNAIS

NOVEMBER 02, 2023

DRAWING #

Fontana, CA

PROJECT: DESIGNED BY:

BRITTANY BOURBONNAIS

NOVEMBER 02, 2023

DRAWING #

Fontana, CA

PROJECT: DESIGNED BY:

BRITTANY BOURBONNAIS

NOVEMBER 02, 2023

DRAWING #

COMPONENT 1: LIME

COMPONENT 2: BLUE

ROTOMOLDED PLASTIC 1: CYAN

ROTOMOLDED PLASTIC 2: GRAYSTONE

ROTOMOLDED PLASTIC 3: N/A

SHEET PLASTIC 1: BEIGE

SHEET PLASTIC 2: N/A

2-TONE PLASTIC: BEIGE/GRAY

ROPE: N/A

ECO-ARMOR: GRAY

MODIFIED COLORS LISTED BELOW

ROCK CLIMBER/ 72’’ GLIDE SLIDE: GRAYSTONE

---------------------------BERLINER-----------------------------------

POST: RAL 5017 TRAFFIC BLUE

NODES: RAL 9007 GRAY ALUMINUM

ROPE: LIME

COLOR PALETTE: MANUFACTURERS:

FONTANA AREA B

Fontana, CA

PROJECT: DESIGNED BY:

BRITTANY BOURBONNAIS

NOVEMBER 02, 2023

DRAWING #

0 5' 10'

48" 72" 72"36"

SINGLE POST SWING

W/ BELT SEATS

AT 7' 6'' HIGH

(GL-swinging)

TOTAL ELEVATED PLAY COMPONENTS: 7

TOTAL ELEVATED PLAY COMPONENTS ACCESSIBLE BY RAMP: 0 REQUIRED: 0

TOTAL ELEVATED PLAY COMPONENTS ACCESSIBLE BY TRANSFER: 7 REQUIRED: 4

TOTAL ACCESSIBLE GROUND LEVEL COMPONENTS SHOWN: 4 REQUIRED: 2

TOTAL ACCESSIBLE GROUND LEVEL COMPONENTS OF DIFFERENT TYPES: 3 REQUIRED: 2

* APPLICABLE ONLY WITH ADA COMPLIANT SURFACING.

POURED IN PLACE

RUBBER SURFACING

2940 SQ FT

31'-11"

26'-7"

51'-2"

35'

39'-8"

26'-7"

UFO

M3

20' X 30' FABRIC

SHADE SHELTER

ADA

STAIRS

(not a play component)

PIPEWALL

W/ TELESCOPE

(elevated)

STOREFRONT

(GL-

imaginative)

VERY BURIED

PANEL (deck)

ADA BELL

PANEL

(GL-music)

ROCK

CLIMBER

(elevated)

GLIDE

SLIDE

(elevated)

CLIMBING

SQUARES

(elevated)

POST

MOUNT

DRUM

(GL-music)

TRANSFER

STATION W/ STEP

(not a play component)

60" ACCESSIBLE

ROUTE, PG 3, PG 7

48' X 30'

CLEAR SPACE

60" ACCESSIBLE

ROUTE, PG 3, PG 7

ADA STAIR

(not a play component)

ACCESS

GLIDE

SLIDE

(elevated)

60" ACCESSIBLE

ROUTE, PG 3, PG 7

PLAY STRUCTURE AND LAYOUT OF THE COMPONENTS CONFORM TO

ASTM F1487-17 AND CPSC #325 GUIDELINES AND CCR TITLE 22,

DIVISION 4 CHAPTER 22.

CRITICAL FALL HEIGHT OF OVERALL PLAY AREA: 90"

FONTANA AREA B

Fontana, CA

BRITTANY BOURBONNAIS

OCTOBER 09, 2023

DRAWING #

Equipment Manufacturer

350-2227

Northern Lights

Equipment Manufacturer

350-2227

Northern Lights

0 .5 1.0

0 5'

Meters2.0 3.0

10'

NUVO

TRANSFER

STATION

36" 0,92M

48" 1,22M

32'-8" [9.96M]

28'-6" [8.69M]

6'-1" [1.86M]

6'-1" [1.86M]

6'-1" [1.86M]

