PDF 31 MB Posted
- Attached to
- Landslide Repairs in Ciales, Puerto Rico
- Solicitation number
- 693C73-24-B-000008
About this file
This document is a solicitation for the Landslide Repairs in Ciales, Puerto Rico project, Solicitation Number 693C73-24-B-000008. The project consists of repairing landslides caused by Hurricanes Irma and Maria on various PR highways in the Ciales municipality. The work includes utility relocation, embankment reconstruction, landslide stabilization, drainage systems, retaining walls, milling and overlay, pavement reconstruction, guardrail replacement, and other miscellaneous work. The project is estimated to be between $5,000,000 to $10,000,000 and is set aside for certified Small Business Concerns. Bid documents will be issued around April 1, 2024, and bids are due on a date to be specified. Interested vendors must be registered in the System for Award Management (SAM) database at the time of offer submission. Visitors attending the bid opening must arrive at least 1 hour prior, present a valid ID, and be escorted by a government employee. Bidders are encouraged to submit bids electronically.
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PS&E 2
ER-HWY-227 & 228
LOCATION
SCHEDULE OF DRAWINGS
PONCE GUAYAMA
FAJARDO
SAN JUAN
ARECIBO
AGUADILLA
MAYAGUEZ
LOCATION PLAN
AUTHORITY
HIGHWAY & TRANSPORTATION
COMMONWEALTH OF PUERTO RICO
DESIGN AREA
AND PUBLIC WORKS
DEPARTMENT OF TRANSPORTATION
COMMONWEALTH OF PUERTO RICO
A UT HORITY
NOITATROPSNART&YAWHGIH
FRANCISCO R. KLEIN-MOYA
KLEIN ENGINEERING, PSC
P R E P A R E D B Y
ENGINEERING
LIC. NO. 20659
CONSULTANTS
R-8
HIGHWAY DESIGN MANUAL 1979
NONE
ARTERIAL
APPROVAL DATE BY PRHTA
3.
2.
1.
DESCRIBE THE EXCEPTION
(YES OR NO)--
(LEVEL, ROLLING, MOUNTAINOUS)--
(V)--
(T)--
(D)--
(DHV)--
(FUTURE, 2035)--
(2013)--
(FULL, PARTIAL, NONE)--
(PRHTA)--
(AASHTO)--
(PRHTA GENERAL DESIGN STANDARDS)--
AVERAGE DAILY TRAFFIC
DESIGN SPEED
MAXIMUM GRADE
TYPE OF TERRAIN
MINIMUM CURVE RADIUS--
MAXIMUM SUPERELEVATION--
DESIGN LOAD FOR STRUCTURES--
DESIGN EXCEPTION?
PERCENT OF TRUCK
DIRECTIONAL DISTRIBUTION
DESIGN HOURLY VOLUME
AVERAGE DAILY TRAFFIC
CONTROL OF ACCESS
FUNCTIONAL HIGHWAY CLASSIFICATION
FUNCTIONAL HIGHWAY CLASSIFICATION
DESIGN CLASS CODE
STRUCTURES DESIGN CODE--
HIGHWAY DESIGN CODE--
GENERAL DESIGN CRITERIA
NOTE:
LANDSLIDE AND ROAD DAMAGE EVALUATION
MUNICIPALITY OF CIALES, PUERTO RICO
A C CODE NUMBER 836579 / ER-9999(320)
SCALE = 1:20,000
PROJECT LENGTH
RURAL
PROJECT SITE
FINAL PLANS 100%
TOTAL LENGTH OF PROJECT 0.1107 Km. = = 0.0688 Mi.
CIDRA
AND REPAIR RECOMMENDATIONS
"ALL WORK ON THIS PROJECT SHALL BE PERFORMED AND ALL MATERIALS SHALL
BE IN STRICT ACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR ROAD
AND BRIDGE CONSTRUCTION AND GENERAL PROVISIONS APPROVED BY THE
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY IN 2005 AND
SUBSEQUENT AMENDMENTS IN EFFECT AT THE TIME OF BIDDING, WITH THE
STANDARD DRAWINGS, WITH THESE PLAN AND WITH ALL SPECIAL PROVISIONS
A N D I N S T R U C T I O N S I N C L U D E D I N T H E C O N T R A C T B O O K "
A.C. PROJECT
CODE NO.
TOTAL
SHEETS
MUNICIPALITYHIGHWAY
FISCAL
YEAR
ISLAND
SHEET
NO.
FED. AID H'WAY
PROJECT N0.
1 732019P.R.CIALESPR-149
SECTION
REFERENCEDESCRIPTION
ER-HWY-227, PR-149, KM. 42.80
ER-HWY-228, PR-149, KM. 42.90
TYPICAL SECTIONS
CENTERLINE GEOMETRY AND VERTEX DATA TABLE
EXISTING CONDITIONS
DEMOLITION
SOIL SURVEY
PLAN AND PROFILE
EROSION AND SEDIMENTS CONTROL
CROSS SECTIONS PLANS
P.R.A.S.A. UTILITIES PLANS
DRAINAGE AND GRADING
MAINTENANCE OF TRAFFIC
TABLE OF STRUCTURES
CONTROL POINTS
GENERAL NOTES, LEGEND AND SYMBOLS
INDEX OF SHEETS
TITLE SHEET GR/1
GR/2
GR/3
GR-A/4
GR-A/5
GR-A/6
GR-A/8
GR-A/7
MOT/1-3
SS-A/1-2
PP-A/1-2
DR-A/1-3
EC-A/1
UTW-A/1-3
CS-A/1-3
GROUP B - PS&E 2
TRAFFIC SIGNING AND PAVEMENT MARKING TS-A/1-2
2017 AASHTO LRFD Bridge Design Specifications, 8th Edition
N/A
N/A
N/A
50%
N/A
N/A
MOUNTAINOUS
6%
LIVE LOAD SURCHARGE ON BACKFILL BASED ON HL-93 TRUCK LOADING WB-40
NO
TREE INVENTORY PLAN TI-A/1
STRUCTURAL PLANS RW-A/1-4
GR-A/9
ELECTRICAL PLANS UTE-A/1-2
TELECOMMUNICATIONS PLANS UTT-A/1-2
SITE-A ER-HWY-227
TYPICAL SECTIONS
CENTERLINE GEOMETRY AND VERTEX DATA TABLE
EXISTING CONDITIONS
DEMOLITION
SOIL SURVEY
PLAN AND PROFILE
EROSION AND SEDIMENTS CONTROL
CROSS SECTIONS PLANS
P.R.A.S.A. UTILITIES PLANS
DRAINAGE AND GRADING
TABLE OF STRUCTURES
CONTROL POINTS
GR-B/4
GR-B/5
GR-B/6
GR-B/8
GR-B/7
SS-B/1-2
PP-B/1-2
DR-B/1
EC-B/1
UTW-B/1-3
CS-B/1-3
TRAFFIC SIGNING AND PAVEMENT MARKING TS-B/1-2
TREE INVENTORY PLAN TI-B/1
STRUCTURAL PLANS RW-B/1-4
GR-B/9
ELECTRICAL PLANS UTE-B/1-2
TELECOMMUNICATIONS PLANS UTT-B/1-2
SITE-B ER-HWY-228
TERMINAL DETAILS ID-B/1
D
ES
IG
N
W O
R K
D R
AW
IN
G
D
AT
E
BY
TR
AC
ED
C H
EC
K
FI
N
AL
C
H
EC
K
KE
PS
C
TA
G
TA
G
FR
K
C G
T
.0 7.
.0 7.
.0 7.
.1 0.
.1 0.
AC-836579ER-9999(320)
DATE
DATE
DATE
DATE
SUBMITTED:
DR. EDWIN E. GONZÁLEZ MONTALVO, PE
DIRECTOR, TRAFFIC ENGINEERING
MARIA I. AYALA RIVERA, PE
LISSETTE LUGO COLÓN
DIRECTOR, CONSTRUCTION AREA
CARLOS A. LLOVERAS MATTEI
DIRECTOR, ESTIMATES AND BIDS OFFICE
AND OPERATIONS AREA
RECOMMENDED AND APPROVED:
DATE
DIRECTOR, PROGRAMMING
DR. ÁNGEL J. ALICEA RODRÍGUEZ
AND SPECIAL STUDIES AREA
EXECUTIVE DIRECTOR
DATEDR. ÁNGEL J. ALICEA RODRÍGUEZ
DIRECTOR, DESIGN AREA
RIGHT OF WAY TITLE SHEET ROW-A/1
RIGHT OF WAY TYPICAL SECTIONS ROW-A/2
RIGHT OF WAY PLAN ROW-A/3
RIGHT OF WAY CROSS SECTIONS ROW-A/4-5
RIGHT OF WAY TABLES ROW-A/6
I N D E X O F S H E E T S
SECTION "GR" GENERAL
SECTIONAL
REFERENCED E S C R I P T I O N
SHEET
NO.
TITLE SHEET GR/1
INDEX SHEET GR/2
MAINTENANCE OF TRAFFIC GENERAL NOTES AND TABLE MOT/1
SECTION "MOT" MAINTENANCE OF TRAFFIC
GR/3GENERAL NOTES, LEGEND AND SYMBOLS
GR-A/4TYPICAL SECTIONS7
GR-A/5CENTERLINE GEOMETRY AND VERTEX DATA TABLE8
GR-A/6CONTROL POINTS9
GR-A/8EXISTING CONDITIONS PLAN11
GR-A/7TABLE OF STRUCTURES10
GR-A/9DEMOLITION PLAN12
EROSION AND SEDIMENTS CONTROL PLAN EC-A/1
SECTION "EC-A" EROSION AND SEDIMENTS CONTROL (SITE-A)
SOIL SURVEY PLAN SS-A/1
SECTION "SS-A" BORINGS (SITE-A)
BORING LOGS SS-A/214
PLAN PP-A/1
SECTION "PP-A" PLAN AND PROFILE (SITE-A)
DRAINAGE AND GRADING PLAN DR-A/1
SECTION "DR-A" DRAINAGE AND GRADING (SITE-A)
SECTION "UTW-A" P.R.A.S.A. UTILITIES (SITE-A)
ELECTRICAL NOTES, LEGEND AND DETAILS UTE-A/1
SECTION "UTE-A" ELECTRICAL UTILITIES (SITE-A)
ELECTRICAL UTILITIES PLAN UTE-A/225
TELECOMMUNICATIONS NOTES AND LEGEND UTT-A/1
SECTION "UTT-A" TELECOMMUNICATIONS UTILITIES (SITE-A)
TELECOMMUNICATIONS UTILITIES PLAN UTT-A/227
SECTIONAL
REFERENCED E S C R I P T I O N
SHEET
NO.
