Plans, Project #24-05-62-01, East Road Maintenance, Hawthorn Lake WMA, Mahaska Co.pdf
PDF 3 MB Posted
- Solicitation number
- 24-05-62-01
- Issued by
- Lyon County, Iowa
About this file
This is a construction plan set from the Iowa Department of Natural Resources (DNR) for road maintenance work at Hawthorn Lake Wildlife Management Area (WMA) East in Mahaska County, Iowa (DNR Project #24-05-62-01, DOT Project # SP-00SP-0(10)—7C-00). The project involves granular roadway maintenance including blading/shaping, spreading new rock, culvert replacement, ditch construction, and silt removal at the boat ramp. Key quantities include 170 tons of granular surfacing, 56 linear feet of 18" concrete roadway pipe with 2 aprons, 20 cubic yards of excavation waste, reshaping 6 stations of ditches, 7.22 stations of roadbed reconstruction, and 9 cubic yards of pipe bedding material.
The construction plans include detailed technical specifications, cross sections, and installation details for the roadway improvements and drainage structures. The work area is located approximately 1 mile south of Barnes City on V13, covering sections 2-3, 9-11, 14-15 within T77N, R14W. The project site encompasses parts of the 1,773-acre Hawthorn WMA, which consists of half upland and half timber habitat. All work must conform to Iowa DOT standards and specifications, with materials sourced from DOT-approved suppliers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1290307-event.pdf | ||
| 1288189-event.pdf | ||
| Contract, Project #24-05-62-01, East Road Maintenance, Hawthorn Lake WMA, Mahaska Co.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C O
V E R S
H E E T
SHEET INDEX
PROJECT DESCRIPTION AUTHORIZATION TO BID
DATEENGINEERING BUREAU CHIEF
DATEAUTHORIZATION - PARKS | WILDLIFE | FISHERIES | LAW ENFORCEMENT | FORESTRY
DIRECTORY
COMPANY
ADDRESS
CITY,STATE,ZIP
TELEPHONE
FAX
CONTACT
COMPANY
ADDRESS
CITY,STATE,ZIP
TELEPHONE
FAX
CONTACT
PROJECT MANAGER CONSTRUCTION INSPECTOR
BRUCE L.
FLIPPIN
19513
AWOI
G R
E E
NI
N
E
L O
ANISSEFOR
P
D E
S N
E
CI
L
UNDER THE LAWS OF THE STATE OF IOWA.
DECISIONS WITH REGARD TO THE DESIGN WERE MADE BY ME
PREPARED UNDER MY SUPERVISION AND THAT ENGINEERING
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PAGES COVERED BY THIS SEAL:
MY LICENCE RENEWAL DATE IS DECEMBER 31, 20
PRINTED OR TYPED NAME
SIGNATURE DATE
BRUCE L. FLIPPIN
A.01 jason.kruse@dnr.iowa.gov
515-250-3707
JASON KRUSE
IOWA DEPARTMENT OF NATURAL RESOURCES
bruce.flippin@dnr.iowa.gov
515-281-8685
515-689-8009
BRUCE L. FLIPPIN
DES MOINES, IA, 50321
6200 PARK AVENUE
IOWA DEPARTMENT OF NATURAL RESOURCES
DNR PROJECT #24-05-62-01
DOT PROJECT # SP-00SP-0(10)—7C-00
MAHASKA COUNTY, IOWA
ROAD MAINTENANCE
HAWTHORN LAKE WMA EAST
FOR
CONSTRUCTION DOCUMENTS
IOWA DEPARTMENT OF NATURAL RESOURCES
D.01
C.01
B.05
B.04
B.03
B.02
B.01
A.02
A.01
SITE PLAN
QUANTITIES AND GENERAL INFORMATION
TYPICAL CROSS SECTIONS AND DETAILS
TYPICAL CROSS SECTIONS AND DETAILS
TYPICAL CROSS SECTIONS AND DETAILS
TYPICAL CROSS SECTIONS AND DETAILS
TYPICAL CROSS SECTIONS AND DETAILS
LOCATION MAP
COVER SHEET
replacement, ditch construction and a small amount of silt removal at the boat ramp.
This project consists of granular roadway maintenance - blading/shaping, spreading new rock, culvert
PROJECT NUMBER:
DATE:
NO.
DATE
BY
REVISION
DRAWN BY:
CHK'D BY:
SHEET No:
N A
T U
R A
L R
E S
O U
R C
E S
IO
W
A D
E P
A R T
M E
N T
F
N S
U L T A
N T
BLF
R O
A D M
A
IN
T E
N A
N C
E F
O R
SEPT 2024
24-05-62-01
M A
H A
S K
A C
O U
N T Y
P
A R
K A
V E
N U
E
D E S M
O
IN
E S
IA
E N
G
IN
E E R
IN
G S
E R
V
IC
E S
H
W T H
O R
N L
A K
E W
M A E
A S T R
O
D
PROJECT NUMBER:
DATE:
NO.
