This file contains detailed engineering plans for the Edgewater Stable Access Bridge Replacement project in Rock Creek Park, Washington, D.C. The project, designated as NP ROCR 910(1), involves replacing the existing bridge deck, bridge rail, and curbs, reconstructing bridge approaches, and repairing bioretention facilities. The project spans 0.04 miles and is located at coordinates Longitude 77°02'58.70" and Latitude 38°55'18.30".
The federal contract opportunity, solicitation number 693C73-25-R-000051, is being conducted by the Department of Transportation Federal Highway Administration. The project is estimated to cost between $2,000,000 and $5,000,000, with the Request for Proposal (RFP) documents expected to be issued on or about April 16, 2025. Offerors will be required to submit qualifications demonstrating experience with similar complex infrastructure projects. The solicitation includes specific subcontracting goals: 43.02% for Small Businesses, 5% for Small Disadvantaged Businesses, 5% for Women-Owned Small Business Entities, 3% for HUBZone businesses, and 5% for Service-Disabled Veteran-Owned Small Businesses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0002 - NP ROCR 910(1).pdf | ||
| Amendment 0001 - NP ROCR 910(1).pdf | ||
| ADV_Offerors Qualifications Form.doc | DOC document | |
| RFP Solicitation - NP ROCR 910(1).pdf | ||
| FP14_Eng.pdf | ||
| Bridge Inspection Report_3450-033P2833.pdf | ||
| Geotech Report_Aug 2023.pdf | ||
| Subcontracting Plan - NP ROCR 910(1).doc | DOC document | |
| VETS-4212 Form.pdf | ||
| Categorical Exlclusion Form (NEPA).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF THE INTERIOR
Title Sheet
Symbols And Abbreviations
Location Map
Typical Section
Tabulation of Quantities
Construction Plan & Profiles
Erosion And Sediment Control Narrative
Standards And Details
DESCRIPTION
INDEX TO SHEETS
PLANS FOR PROPOSED
NATIONAL PARK SERVICE
PLANS PREPARED BY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
Decemeber, 2024
Know what'sbelow.
before you dig.Call
R
U.S. Department of Transportation
Administration
Federal Highway
SHEET
NO
A01
A05
A02-A03
B01
C01
D01-D03
M01-M02
N01
S01-S16
Temporary Traffic Control Narrative
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH: 0.04 Miles
ADT (2021)
ADT (2031)
DHV
C/A
N/A
N/A
SPECIFICATIONS:
BRIDGE:
DESIGN DESIGNATION:
LANE MILES:
and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
ROAD: WIDTH
20'
SURFACE BASE SUBGRADE
N/A
ROAD: WIDTH
20'
SURFACE BASE SUBGRADE
AGGREGATE N/A
Access Road(New)
Edgewater Stables
ROCK CREEK PARK
(STRUCTURE NO. 3450-033P)
STABLE ACCESS BRIDGE
REPLACEMENT OF EDGEWATER
N
KEY MAP
WASHINGTON DC AND METROPOLITAN AREA
15 12 6 0 15
SCALE IN MILES
VIRGINIA
SPRINGFIELD
ALEXANDRIA
ANDREWS
AIR FORCE
BASE
BETHESDA
MCLEAN
ARLINGTONFALLS
CHURCH
VIENNA
SILVER
SPRING
HYATTSVILLE
ROCK
CREEK
PARK
FT
MYER
B A
L T
W A S
H
P A
R K
W A
Y
GEORGE
P A
R K
W A
Y
MARYLAND
WASH. DC
W A S
H
D
IS
T R
IC
T O
F C O
LU
M B
IA
A R
LIN
G T O
N C
O
FA
IR
FA
X C
O
M O
N T G
O M
E R Y C
O
P R
IN
C E G
E O
R G E S C
O
PROJECT NP ROCR 910(1)
W
IS
C O
N S
IN
O L
D
G E
O R
G E T O
W N R
O A
D
RO
AD
RIVER
C A B
IN
JO
H
N
W E S T E R
N
A V E
N E
B R
A S
K A
A V E
A V E
N U E
M A
C
R T
H U
R
B
LV
D
M A C A
R T H
U R
BLVD.
WESTMORELAND CIRCLE
M O
N T G
O M
E R
Y C
O
W A S H
IN
G T O
N
D .C
WARD
CIRCLE
C A
N A L
R O
A D
GEORGETOWN
RESERVOIR
BLVD.
MAC ARTHUR
A M
E R
IC
A N
L E
G
IO
N
M E
M O
R
IA
L
B
R
ID
G E
POTOM
A
C
R
IV
E R
LITTLE
FALLS
DAM
C L A R
A
B A
R T
O N
P K
W Y
CHAIN
BRIDGE
C H
E S
A P
E A
K E
A N
D
O H
IO
C A N
A L
P O T O
M A C
RIVER
F A
IR
F
X
O
A R L
IN
G T
B E
L T
W A
Y
Church
BARTON
A V
E N
U E
M A C A
R T H
U R
B L V
D
GEORGE
WASH.
MEM.
P K
W Y
GEORGE
W A S H
M E
M
P K
W Y
C O
N N
E C
T
IC
U T
A V
E
B L V
D
U N
IV
E R S
IT
Y
G E
O R
G
IA
A V E
A L A S
K A
A V E
G E
O R
G
IA
A V
E N
U E
B R
A N
C H
R O
A D
AVE.
MISSOURI
N E
W
H A
M S
H
IR
E
A V E
FLORIDA
AVE.
N E
W
H A
M S
H
IR
E
RHODE
AVE.
W
IS
C O
N S
IN
A V
E N
U E
W
IS
C O
N S
IN
A V
E
ROCK
CREEK
PARK
C O
N N
E C
T
IC
U T
A V
E
T
H S
T R
E E
T
K E
Y
B R
ID
G E
COUNTYFAIR
FAX
VIRGINIA
MONTGOMERY COUNTY
Falls
A R L
IN
G T O
N C
O
F A
IR
F A X C
O
Arlington
Great Falls
MARYLAND
Bethesda
P K
W Y
CLARA
PKWY.
MILITARY ROAD
A V E
K A
N S
A S
GRANT
CIRCLE
CIRCLE
SHERMAN
LOGAN
CIRCLE
ISLAND
AVE.
YORK
NEW
Takoma
Park
Silver
Spring
Potomac
CIRCLE
A V E
DUPONT
STREET
STREET
M
K
D.C.
STREETP
Kensington
M O
N T
G O
M E
R Y C
O
M O
N T G
O M
E R
Y C
O
W A S H
IN
G T O
N , D .C
P .G
C O
INDEPENDENCE AVENUE
CONSITUTION AVENUE
WASHINGTON
CIRCLE
S T
R E
E T rd
CIRCLE
SHERIDAN
CIRCLE
THOMAS
CANAL
ROAD
T
H S
T
T
H S
T
VIR
G
IN
IA AVE
T
H S
T
T
H S
T
50 1
Not to Scale
N
M A S S A C
H U S E
TTS
A V E N
U E
M A S S A C
H U S E T T S
WASHINGTON, DC
NP ROCR 910(1)
PROJECT
Last inspected June 15, 2021)
(Edgewater Stable Access Bridge, Structure No. 3450-033P, Project Manager
Dan Weston
Lead Designer
Chris Burnell
Highway Design Manager
Kayan Choudhry
A04
Survey Information
0.04 Miles
bioretention facilities, and other miscellaneous work.
bridge approaches. The work also includes the repair of existing
Access Bridge deck, bridge rail and curbs, and reconstruction of
This project consists of replacement of the Edgewater Stable
R01-R32 Bridge Plans
M03-M06 Erosion And Sediment Control Plans
ACP
C02-C03 Summaries and Schedules
N02-N03 Temporary Traffic Control Plan
T01-T03 Cross Sections
N/AD
10V (MPH)
N/Ae (max)
M07-M11 Bioretention Facility Repair Plans
M12 Existing SWM Cover Map
M13 SWM Management Plan Compliance Data
NP ROCR 910(1)
Project
:4
P
M e c e m b e r
A
S h e e t
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v
\C A
D D
\A
-R
O C
R
(1 tt l.
d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) A01
NPS Drwg. No. 821-177658 PMIS No. 245035
RBAR
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve original ground outside diameter out to out ordinary high water mark on center nominal maximum size aggregate normal crown north mon.
min.
max.
MP
ML
monument minimum maximum mile post main line spacing, spaces or spaced shoulder section point of spiral to curve seasonal average daily traffic south spa.
shldr.
sec.