6'-2" [1.88M]

SLING

SEAT

GLIDE

SLIDE

GLIDE

SLIDE

RIBBON

CLIMBER

POST

MOUNT

BELLS

90° GLIDE

SLIDE

CLIMBING

SQUARES

KALEIDO

CATWALK

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

POST

MOUNT

WHEEL

POST

MOUNT

DRUM

KALEIDO

BARRIER

KALEIDO

BARRIER

6'-1" [1.87M]

6'-4" [1.94M]

Total Elevated Play Activities:

Total Ground-Level Play Activities:

Accessible Elevated Activities

Accessible Ground-Level

Activities

Accessible Ground-Level Play Types

Required

Provided

A D

A S

C H

ED

U

LE 6

PLAYWORLD SYSTEMS, INC.

1000 Buffalo Road

Lewisburg, PA

17837-9795 USA

B Paper Size

DATE:

SCALE:PROJECT NO:

*PLAYGROUND SUPERVISION REQUIRED

DRAWN BY:

USER CAPACITY: AGE GROUP:

AREA: PERIMETER:

EQUIPMENT SIZE:

USE ZONE:

FALL HEIGHT:

CPSC #325

ASTM F1487-

N O

R

TH

ER

N

L

IG

H

TS

CA

TA

LO

G

P

RE

-D

ES

IG

N

350-2227 1/4"=1'-0"

M. MERTZ

07-FEB-22

20'5" x 16'3" x 12'8" 6,22M x 4,95M x 3,86M

32'8" x 28'6" 9,96M x 8,69M

836 SqFt.

77,66 SqM.

105'7" 32,18M

4 Ft.

1,22M

29 2-5

0 .5 1.0

0 5'

Meters2.0 3.0

10'

36" 0,92M

48" 1,22M

32'-8" [9.96M]

28'-6" [8.69M]

6'-1" [1.86M]

6'-1" [1.86M]

6'-1" [1.86M]

6'-2" [1.88M]

6'-1" [1.87M]

6'-4" [1.94M]

Total Elevated Play Activities:

Total Ground-Level Play Activities:

Accessible Elevated Activities

Accessible Ground-Level

Activities

Accessible Ground-Level Play Types

Required

Provided

A D

A S

C H

ED

U

LE 6

PLAYWORLD SYSTEMS, INC.

1000 Buffalo Road

Lewisburg, PA

17837-9795 USA

B Paper Size

DATE:

SCALE:PROJECT NO:

*PLAYGROUND SUPERVISION REQUIRED

DRAWN BY:

USER CAPACITY: AGE GROUP:

AREA: PERIMETER:

EQUIPMENT SIZE:

USE ZONE:

FALL HEIGHT:

CPSC #325

ASTM F1487-

N O

R

TH

ER

N

L

IG

H

TS

CA

TA

LO

G

P

RE

-D

ES

IG

N

350-2227 1/4"=1'-0"

M. MERTZ

07-FEB-22

20'5" x 16'3" x 12'8" 6,22M x 4,95M x 3,86M

32'8" x 28'6" 9,96M x 8,69M

836 SqFt.

77,66 SqM.

105'7" 32,18M

4 Ft.

1,22M

29 2-5

B Paper Size

FOOTING LEGEND

DATE:

SCALE:

*PLAYGROUND SUPERVISION REQUIRED

DRAWN BY:

136"

ZZCH

148"GZ

SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)

SUPPORT POST FOOTING (DETAIL 1 or 4)

INDICATES POST LENGTH)

THICK BORDER INDICATES POST

EXTENSION LOCATION

CANTILEVER, "T" POST, AND COMPONENT

POST FOOTING (DETAIL 2)

(ZZCH1850 INDICATES PART NUMBER)

GROUND ZERO POST FOOTING (DETAIL 2)

INDICATES POST LENGTH)

COMPONENT FOOTING (DETAIL 3)

(136"

(148"

PO

ST

F O

O

TI

N G

D

ET

A

IL

S

PL

AY

M

AK

ER

S / C

HA

LL

EN

G

ER

S

FOOTING DETAIL

PW CAD

18-NOV-20

NOT TO SCALE

Post Footing Detail Post Footing Detail

Factory-Applied Protective Surfacing Level Sticker

Ground Level

Component Footing Detail

Perforated End Cap or Porous Material

Varies

DETAIL 3

Concrete

2b Stone

(762mm) 30"