DATE
BY
REVISION
DRAWN BY:
T U
R A
L R
E S
O U
R C
E S
IO
W
A D
E P
A R T
M E
N T
N S
U L T A
N T
BLF
R O
A D M
A
IN
T E
N A
N C
E F
O R
SEPT 2024
24-05-62-01
M A
H A
S K
A C
O U
N T Y
P
A R
K A
V E
N U
E
D E S M
O
IN
E S
IA
E N
G
IN
E E R
IN
G S
E R
V
IC
E
W T H
O R
N L
A K
E W
M A E
A S T R
O A
D
B.01
T Y P
IC
A L C
R O
S S S
E C
T
IO
N S A
N D D
E T A
IL
S
Normal Subgrade Limit
Profile Grade
Typical Roadway Section - Center Crown
V A
R I
E S
E X I
S T I
G
U
B G
R A
D E by the Engineer.
areas specifically designated appropriately modified for
Normal sections shown may be
Note:
4.0%4.0%
% VARIES EXISTING FORESLOPE
EXI
ST
IN
G
FORE
SL
OP
E
R
C K
VARIES
WIDTH
VARIESVARIES
WIDTH
TO ROADWAY
SHULDER MATERIAL
MOVE ANY HIGH
TO ROADWAY
SHULDER MATERIAL
MOVE ANY HIGH
% VARIES
10'HEADING WEST 101+22 100+00
10'TOP OF LEVEE 30+30 0+00
WIDTHLOCATIONSTATION TO STATION
NO.
DATE
BY
REVISION
DRAWN BY:
T U
R A
L R
E S
O U
R C
E S
IO
W
A D
E P
A R T
M E
N T
N S
U L T A
N T
BLF
R O
A D M
A
IN
T E
N A
N C
E F
O R
SEPT 2024
24-05-62-01
M A
H A
S K
A C
O U
N T Y
P
A R
K A
V E
N U
E
D E S M
O
IN
E S
IA
E N
G
IN
E E R
IN
G S
E R
V
IC
E
W T H
O R
N L
A K
E W
M A E
A S T R
O A
D
B.02
T Y P
IC
A L C
R O
S S S
E C
T
IO
N S A
N D D
E T A
IL
S
TYPICAL DITCH CROSS SECTION
2:1 MAX FORE AND BACK SLOPE
F
E E T
ROADWAY
NO.
DATE
BY
REVISION
DRAWN BY:
T U
R A
L R
E S
O U
R C
E S
IO
W
A D
E P
A R T
M E
N T
N S
U L T A
N T
BLF
R O
A D M
A
IN
T E
N A
N C
E F
O R
SEPT 2024
24-05-62-01
M A
H A
S K
A C
O U
N T Y
P
A R
K A
V E
N U
E
D E S M
O
IN
E S
IA
E N
G
IN
E E R
IN
G S
E R
V
IC
E
W T H
O R
N L
A K
E W
M A E
A S T R
O A
D
B.03
T Y P
IC
A L C
R O
S S S
E C
T
IO
N S A
N D D
E T A
IL
NO.
DATE
BY
REVISION
DRAWN BY:
T U
R A
L R
E S
O U
R C
E S
IO
W
A D
E P
A R T
M E
N T
N S
U L T A
N T
BLF
R O
A D M
A
IN
T E
N A
N C
E F
O R
SEPT 2024
24-05-62-01
M A
H A
S K
A C
O U
N T Y
P
A R
K A
V E
N U
E
D E S M
O
IN
E S
IA
E N
G
IN
E E R
IN
G S
E R
V
IC
E
W T H
O R
N L
A K
E W
M A E
A S T R
O A
D
B.04
T Y P
IC
A L C
R O
S S S
E C
T
IO
N S A
N D D
E T A
NO.
DATE
BY
REVISION
DRAWN BY:
T U
R A
L R
E S
O U
R C
E S
IO
W
A D
E P
A R T
M E
N T
N S
U L T A
N T
BLF
R O
A D M
A
IN
T E
N A
N C
E F
O R
SEPT 2024
24-05-62-01
M A
H A
S K
A C
O U
N T Y
P
A R
K A
V E
N U
E
D E S M
O
IN
E S
IA
E N
G
IN
E E R
IN
G S
E R
V
IC
E
W T H
O R
N L
A K
E W
M A E
A S T R
O A
D
B.05
T Y P
IC
A L C
R O
S S S
E C
T
IO
N S A
N D D
E T A
NO.
DATE
BY
REVISION
DRAWN BY:
T U
R A
L R
E S
O U
R C
E S
IO
W
A D
E P
A R T
M E
N T
N S
U L T A
N T
BLF
R O
A D M
A
IN
T E
N A
N C
E F
O R
SEPT 2024
24-05-62-01
M A
H A
S K
A C
O U
N T Y
P
A R
K A
V E
N U
E
D E S M
O
IN
E S
IA
E N
G
IN
E E R
IN
G S
E R
V
IC
E
W T H
O R
N L
A K
E W
M A E
A S T R
O A
D
Q U
A N
T
IT
IE
S A
N D G
E N
E R
A L I
N F O
R M
A T
IO
N
ITEM
NO.