SC
SADT
S
NMSA
NC
N
OG
OD
o. to o.
ohwm
o. c.
pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
rte.
rt. or RT reqd.
reinf.
RECP
rdwy.
R/W
R.
R route right required reinforcement rolled erosion control product roadway right-of-way range radius symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot sym.
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SS
SRS
sqyd sqft typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed
W west
1 6
1 6
SEC.
SEC.
0.00EL. E
N 187
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION ROCK CREEK PARKROCK CREEK PARK
(STRUCTURE NO. 3450-033P)
EDGEWATER STABLE ACCESS BRIDGE
ABBREVIATIONS
SYMBOLS AND
SHEET 1 OF 2
lat.
lam.
L latitude lamination length of curve
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Section Line4
Section Corner (Found, Projected)4
Section Line16
Section Corner (Found, Projected)16
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Railroad
Trail
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir; Marshland
Spring or Seep
Treeline; Individual Trees, Pine
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Control Point (Terrestrial and GPS); Jump Hub
DSY
drwg(s).
dist.
diaph.
diag.
dia.
DHV
D ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CO
CMP
CL
cc or c. to c.
brg.
br.
BP
BM
BK
appr.
AH
ADT
ACP
abut.
double solid yellow drawing(s) distance diaphragm diagonal diameter design hourly volume diameter centers curve to spiral continuous construction joint connection concrete column contracting officer corrugated metal pipe centerline center to center bearing bridge balance point benck mark back approach ahead average daily traffic asphalt concrete pavement abutment expansion joint excavation edge of water equivalent single axle load edge of road equation edge of travel way edge of shoulder edge of pavement embankment elevation elevation with number superelevation rate east flg.
fin.
flange finish exp. jt.
exc.
EW
ESAL
ER
EQ or eq.
EOT
EOS
EOP
emb.
elev.
elev.
e
E θs Ø ∆c spiral central angle diameter curve central angle total central angle ftg.
galv.
ga.
HW
hex.
hdwl.
ID
jt.
footing galvanized gage (gauge) high water hexagon headwall inside diameter joint
LW
lt. or LT Ls
LPSM
long.
LOD
low water left length of spiral lump sum longitudinal Limits of Disturbance
:0
J u ly
A
S h e
P
R O
J E
C T
S \r o c r\
(1
P ro j_
D e v \C
A D
D \A
-A
-R
O C
R (1 s y m
.d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) A02
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:
AREA PATTERN
U.S. DEPARTMENT OF TRANSPORTATION ROCK CREEK PARK
(STRUCTURE NO. 3450-033P)
EDGEWATER STABLE ACCESS BRIDGE
ABBREVIATIONS
SYMBOLS AND
SHEET 2 OF 2
Fiber Roll or Wattle
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Concrete Barrier
Slope Stake Limits
Delineators
Signs (single, double post; portable)
Transition
Toe of Fill
Top of Cut
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Pipe Culvert with Drop Inlet
Box Culvert
Underground Utilities
Overhead/Above Ground Utilities
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
EXISTING PROPOSED
DI
Pavement Removal / Roadway Obliteration
Full Depth Pavement
Sidewalk Asphalt/Concrete
Mill and Overlay
Overlay
Silt Fence
Diversion Berm
Drainage Divide
Check Dam
Limits of Disturbance
:0
J u ly
A
S h e
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v \C
A D
D \A
-A
-R
O C
R (1 s y m
.d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) A03
PMIS NO. 245035
Edgewater Stable Access Bridge
Long. 77° 02' 58.70"
Lat. 38° 55' 18.30"
Edgewater Stable Access Road
3450-033P
4803 SF
Parking Lot
Edgewater Stable
Staging Area, 5295 SF
Right Shoulder Area
Beach Dr. NB
Staging Area, Trails During Construction
Close Access From Social
U.S. DEPARTMENT OF TRANSPORTATION ROCK CREEK PARK
Scale in Feet
500' 1000'
ROCK CREEK PARK
(STRUCTURE NO. 3450-033P)
EDGEWATER STABLE ACCESS BRIDGE
LOCATION MAP
:0
J u ly lO C
A T
IO
N m
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v
\C A
D D
\A
-R
O C
R
(1 lo c .d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) A04
N 457000 E
4X4' BO
ELEV. 21.15'
E L E
V . 2
.3
ELEV. 21.67'
O H
W M E
LE
V . 2
.7
24"x12.02' CM P
3"RCP FL 24.06'
.5
E L E V . 2
.7
ELEV. 28.85'
" R
C P
U N
K C
O N
C R
E T E S
L A
B S
C M
P
OVERHEAD BRIDGE
PIER
OVERHEAD BRIDGE
PIER
OVERHEAD BRIDGE
PIER
OVERHEAD BRIDGE
PIER
24"MAPLE
28"
32.64
FIS
H
IN
G
W A R N
IN
G
"O
A K
"O
A K
11"OAK
ELEV. 37.34'
18"X15"
18"
17"OAK
8" CMP8"
"O
A K
B U
IL
D
IN
G
15"X18"
"O
A K
26"OAK
9"DEAD
10486
10460
H O
R S E C
R O S S
20"x51.06' CMP
TOP
17" OAK
STOP
U N
K U
TILITY
U N
K U
T
IL
IT
Y
BOR1
28"
BOR3
17"MAPLE
T
R E
E
BOR2
BOR
BOR
W O
O D
L Y L
A N
E B
R I D
G E
M A
P L E
V I S I T
O R P
A R
K I N
G
PETS
P A
R K
IN
G P
E R
M
IT
10"
S E
W E
R M
A N
H O
L E
S E
W E
R M
A N
H O
L E
S E
W E R
M A N
H O
LE
G
S V
A L V
E
G A S V
A L V
E
10"
43.88
44.05
R E S
E R
V E P
A R
K
IN
G
F
IR
H Y
D R
A
N H
O L E
M A N
H O
LE
M A
N H
O L E
U.
S.
PARK
POLIC
E
TRAI
NI
NG
STATI
ON
OFF
IC
E
F L
A G P
O L E
21"TOPAA
RO
C
KC
REEC
K
PARKW
AY
LE
FT
O
N
EW
AY
RI
G H T
O N
EW
AY
M O
N
TO
F
RI
D
L P
L P
L P
E
LE
C . M
A N
H O
LE
E
LE
C . M
A N
H O
LE
EM
TWIN38"OAK
EBOX
TWIN38"OAK
10"
U N
K U
T
IL
IT
Y
S E
W E R
M A
N H
O L E
W R
O N
G W
A Y
DO NOT ENTER 3:45-6:30PM M-F EXC HOLIDAYYS
STOP_WRONG WAY (B-B)
36"TRIPLE
25"
36"QUAD
BIKE XING PED XING
NO LT TURNNO LT TURN 6:30AM TO 9:30AM
ELSP YI
48"OAK
SP
FITNESS EVENTS GROUP C
3"OAK
2"OAK
SP
STOP
SP
12"OAK
SP
BIKE XING
2-PT EXER TRAIL-> PARCOURSE
KEEP RT
ELSP YI
SP
SP
SP
25MPH+NO U
Vert. : NAVD 1988 Coordinate System, US State plane 1983, MD 1900, Hor. : NAD 1988, 2.
Azimuth angle shown is based on North Axis at clockwise direction.1.
Notes
PROJECT CONTROL POINTS
NAME NORTHING EASTING ELEV. TYPE
3004 457300.162 1298255.466 36.927 Pin & Cap
4000 456987.297 1298211.774 37.268 TBAR
4001 457012.297 1298302.914 42.434 TBAR
4002 456770.091 1298215.841 44.685 TBAR
4003 457159.898 1298169.705 38.550 TBAR
6003 457067.941 1298058.960 43.386 TBAR
M A
P L
MON
"O
A K
"O
A K
"O
A K
F
IR
D R
A N
T
S E
W E
R M
A N
H O
L E
M A
N H
O L E
STOP
S E
W E R
M A N
H O
LE
S
M A N
H O
LE
L P
TBAR
TBAR
TBAR
TBAR
PIN W/CAPTBAR
V I S I T
O R P
A R
K I N
G
T
R E
E
N N
NN
NN
20" CMP
' 4
A z
A z . 3
A
z. 3
17'
A
z. 1
Az. 7 9°
5'
20'
Az. 120°
Az. 281°
A z . 3
A z . 1
A z . 1
A z.
A z
10'
A z
Az. 117°
6'
Az. 98°
A z.