(610mm) 24"

(305mm) Diameter

12"

Varies

Component

Protective Surfacing Level

Surface Mount Detail

DETAIL 4

Concrete Slab or Pier Base

Protective Surfacing

Surface Mount

Level

2"(51mm) 2" (51mm) Anchor Bolts

Supplied By Customer

Post

Level Sticker Protective Surfacing Factory-Applied

Support Post, Spiral Slide and

Perforated End Cap

Factory-Applied or Porous Material

Ground Level

Protective Surfacing Level Sticker

Concrete

2b Stone

DETAIL 1

Diameter (457mm)

18"

Varies

Protective Surfacing

Support Post

(1067mm) 42"

(914mm) 36"

Level

Level Sticker

GroundZerO, Cantilever and "T"

(1372mm)

(1220mm)2" (51mm)

Varies

54"

DETAIL 2

2b Stone

Concrete

18"

Diameter (457mm)

Perforated End Cap or Porous Material

48"

Varies

Varies

2" (51mm) Ground Level

Protective Surfacing

Support Post

Protective Surfacing Factory-Applied

Level

SITE NOTES:

1) The site plan provided must be checked against the actual site area to ensure that placement of your structure meets required clearances.

2) The dimensions labeled are for location of footing holes, not exact placement of equipment. Assemble, plumb, and level equipment before pouring concrete.

3) There must be a minimum distance of 6' (1830mm) between any obstacle, sidewalk, etc., and your structure.

4) Slides must have a use zone that extends out from the lower exit section of the slide a distance that is at least 6' (1830mm) or equal to the vertical distance from the highest point of the sliding surface to the top of the protective surfacing, whichever is greater. The slide use zone should not extend greater than 8' (2438mm) from the end of the lower exit section.

5) The complete area, including the space under and around the equipment, must be covered with an impact attenuating material.

See the 1997 publication, "Handbook for Public Playground Safety", published by the U.S. Consumer Product Safety Commission, for guidelines and recommendations on the type and depth of surfacing material. For a copy of the "Handbook for Public Playground Safety", write to: U.S. Consumer Product Safety Commission

Office of Information and Public Affairs Washington, D.C. 20207

INSTALLATION NOTES:

1) Paved surfaces, such as asphalt and concrete, are not acceptable for use under your structure.

2) It is the consumer's responsibility to check with local utilities prior to excavating footings for any underground utility lines that may exist within the installation area.

3) It is the consumer's responsibility to check local soil conditions and drainage within the site area. Inquire with local contractors for appropriate recommendations.

4) If the structure is to be installed across uneven terrain, maintain the support post mark for protective surfacing level at the lowest grade. Adjust other footings accordingly.

5) The base of footings must be below frost lines.

6) Do not encase the bottom of support posts in concrete. Place all posts directly on packed stone.

7) Assemble the entire structure before pouring concrete unless specifically instructed to do so in the individual component installation instructions.

8) Read completely the installation instructions provided with your structure prior to beginning construction.

STONE OPTION BLOCK OPTIONOR

STONE OPTION BLOCK OPTIONOR STONE OPTION BLOCK OPTIONOR

Factory-Applied Protective Surfacing Level Sticker

Ground Level

Varies

Concrete

(762mm) 30"

(610mm) 24"

(305mm) Diameter

12"

Varies

Component

Protective Surfacing Level

2"(51mm)

Factory-Applied

Ground Level

Protective Surfacing Level Sticker

Concrete

Diameter (457mm)

18"

Varies

Protective Surfacing

Support Post

(1067mm) 42"

(914mm) 36"

Level

2" (51mm)

Varies

Level Sticker

(1372mm)

(1220mm)

54"

Concrete

18"

Diameter (457mm)

48"

Varies

Varies

2" (51mm) Ground Level

Protective Surfacing

Support Post

Protective Surfacing Factory-Applied

Level

Material Porous Block

Material Porous Block

Material Porous Block

PLAYWORLD SYSTEMS, INC.

