Plans - NP SER PMS FY23(1).pdf
PDF 12 MB Posted
- Solicitation number
- 693C73-24-B-000004
About this file
This document provides details on a federal contract opportunity for pavement preservation services. The solicitation number is 693C73-24-B-000004 and is being issued by the Department of Transportation Federal Highway Administration for pavement preservation of roads and parking areas in Gulf Islands National Seashore. Responses are due by June 30, 2023 and the contract is expected to be awarded by September 30, 2023. The 12MB file attached outlines the full scope of services required, which includes repair and sealing of asphalt surfaces throughout the national park to maintain safe and accessible roadways and parking lots.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLANS FOR PROPOSED PROJECT
NPS PMIS NO. 327260
AND JACKSON COUNTY, MISSISSIPPI
COUNTIES, FLORIDA
ESCAMBIA AND SANTA ROSA
NATIONAL
PARK
SERVICE
Project Manager
Ramesh Kotadia
Lead Designer
Chris Burnell
Highway Design Manager
Jamal Ghazi Alam
INDEX TO SHEETS
PLANS PREPARED BY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SEPTEMBER, 2023
ASHBURN, VIRGINIA
EASTERN FEDERAL LANDS HIGHWAY DIVISION
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M patching, pavement markings, and other miscellaneous work.
Work consists of pavement micro surfacing, thin-lift overlay, of identified roadways including pull-off and parking areas.
This project consists of the pavement preservation
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH: 10.722 miles
SPECIFICATIONS:
and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
ROAD:
Title Sheet
Symbols And Abbreviations
Location Map
Typical Section
Summaries and Schedules
Temporary Traffic Control Plan
DESCRIPTION
SHEET
NO
A01
A02-A03
A04-A07
B01-B02
C02-C10
S01-S08
M01 Erosion and Sediment Control Narrative
C01 Tabulation of Quantities
N
KEY MAP
STATE OF MISSISSIPPI
MELBOURNE
FT. LAUDERDALE
MIAMI
FORT MYERS
ST. PETERSBURG
TALLAHASSEE
JACKSONVILLE
ORLANDO
HOLLY
SPRINGS TUPELO
P A
R K
W A
Y
T R
A C
E
DELTA
N
ATCH
EZ
NATCHEZ
JACKSON
MERIDIAN
GULFPORT
VICKSBURG
KEY MAP
STATE OF FLORIDA
NP SER PMS FY23(1)
MISSISSIPPI ALABAMA
FLORIDALOUISIANA
NO SCALE
38.658
(See Location Maps)
NO SCALE
LANE MILES:
NP SER PMS FY23(1)
N01-N02
Standards And Details fddfd cvccvcdf.
Call Sunshine811 prior to digging:
811 or (800) 432-4770 (FL) www.sunshine811.com
Call Mississippi811 prior to digging:
811 or (800) 227-6477 (MS) www.ms811.com
N
GULF ISLANDS NATIONAL SEASHORE
NATIONAL PARK SERVICE
U. S. DEPARTMENT OF THE INTERIOR
GULF ISLANDS NATIONAL SEASHORE
ROADS AND PARKING AREAS IN
PAVEMENT PRESERVATION OF
NP SER PMS FY23(1)
:4
M
S e p te m b e r
T it le S h e e t
N P fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\A -N
P S
E R
P
M S
F
Y tt l.
d g n
STATE PROJECT
NUMBER
SHEET
FL/MS NP SER PMS FY23(1) A01
NPS Drwg No. 635/186839 NPS PMIS No. 327260
0.00EL.
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve original ground outside diameter out to out ordinary high water mark on center nominal maximum size aggregate normal crown north mon.
min.
max.
MP
MOD
ML
monument minimum maximum mile post modification main line spacing, spaces or spaced shoulder section point of spiral to curve seasonal average daily traffic south spa.
shldr.
sec.
SC
SADT
S
NMSA
NC
N
OG
OD
o. to o.
ohwm
o. c.
pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
rte.
rt. or RT reqd.
reinf.
RECP
rdwy.
R/W
R.
R route right required reinforcement rolled erosion control product roadway right-of-way range radius symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot sym.
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SS
SRS
sqyd sqft typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed
W west
1 6
1 6
SEC.
SEC.
E
N 0
RBAR
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION GULF ISLANDS NATIONAL SEASHORE
DSY
drwg(s).
dist.
diaph.
diag.
dia.
DHV
D ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CO
CMP
CL
cc or c. to c.
brg.
br.
BP
BM
BK
appr.
AMD
AH
ADT
ACP
abut.
double solid yellow drawing(s) distance diaphragm diagonal diameter design hourly volume diameter centers curve to spiral continuous construction joint connection concrete column contracting officer corrugated metal pipe centerline center to center bearing bridge balance point bench mark back approach amendment ahead average daily traffic asphalt concrete pavement abutment expansion joint excavation edge of water equivalent single axle load edge of road equation edge of travel way edge of shoulder edge of pavement embankment elevation elevation with number superelevation rate east flg.
fin.
flange finish exp. jt.
exc.
EW
ESAL
ER
EQ or eq.
EOT
EOS
EOP
emb.
elev.
elev.
e
E θs Ø ∆c spiral central angle diameter curve central angle total central angle ftg.
galv.
ga.
HW
hex.
hdwl.
ID
jt.
footing galvanized gage (gauge) high water hexagon headwall inside diameter joint lat.
lam.
L latitude lamination length of curve
LW
lt. or LT Ls
LPSM
long.