2°
SURVEY CONTROL POINTS REFERENCES
N
TBAR
T B
A R
TBAR
6003 TB
A R
T B
A R
C A P
SURVEY INFORMATION
(STRUCTURE NO. 3450-033P)
EDGEWATER STABLE ACCESS BRIDGE
U.S. DEPARTMENT OF TRANSPORTATION ROCK CREEK PARK
:2 u g u s t
A
S h e
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v
\C A
D D
\A
-R
O C
R
(1 s u r.
d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) A05
B01
NOTES:
project limits.
6. Transition roadway cross slopes from 2% to match existing at
5. See D sheets for limits of work.
to Section 625.
4. Establish turf to disturbed areas except traveled way according
3. See Section 107 for protection of existing trees.
2. Obtain CO approval of all work limits before beginning work.
1. See Bridge Plans for details of bridge work.
CL RoadwayCL
10+15 to 10+37
PROPOSED PAVEMENT STRUCTURE
Aggregate base, depth varies
EXISTING PAVEMENT STRUCTURE
Existing ground
Asphalt concrete pavement, depth varies
North West Approach
Edgewater Stable Access Bridge
Asphalt tack coat
2-inch depth, Type IV Roughness, Pavement Binder PG 64-22.
Aspahlt concrete pavement, Gyratory Mix, 1/2-Inch NMSA, <0.3 Million ESAL, 2% 2%
(typ.)
Replace existing curb and gutter
(typ.)
Replace existing curb and gutter
(typ.)
Replace existing curb
PROPOSED PAVEMENT STRUCTURE
Aggregate base, depth varies
EXISTING PAVEMENT STRUCTURE
Existing ground
Asphalt concrete pavement, depth varies
South East Approach
Edgewater Stable Access Bridge
Replace existing curb (typ.)
CL RoadwayCL
11+71 to 12+20
Geotextile Class 2 - Type E Separation and Stabalization
Geotextile Class 2 - Type E Separation and Stabalization
Removal of Pavement, 8-inch depth
Removal of Pavement, 10-inch depth
½-inch NMSA, 2-inch depth Asphalt concrete pavement, Gyratory Mix, <0.3 Million ESAL, 4-inch depth Aggregate Base Grading C or D
2-inch depth, Type IV Roughness, Pavement Binder PG 64-22.
Aspahlt concrete pavement, Gyratory Mix, 1/2-Inch NMSA, <0.3 Million ESAL, Asphalt tack coat
6-inch depth Aggregate Base Grading C or D
½-inch NMSA, 2-inch depth Asphalt concrete pavement, Gyratory Mix, <0.3 Million ESAL, 2:
Max 2:1 Max
2:1 Max2:
Max 2% 2%
U.S. DEPARTMENT OF TRANSPORTATION ROCK CREEK PARK
(STRUCTURE NO. 3450-033P)
EDGEWATER STABLE ACCESS BRIDGE
TYPICAL SECTIONS
Not to Scale
Construction Limits
14' - 36'
Travel lane
12' - 14'
Travel lane
Construction Limits
:3
A u g u s t
B
S h e
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v
\C A
D D
\B
-0
-R
O C
R
(1 ty p
.d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) B01
QUANTITIES
TABULATION OF
ROCK CREEK PARK
U.S. DEPARTMENT OF TRANSPORTATION
:5
D e c e m b e r
C
S H
E
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v
\C A
D D
\C
-0
-R
O C
R
(1 q n t.
d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) C01
AND SCHEDULES
SUMMARIES
ROCK CREEK PARK
U.S. DEPARTMENT OF TRANSPORTATION
U.S. DEPARTMENT OF TRANSPORTATION ROCK CREEK PARK
:1
D e c e m b e r
C
S h e
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v
\C A
D D
\C
-0
-R
O C
R
(1 q n t.
d g n
:1
D e c e m b e r
C
S h e
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v
\C A
D D
\C
-0
-R
O C
R
(1 q n t.
d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) C02
NPS Drwg. No. 821-177658 PMIS No. 245035
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) C02
SCHEDULES
SUMMARIES AND
U.S. DEPARTMENT OF TRANSPORTATION
:1
A u g u s t
C
S h e
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v \C
A D
D \C
-0
-R
O C
R (1 q n t.
d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) C03
T
O P
A A
O
A K
O
A K
D
E A
D
O
A K
M A
P L E
O
A K
M A
P L E
B O
R
B O
R
B O
R
B O
R B
O R
X
.6
X
T
6 1
C M P
ELE
V.
7.
ELE
V .8
E L E
V .3
"x
.0
C
M P
ELEV. 21.3
5'
19.51
24"M
APLE
8"TREE
G A S
VA
LV
E
U N
K C
O N C R E T E S
LA
B S
M A
N H
O L E S
S E
W E
R M
A N
H O
L E
L P
E L E
C . M
A N
H O
L E
U N
K U
T
IL
IT
Y
L P
M A
N H
O L E
U N
K U
T
IL
IT
Y
U N
K U
TILITY
8"
OAK
9"
OAK 7"
OAK
4"
OAK
U N
K U
TILITY
B U
IL
D
IN
G
P I E
R O
V E
R H
E A
D B
R I D
G E
O F F I C
E T
R A I N I N
G S
T A
T I O
N U .S
P A
R K P
O L I C
E
" R
CP
N
E 1
S4 7°
'3 0"
E
S4 6°
'4 2"
E e = 0
'92.00L =
'49.24T =
'104.29R =
(RT)50°32'36"Δ =
12+04.93PI
C1 e = 0 '177.32L = '90.11T = '404.00R =
(RT)25°08'50"Δ =
13+37.81PI
C2
.7
C
.0
P
B
N
E= 1298143.9233
N= 457162.4303
10+15.00 Begin Project
E= 1298277.2837
N= 457010.8287
12+20.00 End Project
12+20 End full depth pavement
11+67 Begin full depth pavement repair
End approach slab
10+42 begin approach slab
End full depth pavement repair
10+15 pavement repair
Begin full depth
B e ac h D ri ve
Br idg e
Ed ge wate r S tab le
C1 C2
End remove and replace curb
(16-inch depth) 11+67.00 Begin remove and replace curb bioretention facility repair plans bioretention facility as shown in Protect and repair existing bioretention facility repair plans bioretention facility as shown in
Protect and repair existing
10+15 curb and gutter (10-inch depth) Begin remove and replace curb and gutter 10+42 End remove and replace
(16-inch depth) 11+76 Begin remove and replace curb
Clearing limits limits clearing clearing limits baseline Construction
Saw cut pavement
EOP
Existing
EOP
Proposed
EOP
Existing
10+15 curb and gutter (10-inch depth)
Begin remove and replace
See bridge plans Method A, Class 6 Place Riprap, See bridge plans Method A, Class 6
Place Riprap, S e e s h e e t
D
M a tc h li n e S ta ti o n protect in place Existing sign
Type 4, 21 LF Paved waterway paved waterway.
replacing existing
(16-inch depth) 12+20 End remove and replace curb
1573 SF, E251-A
Permanent vegetated riprap
894 SF, E251-A
(vegetated riprap)
Permanent vegetated riprap
106 tons Place riprap method A, Class 6
214 tons (vegetated riprap)
Place riprap method A, Class 6
U.S. DEPARTMENT OF TRANSPORTATION ROCK CREEK PARK
(STRUCTURE NO. 3450-033P)
EDGEWATER STABLE ACCESS BRIDGE
10+00 to 13+80
CONSTRUCTION PLAN
SCALE IN FEET
0 20 40
:1 e c e m b e r
D
S h e
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v \C
A D
D \D
-R O
C R
(1 p ln .d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) D01
PMIS No. 245035 NPS Drwg. No. 821-177658
Proposed Profile
Existing Ground
10+42
Begin approach slab
11+67
End approach slab
U.S. DEPARTMENT OF TRANSPORTATION ROCK CREEK PARK
(STRUCTURE NO. 3450-033P)
EDGEWATER STABLE ACCESS BRIDGE
10+00 to 13+80
CONSTRUCTION PROFILE
SCALE IN FEET
0 20 40
SCALE IN FEET
0 20 40
14 14
16 16
18 18
20 20
22 22
24 24
26 26
28 28
30 30
32 32
36 36
38 38
40 40
42 42
44 44
46 46
48 48
10+00 11+00 12+00 13+00 14+00
34 34
.9
B e g in
P r o je c t
V P
I
L
.7
-0.500%
+2.409%
V P
I
.6
-0.585%
.4
V P
I
.4
.1
.3
.0
.4
.9
.5
.7
.8
38.79 40.00 41.20 41.51
E n d P r o je c t
.5
+1.20%
:0
A u g u s t
D
S h e
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v \C
A D
D \D
-R
O C
R (1 p ln
.d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) D02
W I N O
A K
T W I N O
A K
T
O P
A A
.0
.8
O X
E M
S
VA
LV
E
HYD
RANT
FIRE
M
AN
H O
LE
SEW
ER
G A S
VA
LV
E
M
AN
H O
LE
SEW
ER
FLAG
PO
LE
M
ANHO
LE
U N
K U
TILITY
P I E
R O
V E
R H
E A
D B
R I D
G E
O F F I C
E T
R A I N I N
G S
T A
T I O
N U .S
P A
R K P
O L I C
E
P I E
R O
V E
R H
E A
D B
R I D
G E
P I E
R O
V E
R H
E A
D B
R I D
G E
P I E
R O
V E
R H
E A
D B
R I D
G E
5 4
0 1
.0
C
.0
P
S e e s h e e t
D
M a tc h li n e S ta ti o n
N
360 LF
Proposed security fence 8 feet tall
360 LF
Proposed security fence 8 feet tall gate 20LF
Security fence
20LF
Security fence gate fenced off site.