1000 Buffalo Road

Lewisburg, PA

17837-9795 USA

Shade Post Footing Detail

DETAIL 5

Level Sticker chart in (914mm)Refer to

Concrete

18"

Diameter (457mm)

36" Min.

Varies 2" Min. (51mm)

Ground Level

Protective Surfacing

Support Post

Protective Surfacing Factory-Applied

Level installs

3" Min. (51mm)

SHADE HAT POST FOOTING (DETAIL 5)

INDICATES POST LENGTH)(210"

210"SP

136"

When utilizing Post Extensions adjust depth of footing/concrete accordingly.

156"

156" 156"

156"

156"

156" 156"

156"

156"

136"

144" 144"

144" 36" 36"

36" 36"

36" 36"

36" 36"

36" 36"

36" 36"72"36"36"

37" 17"

31" 18"

18"31"29"2"

41"2" 33"

29"

14"

15"

10"

19" 21"

7"

64"

18"

64"

18"

NUVO

TRANSFER

STATION

GLIDE

SLIDE

GLIDE

SLIDE

RIBBON

CLIMBER

90° GLIDE

SLIDE

CLIMBING

SQUARES

KALEIDO

CATWALK

153"

104"

153"

118"18"

31"

11"

PLAYWORLD SYSTEMS, INC.

1000 Buffalo Road

Lewisburg, PA

17837-9795 USA

B Paper Size

DATE:

SCALE:PROJECT NO:

*PLAYGROUND SUPERVISION REQUIRED

DRAWN BY:

FOOTING LEGEND

112"

1850ZZCH

144"

GZ

SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)

SUPPORT POST FOOTING (DETAIL 1 or 4)

(112" INDICATES POST LENGTH)

CANTILEVER, "T" POST, AND COMPONENT

POST FOOTING (DETAIL 2)

(ZZCH1850 INDICATES PART NUMBER)

GROUND ZERO POST FOOTING (DETAIL 2)

(144" INDICATES POST LENGTH)

COMPONENT FOOTING (DETAIL 3)

N O

R

TH

ER

N

L

IG

H

TS

CA

TA

LO

G

P

RE

-D

ES

IG

N

350-2227 1/4"=1'-0"

M. MERTZ

07-FEB-22

0 5' 10'

58'-8"

28'

64'-6"

28'-7"

TOTAL ELEVATED PLAY COMPONENTS: 7

TOTAL ELEVATED PLAY COMPONENTS ACCESSIBLE BY RAMP: 0 REQUIRED: 0

TOTAL ELEVATED PLAY COMPONENTS ACCESSIBLE BY TRANSFER: 7 REQUIRED: 4

TOTAL ACCESSIBLE GROUND LEVEL COMPONENTS SHOWN: 11 REQUIRED: 2

TOTAL ACCESSIBLE GROUND LEVEL COMPONENTS OF DIFFERENT TYPES: 6 REQUIRED: 2

* APPLICABLE ONLY WITH ADA COMPLIANT SURFACING.

PLAYTOWN

PLAYHOUSE

TIC-TAC-TOE

PANEL

(gl-manipulative)

ABC & 123

PANEL

(gl-tactile)

ARTIFICIAL TURF

SAFETY SURFACING

1724 SQ FT

CONCRETE CURB

180 LIN FT

RISK

MANAGEMENT

SIGN W/ 2-12

STICKER

BEANSTALK

CLIMBER

(elevated)

BUTTERFLY

CLIMBERS

DUO SEESAW

W/ SEAT BACKS

(gl-rocking)

ROCK

CLIMBER

(elevated)

FOUR-THE-WIN

PANEL (elevated)

ADA DRIVER

PANEL

(gl-manipulative)

PLAYSEAT

(gl-not accessible)

POST

MOUNT

BELLS

(gl-music)

SOLAR

CLIMBER

(elevated)

GLIDE

SLIDE

(elevated)

NUVO

TRANSFER

STATION

(not a play component)

GLIDE

SLIDE

(elevated)

36"48"

36"

42"

CATWALK

(elevated)

30' X 30'

NAVAJO METAL

SHADE SHELTER

CONTRASTING STRIPE

TO BE APPLIED TO

TRANSFER STATION

STEPS

8"

16" 24"

30"

2'-6"

2'

60" ACCESSIBLE

ROUTE

Fontana Area D

FONTANA, CA

PLAY STRUCTURE AND LAYOUT OF THE COMPONENTS CONFORM TO

ASTM F1487-21 AND CPSC #325 GUIDELINES AND CCR TITLE 22,

DIVISION 4 CHAPTER 22.