LOD
low water left length of spiral lump sum longitudinal Limits of Disturbance
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Section Line4
Section Corner (Found, Projected)4
Section Line16
Section Corner (Found, Projected)16
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Railroad
Trail
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir; Marshland
Spring or Seep
Treeline; Individual Trees, Pine
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Control Point (Terrestrial and GPS); Jump Hub
Sheet 1 of 2
:4 e p te m b e r
S
H E
E T
C
E n g in e e ri n g
S o ft w a re
\O p e n
R o a d s D e s ig n e r C
E
.1
\P ro je c t_
W o rk S e ts
\N P
S E
R P
M S
F
\d g n
\A
-A
-N P
S
E R
P
M S
F
Y s y m
.d g n
SYMBOLS AND ABBREVIATIONS
PROJECT
NUMBER
SHEET
A02
NP SER PMS FY23(1)
N
AREA PATTERN
BIL Bipartisan Infrastructure Law
NPS National Park Service
LNFT Linear Feet
ADA Americans with Disability Act
SSW Single Solid White
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:
U.S. DEPARTMENT OF TRANSPORTATION GULF ISLANDS NATIONAL SEASHORE
Fiber Roll or Wattle
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Concrete Barrier
Slope Stake Limits
Delineators
Signs (single, double post; portable)
Transition
Toe of Fill
Top of Cut
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Pipe Culvert with Drop Inlet
Box Culvert
Underground Utilities
Overhead/Above Ground Utilities
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
EXISTING PROPOSED
DI
Pavement Removal / Roadway Obliteration
Full Depth Pavement
Sidewalk Asphalt/Concrete
Mill and Overlay
Overlay
Silt Fence
Diversion Berm
Drainage Divide
Check Dam
Limits of Disturbance
Sheet 2 of 2
:5
S e p te m b e r
S
H E
E T fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\A -A
-N
P S
E R
P
M S
F
Y s y m
.d g n
SYMBOLS AND ABBREVIATIONS
PROJECT
A03
Sheet 1 of 4NO SCALE
SEE DETAIL IN A06
AREA 4
SEE DETAIL IN A07
AREA 5
SEE DETAIL IN A05
AREA 1
SEE DETAIL IN A06
AREA 3SEE DETAIL IN A05
AREA 2
U.S. DEPARTMENT OF TRANSPORTATION
KEY MAP
GULF ISLANDS NATIONAL SEASHORE
F L O
R I D
A
A L
A B
A M
A
M I S
S I S
S I P
P I
:3 e p te m b e r
L o c a ti o n M a p fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\A -N
P S
E R
P
M S
F
Y lo c .d g n
LOCATION MAP
PROJECT
A04
Sheet 2 of 4NO SCALE
See Key Map on sheet A04
AREA 2
See Key Map on sheet A04
AREA 1
NN
AREA 1 AND AREA 2
:2 e p te m b e r
L o c a ti o n M a
C
E n g in e e ri n g S o ft w a re
\O p e n R o a d s D e s ig n e r
C E
.1
\P ro je c t_
W o rk
S e ts
\N P
S E
R P
M S
F \d g n \A
-N
P S
E R
P
M S
F
Y lo c .d g n
LOCATION MAP
PROJECT
A05
AREA 4
Sheet 3 of 4
See Key Map on sheet A04
AREA 3
NO SCALE
AREA 3 AND AREA 4
:2 e p te m b e r
L o c a ti o n M a
E n g in e e ri n g S o ft w a re
\O p e n R o a d s D e s ig n e r
C E
.1
\P ro je c t_
W o rk
S e ts
\N P
S E
R P
M S
F \d g n \A
-N
P S
E R
P
M S
F
Y lo c .d g n
LOCATION MAP
PROJECT
A06
AREA 5
Sheet 4 of 4
AREA 5
:3
J u ly
L o c a ti o n M a
E n g in e e ri n g S o ft w a re
\O p e n R o a d s D e s ig n e r
C E
.1
\P ro je c t_
W o rk
S e ts
\N P
S E
R P
M S
F \d g n \A
-N
P S
E R
P
M S
F
Y lo c .d g
LOCATION MAP
PROJECT
A07
NOTES:
15.
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
CL
Existing Match
Existing
Match
Va rie sVaries
Existing asphalt concrete pavement
Limits of Construction
Varies
Existing ground (typ.)
Micro surfacing, type 2 existing in any direction.
percent, extend milling so finished treatment will have a slope no steeper than existing slope is steeper than 2.08 percent. If existing slope is steeper than 2.08 treatment will have a slope no steeper than 2.08 percent in any direction unless
Extend milling at accessible parking spaces and aisles to ensure the finished a 5 percent grade at any direction of the ramp approach.
Extend milling width at ADA accessible ramps to ensure that there is no more than
Transitional Milling Table or as directed by the CO.
Match existing sidewalk, ADA ramps and gutter elevations by milling according to
Install fiber rolls for inlet protection as directed by the CO. See Detail E157-04.
Do not disturb existing loop detectors or count stations within project limits.
according to Detail E414-01A at locations directed by the CO.
Prior to any paving or micro surfacing, perform crack cleaning, filling, and sealing cost to the Government.
Replace curb or gutter damaged during construction operations at no additional
CO and in accordance with Section 609.
Replace wheelstops damaged due to existing age and condition as directed by the operations at no additional cost to the Government.
storage, and replacement. Replace wheelstops damaged during construction
Take reasonable precautions to prevent damage to wheelstops during removal, as directed by the CO.
pavement markings according to Details E634-01A and E634-05 materials prior to micro surfacing. Place micro surfacing and replace
Remove thermoplastic pavement markings and other deleterious as directed by the CO after paving is completed.
Reset existing wheelstops or place new wheelstops if previously damaged be treated to ensure the micro surfacing is applied to the entire parking area.
Remove wheelstops and clean debris located within the area to of construction and verify with the CO.