against slope to ensure no access is available to
Terminate fence at overhead bridge pier and
Note
U.S. DEPARTMENT OF TRANSPORTATION ROCK CREEK PARK
(STRUCTURE NO. 3450-033P)
EDGEWATER STABLE ACCESS BRIDGE
13+80 to 14+25
CONSTRUCTION PLAN
SCALE IN FEET
0 20 40
:0
A u g u s t
D
S h e
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v \C
A D
D \D
-R
O C
R (1 p ln
.d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) D03
CONTROL NARRATIVE
EROSION & SEDIMENT
(STRUCTURE NO. 3450-033P)
EDGEWATER STABLE ACCESS BRIDGE
Sheet 1 of 2
PROJECT DESCRIPTION
SOILS
GENERAL NOTES AND GUIDELINES
0.53
EROSION & SEDIMENT CONTROL CONSTRUCTION SEQUENCE
Install topsoil, RECP and native riparian seed mix for vegetated riprap along eastern bank. See detail E251-A (sheet S05).
permanent riprap class 6 for western abutment (abutment 1, see bridge plans, Sheet R02).
Remove temporary access pad, diversion berm, sandbags, temporary culvert and tempory riprap apron at western end of bridge. Once removed place reamining
Construct new bridge superstructure, deck, railing and approaches. Open bridge to traffic.
(abutment 1) excluding the area where the temporary access pad overlaps with propised permanent riprap class 6.
abutment (abutment 2). Remove coffer dam, dewatering, and temporary environmental protection for new pier. Place permanent riprap class 6 for western abutment
Install cofferdam, dewatering, and temporary environmental protection for new pier. Construct new pier, new western abutment (abutment 1) and new eastern
Stage 3
Extend temporary access pad to its full width within the stream. Maintain this temporary access pad for the duration of bridge closure. Remove remainder of bridge.
Stage 2
Remove diversion berm at east end of bridge.
not install topsoil, RECP and native riparian seed mix at this stage.
access pad at east end of bridge. place remaining permanent riprap class 4 for vegetated riprap where temporary access pad was. See detail E251-A (sheet S05). Do
(abutment 2, see bridge plans, Sheet R02). Place pole plantings and permanent riprap class 4 along eastern bank. See detail E251-A (sheet S05). Remove temporary placing permanent riprap class 6 under the OHWM along the eastern bank of the bridge. See detail E251-A (sheet S05). Place permenant riprap for eastern abutment
Remove existing eastern abutment (abutment 2) and pier, demolish eastern approach pavement. Excavate eastern bank and begin placing vegetated riprap by temporary access pad at the east end of bridge. Install debris shield system as specified in Section 203.
Ensure that temporary diversion culverts have 18-inches of aggregate base as cover above, below and around them to avoid crushing. Construct diversion berm and
Construct temporary diversion berms, sandbags, temporary culverts and temporary riprap apron, and partial temporary access pad for crane at west end of bridge
Stage 1 immediately stabilize the associated disturbed areas. Once installed, do not modify the type, size, or location of any control or practice without approval of the CO.
Employ temporary stabilization practices in incremental stages when necessary as construction proceeds. Upon completion of any ground disturbing activity, directed by the CO.
inlet protection, and tree protection at the locations specified in the plans or as Prior to any clearing, grubbing, and excavation, install perimeter controls, temporary established.
All erosion and sediment practices are to be installed prior to any major soil disturbance, in their proper sequence, and maintained until permanent protection is areas outside the limits of work.
Preserve existing vegetation, trees, and shrubs when possible, and as directed by the CO. Do not disturb or clear vegetated
Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.
Do not allow any construction equipment to operate or access the down-slope side of the perimeter control measures.
borrow material removed from the construction site shall be stabilized at the site of placement.
Do not place excavated soil material adjacent to creeks, streams, or bodies of water in a manner that will cause it to be washed away by high water or runoff. Excess
No construction access will be permitted through a wetland or a waterway.
Install all erosion and sediment control devices in accordance with state and county requirements; as well as, Subsection 107.10.
defined/outlined in the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14) and the Special Contract Requirements.
throughout the life of the project to control erosion and to minimize the sedimentation of rivers, creeks, and streams. Soil erosion control measures are also
The Erosion and Sediment Control Narrative is intended to act as a guideline for preventing erosion and controlling sediment.The work consists of applying measures discharge surface waters to the National Response Center at 1-800-424-8802.
Develop and implement a Spill Prevention Control and Countermeasures (SPCC) Plan following the requirements under 40 CFR 112. Report spills large enough to
The total area of soil disturbance for the project is approximately acres. The receiving water is the Potomac River installation of riprap.
Soil disturbing activities include: placing and removing cofferdams, placing temporary construction access for removal of existing pier and installation of new piers.
repair of existing bioretention facilities, and other miscellaneous work.
This project consists of replacement of the Edgewater Stable Access Bridge deck, bridge rail and curbs, reconstruction of bridge approaches. The work also includes the
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION ROCK CREEK PARK
:5
A u g u s t
M
S H
E
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v
\C A
D D
\M
-R
O C
R
(1 e s .d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) M01
CONTROL NARRATIVE
EROSION & SEDIMENT
(STRUCTURE NO. 3450-033P)
EDGEWATER STABLE ACCESS BRIDGE
Sheet 2 of 2
VEGETATIVE STABILIZATION
Item Rate (pounds per acre)
700Fertilizer (10-20-20)
Agricultural Limestone (85 percent CaCO )
Name of Seed
Total =
In accordance with Subsection 625.07 apply seed at the following rates for each season as stated below:
Catalina Perennial Ryegrass
Impact Kentucky Bluegrass
Chewing Fescue
Redcoat Tall Fescue
Barlexas Tall Fescue
February 15 to November 15
Rates (pounds per acre)
Seeding Seasons and
Total =
Catalina Perennial Ryegrass
Impact Kentucky Bluegrass
Chewing Fescue
Redcoat Tall Fescue
Barlexas Tall Fescue
November 16 to February 14
250.0
25.0
25.0
62.5
62.5
75.0
30.0
30.0
75.0
75.0
90.0
Mulch Rate (pounds per acre)
In accordance with Subsection 625.08 apply mulch at the following rates:
Straw
Fiber Mulch
5000 (1 to 2 inch mat)
5000 (1 to 2 inch mat)
MAINTENANCE AND INSPECTION PROCEDURES
turf area mix only:In accordance with Subsection 625.06, apply limestone and fertilizer at the following rates for the roadside not include the vegetated riprap.
There will be 0.11 acres in need of stabilization as a result of this project. Prepare areas of turf establishment with fertilizer, topsoil and mulch. This area does necessary.
to ensure that culvert remains firmly in place and is not damaged or clogged. Clean clogged culvert and outlets or replace clogged or damaged culverts as
Inspect Temporary culverts - Inspect temporary culverts every seven days, and after every storm event. Check for mud/sediment buildup and pipe integrity.
for proper disposal.
entrance fails to perform effectively. Immediately brush or sweep up soil that has been tracked off-site onto the roadway replace, or add stone whenever the
Stabilized construction entrances - Inspect stabilized construction entrances every seven days. Check for mud/sediment buildup and pad integrity. Wash, of fence within 24 hours of inspection.