CRITICAL FALL HEIGHT OF OVERALL PLAY AREA: 48"

BRITTANY BOURBONNAIS

FEBRUARY 4, 2025

DRAWING # C25034CHR2

PROJECT # 25000932

Fontana Area D

FONTANA, CA

PROJECT: DESIGNED BY:

BRITTANY BOURBONNAIS

FEBRUARY 7, 2025

DRAWING # C25034CHR2

FONTANA, CA

PROJECT: DESIGNED BY:

BRITTANY BOURBONNAIS

FEBRUARY 7, 2025

DRAWING # C25034CHR2

FONTANA, CA

PROJECT: DESIGNED BY:

BRITTANY BOURBONNAIS

FEBRUARY 7, 2025

DRAWING # C25034CHR2

FONTANA, CA

PROJECT: DESIGNED BY:

BRITTANY BOURBONNAIS

FEBRUARY 7, 2025

DRAWING # C25034CHR2

COMPONENT 1: LIME

COMPONENT 2: BLUE

ROTOMOLDED PLASTIC 1: CYAN

ROTOMOLDED PLASTIC 2: N/A

ROTOMOLDED PLASTIC 3: N/A

SHEET PLASTIC 1: BEIGE

SHEET PLASTIC 2-3: BLUE

2-TONE PLASTIC: BEIGE/GRAY

ROPE: N/A

ECO-ARMOR: GRAY

MODIFIED COLORS LISTED BELOW

ROCK CLIMBER: GRAYSTONE

BUTTERFLIES: ORANGE, CHARTREUSE, PLUM, TEAL,

TROPICAL YELLOW

COLOR PALETTE: MANUFACTURERS:

Fontana Area D

FONTANA, CA

PROJECT: DESIGNED BY:

BRITTANY BOURBONNAIS

FEBRUARY 7, 2025

DRAWING # C25034CHR2

Fontana Area E Fontana, CA

PROJECT: DESIGNED BY:

BRITTANY BOURBONNAIS

OCTOBER 3 , 2025

DRAWING # C24458CHR1 25

PROJECT # 24009013

Fontana, CA

PROJECT: DESIGNED BY:

BRITTANY BOURBONNAIS

OCTOBER 3 , 2025

DRAWING # C24458CHR1 25

Fontana, CA

PROJECT: DESIGNED BY:

BRITTANY BOURBONNAIS

OCTOBER 3 , 2025

DRAWING # C24458CHR1 25

Fontana, CA

PROJECT: DESIGNED BY:

BRITTANY BOURBONNAIS

OCTOBER 3 , 2025

DRAWING # C24458CHR1 25

Fontana, CA

PROJECT: DESIGNED BY:

BRITTANY BOURBONNAIS

OCTOBER 3 , 2025

DRAWING # C24458CHR1 25

Fontana, CA

PROJECT: DESIGNED BY:

BRITTANY BOURBONNAIS

OCTOBER 3 , 2025

DRAWING # C24458CHR1 25

COMPONENT 1: LIME

COMPONENT 2: LIME

ROTOMOLDED PLASTIC 1: CYAN

ROTOMOLDED PLASTIC 2: BROWNSTONE

ROTOMOLDED PLASTIC 3: N/A

SHEET PLASTIC 1: BEIGE

SHEET PLASTIC 2: N/A

2-TONE PLASTIC: BEIGE/GRAY

ROPE: N/A

ECO-ARMOR: GRAY

MODIFIED COLORS LISTED BELOW

TUBE SLIDE/MEDIUM STEPPERS: BROWNSTONE

SHADE: ARIZONA

COLOR PALETTE: MANUFACTURERS:

Fontana Area E Fontana, CA

PROJECT: DESIGNED BY:

BRITTANY BOURBONNAIS

OCTOBER 3 , 2025

DRAWING # C24458CHR1 25

TOTAL ELEVATED PLAY COMPONENTS: 11

TOTAL ELEVATED PLAY COMPONENTS ACCESSIBLE BY RAMP: 0 REQUIRED: 0

TOTAL ELEVATED PLAY COMPONENTS ACCESSIBLE BY TRANSFER: 11 REQUIRED: 6

TOTAL ACCESSIBLE GROUND LEVEL COMPONENTS SHOWN: 17 REQUIRED: 4

TOTAL ACCESSIBLE GROUND LEVEL COMPONENTS OF DIFFERENT TYPES: 9 REQUIRED: 3

* APPLICABLE ONLY WITH ADA COMPLIANT SURFACING.

0 5' 10'

NUVO

TRANSFER

STATION

(not a play component)

36"

48"

36"

CATWALK

(elevated)

36" RISE

90° CLOUDWALK

(elevated(

NUVO 360°

SPIRAL SLIDE

(elevated)

CLIMBING

SQUARES

CLIMBER

(elevated)

RIBBON

CLIMBER

(elevated)

GLIDE

SLIDE

(elevated)

TUBE SLIDE

W/ WINDOW

SECTIONS

(elevated)

ANYWHERE

SEAT

(gl-cozy spot)

BABBLE-ON

(gl-audio-pt 1 of 2)

BABBLE-ON

(gl-audio-pt 2 of 2)

DRUM

(music)

WHEEL

(gl-manipulative

36" RISE

VERTICAL'S'

CRAWL TUBE

(elevated) A-MAZING

PANEL

(elevated)

NUVO

GEARS PANEL

(elevated)

STOREFRONT

(gl-imaginary)

42"

72"

72"72"

72" BEANSTALK

CLIMBER

(elevated)

118 SQ FT

SHADE HAT

118 SQ FT

SHADE HAT

SPIN

CUP

(gl-spinning)

PLAYCUBE

(gl-climbing)

3) UNITY

STEPPERS

(gl-balance)

PLAYCUBE

(gl-climbing)

TOSS UP

(gl-game)

3-BAY, 5" OD ARCH SWING

W/ 5 BELT SEATS,

1 ADA SEAT

AT 8' HIGH

(gl-swinging)

ENGINEERED

WOOD FIBER

1815 SQ FT

ENGINEERED

WOOD FIBER

1659 SQ FT

CONCRETE

ADA RAMP

CONCRETE

ADA RAMP

RISK

MANAGEMENT

SIGN W/ 2-5

STICKER

SEATS TO BE

INSTALLED

BETWEEN 11" - 24"

FROM GROUND

15" 22"

29"

CONTRASTING STRIPE

TO BE APPLIED TO

TRANSFER STATION

STEPS

ADA

SEAT

48" x 30"

CLEAR SPACE

2'2'

6'

13'

21'-6"

23'-5"

23'-10"

15'-5"

ADDITIONAL

AREA NEEDED

309 SQ FT

PLAYTOWN

PLAYHOUSE

TO BE INSTALLED

WITHOUT

CRAWL TUBE

(gl-manipulative)

Fontana Area E Fontana, CA

PLAY STRUCTURE AND LAYOUT OF THE COMPONENTS CONFORM TO

ASTM F1487-21 AND CPSC #325 GUIDELINES AND CCR TITLE 22,

DIVISION 4 CHAPTER 22.

CRITICAL FALL HEIGHT OF OVERALL PLAY AREA: 96"

BRITTANY BOURBONNAIS

OCTOBER 1, 2025

DRAWING # C24458CHR1 25

Fontana 2-5 Docs.pdf
C25243CHR1 LEADERS.pdf
Sheets and Views
AGES 2-12
C25034CHR2 LEADERS.pdf
Sheets and Views
AGES 2-12
C25034CHR2 LEADERS.pdf
Sheets and Views
AGES 2-12
C24458CHR1 25 LEADERS.pdf
Sheets and Views
AGES 2-5
Fontana Area B C23438CH-LEADERS.pdf
Sheets and Views
AGES 2-5

File details come from the government source that posted it. Updated .