ESTIMATE REFERENCE INFORMATION
DESCRIPTION
ESTIMATED PROJECT QUANTITIES
ITEM NO. ITEM UNIT TOTAL
GENERAL NOTES
C.01
2552 - REPLACEMENT OF UNSUITABLE BACKFILL MAT'L (CLASS II PIPE BEDDING)
2533 - MOBILIZATION
2528 - TRAFFIC CONTROL
2518 - SAFETY CLOSURE
2507 - EROSION STONE
2416 - CULV, CONC RDWY PIPE, 18"
2416 - APRON, CONC, 18"
2312 - GRANULAR SURFACING ON ROAD, CLASS A CRUSHED STONE - 2, 3, 4-INCH
2127 - RECONSTRUCTION OF ROADBED - BLADING/SHAPING
2125 - RESHAPING DITCHES
2102 - EXCAVATION, CL 10, WASTE
CY
LS
LS
EACH
TON
LF
EACH
TON
STA
STA
CY
7.22 fence, rock ditch checks, silt basins or silt dikes.
to install and maintain erosion control features on the project. This may involve seeding, silt The contractor is expected to have materials, equipment, and labor available on a daily basis finish grade.
The contractor shall shape graded area to maintain surface drainage. All elevations are to caused by such work.
additional compensation will be allowed to the contractor for any interference or delay determine their existence and exact location and to avoid damage thereto. No claims for existence of which is presently not known or shown. It is the contractor’s responsibility to their locations must be considered approximate only. It is possible there may be others, the structures and utilities have been plotted from available surveys and records and therefore access to these facilities for necessary modification of services. Underground facilities, of those utilities prior to the beginning of any construction. The contractor shall be afforded construction area, it shall be the responsibility of the contractor to notify the DNR Engineer Where utilities and fixtures are shown as Existing on the plans or encountered within the will be subject to the approval of the DNR Engineer.
equipment or use these areas for storage of materials. Storage, parking and service areas construction limits. The contractor will not be permitted to park or service vehicles and The contractor shall not disturb desirable grass areas and desirable trees outside the stated in the plans or approved by the DNR Engineer.
hauled to these sites. No material shall be placed within the right-of-way, unless specifically into the work involved on this project. No payment for overhaul will be allowed for material material (excavated material or broken concrete) which is not desirable to be incorporated It shall be the contractor’s responsibility to provide waste areas or disposal sites for excess proceeding with the work.
shall notify the DNR Engineer of any discrepancies, omissions, and/or conflicts prior to The contractor shall verify, at the site, all dimensions and conditions shown on the plans and to the plans, specification, special provisions and contract.
visit the project site shall not relieve the contractor from performing the work in accordance themselves with the actual job conditions prior to bidding and the start of work. Failure to The contractor shall visit the site and inspect the project area and thoroughly familiarize ordinances.
All work shall conform to and be performed in accordance with all applicable codes and
Verify actual locations and elevations with DNR Engineer.
C. DOT approved source.
B. Fill to haunch of culvert.
A. Use for pipe bedding - Use Class II material11
A. Follow Iowa DOT specification section 2528, subsection N -Safety Closure, 1. Road Closures for set-up.8
B. DOT approved source.
A. Place at the inlet of new culvert.7
E. DOT approved source.
D. Wrap and pin ALL connections - use type 3 connections.
C. Use existing flowline elevations for new culvert installation.
B. Dispose of existing culvert offsite.
A. Remove and replace existing culvert.5-6
D. Quantities based on a 4-inch depth.
C. DOT approved source.
B. Roll after spreading.
A. A final leveling of the aggregate after being dumped, is required.4
D. DO NOT WASTE HIGH SHOULDER MATERIAL IN DITCH!
C. Remove any high shoulder areas, before spreading new rock. See sheet B.01 for details.
B. Re-establish roadway crown: 4% positive drainage each way from centerline; 4% across the width in banked sections.
A. Repair potholes by scarifying surrounding area to depth of pothole and recompacting.3
D. Spoil may be spread in field west of ditch. No more than 6-inches deep.
C. DNR Field Engineer will mark inflection point - Leave a 20-foot wide area for field access.
B. Positive drainage to existing culvert: ~0+00 to 100+00 drains to roadway culvert. ~100+00 to 600+00 drains to site culvert.
A. Make a ditch approximately 2-foot deep and 4-foot wide - See Sheet B.02 for details.2
C. Dispose of spoil offsite.
B. Remove at the direction of the DNR Field Engineer.
A. This item for removing gravel/silt, above and below water level, on and around the boat ramp.1
File details come from the government source that posted it. Updated .