Inspect weekly and after each runoff event. Remove sediment deposits from silt fence when it reaches half the height of the device. Replace damaged section
Silt Fence - Install Silt Fence by hand to control runoff from disturbed areas. Ensure placement area be free of debris including rocks, sticks, and roots.
reached their rated capacity.replace damaged filter bags, or bags that have
Filter bags - Check filter bags daily during dewatering operations for punctures, tears, or other damage, and for capacity. Immediately cease pumping and event. Repair and replace any damaged measures by the end of the day.
and the individual permitting requirements. Inspect and maintain erosion control facilities daily during construction activities and immediately following a rain
Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices according to Section 157, the Details shown in the plans, EROSION & SEDIMENT CONTROL CONSTRUCTION SEQUENCE CONTINUED stabilized and vegetation is established, remove all perimeter controls after obtaining approval from the CO.
Once finished grading is achieved and all construction operations in each work area have been completed and all upslope areas are Seed and establish turf.
stone, bioretention cell filter media, and Rock Creek from the flushed sediment.
include flushing all inflow and outflow pipes to/from each facility of sediment, collecting anddisposing/stabilizing that sediment, and protecting any new riprap, Repair the existing bioretention facilities on the north western end of the bridge to their original standards as shown in the included GSI plans. This will
Stage 3 Continued
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION ROCK CREEK PARK
:3
A u g u s t
M
S
H E
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v \C
A D
D \M
-R
O C
R (1 e s .d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) M02
X
.6
X
T
12" CMP
L E
V .7
E L E
V .8
E L E
V .3 x .0
C M
P
E L E
V .6
E L E V .3 x .0
C M
P
.5
GAS VALVE
HYDRANT
FIRE
MANHOLE
SEWER
GAS VALVE
MANHOLE
SEWER
FLAG POLE
UNK CONCRETE SLABS
MANHOLES
SEWER
MANHOLE
ELEC. MANHOLE
LP
LP
ELEC. MANHOLE
UNK UTILITY
LP
MANHOLE
UNK UTILITY
UNK UTILITY
BUILDING
PIE
R
O V E R H E A D B
R
ID
G E
PIE
R
O V E R H E A D B
R
ID
G E
R C P
N
E 1298000
5 3
N
Beach Drive
B ri d g e
E d g e w a te r S ta b le
Disturbance Limits of Roadway
Disturbance Limits of Roadway
Detail E626-01 removed trees replace any disturbed or Proposed Staging Area
Proposed Staging Area
OHWM
Existing
OHWM
Existing facility repair plans in indluded bioretention bioretention facility as shown
Protect and repair existing
90'
Disturbance Limits of Roadway
Riprap Area (199 SF) Permanent Impacts
Riprap Area (405 SF) Permanent Impacts
Riprap Area (390 SF) Permanent Impact
120'
U.S. DEPARTMENT OF TRANSPORTATION
(STRUCTURE NO. 3450-033P)
EDGEWATER STABLE ACCESS BRIDGE
CONTROL PLAN
EROSION AND SEDIMENT
SCALE IN FEET
0 20 40
ROCK CREEK PARK
LIMITS OF DISTRUBANCE AND STREAM IMPACTS
Sheet 1 of 4
Temporary Stream Impacts
Permanent Stream Impacts
3098 SF
994 SF
AREA
allow access to buidlings and facilities at all times
Limit staging area impatcs in Edgewater Stables parking area to 1.
NOTES:
:1 e c e m b e r
M
S h e
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v \C
A D
D \M
-M
X
-R O
C R
(1 p ln
.d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) M03
NPS Drwg. No. 821-177658 PMIS No. 245035 repair plans included bioretention facility bioretention facility as shown in Protect and repair existing
GAS VALVE
HYDRANT
FIRE
MANHOLE
SEWER
GAS VALVE
MANHOLE
SEWER
FLAG POLE
UNK CONCRETE SLABS
MANHOLES
SEWER
MANHOLE
ELEC. MANHOLE
LP
LP
ELEC. MANHOLE
UNK UTILITY
LP
MANHOLE
UNK UTILITY
UNK UTILITY
BUILDING
PIE
R
O V E R H E A D B
R
ID
G E
PIE
R
O V E R H E A D B
R
ID
G E
N
5 3
F B
F B
N
Beach Drive
B ri d g e
E d g e w a te r S ta b le
Disturbance Limits of Roadway
Disturbance Limits of Roadway
Detail E626-01 removed trees replace any disturbed or Proposed Staging Area
Proposed Staging Area
OHWM
Existing
OHWM
Existing
Detail E157-02 Install Silt Fence
Detail E157-02 Install Silt Fence
Detail E157-08A 37 L.F.
Diversion Install Sandbag (supersack)
Detail E157-08A 200 L.F.
Diversion Install Sandbag (supersack)
Detail E157-10 Place filter bag
Detail E157-10 Place filter bag facility repair plans in indluded bioretention bioretention facility as shown
Protect and repair existing
51 LF each
Temporary culvert
SF
class 4, 344
Riprap apron, Temporary
Detail E157-01
Construction Exit, Stabilized
Detail E157-02
Intall Silt Fence
Do not disturb existing culvert
6 existing trees remove and replace
90'
Disturbance Limits of Roadway see sheet R04 Temporary access pad see sheet R04 Temporary access pad
Detail E157-01
Stabilized Construction Exit, 120'
U.S. DEPARTMENT OF TRANSPORTATION
SCALE IN FEET
0 20 40
(STRUCTURE NO. 3450-033P)
EDGEWATER STABLE ACCESS BRIDGE
CONTROL PLAN
EROSION AND SEDIMENT
ROCK CREEK PARK
STAGE 1
Sheet 2 of 4 o a minimum of +/- 35% of exisiting channel width.t
Limit reduction of channel width as stated in Hydraulic memo 2.
construction.
Protect all existing pipes and culverts prior to and during 1.
NOTES:
:2 e c e m b e r
M
S h e
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v \C
A D
D \M
-M
X
-R O
C R
(1 p ln
.d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) M04
NPS Drwg. No. 821-177658 PMIS No. 245035 repair plans included bioretention facility
FIRE
MANHOLE
SEWER
GAS VALVE
MANHOLE
SEWER
FLAG POLE
UNK CONCRETE SLABS
MANHOLES
SEWER
MANHOLE
ELEC. MANHOLE
LP
LP
ELEC. MANHOLE
UNK UTILITY
LP
MANHOLE
UNK UTILITY
UNK UTILITY
BUILDING
PIE
R
O V E R H E A D B
R
ID
G E
PIE
R
O V E R H E A D B
R
ID
G E
N
5 3
F B
F B
N
Beach Drive
B ri d g e
E d g e w a te r S ta b le
Disturbance Limits of Roadway
Disturbance Limits of Roadway
Detail E626-01 removed trees replace any disturbed or Proposed Staging Area
Proposed Staging Area
OHWM
Existing
OHWM
Existing
Detail E157-02 Install Silt Fence
Detail E157-02 Install Silt Fence
Detail E157-08A 37 L.F.
Diversion Install Sandbag (supersack)
Detail E157-08A 200 L.F.
Diversion Install Sandbag (supersack)
Detail E157-10 Place filter bag
Detail E157-10 Place filter bag facility repair plans in indluded bioretention bioretention facility as shown
Protect and repair existing
51 LF each
Temporary culvert
SF
class 4, 344
Riprap apron, Temporary
Detail E157-01
Construction Exit, Stabilized
Detail E157-02
Intall Silt Fence
Do not disturb existing culvert
90'
Disturbance Limits of Roadway see sheet R04 Temporary access pad see sheet R04 Temporary access pad
Detail E157-01
Stabilized Construction Exit, 120'
U.S. DEPARTMENT OF TRANSPORTATION
SCALE IN FEET
0 20 40
(STRUCTURE NO. 3450-033P)
EDGEWATER STABLE ACCESS BRIDGE
CONTROL PLAN
EROSION AND SEDIMENT
ROCK CREEK PARK
STAGE 1
Sheet 2 of 4 as directed by the CO.
3. Install replacement trees according to Section 626 and o a minimum of +/- 35% of exisiting channel width.t
Limit reduction of channel width as stated in Hydraulic memo 2.
construction.
Protect all existing pipes and culverts prior to and during 1.
NOTES:
:4
D e c e m b e r
M
S h e
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v \C
A D
D \M
-M
X
-R O
C R
(1 p ln
.d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) M04
NPS Drwg. No. 821-177658 PMIS No. 245035 repair plans included bioretention facility
FIRE
MANHOLE
SEWER
GAS VALVE
MANHOLE
SEWER
FLAG POLE
UNK CONCRETE SLABS
MANHOLES
SEWER
MANHOLE
ELEC. MANHOLE
LP
LP
ELEC. MANHOLE
UNK UTILITY
LP
MANHOLE
UNK UTILITY
UNK UTILITY
BUILDING
PIE
R
O V E R H E A D B
R
ID
G E
PIE
R
O V E R H E A D B
R
ID
G E
N
5 3
F B
F
120'
N
Beach Drive
B ri d g e
E d g e w a te r S ta b le
Disturbance Limits of Roadway
Disturbance Limits of Roadway
Proposed Staging Area
OHWM
Existing
OHWM
Existing
Detail E157-02 Install Silt Fence
Detail E157-02 Install Silt Fence
Detail E157-08A 37 L.F.