Determine patching limits based on conditions encountered at the time pavement preservation operations.
gates, pillars and walkways from asphalt overspray during all stone walls, concrete barriers, concrete islands, manholes, cemetery
Protect all roadside elements such as curb and gutters, curbs, Furnish and place micro surfacing in accordance with Section 409.
footprint of the existing pavement.
extent of micro surfacing and thin-lift overlay. Limit work to the
Refer to Pavement Summaries and Schedules sheets for area and and Note 3
See Transitional Milling Table
CL
Existing Match
Existing
Match
VariesVa rie s
Varies
Existing asphalt concrete pavement
Limits of Construction
Varies
Existing ground (typ.)
#4 Sieve NMSA, <0.3 Million ESAL inch Asphalt Concrete Pavement, Gyratory Mix, -4
Tack Coat
(ft) *
Milling width
(in)
Milling depth
3 to 4
2 to 3
1 to 2
0 to 1
(Parking Areas)
TRANSITIONAL MILLING TABLE
* See Notes 13, 14, and 15
THIN-LIFT ASPHALT OVERLAY
PAVEMENT PRESRVATION TYPICAL SECTION
MICRO SURFACING
PAVEMENT PRESRVATION TYPICAL SECTION
See Note 3
U.S. DEPARTMENT OF TRANSPORTATION
AND THIN-LIFT ASPHALT OVERLAY
PAVEMENT MICRO SURFACING
:1 e p te m b e r
B fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\B -B
-N
P S
E R
P
M S
F
Y ty p .d g n
TYPICAL SECTIONS
PROJECT
B01
Do not disturb existing utilities.
surfacing.
Perform asphalt pavement patching prior to applying micro to Section 418.
Patch asphalt concrete pavement areas according with the CO.
encountered at time of construction and verify
Determine patching limits based on conditions by the CO. See Detail E157-04.
Install fiber rolls for inlet protection as directed
C
12" 12"
V a r ie s
L Road to distress
Patch saw cut parallel/perpendicular
Pavement replacement limits to edge of pavement of pavement, remove
<24" from the edge
If the patch limit is
PLAN VIEW
ASPHALT CONCRETE PAVEMENT PATCH
m in
Pavement Distress
ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
SECTION A-A
full depth (typ.)
Saw cut vertical face subbase, or subgrade
Remove pavement to expose perimeter (typ.)
Apply tack coat to patch
3' min.
Varies
SECTION A-A
Apply tack coat between asphalt lifts
Place in 2 equal lifts, min.
thickness if the existing pavement is less.
(match depth of existing asphalt) or 4" min.
Asphalt concrete pavement, type I
ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
for final surface treatment
See Pavement Preservation Typical Section
Existing Ground (typ.)
6"
3' min.
Varies a min. of 10"
Remove the pavement base and subgrade
Apply tack coat between asphalt lifts
Place in 2 equal lifts, min.
thickness if the existing pavement is less.
(match depth of existing asphalt) or 4" min.
Asphalt concrete pavement, type I for final surface treatment
See Pavement Preservation Typical Section perimeter (typ.)
Apply tack coat to patch
Existing ground (typ.)face full depth (typ.)
Saw cut vertical
Geotextile, class 2, type E
Limit of undercut crushed aggregate
Backfill with min. 6" pavement (typ.)
Existing asphalt concrete pavement (typ.)
Existing asphalt concrete
5.
4.
3.
2.
1.
U.S. DEPARTMENT OF TRANSPORTATION
PAVEMENT FULL DEPTH PATCH
TYPE 1 AND TYPE 2
GULF ISLANDS NATIONAL SEASHORE
NO SCALE
:1 e p te m b e r
B fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\B -B
-N
P S
E R
P
M S
F
Y ty p .d g n
TYPICAL SECTIONS
PROJECT
B02
:3 e p te m b e r
Q u a n ti ty
T a b u la ti o n S h e e t fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C -N
P S
E R
P
M S
F
Y q ty
.d g n
TABULATION OF QUANTITIES
PROJECT
C01
Sheet 1 of 9
SCHEDULE A
:1
J u ly
P a v e m e fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C -N
P S
E R
P
M S
F
Y q ty
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C02
Sheet 2 of 9
SCHEDULE B
:1
J u ly
P a v e m e fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C -N
P S
E R
P
M S
F
Y q ty
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C03
Sheet 3 of 9
SCHEDULE C
:1
J u ly
P a v e m e fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C -N
P S
E R
P
M S
F
Y q ty
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C04
SCHEDULE D
Sheet 4 of 9
:1
J u ly
P a v e m e fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C -N
P S
E R
P
M S
F
Y q ty
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C05
Sheet 5 of 9
SCHEDULE A
:3 e p te m b e r
P a v e m e n t M a r k in g fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C -N
P S
E R
P
M S
F
Y q ty
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C06
Sheet 6 of 9
SCHEDULE B
:3 e p te m b e r
P a v e m e n t M a r k fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C -N
P S
E R
P
M S
F
Y q ty
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C07
Sheet 7 of 9
SCHEDULE C
:3 e p te m b e r
P a v e m e n t M a r k fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C -N
P S
E R
P
M S
F
Y q ty
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C08
SCHEDULE D
Sheet 8 of 9
:3 e p te m b e r
P a v e m e n t M a r k fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C -N
P S
E R
P
M S
F
Y q ty
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C09
Sheet 9 of 9
ALL SCHEDULES
:4
J u ly
C o n s tr u c ti o n S ig s fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C -N
P S
E R
P
M S
F
Y q ty
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C10
No new impervious surface will be created by work under this project.
be disturbed, contact the Contracting Officer (CO) before any disturbance.