SECTION "TS-A" TRAFFIC SIGNING AND PAVEMENT MARKING (SITE-A)
TRAFFIC SIGNING AND PAVEMENT MARKING PLAN TS-A/229
SECTION "RW-A" RETAINING WALL (SITE-A)
RIGHT OF WAY TITLE SHEET ROW-A/1
SECTION "ROW" RIGHT OF WAY
RIGHT OF WAY TYPICAL SECTIONS ROW-A/239
MAINTENANCE OF TRAFFIC PLAN (STAGE-1) MOT/25
CROSS SECTIONS KEY PLAN CS-A/1
SECTION "CS-A" CROSS SECTIONS (SITE-A)
CROSS SECTIONS CS-A/235
DRAINAGE PROFILES AND DETAILS DR-A/218
PROFILE PP-A/216
P.R.A.S.A. UTILITIES PLAN UTW-A/121
P.R.A.S.A. UTILITIES DETAILS UTW-A/222
STRUCTURAL NOTES & DESIGN CRITERIA RW-A/130
RETAINING WALL FOUNDATION PLAN RW-A/231
RETAINING WALL SECTION & SCHEDULE RW-A/332
RETAINING WALL PROFILE RW-A/433
TREE INVENTORY PLAN TI-A/1
SECTION "TI-A" TREE MITIGATION (SITE-A)
MAINTENANCE OF TRAFFIC PLAN (STAGE-2) MOT/36
SECTION "GR-A" GENERAL (SITE-A)
SIGN DATA TABLE AND DETAILS TS-A/128
CROSS SECTIONS CS-A/336
GR-B/4TYPICAL SECTIONS44
GR-B/5CENTERLINE GEOMETRY AND VERTEX DATA TABLE45
GR-B/6CONTROL POINTS46
GR-B/8EXISTING CONDITIONS PLAN48
GR-B/7TABLE OF STRUCTURES47
GR-B/9DEMOLITION PLAN49
EROSION AND SEDIMENTS CONTROL PLAN EC-B/1
SECTION "EC-B" EROSION AND SEDIMENTS CONTROL (SITE-B)
SOIL SURVEY PLAN SS-B/1
SECTION "SS-B" BORINGS (SITE-B)
BORING LOGS SS-B/251
PLAN PP-B/1
SECTION "PP-B" PLAN AND PROFILE (SITE-B)
DRAINAGE AND GRADING PLAN DR-B/1
SECTION "DR-B" DRAINAGE AND GRADING (SITE-B)
SECTION "UTW-B" P.R.A.S.A. UTILITIES (SITE-B)
ELECTRICAL NOTES, LEGEND AND DETAILS UTE-B/1
SECTION "UTE-B" ELECTRICAL UTILITIES (SITE-B)
ELECTRICAL UTILITIES PLAN UTE-B/261
TELECOMMUNICATIONS NOTES AND LEGEND UTT-B/1
SECTION "UTT-B" TELECOMMUNICATIONS UTILITIES (SITE-B)
TELECOMMUNICATIONS UTILITIES PLAN UTT-B/263
SECTION "TS-B" TRAFFIC SIGNING AND PAVEMENT MARKING (SITE-B)
TRAFFIC SIGNING AND PAVEMENT MARKING PLAN TS-B/265
SECTION "RW-B" RETAINING WALL (SITE-B)
CROSS SECTIONS KEY PLAN CS-B/1
SECTION "CS-B" CROSS SECTIONS (SITE-B)
CROSS SECTIONS CS-B/271
PROFILE PP-B/253
P.R.A.S.A. UTILITIES PLAN UTW-B/157
P.R.A.S.A. UTILITIES DETAILS UTW-B/258
STRUCTURAL NOTES & DESIGN CRITERIA RW-B/166
RETAINING WALL FOUNDATION PLAN RW-B/267
RETAINING WALL SECTION & SCHEDULE RW-B/368
RETAINING WALL PROFILE RW-B/469
TREE INVENTORY PLAN TI-B/1
SECTION "TI-B" TREE MITIGATION (SITE-B)
SECTION "GR-B" GENERAL (SITE-B)
SIGN DATA TABLE AND DETAILS TS-B/164
CROSS SECTIONS CS-B/372
DRAINAGE STRUCTURAL DETAILS DR-A/319
TERMINAL DETAILS ID-B/1
SECTION "TI-B" TERMINAL DETAILS (SITE-B)
RIGHT OF WAY PLAN ROW-A/340
RIGHT OF WAY CROSS SECTIONS ROW-A/441
RIGHT OF WAY CROSS SECTIONS ROW-A/542
RIGHT OF WAY TABLES ROW-A/643
P.R.A.S.A. UTILITIES DETAILS UTW-A/323
P.R.A.S.A. UTILITIES DETAILS UTW-B/359
INDEX OF SHEET
GR
NOT TO SCALE
PUERTO RICO HIGHWAY & TRANSPORTATION AUTHORITY
KLEIN ENGINEERING, PSC
ENGINEERING CONSULTANTS
A.C. PROJECT
CODE NO.
DATE REVISION
TOTAL
SHEETS
MUNICIPALITYHIGHWAY
FISCAL
YEAR
ISLAND
SHEET
NO.
FED. AID H'WAY
PROJECT N0.
AC-836579 CIALES 2019
AND REPAIR RECOMMENDATIONS
MUNICIPALITY OF CIALES, PUERTO RICO
LANDSLIDE AND ROAD DAMAGE EVALUATION
PR-149 P.R. 73ER-9999(320)
D
ES
IG
N
W O
R K
D R
AW
IN
G
D
AT
E
BY
TR
AC
ED
C H
EC
K
FI
N
AL
C
H
EC
K
KE
PS
C
TA
G
TA
G
FR
K
C G
T
.0 7.
.0 7.
.0 7.
.1 0.
.1 0.
REINFORCED CONCRETE PIPER.C.P.
GASG.
GRD.
GRAV.
INV.
HYD.
HOR.
J.E.
I.E.
H.W.
G.V.
HIGH WATER
GAS VALVE
JUNCTION BOX
INVERT ELEVATION
HORIZONTAL
INVERT
HYDRANT
GROUND
GRAVEL
CU.M.
CULV.
DEG.
DWG.
DWY.
ELEV.
E. TO E.
ENGR.
EST.
EXC.
EXIST.
EXP.
EXT.
FWD.
F. TO F.
E.H.W.
FA
G.I.
F.L.
F.
FAS
FAP
E
E.G.
C.
DIA.
DIM.
CS
EXISTING
EXISTING GROUND
EXPANSION
EXTERNAL DISTANCE
GALVANIZED IRON
FLOW LINE
FEDERAL AID SECONDARY
FEDERAL AID PRIMARY
FEDERAL AID
FACE TO FACE
EXTREME HIGH WATER
FORWARD
FILL
EXTERNAL
CUBIC METER
CURVE TO SPIRAL
DIMENSION
DRIVEWAY
ELEVATION
END TO END
EXCAVATION
DRAWING
ENGINEER
ESTIMATE
CUT
DEGREE
DIAMETER
CULVERT
W.MTR. WATER METER
NOT INCLUDED IN CONTRACT
WIRE MESH FENCE
N.I.C.
W.I.
W.M.F.
W.V.
W.W.
WATER VALVE
WING WALL
WROUGHT IRON
SANITARY SEWER
SANITARY SEWER MANHOLE
SPIRAL TO CURVE
SPIRAL TO TANGENT
TOP ELEVATION
TELEPHONE POLE
TANGENT TO SPIRAL
TANGENT DISTANCE OF CURVE
VERTICAL CURVE
STORM SEWERS.S.
T.P.
VERT.
V.C.
W.M.
T.G.
T.E.
UG.
TEL
TS
T S.L.
S.G.
STR.
TOP OF GRADE
UNDERGROUND
VERTICAL
WATER MAIN
TELEPHONE
SURVEY LINE
SUBGRADE
STRUCTURE
S.M.H.
ST
SQ.M.
STA.
SHDR.
SW.
SC
RDWAY
SAN.S.
RD.
R.O.W.
RET.
RT.
SHOULDER
SIDEWALK
SQUARE METER
STATION
RETAINING
RIGHT
RIGHT OF WAY
ROAD
ROADWAY
BITUMINOUS COATED CORRUGATED
AGG.
ASB.
ASPH.
B.W.F.
B & S
BIT.CONC.
B.C.C.M.P.
BLDG.
C.I.P
C. TO C.
CTD.
COL.
COM.
CONC.
C.O.A.
COORD.
C.M.P.
C.M.
C.B.
C.L.
C.I.
B.M.
B.V.
BK.
B.L.
AH.
AL.
CAST IRON
CATCH BASIN
CENTER LINE
CAST IRON PIPE
CENTER TO CENTER
COMMUNICATIONS
CONTROL OF ACCESS
COORDINATES
CORRUGATED METAL
CORRUGATED METAL PIPE
COLUMN
CONCRETE
COATED
BUILDING
METAL PIPE
AGGREGATE
ASBESTOS
BASE LINE
BARBED WIRE FENCE
BEARING VALUE
BELL AND SPIGOT
BENCH MARK
BITUMINOUS CONCRETE
ASPHALT
BACK
AHEAD
ALUMINUM
ABUT. ABUTMENT
RADIUS OF CURVATURE
POINT OF VERTICAL INTERSECTION
PROPOSED GRADE
PROPERTY LINE
PORTLAND CEMENT CONCRETE
POINT OF TANGENCY
POINT OF REVERSE CURVE
POINT OF INTERSECTION
POINT OF CURVATURE
POINT OF COMPOUND CURVATURE
OUTSIDE TO OUTSIDE
OUTSIDE DIAMETER
MEAN SEA LEVEL
MEAN HIGH WATER
LENGTH OF CURVE
P.P.
P.G.
P.V.I.
RR.
R
PROP.
P.L.
PRC
P.C.C.
PWR.
PT
PI
PC
PCC
POWER POLE
RAILROAD
PROPOSED
POWER
O.C.
PVMT.
O. TO O.
O.D.
M.S.L.
MON.
MIN.
M.L.
M.H.W.
MAX.
M.H.
M.B.
L.P.
L
PAVEMENT
ON CENTER
MONUMENT
MINIMUM
MAXIMUM
MANHOLE
MAIN LINE
MAIL BOX
LIGHT POLE
LT. LEFT
ABBREVIATIONS:
LOWER - LOCATION
UPPER - CODE
IDENTIFY TYPE,ETC
IDENTIFY IF REQ.
IDENTIFY
PER TYPE
IDENTIFY AS
IDENTIFY
AS PER TYPE
TYPE & FLOW
IDENTIFY SIZE
IDENTIFY TYPE
PROP. SIGN IDENT.
SIGNS,GROUND,MTD.
BUILDING
TREES, PALM TREE
WATER COURSE
DITCH
CONC. PARAPETS
MANHOLES
HEADWALLS
INLETS
TOE OF SLOPE
TOP OF CUT
PIPES
RETAINING WALL
or or or or
IDENTIFY TYPE
IDENTIFY TYPE
IDENTIFY
IDENTIFY
IDENTIFY ROAD
MAGNETIC
TRUE
IDENTIFY
AT SPOT ELEV.
DECIMAL POINT
IDENTIFY
IDENTIFY
SURVEY MONUMENT
BARRIER
GUARDRAIL
CURB
SIDEWALK
PAVEMENT
CONTOUR LINES
NORTH ARROW
NORTH ARROW
HORIZONTAL P.I.
SPOT ELEVATION
SIDEWALK
FEATURE
CENTER LINE
SYMBOL
PROPOSED EXISTING REMARKS
MH
7.72
STA-1
7.72
ELECTRIC POLE
TELEPHONE POLE
HYDRANT
WATER VALVE
TOS
TOC
DEMOLITION
GENERAL NOTES:
TEL
ELEC
IDENTIFYPLANTING
CONCRETE SWALE
SLOPE
PROJECT LIMIT
PROPERTY LIMIT
IDENTIFY TYPEFENCE X X X X X X
IDENTIFYBORINGS
1. THE COORDINATES USED IN THIS CONTRACT ARE BASED ON THE PUERTO RICO LAMBERT COORDINATES SYSTEM NAD-83.
2. THE DATUM USED FOR THE VERTICAL CONTROL SYSTEM IS MEAN SEA LEVEL.
3. THE METRIC SYSTEM HAS BEEN USED THROUGHOUT THE PLANS FOR THIS PROJECT, EXCEPT WHERE OTHERWISE SPECIFIED.
4. ARROWS ON PIPES AND CULVERTS INDICATE THE DIRECTION OF FLOW.
5. NORTH ARROW POINTS TO THE TRUE NORTH.
6. FINAL GRADING ELEVATIONS SHOWN ALONG EXISTING ROADWAYS GENERALLY CONFORM TO EXISTING PAVEMENT SLOPES AND
ELEVATIONS, EXCEPT WHERE NECESSARY TO INCREASE CROSS SLOPE TO MINIMUM REQUIRED FOR ADEQUATE DRAINAGE
PURPOSES.
7. A SAFETY EDGE SHALL BE CONSTRUCTED AT THE OUTER EDGE OF PAVED ROADWAYS WITHIN THE LIMITS OF THE PROJECT WHERE A
CURB IS NOT PROPOSED. SAFETY EDGE DETAILS CAN BE OBTAINED FROM FHWA.
8. THE CONTRACTOR SHALL MAINTAIN FREE ACCESS TO ALL PROPERTIES ALONG THE LENGTH OF THE PROJECT THROUGHOUT THE
DURATION OF THE CONTRACT FOR THE CONSTRUCTION OF THIS PROJECT.
9. ANY UTILITY DAMAGE OCCURRING DURING CONSTRUCTION SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSES.
10. CONTRACTOR SHALL REFER TO THE GEOTECHNICAL REPORT PREPARED BY DESPIAU ASSOCIATES FOR THE PROJECT, REFERENCE
NO. DA/18O3743, DATED JANUARY 23, 2019 FOR ER-HWY-227; AND REFERENCE NO. DA/18O3742, DATED JANUARY 25, 2019 FOR
ER-HWY-228.