Diversion Install Sandbag (supersack)
Detail E157-10 Place filter bag
Detail E157-10 Place filter bag facility repair plans in indluded bioretention bioretention facility as shown
Protect and repair existing
51 LF each
Temporary culvert
SF
class 4, 344
Riprap apron, Temporary
Detail E157-01
Construction Exit, Stabilized
Detail E157-01
Construction Exit, Stabilized
Detail E157-02
Intall Silt Fence
Do not disturb existing culvert
6 existing trees remove and replace
90'
Disturbance Limits of Roadway see sheet R04 Temporary access pad see sheet R04 Temporary access pad see sheet R04 Cofferdam
Detail E626-01 removed trees replace any disturbed or Proposed Staging Area
U.S. DEPARTMENT OF TRANSPORTATION
SCALE IN FEET
0 20 40
(STRUCTURE NO. 3450-033P)
EDGEWATER STABLE ACCESS BRIDGE
CONTROL PLAN
EROSION AND SEDIMENT
ROCK CREEK PARK
STAGE 3
Sheet 4 of 4 o a minimum of +/- 35% of exisiting channel width.t
Limit reduction of channel width as stated in Hydraulic memo 2.
construction.
Protect all existing pipes and culverts prior to and during 1.
NOTES:
:3 e c e m b e r
M
S h e
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v \C
A D
D \M
-M
X
-R O
C R
(1 p ln
.d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) M06
NPS Drwg. No. 821-177658 PMIS No. 245035 repair plans included bioretention facility
FACILTIY ONLY. NOT FOR NEW CONSTRUCTION
AS BUILT BEACH DRIVE PLANS FOR REPAIR OF BIORETENTION
U.S. DEPARTMENT OF TRANSPORTATION ROCK CREEK PARKROCK CREEK PARK
(STRUCTURE NO. 3450-033P)
EDGEWATER STABLE ACCESS BRIDGE
PLANS
BIORETENTION FACILITY REPAIR
Sheet 1 of 5
:5
A u g u s t
M
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v \C
A D
D \M
-M
X
-R O
C R
(1 p ln
.d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) M07
U.S. DEPARTMENT OF TRANSPORTATION ROCK CREEK PARKROCK CREEK PARK
(STRUCTURE NO. 3450-033P)
EDGEWATER STABLE ACCESS BRIDGE
Sheet 2 of 5
PLANS
BIORETENTION FACILITY REPAIR
:5
A u g u s t
M
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v \C
A D
D \M
-M
X
-R O
C R
(1 p ln
.d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) M08
U.S. DEPARTMENT OF TRANSPORTATION ROCK CREEK PARKROCK CREEK PARK
(STRUCTURE NO. 3450-033P)
EDGEWATER STABLE ACCESS BRIDGE
Sheet 3 of 5
PLANS
BIORETENTION FACILITY REPAIR
:0
A u g u s t
M
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v \C
A D
D \M
-M
X
-R O
C R
(1 p ln
.d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) M09
U.S. DEPARTMENT OF TRANSPORTATION ROCK CREEK PARKROCK CREEK PARK
(STRUCTURE NO. 3450-033P)
EDGEWATER STABLE ACCESS BRIDGE
Sheet 4 of 5
PLANS
BIORETENTION FACILITY REPAIR
:0
A u g u s t
M
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v \C
A D
D \M
-M
X
-R O
C R
(1 p ln
.d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) M10
U.S. DEPARTMENT OF TRANSPORTATION
(STRUCTURE NO. 3450-033P)
EDGEWATER STABLE ACCESS BRIDGE
Sheet 5 of 5
PLANS
BIORETENTION FACILITY REPAIR
ROCK CREEK PARKROCK CREEK PARK
:0
A u g u s t
M
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v \C
A D
D \M
-M
X
-R O
C R
(1 p ln
.d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) M11
FEMA FLOODPLAIN
DRAINAGE AREA
LIMIT OF DISTURBANCE
IMPERVIOUS
COMPACTED
NATURAL
SOIL TYPE
U.S. DEPARTMENT OF TRANSPORTATION
EXISTING SWM COVER MAP
(STRUCTURE NO. 3450-033P)
EDGEWATER STABLE ACCESS BRIDGE
ROCK CREEK PARK
200'100'0
Scale in Feet
N
DA COVER MAP
100'50'0
Scale in Feet
LOD COVER MAP (HALF-SCALE)
N
NORTH LOD STAGING AREA
NORTH LOD
SOUTH LOD
O P
P E
I
S T
O P
S P
S P
E L
I
S
PS
P
S P
S P
M P
H +N
U
K E
N O
R N
N O
R N
:3
:3
A
M
B
IK
IN
G
P
G
S T
O P
W R
O
W
Y
(B -B
T E
R
:4
-6 :3
-F
L
ID
A Y Y S
-P
A
IL
P
A R
C O
U R S
E
B
IK
G
S P
F
IT
N E
V E
N
O
O
X
E M
HORSE_CROSS
FI
SHI
NG
W
ARNI
NG
WRONG
WAY
M O
NTO
FRID
LEFT O
NEW
AY RIGHT O
NEW
AY
RO
CKCREECK PARKW
AY
RESERVE PARKING
VISITOR PARKING
PARKING PERMIT
WOODLY LANEBRIDGE
FLAG POLE
UNK CONCRETE SLABS
LP
LP
LP
BUILDIN
G
P
IE
R
O V E R H E A D B
R
ID
G E
P
IE
R
O V E R H E A D B
R
ID
G E
O
FFIC
E
T R A
IN
IN
G S
TA
T
IO
N
U .S
. PA
R K P
O
LIC
E
P
IE
R
O V E R H E A D B
R
ID
G E
P
IE
R
O V E R H E A D B
R
ID
G E
U4 W
W W
U
M bD
UsB
Ck
Ck
WCkCk
W
UsB Ck
M bDUs B
MbD UsB
MbD
UsB
U1 M bD
U1 U4
U1
U4 U
SgB
JtC
Jt C
:0
A u g u s t
D D e s ig n S u r v
F
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v \C
A D
D \M
-R
O C
R (1
C o v e r
M a p P la n .d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) M12
U.S. DEPARTMENT OF TRANSPORTATION
(STRUCTURE NO. 3450-033P)
EDGEWATER STABLE ACCESS BRIDGE
COMPLIANCE DATA
SWM MANAGEMENT PLAN
:2
S e p te m b e r
M
P R
O J E
C T
S \r o c r\
(1
P ro j_
D e v \C
A D
D \M
-M
X
-R O
C R
(1 p ln
.d g n
STATE PROJECT
NUMBER
SHEET
DC NP ROCR 910(1) M13
R01
M
P R
O J E
C T
S \r o c r\
(1
B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \1
\0
P R
O J E
C T
S
.d g n
GENERAL NOTES AND INDEX
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
/6 /2
R R
O C
R
(1
G
N .D
G N
A C
T U
A L
F
IL
E th
HL-93. Maximum Dynamic Load Allowance, IM=33%
Live Loads:
GENERAL NOTES:
Design:
AASHTO LRFD Bridge Design Specifications, 9 Edition, 2020.
SPECIFICATIONS:
Construction Specifications, and 60 durometer hardness, Method A.
Furnish bearing pads conforming to the requirements of Section 18.2 of AASHTO LRFD
Bearings:
load f'si = 0.75 f'u = 202,500 psi.
to AASHTO M 203, Grade 270. Pre-tension each strand to a total 43,950 lbs, at which
Furnish 0.6-inch diameter, seven wire, low-relaxation, prestressing strand conforming
Prestressing Steel:
Dead Load:
Construction Tolerance Load: 17 psf
Railing weight: 173 plf
Future Wearing Surface: 25 psf
Concrete: 150 pcf
DESIGN LOADS:
No Scale
GEOTECHNICAL REPORT:
CVCV/SA
curbs and approach slabs conforming to ASTM A775.
Furnish epoxy coated reinforcing steel for prestressed girders, bridge overlay, Provide 2-inch cover for reinforcing steel unless otherwise noted.
Furnish reinforcing steel conforming to AASHTO M 31, Grade 60 deformed.