Soil disturbing activities are minimal in this project and do not exceed 1 acre. If more than 1 acre will markings, and other miscellaneous work.
parking areas. Work consists of pavement micro surfacing, thin-lift overlay, patching, pavement
This project consists of the pavement preservation of identified roadways including pull-off and
Project Description
Response Center at 1-800-424-8802.
requirements under 40 CFR 112. Report spills large enough to discharge to surface waters to the National
Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the material according to Federal, State, and local regulations.
waste materials. Do not dispose of hazardous waste materials into the on-site dumpsters. Dispose of
Store all hazardous waste materials in appropriate and clearly marked containers away from other non-battery fluid. If feasible, conduct these activities in a covered area to avoid contact with storm water.
maintenance could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and
Hazardous waste will not be generated from normal construction activities. Equipment fueling and containers. Collect and store all waste in dumpsters, or in metal or plastic drums, as appropriate.
Solid waste generated from the project will consist of construction debris, garbage, and empty prevent contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.
Inspect and maintain on a regular basis, all mechanized equipment used in or near surface water to
Waste, garbage, sanitary waste
Soaps, solvents used for vehicle washing
Fuels, oils, equipment-related compounds
Wash-water from concrete, paint, curing compounds, and other construction materials
The following discharges are prohibited:
Prohibited Discharges
Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.
measures.
Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control
Do not allow construction vehicles to track sediment outside the project limits.
No construction access will be permitted through a wetland or waterway.
Officer (CO).
Do not modify the type, size, or location of any control or practice without prior approval from the Contracting for Construction of Roads and Bridges on Federal Highway Projects, FP-14, and the Special Contract Requirements.
measures consist of soil erosion control measures which are also defined and outlined in the Standard Specifications sedimentation of rivers, streams, and impoundments such as lakes, reservoirs, bays, and coastal waters. The
The work consists of applying measures throughout the life of the project to control erosion and to minimize the
The Erosion & Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment.
General Guidelines construction limits.
does not leave the project site. Perimeter controls include fiber roll and other specified measures outside the
Prior to any clearing, grubbing, or excavation, construct perimeter controls to ensure that disturbed sediment
Phase I Establish Perimeter Controls
Sequence of Construction
Remove all other perimeter controls when directed by the CO.
Remove fiber roll only after all upslope areas are stabilized and vegetation is well established.
Remove all devices used for dewatering.
Inspect, clean, and repair all culvert outlet protection, riprap basins, and stabilized channels.
disturbed areas where vegetation has not established.
Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas.
Finish grading, place riprap, and apply permanent turf establishment to any remaining
After completion of roadway construction, do the following as directed by the CO:
Phase III Final Construction / Stabilization and staging areas.
Provide watering for dust control within the construction limits, on active haul roads, and in pits completed culverts.
grade and are stabilized (with vegetation, riprap, or pavement) before routing drainage through
Upon completion of culverts, ensure that culvert entrances, outlets, and outlet channels are at final
Install inlet protection prior to diverting water through inlets.
storm runoff.
At the end of each day’s grading operations, shape earthwork to minimize and control erosion from
625.
days within 7 days. Apply permanent turf establishment to the finished slopes according to Section Apply temporary turf establishment in disturbed areas that will remain exposed for over 14 calendar along the roadway.
the culverts as called out in the Erosion and Sediment Control plans. Install filter berms in ditches Apply intermediate controls during rough grading operations. Install fiber foll in areas surrounding
Phase II Intermediate Controls
Record the inspection date and summary of findings within 24 hours of completing a site inspection.
the device. Dispose of the sediment legally off-site.
Fiber Roll - Remove sediment deposits from behind the fiber roll when they are half the height of end of the day.
0.25 inches or more, and daily during wet weather. Repair or replace any damaged measures by the Check and maintain erosion control measures once every 7 days and within 24 hours after a rain of according to Section 157, the details shown in the plans, and the individual permitting requirements.
Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices
Maintenance and Inspection Procedures
:2
J u ly
U
S
S u r_ ft
D fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\M -N
P S
E R
P
M S
F
Y e s c n a r.
d g n
CONTROL NARRATIVE
EROSION AND SEDIMENT
PROJECT
M01
5. See Detail E635-01 for temporary traffic control sign mounting requirements.
4. Place Bipartisan Infrasture Law Sign at the beginning and end of project. See Detail E635-15.
3. Install signs at locations directed by the CO.
2. See Section 156 for temporary traffic control requirements.
1. See Sheet N02 for temporary traffic control closure details.
:3 e p te m b e r
N
E n g in e e ri n g
S o ft w a re
\O p e n
R o a d s D e s ig n e r
C E
.1
\P ro je c t_
W o rk S e ts
\N P
S E
R P
M S
F
\d g n
\N
N P
S E
R P
M S
F Y
(1 tt c .d g n
PROJECT
N01
U.S. DEPARTMENT OF TRANSPORTATION
PLAN
TEMPORARY TRAFFIC CONTROL
Varies
500'
500'
CLOSED
PARKING CLOSED
PARKING
(Mounted on Type 3 Barricade)
48"x30"
R11-2 (Modified)
(Mounted on Type 3 Barricade)
48"x30"
R11-2 (Modified)
AHEAD
CLOSED
PARKING
36"x36" W20-3 (Modified)
AHEAD
CLOSED
PARKING
36"x36" W20-3 (Modified)
TYPICAL PARKING AREA CLOSURE
500'
500'
TYPICAL ROAD CLOSURE
CLOSED
ROAD
(Mounted on Type 3 Barricade)
48"x30"
R11-2
AHEAD
CLOSED
ROAD
36"x36" W20-3
CLOSED
ROAD
(Mounted on Type 3 Barricade)
48"x30"
R11-2
AHEAD
CLOSED
ROAD
36"x36" W20-3
Barricade Type 3 (typ.)