11. THE CONTRACTOR SHALL NOTIFY THE PRHTA'S SOILS ENGINEERING OFFICE AT LEAST THREE (3) DAYS PRIOR TO COMPLETION OF EXCAVATIONS OR COMMENCEMENT OF RETAINING WALL INSTALLATION OPERATIONS. NO FOUNDATION FILL OR CONCRETE SHALL BE DEPOSITED UNTIL THE SOIL BEARING CAPACITY IS VALIDATED BY A GEOTECHNICAL ENGINEER.
12. PLACEMENT AND COMPACTION PROCEDURES OF NEW SOIL FILL AND BACKFILL MATERIAL SHALL COMPLY WITH SPECIFICATIONS 203, 206, 207, AND RECOMMENDATIONS ESTABLISHED ON THE GEOTECHNICAL REPORT DISCUSSED IN NOTE NUMBER 10.
13. COMPACTION OF ALL EMBANKMENTS SHALL BE CONTROLLED AS SPECIFIED IN SPECIFICATION 203. ASSHTO DESIGNATION T-180-74, METHOD "D" SHALL BE USED TO DETERMINE MAXIMUM OPTIMUM MOISTURE OF MATERIALS.
14. UNSUITABLE MATERIAL SHALL BE DISPOSED BY THE CONTRACTOR IN PLACES APPROVED BY THE RESIDENT ENGINEER. THE COST OF REMOVAL AND DISPOSED SHALL BE CONSIDERED INCIDENTAL TO THE PROPOSED REPAIRS AND INCLUDED IN THE UNIT PRICE GIVEN
FOR UNCLASSIFIED EXCAVATIONS.
15. CONTINUOUS MAINTENANCE SHALL BE KEPT FOR ALL PERMANENT AND PROVISIONAL DRAINS DURING THE CONSTRUCTION OF BASE
COURSE.
16. NEW CONSTRUCTION SHALL MEET HORIZONTAL AND VERTICAL ALIGNMENTS OF EXISTING FACILITIES.
17. THE CONTRACTOR WILL BE RESPONSIBLE OF PROVIDING ANY MEASURE TO PREVENT CONTROL AND ABATE WATER POLLUTION, RESULTING FROM SOIL EROSION AT ALL TIMES DURING THE CONSTRUCTION STAGES IN COMPLIANCE WITH SECTION 107.09 OF THE GENERAL PROVISIONS. CONSTRUCTION AND / OR INSTALLATION OF ALL PERMANENT PROJECT POLLUTION CONTROL FEATURES SHALL BE PERFORMED AT THE COMMENCEMENT OF THE PROJECT, FOLLOWING THE APPROVED WORK SCHEDULE PRESENTED TO
THE ENGINEER.
18. EROSION AND SEDIMENT CONTROL PLAN MEASURES SHALL BE INSPECTED AND REPAIRED TO ORIGINAL CONDITIONS AFTER EACH
RAINFALL EVENT THAT EXCEEDS 2" IN 24 HOURS.
19. SEDIMENT SHALL BE REMOVED, AND ALL EROSION CONTROL MEASURES RESTORED TO THEIR ORIGINAL DIMENSIONS WHEN
SEDIMENT HAS ACCUMULATED TO 1/2 OF THE DESIGN DEPTH.
20. EROSION CONTROL MEASURES SHALL BE REMOVED AND THE AREA STABILIZED UPON COMPLETION OF WORK.
21. INLETS AND MANHOLES SHALL COMPLY WITH SPECIFICATION 604.
22. ALL DRAINAGE STRUCTURES, INCLUDING PIPES, SWALES, DETENTION PONDS, INLETS, MANHOLES, AND OTHERS SHALL BE
PERIODICALLY MAINTAINED AND CLEANED IN ORDER TO REMOVE SEDIMENT AND OTHER OBSTRUCTIONS IN ORDER TO PROVIDE
ADEQUATE HYDRAULIC CONDITIONS.
23. SEE STRUCTURAL PLANS FOR DETAILS OF PROPOSED STRUCTURES INCLUDED IN THIS PROJECT. SEE NOTES ON SHEET RW-A/1 &
RW-B/1.
24. SEE NOTES ON SHEET UTW-A/1 & UTW-B/1 FOR P.R.A.S.A. UTILITIES WORK TO BE DONE AS PART OF THIS PROJECT.
25. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND VERIFYING WITH THE CORRESPONDING UTILITIES AGENCIES' REGIONAL
OFFICE THE EXACT LOCATION OF ALL UTILITIES BEFORE ANY EXCAVATION WORK IS PERFORMED.
26. HOT PLANT MIX BITUMINOUS ASPHALT PAVEMENT SHALL FOLLOW SPECIFICATION 401.
27. LEAN CONCRETE BASE SHALL FOLLOW SPECIFICATION 305.
28. PAVEMENT MARKINGS SHALL BE AS INDICATED ON PLANS, AND CONFORMING TO PART 3 OF THE MUTCD AND SPECIFICATION 716.
29. WHERE PROPOSED CURB OR CURB AND GUTTER MEETS EXISTING ONE AND IS A DIFFERENT TYPE PROPOSED CURB SHAPE, OR CURB
AND GUTTER, SHALL BE GRADUALLY REVISED TO MATCH EXISTING SHAPE. THIS CHANGE SHALL BE ACCOMPLISHED IN LAST 2 TO 5
METERS OF PROPOSED WORK.
30. ALL PAVEMENT MARKINGS SHOWN ON PLANS SHALL BE PROVIDED. ALL OTHER EXISTING PAVEMENT MARKINGS SHALL BE REMOVED.
THIS REMOVAL SHALL BE CONSIDERED INCIDENTAL TO THE COST OF PROVIDING NEW PAVEMENT MARKINGS AND SHALL BE DONE IN
ACCORDANCE WITH SPECIFICATIONS OF THIS CONTRACT.
31. TRAFFIC SIGNS SHALL COMPLY WITH SPECIFICATION 613, THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, 2009 INCLUDING REVISIONS 1 AND 2 (MUTCD), AND THE DETAILS PRESENTED IN THE GMTS AND OHTS SERIES OF PRHTA'S INTERIM STANDARD
DRAWINGS DATED FEBRUARY 2019.
32. MAINTENANCE AND PROTECTION OF TRAFFIC SHALL COMPLY WITH SPECIFICATION 638 AND REVISION FROM APRIL 29, 2014.
33. ROADSIDE BARRIERS AND ALL SAFETY APPURTENANCES SHALL MEET MASH CRITERIA FOR CRASHWORTHINESS AND BE INSTALLED
FOLLOWING PRHTA STANDARD DRAWINGS FROM JUNE, 2018.
34. TOPOGRAPHIC AS-BUILT PLANS WERE PREPARED BY SURVEYORS GROUP, BASED ON FIELD WORK COMPLETED DECEMBER, 2018.
PLANS PRESENT EXISTING SITE CONDITIONS AT THE TIME TOPOGRAPHIC SURVEY WAS DONE.
PUERTO RICO AQUEDUCTS AND SEWERS AUTHORITYP.R.A.S.A.
TOP OF FOOTINGT/F
BOTTOM OF WALLB/W
GENERAL NOTES, LEGEND AND
SYMBOLS
GR
NOT TO SCALE
PUERTO RICO HIGHWAY & TRANSPORTATION AUTHORITY
KLEIN ENGINEERING, PSC
ENGINEERING CONSULTANTS
A.C. PROJECT
CODE NO.
DATE REVISION
TOTAL
SHEETS
MUNICIPALITYHIGHWAY
FISCAL
YEAR
ISLAND
SHEET
NO.
FED. AID H'WAY
PROJECT N0.
AC-836579 CIALES 2019
AND REPAIR RECOMMENDATIONS
MUNICIPALITY OF CIALES, PUERTO RICO
LANDSLIDE AND ROAD DAMAGE EVALUATION
PR-149 P.R. 73ER-9999(320)
D
ES
IG
N
W O
R K
D R
AW
IN
G
D
AT
E
BY
TR
AC
ED
C H
EC
K
FI
N
AL
C
H
EC
K
KE
PS
C
TA
G
TA
G
FR
K
C G
T
.0 7.
.0 7.
.0 7.
.1 0.
.1 0.
ACTIVITY AREA
SIGN LOCATION NUMBER
SIGN CODE NUMBER
TRAFFIC SIGN
LEGEND:
FOR THE CONSTRUCTION OPERATION OF THE LANDSLIDE REPAIRS LOCATED AT STATE ROAD PR-149, KM. 42.8 & KM. 42.9, IN THE MUNICIPALITY OF CIALES, THE FOLLOWING CONSTRUCTION SCHEDULE AND SPECIAL INSTRUCTIONS SHALL BE FOLLOWED IN ORDER TO MAINTAIN TRAFFIC FLOW WITH THE LEAST POSSIBLE INTERFERENCE FROM CONSTRUCTION OPERATIONS. ANY ALTERATIONS TO THIS SCHEDULE SHALL BE
SUBMITTED IN WRITING TO PRHTA FOR APPROVAL, PRIOR TO ITS APPLICATION.
ALL PRECAUTIONS SHALL BE TAKEN SO THAT CONSTRUCTION WORK IS PERFORMED IN SUCH WAY AS TO AVOID UNNECESSARY INCONVENIENCES TO TRAFFIC AND PROVIDE THE SAFEST POSSIBLE ENVIRONMENT TO
ROAD USERS AND WORKERS.
SPECIFIC SITUATIONS NOT COVERED BY THESE PLANS SHALL BE PRESENTED TO THE ENGINEER IN WRITING TEN (10) CALENDAR DAYS PRIOR TO THE BEGINNING OF CONSTRUCTION WORK IN THE AREA, IN ORDER TO
PROVIDE CLARIFICATIONS AND / OR RECOMMENDATIONS.
CONSTRUCTION SCHEDULE
STAGE 1
A. INSTALL TEMPORARY SAFETY DEVICES AND CONSTRUCTION SIGNS AS
INDICATED ON PLANS.
B. MAINTAIN A MINIMUM 4.5 METER WIDE LANE OPEN AT ALL TIMES TO
TRAFFIC.
C. PROCEED WITH THE CLEARING AND GRUBBING OF NORTH EDGE OF ROW.
D. PROCEED WITH THE SPECIAL INLET BOX, CONCRETE APRON SLAB,
CLEANING EXISTING 30" RCP, PARTIALLY INSTALLATION OF (2) NEW 36"
RCP.
E. PROCEED WITH INSTALLATION OF WATER PIPES.
F. PROCEED WITH THE PAVING OF NORTH EDGE OF PR-149.
G. COMPLETE CORRESPONDING SIGNING AND PAVEMENT MARKINGS.
STAGES
21 1, 6
2 2
5 2
SIGN TABLE
LEGENDCODE
NUMBER
LOCATION
NUMBER
SIGN
CODE
SIZE OF SIGN
PANELS
OVERHEAD
STRUCTURE
TYPE
REFERENCE
MANUAL
TOTAL
ITEM
N/A
SEE
D.T.P.W.
MANUAL
N/A
SEE
D.T.P.W.
MANUAL
N/A
SEE
D.T.P.W.
MANUAL
N/A
SEE
D.T.P.W.
MANUAL
G20-2A 48" X 36"
TERMINA
TRABAJO EN
CARRETERA
2, 7
4, 9
5, 10
W20-7 36" X 36"
W20-6 36" X 36"CARRIL
UN SOLO
450 MTS
W20-3 36" X 36"EN CARRETERA
TRABAJO
ADELANTE
STAGE 2
A. INSTALL TEMPORARY SAFETY DEVICES AND CONSTRUCTION SIGNS AS
INDICATED ON PLANS.
B. MAINTAIN A MINIMUM 3.65 METER WIDE LANE OPEN AT ALL TIMES TO
TRAFFIC.
C. PROCEED WITH THE CLEARING AND GRUBBING & WIDENING OF SOUTH
EDGE OF ROW.
D. COMPLETE CLEANING EXISTING 30" RCP, COMPLETE INSTALLATION OF (2)
NEW 36" RCP.
E. PROCEED WITH THE INSTALLATION OF HEADWALL TYPE A & RIP-RAP
PROTECTION.
F. PROCEED WITH THE CONSTRUCTION OF (2) NEW RETAINING WALL (SITE
227 & SITE 228).
G. PROCEED WITH THE REPAVING OF PR-149 AND THE INSTALLATION OF
PROPOSED LONGITUDINAL ROADSIDE BARRIERS.
H. COMPLETE CORRESPONDING SIGNING AND PAVEMENT MARKINGS.
3 2N/A
SEE
D.T.P.W.
MANUAL
3, 8 W3-4 36" X 36"A
PREPARESE
PARAR
FLAGGER STATION 0.127m = 5"
1/16" ALUMINUM ALLOY
3105 OR 5052 PLATE
HOLE FOR
BOLT
1/16" ALUMINUM ALLOY
3105 OR 5052 PLATE
0.
7m
0.127m = 5"
FRONT VIEW SIDE VIEW
TEMPORARY CONCRETE BARRIER
REFLECTIVE SHEETING ON TOP OF
TEMPORARY CONCRETE BARRIERS
MOUNTING DETAILS
GENERAL NOTES
1. SEVERAL JOBS CAN BE PERFORMED SIMULTANEOUSLY BY THE CONTRACTOR, WITH PRIOR APPROVAL FROM THE PROJECT
ENGINEER.
2. PROVISIONAL SIGNING AND TRAFFIC CONTROL DEVICES SHALL BE INSTALLED AS SHOWN IN THESE PLANS AND FOLLOWING THE STANDARDS SET FORTH IN PART VI, TEMPORARY TRAFFIC CONTROL, OF THE M.U.T.C.D. 2009 EDITION, INCLUDING REVISIONS 1 AND 2, AS WELL AS IN PRHTA'S STANDARD DRAWINGS, MPT SERIES.
3. WORK FOR THIS PROJECT IS CONSIDERED AS LONG-TERM STATIONARY, AS DEFINED IN THE M.U.T.C.D. 2009 EDITION. CONTRACTOR SHALL STORE ALL EQUIPMENT, MATERIALS, SIGNS, DRUMS, AND OTHER DEVICES USED FOR CONSTRUCTION IN THE CONTRACTOR'S
DESIGNATED STAGING AREA, WHICH SHALL BE APPROVED BY THE ENGINEER.
4. CONTRACTOR SHALL REFER TO AASHTO'S ROADSIDE DESIGN GUIDE, THE 2009 EDITION OF THE M.U.T.C.D., INCLUDING REVISIONS 1 AND 2, AND PRHTA'S STANDARD DRAWINGS FOR DETAILS ON BARRIERS TO BE USED DURING CONSTRUCTION.
5. CONTRACTOR SHALL COMPLY WITH SPECIFICATIONS 613 AND 638 OF PRHTA'S STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, 2005 EDITION, AND SUBSEQUENT AMENDMENTS, SUPPLEMENTAL SPECIFICATIONS, AND SPECIAL PROVISIONS.
6. CONTRACTOR SHALL INSTALL STROBE LIGHTS TO ALL VEHICLES USED FOR THIS PROJECT.
7. CONTRACTOR SHALL INSTALL A TRUCK-MOUNTED ATTENUATOR (TMA) TO ALL TRUCKS USED AS SHADOW VEHICLES IN THIS
PROJECT. A SHADOW VEHICLE EQUIPPED WITH A TMA SHALL BE PRESENT AT ALL TIMES WHEN HEAVY EQUIPMENT OR PERSONNEL IS
IN THE ACTIVITY AREA.
8. NO WORK OTHER THAN MOBILIZATION SHALL BE DONE UNTIL THE PROJECT'S PROGRESS SCHEDULE IS APPROVED BY THE
ENGINEER.
9. ANY PROPOSED ALTERATION TO THE SCHEDULE THAT MAY IMPROVE TRAFFIC OPERATIONS AND SAFETY WITHIN THE CONSTRUCTION AREA SHALL BE SUBMITTED TO THE ENGINEER, IN WRITING, NO LESS THAN TWENTY-ONE (21) CALENDAR DAYS PRIOR TO ITS PROPOSED IMPLEMENTATION. ALTERATIONS TO THE SCHEDULE SHALL ONLY BE DONE IF APPROVED BY THE
ENGINEER AND AT NO ADDITIONAL COST TO THE OWNER.
10. CONTRACTOR SHALL FURNISH TTC DEVICES THAT MEET MASH CRITERIA FOR APPLICABLE CRASHWORTHINESS STANDARDS.
11. CONTRACTOR SHALL AVOID FALLING DEBRIS, TOOLS, EQUIPMENT, OR ANY MATERIAL INTERFERE OR IMPACT THE MOTORING PUBLIC
USING THE ROADWAY. ALL MATERIALS, LABOR, EQUIPMENT, AND WORK NECESSARY FOR IMPLEMENTING AND COMPLYING WITH THIS REQUIREMENT IS A SUBSIDIARY OBLIGATION OF THE CONTRACT UNDER EXISTING PAY ITEMS.
12. CONTRACTOR SHALL USE BALLOON LIGHTING TO AVOID THAT GLARE MAY AFFECT DRIVERS.
13. FLAGGER STATIONS SHALL BE PRESENT 24 HOURS A DAY, 7 DAYS A WEEK, THROUGHOUT CONSTRUCTION.
14. CONTRACTOR SHALL INSTALL ORANGE RETROREFLECTIVE PANELS ON TOP OF TEMPORARY CONCRETE BARRIERS.
15. THE DESIGN OF SIGN PLATES SHALL BE IN ACCORDANCE WITH THE "MANUAL DE ROTULACION PARA LAS VIAS PUBLICAS DE PUERTO
RICO 2020" AND STANDARD DRAWINGS MPT-24 TO MPR-27.
16. THE NUMBER OF CHANNELIZING DEVICES FOR PARTS OF TRAFFIC CONTROL ZONE SHALL BE IN ACCORDANCE WITH STANDARD
DRAWING MPT-10.
SCALE=1:400
MAINTENANCE OF TRAFFIC
GENERAL NOTES AND TABLE
PUERTO RICO HIGHWAY & TRANSPORTATION AUTHORITY
KLEIN ENGINEERING, PSC
ENGINEERING CONSULTANTS
A.C. PROJECT
CODE NO.
DATE REVISION
TOTAL
SHEETS
MUNICIPALITYHIGHWAY
FISCAL
YEAR
ISLAND
SHEET
NO.
FED. AID H'WAY
PROJECT N0.
AC-836579 CIALES 2019
AND REPAIR RECOMMENDATIONS
MUNICIPALITY OF CIALES, PUERTO RICO
LANDSLIDE AND ROAD DAMAGE EVALUATION
PR-149 P.R. 73ER-9999(320)
D
ES
IG
N
W O
R K
D R
AW
IN
G
D
AT
E
BY
TR
AC
ED
C H
EC
K
FI
N
AL
C
H
EC
K
KE
PS
C
TA
G
TA
G
FR
K
C G
T
.0 7.
.0 7.
.0 7.
.1 0.
.1 0.
MOT
RIGHT OF WAY LIMIT
KMKM
KMKM
STA-D11
STA-D14
STA-D16
STA-D17
STA-D13
STA-D1
STA-D2
617.4
617.40
STA-D15
RI
GH
T
OF
W
AY
L
IM
IT
RIGHT OF WAY LIMIT
X=1
,85
Y=238,250
X=1
,85
Y=238,200
X=1
,85
Y=238,150
X=1
,85
Y=238,100
X=1
,80
Y=238,300
X=1
,80
Y=238,250
X=1
,80
Y=238,200
X=1
,80
Y=238,150
X=1
,80
Y=238,100
X=1
,80
Y=238,050
X=1
,75
Y=238,300
X=1
,75
Y=238,250
X=1
,75
Y=238,200
X=1
,75
Y=238,150
X=1
,75
Y=238,100
X=1
,75
Y=238,350
X=1
,70
Y=238,300
X=1
,70
Y=238,250
X=1
,70
Y=238,200
X=1
,70
Y=238,150
X=1
,70
Y=238,350
X=1
,70
X=1
,65
Y=238,300
X=1
,65
Y=238,250
X=1
,65
Y=238,350
X=1
,60
Y=238,300
RIGHT OF WAY LIMIT
RIGHT OF WAY LIMIT
RIGHT OF WAY LIMIT
RIGHT OF WAY LIMIT
100m
100m
100m
100m
100m
100m
100m
100m
100m
100m
ACTIVITY AREA
STAGE-1
CIALES
PR-149
PR-149
TEMPORARY
CONCRETE BARRIER
TEMPORARY
CONCRETE BARRIER
SITE-A (ER-HWY-227)
SITE-B (ER-HWY-228)
30.00m
INSTALL TYPE III
TL-2 CRASH CUSHION
INSTALL TYPE III
TL-2 CRASH CUSHION
30.00m
MAINTENANCE OF TRAFFIC PLAN -
STAGE 1
PUERTO RICO HIGHWAY & TRANSPORTATION AUTHORITY
KLEIN ENGINEERING, PSC
ENGINEERING CONSULTANTS
A.C. PROJECT
CODE NO.
DATE REVISION
TOTAL
SHEETS
MUNICIPALITYHIGHWAY
FISCAL
YEAR
ISLAND
SHEET
NO.
FED. AID H'WAY
PROJECT N0.
AC-836579 CIALES 2019
AND REPAIR RECOMMENDATIONS
MUNICIPALITY OF CIALES, PUERTO RICO
LANDSLIDE AND ROAD DAMAGE EVALUATION
PR-149 P.R. 73ER-9999(320)
D
ES
IG
N
W O
R K
D R
AW
IN
G
D
AT
E
BY
TR
AC
ED
C H
EC
K
FI
N
AL
C
H
EC
K
KE
PS
C
TA
G
TA
G
FR
K
C G
T
.0 7.
.0 7.
.0 7.
.1 0.
.1 0.
MOT
20100
SCALE=1:400
KMKM
KMKM
STA-D11
STA-D14
STA-D16
STA-D17
STA-D13
STA-D1
STA-D2
617.4
617.40
STA-D15
RI
GH
T
OF
W
AY
L
IM
IT
RIGHT OF WAY LIMIT
X=1
,85
Y=238,250
X=1
,85
Y=238,200
X=1
,85
Y=238,150
X=1
,85
Y=238,100
X=1
,80
Y=238,300
X=1
,80
Y=238,250
X=1
,80
Y=238,200
X=1
,80
Y=238,150
X=1
,80
Y=238,100
X=1
,80
Y=238,050
X=1
,75
Y=238,300
X=1
,75
Y=238,250
X=1
,75
Y=238,200
X=1
,75
Y=238,150
X=1
,75
Y=238,100
X=1
,75
Y=238,350
X=1
,70
Y=238,300
X=1
,70
Y=238,250
X=1
,70
Y=238,200
X=1
,70
Y=238,150
X=1
,70
Y=238,350
X=1
,70
X=1
,65
Y=238,300
X=1
,65
Y=238,250
X=1
,65
Y=238,350
X=1
,60
Y=238,300
RIGHT OF WAY LIMIT
RIGHT OF WAY LIMIT
RIGHT OF WAY LIMIT
RIGHT OF WAY LIMIT
CIALES
PR-149
TEMPORARY
CONCRETE BARRIER
TEMPORARY
CONCRETE BARRIER
100m
100m
100m
100m
100m
100m
100m
100m
100m
100m
ACTIVITY AREA
STAGE-2
PR-149
SITE-A (ER-HWY-227)
SITE-B (ER-HWY-228)
30.00m
30.00m
INSTALL TYPE III
TL-2 CRASH CUSHION
INSTALL TYPE III
TL-2 CRASH CUSHION
MAINTENANCE OF TRAFFIC PLAN -
STAGE 2
MOT
PUERTO RICO HIGHWAY & TRANSPORTATION AUTHORITY
KLEIN ENGINEERING, PSC
ENGINEERING CONSULTANTS
A.C. PROJECT
CODE NO.
DATE REVISION
TOTAL
SHEETS
MUNICIPALITYHIGHWAY
FISCAL
YEAR
ISLAND
SHEET
NO.
FED. AID H'WAY
PROJECT N0.
AC-836579 CIALES 2019
AND REPAIR RECOMMENDATIONS
MUNICIPALITY OF CIALES, PUERTO RICO
LANDSLIDE AND ROAD DAMAGE EVALUATION
PR-149 P.R. 73ER-9999(320)
D
ES
IG
N
W O
R K
D R
AW
IN
G
D
AT
E
BY
TR
AC
ED
C H
EC
K
FI
N
AL
C
H
EC
K
KE
PS
C
TA
G
TA
G
FR
K
C G
T
.0 7.