Reinforcing Steel:
construction submittals will be required according to Section 104.
additional working days will be allowed for these options, and abutments, wingwalls, approach slabs, and bent caps. No
Contractors may elect to cast-in-place any or all the following:
Field verify all dimensions.
Federal Highway Projects, FP-14.
Standard Specifications for Construction of Roads and Bridges on
Construction:
AS/HS
INDEX OF BRIDGE PLAN SHEETS
Subsurface Profile
Boring Location Plan
Reinforcing Steel Bar List - 2
Reinforcing Steel Bar List - 1
Rail Details - 2
Rail Details - 1
South Approach Slab Details
North Approach Slab Details
Expansion Joint Details
Deck Reinforcement Details
Bearing Details
Miscellaneous Details - 1
Girder Details - 2
Girder Details - 1
Typical Section
Framing Plan
Pier Reinforcement
Pier Layout
Miscellaneous Precast Abutment Details - 2
Miscellaneous Precast Abutment Details - 1
Precast Wingwall Details
Precast Abutment 2 Reinforcement
Precast Abutment 2 Pile Cap
Precast Abutment 2 Layout
Precast Abutment 1 Reinforcement
Precast Abutment 1 Pile Cap
Precast Abutment 1 Layout
Foundation Layout
Plan and Elevation
Temporary Access Pad Layout
Site Plan
General Notes and Index
SHEET NO. SHEET TITLE
For boring logs and other geotechnical information, see Soils and Foundation Report No. 01-20, dated November 2020.
Concrete:
-inch, transverse roughened finish.4 1Rake top surface of each beam with an amplitude of
- inch unless otherwise noted.4 3Chamfer exposed edges of all concrete to ASTM C1107 to fill the precast recess holes.
Furnish non-shrink grout with a minimum compressive strength of 5000 psi in 3 days, conforming shear key.
Furnish Class Ultra high performance concrete (UHPC) for VDOT 48" x 27" adjacent box beam with f'c = 5500 psi at release and f'c = 7000 psi at 28 days.
Furnish Class P(Prestressed) concrete for adjacent box beam type VDOT 48" x 27" minimum f'c = 7000 psi at 28 days.
Furnish Class A (Drilled shaft) concrete for drilled shaft with a pier and abutments closure pours with a minimum f'c = 5000 psi at 28 days.
Furnish Class A(AE) concrete for precast abutments, cast in place overlay, and curbs with a minimum f'c = 5000 psi at 28 days.
Furnish Class D(AE) concrete for diaphragm, approach slab, bridge
MATERIALS:
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
177658
245035 DC NP ROCR 910(1)
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
DRAWN BY
Anna Kang of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-130632
Structure Number 3450-033P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EDGEWATER STABLE ACCESS BRIDGE
October 2024
R02
M
P R
O J E
C T
S \r o c r\
(1
B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \1
\0
P R
O J E
C T
S
.d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
/6 /2
Sta. 10+52.23
Begin Bridge Sta. 11+56.65
End Bridge
N
CL Pier
Sta. 11+04.44
10+40.00 10+60.00 10+80.00 11+00.00 11+20.00 11+40.00
CL Roadway
11+60.00
Bridge Length = 104'-5"
R
R
O C
R
(1
S
IT
E
P L
A N
.D G
N A
C T
U A
L F
IL
E bridge structure
Remove existing
1V:2H
1V:4.8H
Geotextile Class 1, Type C
Riprap Class 6 1V:
2H
Geotextile
Class 1, Type C
Class 6
Riprap
Abutment 1
Abutment 2
PLAN
ABUTMENT 1
RIPRAP DETAIL
"=1'-0"16
ABUTMENT 2
RIPRAP DETAIL
1V:
1.
5H
SITE PLAN
11+80.00
R o c k C r e e k
T y p
(T y p
Elev. 32.80
Elev. 30.78
Elev. 22.28
Elev. 30.00
Elev. 23.00
(Typ.)
to be removed
Existing pier
SECTION A-A
Geotextile
Class 1, Type C
1V:
1.
5H
A
AS
Class 6
Riprap
1.
Notes:
vegetative riprap.
See "CONSTRUCTION PLAN AND PROFILE", sheet D01 for
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
177658
CVCV Anna Kang of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-130632
Structure Number 3450-033P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EDGEWATER STABLE ACCESS BRIDGE
ROCK CREEK PARK
October 2024
S47°17'30"E
S47°17'30"E
S47°17'30"E
S46°40'42"E
S47°17'30"E
S47°17'30"E
S47°17'30"E
S46°40'42"E
3'-6"
3'-6"
23'-0"9
"2
15'-8
"2
3'-11
"4
1'-3
"4
6'-5
26'-8"
10'-6"
ELEV. 27.77'H
O
R S
E
C R
O S
S
M O
N T
O F
R I D
L E F T O
N E
W A
Y R I G
H T O
N E
W A
Y
R O
C K
C R
E E
C K P
A R
K W
S47°17'30"E
S46°40'42"E
R03
M
P R
O J E
C T
S \r o c r\
(1
B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \1
\0
P R
O J E
C T
S
.d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
/6 /2
SECTION A-A
pier construction Cofferdam for
(Typ.)
cofferdam sandbag Supersack pier construction Cofferdam for along east embankment Temporary erosion control structure Remove existing to be removed Existing Structure apron Temporary riprap
ELEVATION
PLAN
A A
R
R
O C
R
(1
T
E M
P O
R A
R Y
A C
C E
S S
P A
D .D
G N
A C
T U
A L
F
IL
E
" = 1'-0"16
Notes:
1.
2.
Access Pad Temporary
Access Pad Temporary
Access Pad Temporary
N
TEMPORARY ACCESS PAD LAYOUT
1V:1.5H (m ax.)
3.
Riprap Class 4 apron Culvert Riprap
HS
Turbidity barrier culverts (Typ.)
carbon steel pipe 30" Ø Temporary culverts (Typ.)
carbon steel pipe 30" Ø Temporary
(Typ.)
Supersack sandbag
CV
H :1
V m a x
H :1
V
(m a x.)
4.
Access Pad Temporary for sandbag details.
See "Erosion and Sediment Control Plans" sheets, Obtain the final layout approval from the CO.
The layout provided is based on preliminary analysis.
beginning any removal operations
Submit a removal plan to the CO for approval before
Section 208.
Construct temporary access pad according to cofferdam (Typ.)
Supersack sandbag
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
177658
CV Anna Kang of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-130632
Structure Number 3450-033P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EDGEWATER STABLE ACCESS BRIDGE
ROCK CREEK PARK
October 2024
30'-0"
46'-7"
"2
8'-3 "2
8'-3
"2
59'-5
14'-6"
13'-8"
R04
M
P R
O J E
C T
S \r o c r\
(1
B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \1
\0
P R
O J E
C T
S
.d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
/6 /2
Elev. 38.85
Sta. 10+52.23
Begin Bridge
Sta. 11+56.65
End Bridge
CL Pier
Elev. 40.10
Sta. 11+04.44
L PierC
EXP
Fix Fix
EXP
17' 30" E O
S 47 10+40.00 10+60.00 10+80.00 40' 42" E
O
S 46 11+00.00 11+20.00 11+40.00
CL Roadway
11+60.00
Bridge Length = 104'-5"
OHWL = 23.5 (±)
ground at C Existing
L
Elevation 36.06
Low Concrete
PLAN AND ELEVATION
grade Profile
PLAN
ELEVATION
"=1'-0"16
(Typ.)
11+80.00
Elev. 41.36
Steel Railing
R o c k C r e e k
1:2
R
R
O C
R
(1
P E
.D G
N A
C T
U A
L F
IL
E
1V:
2H
1V:
1.
5H
1V:2H
1V:4.8H
1.
N
(Typ.)
VDOT 48" x 27"
Flow
(cfs)
WSEL
(ft)
Event
10 year
500 year
25 year
50 year
1 year
HYDRAULIC DATA
28.60
30.68
35.80
37.09
41.98
45.48
2 year
100 year 43.94
10335
13840
16340
21840
(See Note 1)
Riprap Class 6
Elev. 32.80
Elev. 30.78
Elev. 22.28
Elev. 30.00
1V:4.8 H
Elev. 23.00(ft)
Freeboard
5.4
0.28
-1.01
-5.9
-7.89
-9.4 for railing details.
See "RAIL DETAILS - 1" and "RAIL DETAILS - 2" sheets
See "SITE PLAN" sheet for complete riprap details.
2.