Barricade Type 3 (typ.)
NO SCALE
:4 e p te m b e r
N fh fl fi le s e rv e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\N
N P
S E
R P
M S
F Y
(1 tt c .d g n
PROJECT
N02
U.S. DEPARTMENT OF TRANSPORTATION
PLAN
TEMPORARY TRAFFIC CONTROL
2%
3%
4%
5%
33'
22'
16'
13'
INLET PROTECTION
set under drain inlet.
Non-woven filter fabricFl ow
FlowFlow
Fl ow
F lo w
F lo w
PLAN VIEW
Area
Undisturbed
Flow
Flow
** Adjust spacing as approved based on site conditions
* Do not install check dams on grades below 2%
50'
33'
25'
20'
PLAN VIEW
FIBER ROLL CHECK DAM
20 ft
15 ft
10 ft1V:2H or Steeper
1V:4H - 1V:2H downslope stakes equidistant between
Upslope stake, place
Flow
8' max
Flow
4' max
Contour line (typ.)
E157-04 height of roll2 1to
Wood mulch or compost
See Note 6
Wood stake (typ.)
See Note 6
Wood stake (typ.)
See Note 11 ends and 36" o.c. (typ.)
Gravel bag weights at
See Note 6
Wood stake (typ.)
FIBER ROLL CHECK DAM CROSS SECTIONS
V-DITCH TRAPEZOIDAL DITCH
ENTRENCHED INSTALLATION
FIBER ROLL ISOMETRIC VIEW
requirements of Subsection 713.13.
Provide gravel bag weights meeting the inlet protection detail.
use gravel bags to support them as shown on the
When fiber rolls are required on paved surfaces, months after installation.
installation and photodegradable fiber rolls 12
Replace biodegradable fiber rolls 6 months after one-half the height of the exposed fiber roll.
Remove sediment deposits when accumulation is ends 12 inches minimum and stake.
When more than one fiber roll is needed, overlap
Subsection 713.08(a).
Furnish wood stakes meeting the requirements of ground and 3 inches protruding above the roll.
length to attain a minimum of 12 inches into the section of 2-inch x 2-inch and of sufficient
Use wood stakes with a minimum nominal cross alignment.
least 8 feet upslope at 45 degrees to the main contours. Extend both ends of the fiber roll at
Place fiber rolls on level grade and parallel to along the fiber roll.
mulch or compost on uphill side of the slope
For untrenched installation, blow or hand place the fiber roll.
1-inch that may interfere with proper function of including rocks, clods, and debris greater than
Prior to installation, clear all obstructions a minimum 12-inch diameter.
For drain inlet protection, use fiber rolls with
Use fiber rolls with a minimum 8-inch diameter.
Subsection 713.12.
Provide fiber rolls meeting the requirements of
NOTES:
See Note 6
Wood stake (typ.)
See Note 6
Wood stake (typ.)
UNTRENCHED INSTALLATION
SLOPE MAX INTERVAL
1V:4H or Flatter
LENGTH ABOVE FIBER ROLLS
MAXIMUM ALLOWABLE SLOPE
SPACING TABLE
FIBER ROLL CHECK DAM
*GRADE
DITCH SPACING (S)
CHECK DAM
8" HIGH 12" HIGH
Downslope stake (typ.)
Upslope stake (typ.)
Downslope stake (typ.)
Upslope stake (typ.)
Downslope stake (typ.)
8" dia. (min.)
Fiber roll, 8" dia. (min.)
Fiber roll, the diameter of the roll (max.)
1Trench into ground
1' (min.)
12" dia. (min.)
Fiber roll, 8" dia. (min.)
Fiber roll, 8" dia. (min.)
Fiber roll, 8" dia. (min.)
Fiber roll, 2' (max.)
(typ.)
Fiber roll
FIBER ROLL OVERLAP
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
FIBER ROLL
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2020
APPROVED: MAY 2016
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
:5
J u ly
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\ s t1 d e ta il .d g n
EFLHD DETAIL
PROJECT
S01
CRACK SEALING AND FILLING
CRACK SEALING CRACK FILLING
1" and greater
Less than 1"
See Note 3
Seal crack with hot applied crack sealant
" below existing surface 4 " to8
Fill crack with hot applied crack filler to
Screed material to 8" to
4" below existing surface
ASPHALT PAVEMENT
CRACK SEALING AND FILLING
E414-01A
NO SCALE
NOTES:
1.
2.
3.
4.
Prepare cracks for sealing and filling according to Section 414. Follow manufacturer's recommendations for sealing and filling cracks.
Force crack repair material into cracks to ensure adhesion to existing surface.
See Subsection 414.06 for minimum crack width.
Squeegee excess crack sealing and filling material left above the surface.
Do not overband cracks.
from the existing surface
Squeegee excess material
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
:4 e p te m b e r
S f h f l1 f il e s e r v e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n p s s e r \p m s f y
\H
W Y
D
E S
\C A
D D
\S td
D e t\ s t4
A d e ta il .d g n
EFLHD DETAIL
PROJECT
S02
"R2
"R8
1" Grout
" Sealant 2
PLAN VIEW
SECTION B-B SECTION A-A
See Note 3
Steel rod
1" R
"4 surface
Pavement "
See Note 4
#4 Reinforcing steel (typ.)
1' (typ.)
" (typ.)16
72 A
A
BB
6' - 7'
1' 1'-6"1'1'-6"
1' 1'
" (typ.)2
" (typ.)2
PLAN VIEW
C
C
SECTION C-C
Formed hole for pin (typ.)
Formed hole for pin (typ.)
Formed hole for pin (typ.)
" Sealant 2
1" Grout
See Note 3
Steel rod
"R8
1" R
1 surface
Pavement
"R2
2" "8
"4
"4
2"
"8
4"
See Note 4
#4 Reinforcing steel (typ.)
"8
6' - 7'
' - 7
Wheelstop
W h e e lsto p
Varies obstructions as directed by the CO.
* Increase distance for wall or other
"2
HEAD-ON PARKING
ANGULAR PARKING
Edge of pavement
WHEELSTOP LAYOUT
CONCRETE WHEELSTOP WITH DRAIN
CONCRETE WHEELSTOP WITHOUT DRAIN
Stall lines
Stall lines
6" (min.)*
1' 1'1'-6" (typ.)
Edge of pavement
CONCRETE WHEELSTOP
NOTES:
3.
2.
1.
1 inch of ends of wheelstop.
Extend the reinforcing steel to within
Subsection 609.08.
-inch steel rods according to 4 steel or
Pin the wheelstops with No. 6 reinforcing the approval of the CO.
to meet manufacturer's standards with
Variations in wheelstops will be allowed perpendicular to stall lines.
Center wheelstops between and
6' - 7'
6' - 7'
"4
E609-03
4.
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2020
APPROVED: MAY 2011
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
:4
J u ly
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\ s t6 d e ta il .d g n
EFLHD DETAIL
PROJECT
S03
SYMBOLS AND WORDS
PAVEMENT MARKINGS
E634-01A
14"12"14"
12"30"30"
33"
27"
R
12"30"30"
33"
R
R
27"
8"
6'
(V
M
P H
(V
M
P H
(V
M
P H
(V
M
P H
4" (typ.)
4" (min.)
7'
6'
(t y p
8'
(t y p
4" (min.)
4" (typ.)
TURN ARROW SYMBOLSTRAIGHT ARROW SYMBOL
COMBINATION SYMBOL
STRAIGHT/TURN ARROW
TRIANGLE SYMBOL
YIELD AHEAD
ACCESSIBILITY SYMBOL
(typ.
TYPE
PAVEMENT MARKING AREAS
12.2
SQFT
"STOP" WORD MESSAGE "YIELD" WORD MESSAGE "ONLY" WORD MESSAGE
"AHEAD" WORD MESSAGE "SCHOOL" WORD MESSAGE
6'-9"
9'-9" with Directional Arrow Bicycle Lane Marking
"YIELD" Word Message Marking
"STOP" Word Message Marking
"SCHOOL" Word Message Marking
"ONLY" Word Message Marking
"AHEAD" Word Message Marking
Yield Ahead Triangle Symbol (V≥45 mph)
Yield Ahead Triangle Symbol (V<45 mph)
Turn Arrow Symbol
Straight/Turn Arrow Combination Symbol
Straight Arrow Symbol w/ Symbol, blue background, and white border w/ Symbol and blue background w/ Symbol only
Accessibility Symbol:
NO SCALE
NOTES:
3.
2.
1.
and white border
(c) w/ Symbol, blue background, background; or
(b) w/ Symbol and blue
(a) w/ Symbol only;
following configurations:
otherwise by the CO in one of the as indicated in the plans or directed Provide Accessibility Symbol marking edition.
"Standard Highway Signs", latest symbols in accordance with the Place all letters, numerals, and
Devices'' (MUTCD), latest edition.
''Manual on Uniform Traffic Control markings in accordance with the Place pavement word and symbol
(m in
24" (min.)
3" (min.)9" R
3"R
3"R
See Note 3 Blue background
See Note 3 White border
R 6"
(typ.)
See Note 3 Accessibility symbol
3'-9" (typ.)
3" R
24"
3.33'
8"
WITH DIRECTIONAL ARROW
BICYCLE LANE MARKING
:5 e p te m b e r
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\ s t6 d e ta il .d g n
EFLHD DETAIL
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
PROJECT
NP SER PMS FY23(1) S04
R7-8
R7-8P
R7-8
R7-8P
R7-8
R7-8
R7-8P
R7-8
R7-8
R7-8P
R7-8
R7-8P
R7-8
RESERVED
PARKING
ACCESSIBLE
VAN
RESERVED
PARKING
ACCESSIBLE
VAN
PARKING
RESERVED
ACCESSIBLE
VAN
RESERVED
PARKING
PARKING
ACCESSIBLE
VAN
RESERVED
PARKING
ACCESSIBLE
VAN
RESERVED
PARKING
RESERVED
RESERVED
PARKING
45 60 75 90 o o o o
25' 22' 20' 18.5'
9.3' 9.0'
CHART B
A A
NO SCALE
SINGLE PARKING SPACE
HEAD-ON PARKING WITH VAN ACCESSIBLE AISLE
DOUBLE PARKING SPACE
ANGULAR PARKING WITH VAN ACCESSIBLE AISLE
DOUBLE PARKING SPACESINGLE PARKING SPACE
See Note 3
Install perpendicular curb ramp
" (typ
" (typ
(t yp
(t yp
See Note 3
Install perpendicular curb ramp
See Note 3
Install perpendicular curb ramp
Van accessible aisle
HEAD-ON PARKING ANGULAR PARKING
5' (min.)
See Note 2
Wheelstop (typ.)
See Note 2
Wheelstop (typ.)
See Note 2
Wheelstop
S e e N o te
W h e e lsto p
' (m in
B
5' (min.)
11' (min.) 9' (min.)
2' (typ.)
6'' (min.)
S e e N o te
W h e e lsto p
See Note 2
Wheelstop
See Note 6 space symbol (typ.)
Accessibility parking
.5
NOTES:
SIGNING IN PARKING AREAS
PAVEMENT MARKINGS AND
Top of existing ground striping (typ.)
4" solid white
4" solid white striping (typ.)
striping (typ.)
4" solid white striping (typ.)
4" solid white
Sign post (typ.)
SIGN MOUNTING
H e ig h t*
* See Notes 4 and 5
6.
5.
4.
3.
2.
1.
Mounting view
See Sign
Mounting view
See Sign
Mounting view
See Sign
CHART A
Spaces
Van-Accessible
Minimum Number of
1 to 25
26 to 50
51 to 75
76 to 100
101 to 150
151 to 200
201 to 300
301 to 400
401 to 500
501 to 1,000 Spaces
2% of Total Parking
Over 1,000 100 over 1,000
20 Plus 1 for each
Accessible Spaces
One out of every 6
Accessible Spaces
One out of every 6 of Accessible Spaces
Minimum Number
Angle (A)
Minimum Length of Stall (B)
Stall Width (C), Parallel to Aisle 12.7' 10.4'
11' (min.)
in Parking Facility
Total Parking Spaces
MINIMUM NUMBER OF ACCESSIBLE PARKING SPACES*
Special Report 125 (Figure 6.2)".
* Chart B based on dimensions recommended in "Parking Principles, and "2015 ABA Standards (Table F208.2)".
Accessible Design Standard (Table 208.02)"
* Chart A based on "2010 ADA Standards for
5' (min.) walkway5' (min.) walkway
PARKING LAYOUT DIMENSIONS FOR 9-FOOT STALLS*
S e e N o te s p a c e s y m b o l
A c c e s s ib il it y p a r k
See Note 6 space symbol
Accessibility parking
' (m in
Van accessible aisle
See Note 3
Install perpendicular curb ramp
4" solid white striping (typ.)
See Note 6 space symbol (typ.)
Accessibility parking parking space symbol details.
Refer to Detail E634-01 for accessibility additional sign mounting information.
Refer to Section 2A.18 of the MUTCD for height of 7 feet.
residential areas, provide a minimum sings installed in business, commercial, or provide a minimum height of 5 feet. For details. For signs installed in rural areas, Refer to Detail E633-01 for sign mounting for curb ramps details.
and the walkway. Refer to Detail ET 615-1 is located between the van accessible aisle
Install perpendicular curb ramp when curb recommendations.
according to the manufacturer's plastic and other types of wheelstops
Section 609 and Detail E609-03. Install
Install concrete wheelstops according to
(MUTCD), latest edition.
on Uniform Traffic Control Devices" markings in accordance with the "Manual
Install pavement striping and symbol
Van accessible aisle
Van accessible aisle
B '-7
'-7
6'-7' 6'-7' 6'-7'
6'-7'
C
9'
.5
B
'-7
'-7
.5
See Chart B See Chart B See Chart B m in w a lk w a y
5' (min.) walkway
B
(typ.)
6" (min.)
Mounting view
See Sign
Mounting view
See Sign
Mounting view
See Sign
A
90 90
A
E634-05
REVISED: AUGUST 2021
APPROVED: MAY 2011
DETAIL APPROVED FOR USE DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
:4
J u ly
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\ s t6 d e ta il .d g n
EFLHD DETAIL
PROJECT
S05
PORTABLE SIGNS
FIXED ROADWAY SIGNS
RURAL AREA URBAN AREA
BREAKAWAY SIGN SUPPORT
4'' x 4''
4'' x 6''
6'' x 6''
6'' x 8''
1.5''
3''
2''
None Required
D
4'
4'
5'
5'
10 20
1 Post 2 Post 3 Post 4 Post
165125
Sign panel
Traffic
Wood post (Fixed)
Holes (See Table) m in m in
Roadway m in m m
Sidewalk m
6' to 12' m
(See Notes 3 and 4)
POST SIZE
DIAMETER
HOLE (SQFT)
MAXIMUM SIGN AREA
POST SIZE TABLE
(min.)
6'-0''
(min.)
2'-0''
(min.)
2'-0''
NOTES:
7.
6.
5.
4.
3.
2.
1.
apart.
cannot be spaced a minimum of 7 feet multiple posts are required and the posts posts are considered non-breakaway if
Signs requiring 6- by 6-inch and greater non-breakaway signs.
Do not place holes in posts of the clearzone or shield with a barrier.
to post spacing, place the sign outside breakaway design cannot be used due the Breakaway Sign Support View. If
For 4- by 6-inch and greater posts, see sign mounting.
Company, utility poles may be used for
When approved by the CO and the Utility
7 feet above the pavement surface.
of the sign, mount the sign a minimum of
When parking is permitted within 200 feet
NCHRP Report 350 for crashworthiness.
sign supports meet the requirements of the approved by the CO. Ensure all portable mounted lower than fixed signs when vertical plane. Portable signs may be
Ensure sign mounts hold the sign face in a
Submit alternate details for portable signs.
All lumber dimensions are nominal.
larger than 10 square feet on double posts.
Mount signs that are wider than 3 feet or
(See Notes 6 and 7)
FIXED SIGNS 4'' X 6'' AND GREATER POSTS)(
E635-01
NO SCALE
SIGN MOUNTING
TEMPORARY TRAFFIC CONTROL
ROAD
AHEAD
WORK
DETOUR
AHEAD
M PH.. .
M PH.. .
ROAD
CLOSED
DETOUR
M PH.. .
CLOSED
AHEAD
LANE
RIGHT
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2020
APPROVED: MAY 2011
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
:4
J u ly
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\ s t6 d e ta il .d g n
EFLHD DETAIL
PROJECT
S06
Traffic flow
Traffic flow not the advisory speed.
Approach speed based on the regulatory posted speed, *
Device spacing
Spacing Table)
(See Length and Channelizing devices
(optional)
BUFFER SPACE
Flagger location
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table)
ATAPER AREABUFFER SPACEVARIABLEBUFFER SPACETAPER AREAABC
WORK
ROAD
AHEAD
See Note 4
W20-1
ONE LANE
ROAD
AHEAD
xx
MPH
W20-4
(optional)
W13-1P xxx
FEET
W20-7
(optional)
W16-2P
Flagger location
WORK SPACE
TERMINATION AREA
ROAD WORK
END
See Note 4
G20-2 the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
Requirements, Section 156.
For project specific minimum width, refer to the Special Contract
For night time flagging operation, provide floodlighting at flagger stations.
WORK AHEAD (W20-1) and END ROAD WORK (G20-2) signs.
If closure is completely within the project limits, eliminate the ROAD name of the Contractor on the pilot car.
a conspicuous location on the rear of vehicle. Prominently display the
For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign at as approved by the CO.
Final location and spacing of devices may be changed to fit field conditions those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place signs similar to
7.
6.
5.
4.
3.
2.
1.
(optional)(optional)
NOTE:SIGN SPACING TABLELENGTH AND SPACING TABLE
50' - 100' 50' - 100'
See Note 6
10' min.
ROAD TYPE
DISTANCE BETWEEN
A B C
Expressway / Freeway
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
LENGTH
SPACE
BUFFER
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
100MPH FEET SPACING IN FEET
6/2005 STANDARD APPROVED FOR USE
7/2022 REVISED:
635-6
(WITH FLAGGERS)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
:1 e p te m b e r
S td
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\ s t6 d e ta il .d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
NP SER PMS FY23(1) S07
5.5
4.
3.
2.
1.
conditions as approved by the CO.
location of signs may be changed to fit field
Install signs where shown in the plans. Final are vector-based, vinyl-ready.
approval by the CO. Ensure all pictographs
All incorporated pictographs are subject to mounting requirements.
Refer to Detail E635-01 for post and sign inches.
Unless otherwise noted, dimensions are
40 Sq. Ft.Area:
Background - Green (retroreflective)
Legend, Border - White (retroreflective)Colors:
2.3" Radius, 1.0" BorderDimensions:
0.92 Sq. Ft.Area:
Background - Blue (retroreflective)
Legend - White (retroreflective)Colors:
NO SCALE
E635-15
See USDOT Pictograph spaced 0.5-inch apart (typ.)
.5-inch stripesThree 0
See NPS Pictograph and Note 3
Background - White (retroreflective)
Border - White (retroreflective)
Legend - PMS 1615, Brown (retroreflective)Colors:
NPS PICTOGRAPH
13.56 68.88 13.56
5.78 84.44 5.78
3.38 89.24 3.38
21.5 53 21.5
30 36 30
BIL PROJECT FUNDING SOURCE SIGN
USDOT PICTOGRAPH
DETAIL APPROVED FOR USE
APPROVED: APRIL 2023
LAW SIGN LAYOUT, 8-FOOT
BIPARTISAN INFRASTRUCTURE
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
:5
J u ly
D r a w in g s F o o
E n g in e e r in g
S o f tw a r e \O p e n
R o a d s D e s ig n e r C
E
.1
\P r o je c t_
W o r k
S e ts
\N P
S E
R P
M S
F
\d g n
\S td
D e t\ s t6
B
I L
F o o t.
d g n
EFLHD DETAIL
PROJECT
S08
.1
D
.7
D
E
M
E
M
.5
.6
13.5613.56
5.2 13.15 0.65
5.2 13.3 0.5
1.5
1.5
0.6C
0.6C0.6C
0.6C
1.1
1.1
1.1
1.1
13.3 0.5 levels:GSCOLORFILL|GSBWFILL|GSOUTLINE
| A Sheets |
| A01-NP_SER_PMS_FY23_1_ttl |
| A02-A03-NP_SER_PMS_FY23_1_sym |
| A02-A03-NP_SER_PMS_FY23_1_sym |
| A04-NP_SER_PMS_FY23_1_loc |
| A04-NP_SER_PMS_FY23_1_loc |
| A04-NP_SER_PMS_FY23_1_loc |
| A04-NP_SER_PMS_FY23_1_loc |
| B Sheets |
| B01-B02-NP_SER_PMS_FY23_1_typ |
| B01-B02-NP_SER_PMS_FY23_1_typ |
| C Sheets |
| C-NP_SER_PMS_FY23_1_qty |
| C-NP_SER_PMS_FY23_1_qty |
| C-NP_SER_PMS_FY23_1_qty |
| C-NP_SER_PMS_FY23_1_qty |
| C-NP_SER_PMS_FY23_1_qty |
| C-NP_SER_PMS_FY23_1_qty |
| C-NP_SER_PMS_FY23_1_qty |
| C-NP_SER_PMS_FY23_1_qty |
| C-NP_SER_PMS_FY23_1_qty |
| M Sheet |
| C-NP_SER_PMS_FY23_1_qty |
| M01-NP_SER_PMS_FY23_1_esc_nar |
| N Sheets |
| N01_NP SER PMS FY23(1)_ttc |
| N01_NP SER PMS FY23(1)_ttc |
| S Sheets |
| st15704_detail |
| st41401A_detail |
| st60903_detail |
| st63401_detail |
| st63405_detail |
| st63501_detail |
| st63506_detail |
| st63515_BIL-8-Foot |
| S sheet.pdf |
| S Sheets |
| st15704_detail |
| st41401A_detail |
| st60903_detail |
| st63401_detail |
| st63405_detail |
| st63501_detail |
| st63506_detail |
| st63515_BIL-8-Foot |
File details come from the government source that posted it. Updated .