.0 7.
.0 7.
.1 0.
.1 0.
20100
SCALE=1:400
HOT PLANT MIX BITUMINOUS PAVEMENT MIX S(75)(12), SPEC. 401
HOT PLANT MIX BITUMINOUS BASE COURSE MIX B(75)(34), SPEC. 401
SUBBASE COURSE, SPEC. 301
0.05m
LEGEND:
0.15m
AGGREGATE BASE COURSE, SPEC. 3043 0.15m
TYPICAL SECTION
SCALE = 1:100
FROM STA.0+00.00 TO STA.0+03.28
X
X
X
X
EXIST. ROW
LIMIT
EXIST. ROW
LIMIT
EXISTING PAVEMENT
STRUCTURE TO REMAIN
5 COLD MILLING, SPEC. 4030.05m
TYPICAL SECTION
SCALE = 1:100
FROM STA.0+03.28 TO STA.0+54.44
PR-149
X
X
X
X
EXIST. ROW
LIMIT
EXIST. ROW
LIMIT
1 2
6 W-BEAM GUARDRAIL (SEE STD. DRAWINGS MB SERIES MASH JUNE 2018), SPEC. 606
12" PERFORATED
DRAIN PIPE
TYPICAL SECTION
SCALE = 1:100
FROM STA.0+65.14 TO STA.0+74.50
X
X
EXIST. ROW
LIMIT
STRUCTURE No.2
HEADWALL TYPE A
STRUCTURE No.1
SPECIAL BOX
(2) 36" RCP
CLASS III
0.80m(MIN)
EXISTING PAVEMENT
STRUCTURE TO REMAIN
TYPICAL SECTION
SCALE = 1:100
FROM STA.0+74.50 TO STA.0+82.31
1 5
X
X
X
X
EXIST. ROW
LIMIT
EXIST. ROW
LIMIT
1 2 3
1 5
7 7
EXISTING PAVEMENT
STRUCTURE TO REMAIN
7 SAFETY EDGE
2H:1V
8 BORROW CLASS "B", CLASSIFIABLE AS A-2-4, OR BETTER, SPEC. 203
TYPICAL SECTION
SCALE = 1:100
FROM STA.0+74.50 TO STA.0+77.77
CL
PR-149CL
PR-149CL
PR-149CL
X
X
X
X
PROPOSED
ROW LIMIT
EXIST. ROW
LIMIT
PR-149CL
1 2 3 7
EXISTING 30"Ø RCP CLASS III
TO BE CLEANED UP TO
DISCHARGE POINT
CONCRETE
APRON SLAB
X
X
PROPOSED
ROW LIMIT
RET. WALL
9 AASHTO TYPE "F" CONCRETE BARRIER, SP-934
10 RIP RAP PROTECTION CLASS VII (HEC 23) , SPEC. 622
TYPICAL SECTION
SCALE = 1:100
FROM STA.0+54.44 TO STA.0+65.14
EXISTING PAVEMENT
STRUCTURE TO REMAIN
1 5
X
X
X
X
EXIST. ROW
LIMIT
EXIST. ROW
LIMIT
7 7
PR-149CL
TYPICAL SECTIONS
PUERTO RICO HIGHWAY & TRANSPORTATION AUTHORITY
KLEIN ENGINEERING, PSC
ENGINEERING CONSULTANTS
A.C. PROJECT
CODE NO.
DATE REVISION
TOTAL
SHEETS
MUNICIPALITYHIGHWAY
FISCAL
YEAR
ISLAND
SHEET
NO.
FED. AID H'WAY
PROJECT N0.
CIALES 2019
LANDSLIDE AND ROAD DAMAGE EVALUATION
MUNICIPALITY OF CIALES, PUERTO RICO
ER-HWY-227, HIGHWAY PR-149 KM 42.80
PR-149 P.R. 73
D
ES
IG
N
W O
R K
D R
AW
IN
G
D
AT
E
BY
TR
AC
ED
C H
EC
K
FI
N
AL
C
H
EC
K
KE
PS
C
TA
G
TA
G
FR
K
C G
T
.0 7.
.0 7.
.0 7.
.1 0.
.1 0.
AC-836579ER-9999(416)
GR-A
SCALE=1:100
X=1
,80
Y=238,250
X=1
,80
Y=238,200
X=1
,75
Y=238,300
X=1
,75
Y=238,250
X=1
,75
Y=238,200
0+82.31
0+00
PRC
PCC
PCC
PT
PC
PT
0+52.63
-0+00
PT
PC PCC
PT
PC
L1
C1
C2
C3
C4
L2
L3
C5
C6
C7
C8
PR-149_RET WALL
ID
C6
L2
C7
C8
L3
C5
VERTEX
PC STA. -0+00.00
VERTEX
PT STA. 0+02.79
STA. 0+02.79
STA. 0+10.06
PC STA. 0+10.06
VERTEX
PT STA. 0+25.65
PC STA. 0+25.65
VERTEX
PT STA. 0+43.21
STA. 0+43.21
STA. 0+50.07
PC STA. 0+50.07
VERTEX
PT STA. 0+52.63
DIST.
7.26
6.87
5-24-44
11-02-23
8-40-21
4-49-14
R
29.58
80.92
115.99
30.43
T
1.40
7.82
8.79
1.28
E
0.03
0.38
0.33
0.03
L
2.79
15.59
17.56
2.56
COORDINATES
N
238267.4674
238266.3454
238265.1498
238265.1498
238258.9367
238258.9367
238252.4802
238246.9883
238246.9883
238240.8120
238235.6504
238235.6504
238232.3162
238232.3162
238231.6945
238231.1690
COORDINATES
E
191748.1007
191748.9345
191749.6587
191749.6587
191753.4223
191753.4223
191757.8352
191763.4027
191763.4027
191769.6640
191776.7850
191776.7850
191782.7886
191782.7886
191783.9082
191785.0761
BEARING
S31-12-19E
S60-57-13E
S74° 00' 27.83"E
R=55.00m
R=77.75m
R=112.81m
R=21.00m
S31° 12' 18.99"E
S60° 57' 13.34"E R=30.43m
R=29.58m
R=80.92m
R=115.99m
BEGIN LINE PR-149
PC STA. 0+00.00
END LINE PR-149
PT STA. 0+82.31
BEGIN LINE PR-149_RET WALL
PC STA. 0+00.00
END LINE PR-149_RET WALL
PT STA. 0+52.63
LINE-PR-149
LINE-PR-149_RET WALL
C9 L4
PR-149
ID
C1
C2
C3
C4
L1
C9
L4
VERTEX
PC STA. 0+00.00
VERTEX
PT STA. 0+10.27
PC STA. 0+10.27
VERTEX
PT STA. 0+28.52
PC STA. 0+28.52
VERTEX
PT STA. 0+51.03
PC STA. 0+51.03
VERTEX
PT STA. 0+57.33
STA. 0+57.33
STA. 0+60.48
PC STA. 0+60.48
VERTEX
PT STA. 0+80.72
STA. 0+80.72
STA. 0+82.31
DIST.
3.15
1.58
10-42-03
13-26-54
11-26-01
17-10-57
46-24-18
R
55.00
77.75
112.81
21.00
25.00
T
5.15
9.17
11.29
3.17
10.72
E
0.24
0.54
0.56
0.24
2.20
L
10.27
18.25
22.51
6.30
20.25
COORDINATES
N
238271.6246
238267.8356
238263.4646
238263.4646
238255.6860
238249.2486
238249.2486
238241.3177
238235.1379
238235.1379
238233.4018
238232.5277
238232.5277
238231.6611
238231.6611
238228.7087
238219.2122
238219.2122
238217.8083
COORDINATES
E
191748.0416
191751.5312
191754.2565
191754.2565
191759.1064
191765.6324
191765.6324
191773.6725
191783.1253
191783.1253
191785.7808
191788.8307
191788.8307
191791.8544
191791.8544
191802.1560
191807.1213
191807.1213
191807.8553
BEARING
S74-00-28E
S27-36-10E
R=25.00m
S27° 36' 10.22"E
CENTERLINE GEOMETRY AND
VERTEX DATA
PUERTO RICO HIGHWAY & TRANSPORTATION AUTHORITY
KLEIN ENGINEERING, PSC
ENGINEERING CONSULTANTS
A.C. PROJECT
CODE NO.
DATE REVISION
TOTAL
SHEETS
MUNICIPALITYHIGHWAY
FISCAL
YEAR
ISLAND
SHEET
NO.
FED. AID H'WAY
PROJECT N0.
CIALES 2019
LANDSLIDE AND ROAD DAMAGE EVALUATION
MUNICIPALITY OF CIALES, PUERTO RICO
ER-HWY-227, HIGHWAY PR-149 KM 42.80
PR-149 P.R. 73
D
ES
IG
N
W O
R K
D R
AW
IN
G
D
AT
E
BY
TR
AC
ED
C H
EC
K
FI
N
AL
C
H
EC
K
KE
PS
C
TA
G
TA
G
FR
K
C G
T
.0 7.
.0 7.
.0 7.
.1 0.
.1 0.
AC-836579ER-9999(416)
GR-A
SCALE=1:150
628.292
631.887
TEL 629.53
STA-D14
ASPHALT EDGE
ASPHALT EDGE
POTABLEWATER PIPE
628.15
627.90
628.11 CONCRETE
W
ALL
W
W
W
W W W W
N37° 41' 33.87"W
S4° 51' 08.29"E
7.73m
6.94m
ELEC
624.199
STA-D12
STA-D11
STA-D2
624.4
622.4
620.4 618.4
616.4 614.4
ASPHALT EDGEASPHALT EDGE
ENTRANCE
624.385
X=1
,65
Y=238,350
S7° 54' 37.91"W
S19° 29' 41.60"E
S8° 42' 27.05"E
S31° 07' 11.86"E
22.42m
49.53m
29.89m
49.37m
TEL TE
L
635.46
631.74
635.75
631.65
KMKM
631.4
629.4
627.4
625.4
623.4
COLLAPSED AREA
ASPHALT EDGE
ASPHALT EDGE
STA-D15
630.12
630.08
630.18
631.634
631.42
632.64
632.70
632.50W W W W W W W W W W W
X=1
,75
Y=238,250
RIGHT OF WAY LIMIT
S42° 22' 40.89"E S36° 34' 08.12"W28.11m
2.19m
CONTROL POINTS
STA-D14
CLEAN-OUT
WATER METER
EXISTING ELEVATION
CONTROL STATION
LUMINARY POLE
TREE
7.72
LEGEND:
WM
STA-1
NOTES:
PUERTO RICO HIGHWAY & TRANSPORTATION AUTHORITY
KLEIN ENGINEERING, PSC
ENGINEERING CONSULTANTS
A.C. PROJECT
CODE NO.
DATE REVISION
TOTAL
SHEETS
MUNICIPALITYHIGHWAY
FISCAL
YEAR
ISLAND
SHEET
NO.
FED. AID H'WAY
PROJECT N0.
CIALES 2019
LANDSLIDE AND ROAD DAMAGE EVALUATION
MUNICIPALITY OF CIALES, PUERTO RICO
ER-HWY-227, HIGHWAY PR-149 KM 42.80
PR-149 P.R. 73
D
ES
IG
N
W O
R K
D R
AW
IN
G
D
AT
E
BY
TR
AC
ED
C H
EC
K
FI
N
AL
C
H
EC
K
KE
PS
C
TA
G
TA
G
FR
K
C G
T
.0 7.
.0 7.
.0 7.
.1 0.
.1 0.
AC-836579ER-9999(416)
CONTROL STATIONS
STATION
STA-D12
COORDINATES
NORTHING ELEVATIONEASTING
238375.3103 191662.0723 619.1777
238356.1227 620.7457191673.6654
DESCRIPTION
PK-NAIL
STA-D11 PK-NAIL
238282.9458 628.4995191739.5519STA-D14 PK-NAIL
238239.4584 632.4387191773.7454STA-D15 PK-NAIL
STA-D11
STA-D12 SCALE = 1:100
SCALE = 1:200
STA-D15
SCALE = 1:100
GR-A
TYPE "D"
D
IA
M E
T E
R O
F P
IP
E
S T
R U
C T
U R
E N
U M
B E
R
INCHES
STATION
TYPE "C"
CURB, L.M.
TYPE "B"MTS TYPE "A" TYPE "D"TYPE "C" TYPE "E"
L E
N G
T H
O F
P
IP
E
CONCRETE
S H
A L L O
W C
O N
C R
E T
E
E N
D S
E C
T
IO
N
"Ø
H A
L F
L.M.TYPE "F"
G U
T T
E R
L .M
C O
N C
R E
T E
C U
R B
A N
D
L.M.
C O
N C
R E
T E
P
IP
E
G U
T T
E R
TYPE "B"TYPE "A"EA TYPE "C"
HEADWALLS
T R
E N
C H
E X
C A
V A
T
IO
N
SPECIAL BOX"3""1"
TYPE
MH
R
IP
-R A
P
CuM.
INLETS
B R
ID
G
E R
A
IL
L.M L.M.
W -B
E A
M G
U A
R D
R A
IL
R E M A R K S
A A
S H
T O
T Y
P E
F
C
O N
C R
E T
E B
A R
R
IE
R
L.M.
R E
T A
IN
IN
G W
A L L
NO.
56 56 57 57 58 58
TOTALS
(T Y
P E
-I
3.66X1.45X2.50
NO.1
"4A"
L.M.
0+03.28, 2.68Rt TO 0+54.44, 2.56 Rt(PR-149)
BRIDGE
L.M.
18.054
0+03.28, 2.68Rt TO 0+54.44, 2.56 Rt(PR-149)
0+71.24, 3.15Lt(PR-149)
0+67.50, 4.93Rt(PR-149)
0+70.10(PR-149)36
0+67.50, 4.93Rt(PR-149)
0+73.95, 2.86Rt(PR-149)
(2) 9.027
52.63
52.63
18.71 52.634011
0+65.14, 3.17Lt TO 0+82.08, 3.25 Rt(PR-149) 18.71
12 0+00.24, 5.60Rt TO 0+54.40, 0.79Rt (PR-149)
0+00.24, 5.60Rt(PR-149)
0+00.24, 5.60Rt(PR-149)
MTS
57 1
L E
N G
T H
O F
P E
R F
O R
A T
E D
P
IP
E
SqM
C O
N C
R E
T E
A P
R O
N S
L A
B
0+76.34, 3.06Lt(PR-149) 3.58
3.58
CuM.
NOT TO SCALE TABLE OF STRUCTURES
PUERTO RICO HIGHWAY & TRANSPORTATION AUTHORITY
KLEIN ENGINEERING, PSC
ENGINEERING CONSULTANTS
A.C. PROJECT
CODE NO.
DATE REVISION
TOTAL
SHEETS
MUNICIPALITYHIGHWAY
FISCAL
YEAR
ISLAND
SHEET
NO.
FED. AID H'WAY
PROJECT N0.
CIALES 2019
LANDSLIDE AND ROAD DAMAGE EVALUATION
MUNICIPALITY OF CIALES, PUERTO RICO
ER-HWY-227, HIGHWAY PR-149 KM 42.80
PR-149 P.R. 73
D
ES
IG
N
W O
R K
D R
AW
IN
G
D
AT
E
BY
TR
AC
ED
C H
EC
K
FI
N
AL
C
H
EC
K
KE
PS
C
TA
G
TA
G
FR
K
C G
T
.0 7.
.0 7.
.0 7.
.1 0.
.1 0.
AC-836579ER-9999(416)
GR-A
TEL TE
L
626.959
628.292
631.887
TEL 629.53
635.46
631.74
635.75
631.65
633.61
638.53
637.97
633.66
634.45
636.52
KMKM
STA-D14
STA-D16
615.4
614.4
631.4
629.4
627.4
625.4
623.4
621.4
619.4
617.4
615.4
613.4
611.4
626.4
624.4
622.4
620.4
618.4
616.4
614.4
612.4
610.4
608.4
COLLAPSED AREA
30"CONCRETE
PIPE
ASPHALT EDGE
ASPHALT EDGE
ASPHALT EDGE
ASPHALT EDGE
POTABLEWATER PIPE
POTABLEWATER PIPE
POTABLEWATER PIPE
CONCRETE WALL
CONCRETE WALL
STA-D15
630.12
630.08
630.18
627.32
626.959
627.41
631.634
631.42
634.67
634.35
634.60
641.99639.02642.11
636.62
636.51
BAMBOO
AREA
632.64
635.66 636.06
633.77
633.63
632.64
632.70
632.50
628.15
627.90
628.11 CONCRETE
W
ALL
S.S .P
IP
E
T.E .=6
.42
I.E .=6
.66
S.S .P
IP
E
T.E .=6
.86
I.E .=6
.10
W
W
W
W
W W W W W W W W W W W W W W W W
W
W
W
W
W
W W
W W
W
W
W
W
RIGHT OF WAY LIMIT
X=1
,80
Y=238,250
X=1
,80
Y=238,200
X=1
,75
Y=238,300
X=1
,75
Y=238,250
RIGHT OF WAY LIMIT
RIGHT OF WAY LIMIT
RIGHT OF WAY LIMIT0+00
0+10
0+20 0+30
0+40
0+50
0+60
0+70 0+80 0+82
PRC
PCC
PCC
PT
PC
PT
LINE-PR-149 BEGINS
(ER-HWY-227)
STA:0+00.00
LINE-PR-149 ENDS
(ER-HWY-227)
STA:0+82.31
EXISTING CONDITIONS PLAN
PUERTO RICO HIGHWAY & TRANSPORTATION AUTHORITY
KLEIN ENGINEERING, PSC
ENGINEERING CONSULTANTS
A.C. PROJECT
CODE NO.
DATE REVISION
TOTAL
SHEETS
MUNICIPALITYHIGHWAY
FISCAL
YEAR
ISLAND
SHEET
NO.
FED. AID H'WAY
PROJECT N0.
CIALES 2019
LANDSLIDE AND ROAD DAMAGE EVALUATION
MUNICIPALITY OF CIALES, PUERTO RICO
ER-HWY-227, HIGHWAY PR-149 KM 42.80
PR-149 P.R. 73
D
ES
IG
N
W O
R K
D R
AW
IN
G
D
AT
E
BY
TR
AC
ED
C H
EC
K
FI
N
AL
C
H
EC
K
KE
PS
C
TA
G
TA
G
FR
K
C G
T
.0 7.
.0 7.
.0 7.
.1 0.
.1 0.
AC-836579ER-9999(416)CONTROL STATIONS
STA-D12 238375.3103 191662.0723 619.1777
238356.1227 620.7457191673.6654
PK-NAIL
STA-D11 PK-NAIL
238282.9458 628.4995191739.5519STA-D14 PK-NAIL
238239.4584 632.4387191773.7454STA-D15 PK-NAIL
GR-A
CLEAN-OUT
WATER METER
EXISTING ELEVATION
CONTROL STATION
LUMINARY POLE
TREE
7.72
LEGEND:
WM
STA-1
NOTES:
L
626.959
628.292
631.887
TEL 629.53
635.46
631.74
635.75
631.65
633.61
638.53
637.97
633.66
634.45
636.52
KMKM
STA-D14
STA-D16
615.4
614.4
631.4
629.4
627.4
625.4
623.4
621.4
619.4
617.4
615.4
613.4
611.4
610.4
611.4
626.4
624.4
622.4
620.4
618.4
616.4
614.4
612.4
610.4
608.4
606.4
COLLAPSED AREA
30"CONCRETE
PIPE
ASPHALT EDGE
ASPHALT EDGE
ASPHALT EDGE
ASPHALT EDGE
POTABLEWATER PIPE
POTABLEWATER PIPE
POTABLEWATER PIPE
CONCRETE WALL
CONCRETE WALL
STA-D15
630.12
630.08
630.18
627.32
626.959
627.41
631.634
631.42
634.67
634.35
634.60
641.99639.02642.11
636.62
636.51
BAMBOO
AREA
632.64
635.66 636.06
633.77
633.63
632.64
632.70
632.50
628.15
627.90
628.11 CONCRETE
W
ALL
S.S .P
IP
E
T.E .=6
.42
I.E .=6
.66
S.S .P
IP
E
T.E .=6
.86
I.E .=6
.10
W
W
W
W
W W W W W W W W W W W W W W W W
W
W
W
W
W
W W
W W
W
W
W
W
RIGHT OF WAY LIMIT
X=1
,80
Y=238,250
X=1
,80
Y=238,200
X=1
,75
Y=238,300
X=1
,75
Y=238,250
RIGHT OF WAY LIMIT
RIGHT OF WAY LIMIT
RIGHT OF WAY LIMIT
EXISTING ASPHALT
TO BE SCARIFIED EXISTING WATER PIPE
TO BE REMOVED
ASPHALT TO
BE SCARIFIED
X=191,749.6487 Y=238,273.1040
EXISTING TREE
TO BE REMOVED
EXISTING TREE
TO BE REMOVEDEXISTING COMMUNICATION
POST TO BE REMOVED
EXISTING COMMUNICATION
POST TO BE REMOVEDEXISTING KILOMETER
SIGN TO BE REMOVED
ASPHALT TO
BE SCARIFIED
X=191,746.4345 Y=238,270.1452
ASPHALT TO
BE SCARIFIED
X=191,809.7373 Y=238,218.7923
ASPHALT TO
BE SCARIFIED
X=191,805.9732 Y=238,216.8243
EXISTING TREE
TO BE REMOVED
EXISTING ASPHALT
TO BE FULL DEPTH
DEMOLISHED
ASPHALT TO
BE DEMOLISHED
X=191,748.5318 Y=238,267.8000
EXISTING TREE
TO BE REMOVED
EXISTING TREE
TO BE REMOVED
ASPHALT TO
BE DEMOLISHED
X=191,750.1769 Y=238,269.1637
ASPHALT TO
BE DEMOLISHED
X=191,786.1141 Y=238,233.5131
ASPHALT TO
BE DEMOLISHED
X=191,785.2057 Y=238,231.4600
ASPHALT TO
BE DEMOLISHED
X=191,798.0360 Y=238,231.0080
ASPHALT TO
BE DEMOLISHED
X=191,793.6535 Y=238,228.5336
ASPHALT TO
BE DEMOLISHED
X=191,805.4653 Y=238,225.3765
ASPHALT TO
BE DEMOLISHED
X=191,801.8996 Y=238,223.3633
EXISTING WATER PIPE
TO BE REMOVED
WATER PIPE
TO BE REMOVED
X=191,806.1326 Y=238,216.9076
WATER PIPE
TO BE REMOVED
X=191,747.4336 Y=238,268.8206
DEMOLITION PLAN
AREA TO BE DEMOLISHED OR REMOVED
LEGEND:
ASPHALT TO BE SCARIFIED
PUERTO RICO HIGHWAY & TRANSPORTATION AUTHORITY
KLEIN ENGINEERING, PSC
ENGINEERING CONSULTANTS
A.C. PROJECT
CODE NO.
DATE REVISION
TOTAL
SHEETS
MUNICIPALITYHIGHWAY
FISCAL
YEAR
ISLAND
SHEET
NO.
FED. AID H'WAY
PROJECT N0.
CIALES 2019
LANDSLIDE AND ROAD DAMAGE EVALUATION
MUNICIPALITY OF CIALES, PUERTO RICO
ER-HWY-227, HIGHWAY PR-149 KM 42.80
PR-149 P.R. 73
D
ES
IG
N
W O
R K
D R
AW
IN
G
D
AT
E
BY
TR
AC
ED
C H
EC
K
FI
N
AL
C
H
EC
K
KE
PS
C
TA
G
TA
G
FR
K
C G
T
.0 7.
.0 7.
.0 7.
.1 0.
.1 0.
AC-836579ER-9999(416)
GR-A
NOTES:
1. FOR ACTIONS TO BE TAKEN WITH EXISTING UTILITIES, REFER
TO DRAWING SERIES UTW-A, UTE-A AND UTT-A.
2. FOR ACTIONS TO BE TAKEN WITH EXISTING TREES, REFER TO
DRAWING SERIES TI-A.
L
TEL
KMKM
STA-D14
STA-D16
STA-D15
W
W
W
W
W W W W W W W W W W W W W W W W
W
W
W
W
W
W W
W W
W
W
W
RI
GH
T
OF
W
AY
L
IM
IT
RIGHT OF WAY LIMIT
X=1
,80
Y=238,250
X=1
,80
Y=238,200
X=1
,75
Y=238,300
X=1
,75
Y=238,250
RIGHT OF WAY LIMIT
RIGHT OF WAY LIMIT
RIGHT OF WAY LIMIT
-0+00
0+20
0+40
0+52.63
PT
PC PCC
PT
PC
LINE-PR-149 &
WIDENING BEGINS
PC. STA:0+00.00
MATCH EXISTING
EDGE OF ROADWAY
X=191,748.0416 Y=238,271.6246
0+82.31
0+00 0+10
0+20 0+30
0+40
0+50
0+60
0+70 0+80
PRC
PCC
PCC
PT
PC
PT
LINE-PR-149_RET WALL BEGINS
STA:0+00.00
LINE-PR-149_RET WALL ENDS
STA:0+52.63
CIALES
LINE-PR-149 ENDS
MATCH SITE 228
STA:0+82.31
X=191,807.8553 Y=238,217.8083
SOIL SURVEY PLAN
PUERTO RICO HIGHWAY & TRANSPORTATION AUTHORITY
KLEIN ENGINEERING, PSC
ENGINEERING CONSULTANTS
A.C. PROJECT
CODE NO.
DATE REVISION
TOTAL
SHEETS
MUNICIPALITYHIGHWAY
FISCAL
YEAR
ISLAND
SHEET
NO.
FED. AID H'WAY
PROJECT N0.
CIALES 2019
LANDSLIDE AND ROAD DAMAGE EVALUATION
MUNICIPALITY OF CIALES, PUERTO RICO
ER-HWY-227, HIGHWAY PR-149 KM 42.80
PR-149 P.R. 73
D
ES
IG
N
W O
R K
D R
AW
IN
G
D
AT
E
BY
TR
AC
ED
C H
EC
K
FI
N
AL
C
H
EC
K
KE
PS
C
TA
G
TA
G
FR
K
C G
T
.0 7.
.0 7.
.0 7.
.1 0.
.1 0.
AC-836579ER-9999(416)
SS-A
NOT TO SCALE
BORING LOGS
PUERTO RICO HIGHWAY & TRANSPORTATION AUTHORITY
KLEIN ENGINEERING, PSC
ENGINEERING CONSULTANTS
A.C. PROJECT
CODE NO.
DATE REVISION
TOTAL
SHEETS
MUNICIPALITYHIGHWAY
FISCAL
YEAR
ISLAND
SHEET
NO.
FED. AID H'WAY
PROJECT N0.
CIALES 2019
LANDSLIDE AND ROAD DAMAGE EVALUATION
MUNICIPALITY OF CIALES, PUERTO RICO
ER-HWY-227, HIGHWAY PR-149 KM 42.80
PR-149 P.R. 73
D
ES
IG
N
W O
R K
D R
AW
IN
G
D
AT
E
BY
TR
AC
ED
C H
EC
K
FI
N
AL
C
H
EC
K
KE
PS
C
TA
G
TA
G
FR
K
C G
T
.0 7.
.0 7.
.0 7.
.1 0.
.1 0.
AC-836579ER-9999(416)
SS-A
L
628.292
631.887
TEL 629.53
635.46
631.74
635.75
631.65
633.61
638.53
637.97
633.66
634.45
636.52 640.29
KMKM
STA-D14
STA-D16
619.4
617.4
615.4
614.4
631.4
629.4
627.4
625.4
623.4
621.4
619.4
617.4
615.4
613.4
611.4
626.4
624.4
622.4
620.4
618.4
616.4
614.4
612.4
610.4
COLLAPSED AREA
30"CONCRETE
PIPE
ASPHALT EDGE
ASPHALT EDGE
ASPHALT EDGE
ASPHALT EDGE
POTABLEWATER PIPE
POTABLEWATER PIPE
POTABLEWATER PIPE
CONCRETE WALL
CONCRETE WALL
STA-D15
630.12
630.08
630.18
626.959
627.41
631.634
631.42
634.67
634.35
634.60
641.99639.02642.11
636.62
636.51
BAMBOO
AREA
632.64
635.66 636.06
633.77
633.63
632.64
632.70
632.50
628.15
627.90
628.11 CONCRETE
W
ALL
S.S .P
IP
E
T.E .=6
.42
I.E .=6
.66
S.S .P
IP
E
T.E .=6
.86
I.E .=6
.10
W
W
W
W
W W W W W W W W W W W W W W W W
W
W
W
W
W
W W
W W
W
W
W
W
W
RIGHT OF WAY LIMIT
X=1
,80
Y=238,250
X=1
,80
Y=238,200
X=1
,75
Y=238,300
X=1
,75
Y=238,250
RIGHT OF WAY LIMIT
RIGHT OF WAY LIMIT
RIGHT OF WAY LIMIT
-0+00
0+20
0+40
0+52.63
PT
PC PCC
PT
PC
LINE-PR-149 &
WIDENING BEGINS
PC. STA:0+00.00
MATCH EXISTING
EDGE OF ROADWAY
X=191,748.0416 Y=238,271.6246
0+82.31
0+00 0+10
0+20 0+30
0+40
0+50
0+60
0+70 0+80
PRC
PCC
PCC
PT
PC
PT
LINE-PR-149_RET WALL BEGINS
STA:0+00.00
LINE-PR-149_RET WALL ENDS
STA:0+52.63
CIALES
5.
m (E
DG
E
OF
P
AV
EM
EN
T)
4.
m (T
RA
VE
LE
D
W
AY
) PROPOSED R.O.W.
RIP-RAP
PROTECTION
4" CONCRETE
APRON SLABSPECIAL
INLET BOX
LINE-PR-149 ENDS
MATCH SITE 228
STA:0+82.31
X=191,807.8553 Y=238,217.8083
MATCH EXISTING
EDGE OF ROADWAY
MATCH EXISTING
EDGE OF ROADWAY
PROPOSED W-BEAM
GUARDRAIL
PROPOSED
TYPE "F BARRIER
TAPER ENDS
STA:0+13.55(PR-149)
OFF:2.75m Rt
TAPER BEGINS
STA:0+45.57(PR-149)
OFF:2.75m Rt
TAPER BEGINS
STA:0+00.00(PR-149)
OFF:2.18m Rt
TAPER ENDS
STA:0+58.45(PR-149)
OFF:2.23m Rt
AASHTO TYPE "F"
BARRIER BEGINS
TYPE IV, TL-3 CRASH
CUSHION TERMINAL
STA:0+03.28(PR-149)
OFF:2.26m Rt
SINGLE FACE W-BEAM
GUARDRAIL ENDS
MEET CONCRETE BARRIER TYPE D-F
WITH THRIE-BEAM TRANSITION
SEE STD. DRAWINGS MB SERIES
DATED JUNE 22, 2018 FOR DETAILS
STA:0+54.44(PR-149)
OFF:2.14m Rt
W-BEAM GUARDRAIL ENDS
BURIED-IN-SLOPE TERMINAL
STA:0+82.08(PR-149)
OFF:3.25m Lt
W-BEAM GUARDRAIL BEGINS
BURIED-IN-SLOPE TERMINAL
STA:0+65.14(PR-149)
OFF:3.17m Lt
SEE SITE 228 FOR
W-BEAM GUARDRAIL
CONTINUATION
RIP-RAP
PROTECTION
PLAN
PUERTO RICO HIGHWAY & TRANSPORTATION AUTHORITY
KLEIN ENGINEERING, PSC
ENGINEERING CONSULTANTS
A.C. PROJECT
CODE NO.
DATE REVISION
TOTAL
SHEETS
MUNICIPALITYHIGHWAY
FISCAL
YEAR
ISLAND
SHEET
NO.
FED. AID H'WAY
PROJECT N0.
CIALES 2019
LANDSLIDE AND ROAD DAMAGE EVALUATION
MUNICIPALITY OF CIALES, PUERTO RICO
ER-HWY-227, HIGHWAY PR-149 KM 42.80
PR-149 P.R. 73
D
ES
IG
N
W O
R K
D R
AW
IN
G
D
AT
E
BY
TR
AC
ED
C H
EC
K
FI
N
AL
C
H
EC
K
KE
PS
C
TA
G
TA
G
FR
K
C G
T
.0 7.
.0 7.
.0 7.
.1 0.
.1 0.
AC-836579ER-9999(416)
PP-A
PR-149 PROFILE
SCALE: H=1:150
V=1:30
PR-149_RET WALL PROFILE
SCALE: H=1:150
V=1:75
0+00
9.
9.
0+10
0.
0.
0+20
0.
0.
0+30
1.
1.
0+40
2.
2.
0+50
3.
3.
0+60
3.
3.
0+70
4.
4.
0+80
5.
5.
0+82.31
5.
5.
7.75%
10.15%
6.29%
6.31%
6.63%
7.62%
8.34%
9.19%
6.69%
9.20%
5.48% 4.62%
5.58%
PVI STA:0+39.10
PVI ELEV:632.57
K:2.76
LVC:8.00
BV
C
S:
+3 5.
BV
C E:
.2
EV
C
S:
+4 3.
EV
C E:
.8
0+00
9.
9.
0+10
0.
0.
0+20
0.
1.
0+30
0.
2.
0+40
2.
2.
0+50
3.
3.
0+52.63
3.
3.
BEGIN PROFILE
STA=0+00.00
ELEV=629.416
END PROFILE
STA=0+82.31
ELEV=635.208
EXISTING GROUND
PROFILE GRADE
(MATCH EXISTING GROUND)
BEGIN WALL PROFILE
STA=-0+00.00
ELEV=629.682
END WALL PROFILE
STA=0+52.63
ELEV=633.571
TOP OF WALL (P.G.)
EXISTING GROUND
NOTE:
FOR RETAINING WALL STRUCTURAL PROFILE,
FOUNDATION AND DETAILS, REFER TO
DRAWING SERIES RW.
SCALE AS SHOWN
PROFILES
PUERTO RICO HIGHWAY & TRANSPORTATION AUTHORITY
KLEIN ENGINEERING, PSC
ENGINEERING CONSULTANTS
A.C. PROJECT
CODE NO.
DATE REVISION
TOTAL
SHEETS
MUNICIPALITYHIGHWAY
FISCAL
YEAR
ISLAND
SHEET
NO.
FED. AID H'WAY
PROJECT N0.
CIALES 2019
LANDSLIDE AND ROAD DAMAGE EVALUATION
MUNICIPALITY OF CIALES, PUERTO RICO
ER-HWY-227, HIGHWAY PR-149 KM 42.80
PR-149 P.R. 73
D
ES
IG
N
W O
R K
D R
AW
IN
G
D
AT
E
BY
TR
AC
ED
C H
EC
K
FI
N
AL
C
H
EC
K
KE
PS
C
TA
G
TA
G
FR
K
C G
T
.0 7.
.0 7.
.0 7.
.1 0.
.1 0.
AC-836579ER-9999(416)
PP-A
SCALE=1:150
SCALE=1:75
540 321
SCALE=1:30
L
628.292
631.887
TEL 629.53
635.46
631.74
635.75
631.65
633.61
638.53
637.97
633.66
634.45
636.52 640.29
KMKM
STA-D14
STA-D16
617.4
615.4
614.4
631.4
629.4
627.4
625.4
623.4
621.4
619.4
617.4
615.4
613.4
611.4
610.4
611.4
626.4
624.4
622.4
620.4
618.4
616.4
614.4
612.4
610.4
608.4
606.4
30"CONCRETE
PIPE
STA-D15
630.12
630.08
630.18
627.32
626.959
627.41
631.634
631.42
634.67
634.35
634.60
641.99639.02642.11
636.62
636.51
632.64
635.66 636.06
633.77
633.63
632.64
632.70
632.50
628.15
627.90
628.11
S.S .P
IP
E
T.E .=6
.42
I.E .=6
.66
S.S .P
IP
E
T.E .=6
.86
I.E .=6
.10
RIGHT OF WAY LIMIT
X=1
,80
Y=238,250
X=1
,80
Y=238,200
X=1
,75
Y=238,300
X=1
,75
Y=238,250
RIGHT OF WAY LIMIT
RIGHT OF WAY LIMIT
RIGHT OF WAY LIMIT
-0+00
0+20
0+40
0+52.63
PT
PC PCC
PT
PC
LINE-PR-149 &
WIDENING BEGINS
PC. STA:0+00.00
MATCH EXISTING
EDGE OF ROADWAY
X=191,748.0416 Y=238,271.6246
0+82.31
0+00 0+10
0+20 0+30
0+40
0+50
0+60
0+70 0+80
PRC
PCC
PCC
PT
PC
PT
LINE-PR-149_RET WALL BEGINS
STA:0+00.00
LINE-PR-149_RET WALL ENDS
STA:0+52.63
CIALES
LINE-PR-149 ENDS
MATCH SITE 228
STA:0+82.31
X=191,807.8553 Y=238,217.8083
0+82.31
0+00
PRC
PCC
PCC
PT
PC
PT
629.43 629.87 630.31 630.63 630.97 631.32 631.64
632.02 632.50
632.89
633.23
633.54
633.94
633.90
633.60
633.27
632.99632.71
632.36 631.80631.35
630.93630.57
630.24 629.86
629.40
5.
m
5.
m
4.
m
TAPER 12:1
4.
m
TAPER 13:1
R=55.00
R=77.75
R=112.81
R=21.0
EXISTING
ASPHALT EDGE
EXISTING
ASPHALT EDGE
5.66m
3.
m
3.00m
7.
m
1.82m
1.69m
0.
m
1.32m
1.01m
RIP-RAP PROTECTION
7.32m (L) X 3.00M (W) X 1.53M (H)
CLASS VII (HEC23)
EXISTING 30"Ø RCP ENTRANCE
TO BE CLEANED AND CONCRETE
APRON SLAB TO BE
CONSTRUCTED
STRUCTURE No.1
SPECIAL BOX
T.E. = 635.50
I.E. = 633.15 (UPSTREAM)
I.E. = 633.00 (DOWNSTREAM)
STRUCTURE No.2
HEADWALL TYPE A
I.E. = 632.25
(2) 36"Ø RCP
CLASS III
L=9.027 S=0.0831
EXISTING 30"Ø RCP
CLASS III TO BE CLEANED
UP TO DISCHARGE POINT
0+
0+
0+
0+
PI
12" PERFORATED
DRAIN PIPE
L=57.00 S=0.07256
STRUCTURE No.3
END SECTION TYPE I
I.E.=627.58
RIP-RAP PROTECTION
1.00m (L) X 0.70M (W) X 0.60M (H)
CLASS III (HEC23)
12" PERFORATED
DRAIN PIPE BEGINS
STA:0+54.40(PR-149)
OFF:0.79m Rt I.E.=631.72
634.53
634.56
634.86 635.14
634.20
634.49 634.58
635.00
RIP-RAP PROTECTION
3.00m (L) X 5.66M (W) X 1.35M (H)
CLASS VII (HEC23)RIP-RAP PROTECTION
2.00M (L) X 2.00M (W) X 0.60M (H)
CLASS III (HEC23)
DRAINAGE AND GRADING PLAN
PUERTO RICO HIGHWAY & TRANSPORTATION AUTHORITY
KLEIN ENGINEERING, PSC
ENGINEERING CONSULTANTS
A.C. PROJECT
CODE NO.
DATE REVISION
TOTAL
SHEETS
MUNICIPALITYHIGHWAY
FISCAL
YEAR
ISLAND
SHEET
NO.
FED. AID H'WAY
PROJECT N0.
CIALES 2019
LANDSLIDE AND ROAD DAMAGE EVALUATION
MUNICIPALITY OF CIALES, PUERTO RICO
ER-HWY-227, HIGHWAY PR-149 KM 42.80
PR-149 P.R. 73
D
ES
IG
N
W O
R K
D R
AW
IN
G
D
AT
E
BY
TR
AC
ED
C H
EC
K
FI
N
AL
C
H
EC
K
KE
PS
C
TA
G
TA
G
FR
K
C G
T
.0 7.
.0 7.
.0 7.
.1 0.
.1 0.
AC-836579ER-9999(416)
DR-A
STRUCTURE No.1
SPECIAL BOX
T.E.= 635.50
I.E.= 633.15 (UPSTREAM)
I.E.= 633.00 (DOWNSTREAM)
A
A
B
B
C
C
SECTION A
SECTION B
SECTION C
PLAN
STRUCTURE No.1
SPECIAL BOX
36"Ø 36"Ø
36"Ø RPC
CLASS III
36"Ø RPC
CLASS III
LADDER RUNG
SPEC. 712
LADDER RUNG
SPEC. 712
2.50m
1.45m
2.50m
3.66m
0.61m
2.50m
3.66m
0.30m
0.30m 0.15m
MORTAR FILL
FROM SPECIAL BOX TO HW TYPE A PROFILE
SCALE: H=1:100
V=1:50
0+000 0+010 0+018
RIP-RAP PROTECTION
3.00m (L) X 5.66M (W) X 1.35M (H)
CLASS VII (HEC23)
STRUCTURE No.2
HEADWALL TYPE A
I.E. = 632.25
STRUCTURE No.1
SPECIAL BOX
T.E. = 635.50
I.E. = 633.15 (UPSTREAM)
I.E. = 633.00
(DOWNSTREAM)
(2) 36"Ø RCP
CLASS III
L=9.027 S=0.0831
FILTER
FABRIC
0.20m FILTER
BLANKET
FROM APRON SLAB TO RIP-RAP PROFILE
SCALE: H=1:100
V=1:50
0+000 0+010 0+017
RIP-RAP PROTECTION
7.32m (L) X 3.00M (W) X 1.53M (H)
CLASS VII (HEC23)
EXISTING 30"Ø
RCP ENTRANCE
TO BE CLEANED
EXISTING 30"Ø RCP
CLASS III TO BE CLEANED
UP TO DISCHARGE POINT
CONCRETE APRON SLAB
TO BE CONSTRUCTED
SEE DETAIL ON THIS SHEET
FILTER
FABRIC
0.20m FILTER
BLANKET
1.82 1.69
1.32
1.01
0.
1.18
0.45
1.00
A
A
3.51m
0.
m SECTION A-A
PLAN VIEW
CONCRETE APPRON SLAB DETAIL
SCALE=1:40
WIRE MESH℄
0 5 100-5
X
X
EXIST. ROW
LIMIT
12" PERFORATED
DRAIN PIPE
RIP-RAP PROTECTION
1.00m (L) X 0.70M (W) X 0.60M (H)
CLASS III (HEC23)
STRUCTURE No.3 SECTION
STRUCTURE No.3
SCALE=1:100
FILTER
FABRIC
0.20m FILTER
BLANKET
SCALE AS SHOWN
DRAINAGE PROFILES AND DETAILS
PUERTO RICO HIGHWAY & TRANSPORTATION AUTHORITY
KLEIN ENGINEERING, PSC
ENGINEERING CONSULTANTS
A.C. PROJECT
CODE NO.
DATE REVISION
TOTAL
SHEETS
MUNICIPALITYHIGHWAY
FISCAL
YEAR
ISLAND
SHEET
NO.
FED. AID H'WAY
PROJECT N0.
CIALES 2019
LANDSLIDE AND ROAD DAMAGE EVALUATION
MUNICIPALITY OF CIALES, PUERTO RICO
ER-HWY-227, HIGHWAY PR-149 KM 42.80
PR-149 P.R. 73
D
ES
IG
N
W O
R K
D R
AW
IN
G
D
AT
E
BY
TR
AC
ED
C H
EC
K
FI
N
AL
C
H
EC
K
KE
PS
C
TA
G
TA
G
FR
K
C G
T
.0 7.
.0 7.
.0 7.
.1 0.
.1 0.
AC-836579ER-9999(416)
DR-A
SCALE=1:50
NOTES:
1. CONTACT ENGINEER IF ANY DISCREPANCY IS FOUND DURING
CONSTRUCTION WITH PROPOSED DETAILS. EXISTING CONDITIONS MAY
VARY FROM AS-BUILT PLANS.
2. CONTRACTOR IS RESPONSIBLE FOR THE WAYS AND METHODS OF
CONSTRUCTION.
3.CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS.
3.FOLLOW ALL RECOMMENDATION PRESENTED ON THE GEOTECHNICAL
REPORT BY DESPIAU ASSOCIATES.
73AC-836579ER-9999(416)
AutoCAD SHX Text
SPECIAL BOX PLAN
AutoCAD SHX Text 1:40
AutoCAD SHX Text
SPECIAL BOX SECTION
AutoCAD SHX Text 1:40
AutoCAD SHX Text #4@0.15
AutoCAD SHX Text
CL.
AutoCAD SHX Text
CL.
AutoCAD SHX Text #4@0.15
AutoCAD SHX Text
CL.
AutoCAD SHX Text
CL.
AutoCAD SHX Text
CL.
AutoCAD SHX Text #4@0.15
AutoCAD SHX Text
PROVIDE SAFETY GRID
AutoCAD SHX Text 4" @ 0.30 O.C.
AutoCAD SHX Text
PROVIDE SAFETY GRID
AutoCAD SHX Text 4" @ 0.30 O.C.
AutoCAD SHX Text
36" RCP
AutoCAD SHX Text
36" RCP
AutoCAD SHX Text
CL.
AutoCAD SHX Text
SPECIAL BOX PLAN & DETAILS
AutoCAD SHX Text
DR-A
AutoCAD SHX Text
AutoCAD SHX Text
PUERTO RICO HIGHWAY & TRANSPORTATION AUTHORITY
AutoCAD SHX Text
KLEIN ENGINEERING, PSC
AutoCAD SHX Text
ENGINEERING CONSULTANTS
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
WORK
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
TRACED
AutoCAD SHX Text
CHECK
AutoCAD SHX Text
FINAL CHECK
AutoCAD SHX Text
A.C. PROJECT
AutoCAD SHX Text
CODE NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
TOTAL
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text
MUNICIPALITY
AutoCAD SHX Text
HIGHWAY
AutoCAD SHX Text
FISCAL
AutoCAD SHX Text
YEAR
AutoCAD SHX Text
ISLAND
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NO.
AutoCAD SHX Text
FED. AID H'WAY
AutoCAD SHX Text
PROJECT N0.
AutoCAD SHX Text
CIALES
AutoCAD SHX Text
AutoCAD SHX Text
LANDSLIDE AND ROAD DAMAGE EVALUATION
AutoCAD SHX Text
MUNICIPALITY OF CIALES, PUERTO RICO
AutoCAD SHX Text
ER-HWY-227, HIGHWAY PR-149 KM 42.80
AutoCAD SHX Text
PR-149
AutoCAD SHX Text P.R.
AutoCAD SHX Text
L
TEL
KMKM
STA-D14
STA-D16
STA-D15
W
W
W
W
W W W W W W W W W W W W W W W W
W
W
W
W
W
W W
W W
W
W
W
W
RIGHT OF WAY LIMIT
X=1
,80
Y=238,250
X=1
,80
Y=238,200
X=1
,75
Y=238,300
X=1
,75
Y=238,250
RIGHT OF WAY LIMIT
RIGHT OF WAY LIMIT
RIGHT OF WAY LIMIT
-0+00
0+20
0+40
0+52.63
PT
PC PCC
PT
PC
LINE-PR-149 &
WIDENING BEGINS
PC. STA:0+00.00
MATCH EXISTING
EDGE OF ROADWAY
X=191,748.0416 Y=238,271.6246
0+82.31
0+00 0+10
0+20 0+30
0+40
0+50
0+60
0+70 0+80
PRC
PCC
PCC
PT
PC
PT
LINE-PR-149_RET WALL BEGINS
STA:0+00.00
LINE-PR-149_RET WALL ENDS
STA:0+52.63
CIALES
LINE-PR-149 ENDS
MATCH SITE 228
STA:0+82.31
X=191,807.8553 Y=238,217.8083
SILT FENCE BEGINS
(SEE STD. DWG. ER 1 OF 20)
L=94.00m
SILT FENCE ENDS
(SEE STD. DWG. ER 1 OF 20)
L=92.00m
SILT FENCE ENDS
(SEE STD. DWG. ER 1 OF 20)
L=20.00m L=10.00m
SILT FENCE BEGINS
(SEE STD. DWG. ER 1 OF 20)
L=10.00m
SEDIMENT LOG
(SEE DETAIL ON
THIS SHEET)
SILT FENCE BEGINS
(SEE STD. DWG. ER 1 OF 20)
L=20.00m
TIGHTLY PACK STRAW
BETWEEN BALES
SURROUNDING INLET GRATE
(SEE STD. DWG. ER 2 OF 20)
TIGHTL…