Notes:
North approach slab South approach slab
AS
7.46
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
177658
DATE BRP NO.BRIDGE PLAN SHEET
BRP-130632
Structure Number 3450-033P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EDGEWATER STABLE ACCESS BRIDGE
ROCK CREEK PARK
October 2024
+2.409%
S47°17'30"E
S46°40'42"E
104'-5"
"2
52'-2"2
52'-2
39.39
.4
R05
M
P R
O J E
C T
S \r o c r\
(1
B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \1
\0
P R
O J E
C T
S
.d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
/6 /2
Sta. 10+52.23
Begin Bridge
Sta. 11+56.65
End Bridge
CL Pier
Sta. 11+04.44
CL
Bridge Length = 104'-5"
FOUNDATION LAYOUT
R
R
O C
R
(1
F O
U N
D A
T
IO
N L
A Y
O U
T .D
G N
A C
T U
A L
F
IL
E
C PierL
S p a
15.39
27.86
30.36
PLAN
ELEVATION
Abutment 2
Pier
Abutment 1
0.50
" = 1'-0"16 3Scale:
" = 1'-0"16 3Scale:
AS SHOWN
bedrock elevations .
See "SUBSURFACE PROFILE" sheet for approximate
2.
1.
Notes:
AS
"2 152'-2 "2
152'-2 of Bedrock
Approximate Top
C
104'-5"
"8
1'-11
4'-6" a b c d e f g h
POINT STATION LEFT OFFSET RIGHT OFFSET
a b c d e f g h
23.66
23.59
10.15 -
8'-7" 8'-0"
ABUTMENT 1 FOOTING POINT TABLE
3'-7" 1'-11"
"8 74'-1"8
11'-10
10+43.53
10+50.42
10+58.32
10+58.32
10+49.92
10+43.11
10+48.87
10+49.09
19.60
10.10 -
10.10
19.39
- 10.06
R o c k
S o c k e t
CL
Roadway
Structure S e e N o te
(Typ. at both abutments)
12" x 84 steel piles
L 12"x 84 steel piles
(T y p
(T y p
(T y p
(kips) (ft)
Factor resistance of all piles length of all piles
Location Resistance Nominal Axial Estimated total pile sheet. For approximate bedrock elevations see Geotechnical Report.
the existing bedrock to a minimum socket depth indicated in this
3. Install all piles thru pre-bored holes. At each location penetrate installation process, according to Section 551.
Indicates test pile, utilizing static load testing during
1'-6"
1'-6" 2'-6"1'-7"
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
177658
DATE BRP NO.BRIDGE PLAN SHEET
BRP-130632
Structure Number 3450-033P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EDGEWATER STABLE ACCESS BRIDGE
ROCK CREEK PARK
October 2024
S47°17'30"ES47°17'30"E
4'-6"4'-6" 1'-6"1'-6"
12'-0"
S p a
8'-0"
S p a
1'-6"Ø Rock socket (Typ.)
4'-0"4'-1"
R06
M
P R
O J E
C T
S \r o c r\
(1
B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \1
\0
P R
O J E
C T
S
.d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
/6 /2
Notes:
Flat Flat
PLAN
ELEVATION
SECTION A-A
AS SHOWN
T y p
A
L
L
N
2% 2%
" = 1'-0"1Scale
PRECAST ABUTMENT 1 LAYOUT
Curb Line Begin bridge
Elev. 37.42
Elev. 27.86
R R
O C
R
(1
P
R E
C A
S T
A B
U T
M E
N T
L
A Y
O U
T .D
G N
A C
T U
A L
F
IL
E
Elev. 27.86
Elev. 37.42
Elev. 39.43
SECTION B-B
" = 1'-0"1Scale
SECTION C-C
" = 1'-0"1Scale
C C closure pour
Cast in place wingwall
Precast
Elev. 38.00 slab
Approach
A
(See Note 4) spacing
Dowel hole
Pile Cap
Precast wingwall
Precast
Abutment
Precast
B
B
C C change
Slope
(Typ.)
C Bearings
Precast abutment Precast Pile Cap wingwall
Precast
Precast pile cap
Precast pile cap
" = 1'-0"8 3Scale
1' -1
1' -5
1' -2
8' -5
4. See "BEARING DETAILS" sheets for more details.
details.
"PRECAST ABUTMENT 1 PILE CAP" sheets for reinforcement
1", "MISCELLANEOUS PRECAST ABUTMENT DETAILS - 2",
DETAILS", "MISCELLANEOUS PRECAST ABUTMENT DETAILS -
2. See "ABUTMENT 1 REINFORCEMENT" , "PRECAST WINGWALL to Subsection 104.03 and Section 552.
Submit precast drawings to the CO for approval and according 1.
3'-7"
T y p
(Typ.)
AS
LC Roadway C Structure
Elev. 39.43
Elev. 38.00
Elev. 37.42
Curb Line Elev. 38.68Elev. 38.68
" = 1'-0"8 3Scale closure pour
Cast in place
(Typ.)
pour (Typ.)
footing closure
Cast in place
Elev. 35.89
Elev. 35.89
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
177658
DATE BRP NO.BRIDGE PLAN SHEET
BRP-130632
Structure Number 3450-033P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EDGEWATER STABLE ACCESS BRIDGE
ROCK CREEK PARK
October 2024
1'-0" "2
1'-1 "2
1'-5
"4
1'-5
3'-7"
"8
1'-11
1'-6"
"4
1'-2
"2
20'-2
"8
3'-8
"4
2'-"4
4'-"4
4'-"4
4'-"4
4'-"4
2'-
"4
11'-3
"8
3'-8
"85
"8
8'-8 "8
8'-8
1'-0"
R07
M
P R
O J E
C T
S \r o c r\
(1
B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \1
\0
P R
O J E
C T
S
.d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
/6 /2
PLAN
ELEVATION
SECTION A-A
AS SHOWN
N
#6AF2 (Top and Bottom)
Lap Splice
(Typ.)
Closure Pour
Cast in place
Closure Pour
Cast in place
Em bedm ent
(Typ.)
18" x 18" Pile recess
4 Spa.@ 61 2"
=2'-2"
(Top and Bottom)
#7AF1
(Typ.) between piles
#7AF1 (Top)
(Typ.)
(Precast Pile Cap 1)
4' -9
'-9
3' -9
'-1
(T yp
4 Spa. @4'-0"=16'-0"
#7AF1 (Top and Bottom)
#6AF2 (Top and Bottom)
PRECAST ABUTMENT 1 PILE CAP
SECTION B-B
R
R
O C
R
(1
P R
E C
A S
T A
B U
T M
E N
T
P
IL
E C
A P
.D G
N A
C T
U A
L F
IL
E
"2 118'-2
#7AF1
(Typ.)
(Top and Bottom)
#6AF6 splice
/w #6AF2
#6AF7
m atch/w
6AF6
A
#6AF2
(Top)
(Typ.)
(Typ.)
B
B
#6AF8 (e.f.)
S pa '-0
1' -0
6AF9
e.
f.)
(T yp
(P re ca st p ile c ap
#6AF6
(Typ.)
Mechanical splice
(Top and Bottom)
(Typ.)
#6AF7
(Typ.) (Top and Bottom)
(Typ.)
(Between piles)
#7AF1 (Top)
Precast wingwallPrecast abutmentPrecast wingwall
P ile re c e s s
A F
(T o p
(B o tto m ) "8
'-1
'-6
S p a
'-8
"8
'-6
(T op
1' -2
A F
(T o p
(B o tto m
Precast pile cap 2 Precast pile cap 1 Precast pile cap 2
#6AF2#6AF4 #6AF4
#6AF2
(Top)
(Bottom)
(Top)
(Bottom)
(Top)
(Bottom)
(Top)
(Bottom)
#6AF4
Sp a.
7AF3
2 Spa.@ 4'-0"=
8'-0"
"2
1'-7
(Typ.)
18"x18" Pile Reccess
(T op a nd B ot to m
(B et w ee n pi le s) Ty p.
2' -2
1' -2
7AF3
(T op
(T yp
#6AF4
(v ar ie s)
(v a rie s
A F (v a rie s
(v a rie s
(T op
(B ot to m
7AF3
(T o p a n d B o tto m
'-0
" (T y p
(Typ.)
#6AF8(e.f.)
(DETAIL A)
closure pour
Cast in place cap 1
Precast pile cap 2
Precast pile splice (Typ.)
Mechanical
DETAIL A
(Typ.)
(over piles)
4"
"8 19'-4
(e.f.)
#6AF8
(e.f.)
#6AF9
9"
Precast abutment
Precast wingwall
(Top and Bottom)
(2) #7 Bars splice (Typ.)
Mechani…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .