This document is Amendment 0001 for a federal solicitation (693C73-25-R-000051) for the Rock Creek Park rehabilitation project in Washington, D.C. The amendment extends the proposal due date to Tuesday, June 3, 2025, at 2:00 p.m. EDT, and provides several key updates including a summary of questions and clarifications from potential offerors, an amended plan sheet (M-05), revisions to Special Contract Requirements, existing bridge drawings, and a blank Past Performance Questionnaire.

The project involves replacing the Edgewater Stable Access Bridge (Structure No. 3450-033P), with work including bridge deck, rail, and curb replacement, approach reconstruction, and bioretention facility repairs. Notable clarifications in the amendment address technical aspects such as: blasting is not permitted, no construction road across the waterway is allowed, existing bridge access will be on foot only, and cast-in-place substructure elements are permitted if the 160 Calendar Day closure period is maintained. The estimated project value ranges from $2-5 million, with specific subcontracting goals including 43.02% for small businesses and smaller percentages for disadvantaged, women-owned, HUBZone, and service-disabled veteran-owned small businesses.

View the file

Other files for this federal contract opportunity

Other files attached to Rock Creek Park, newest first.
File Type Posted
Amendment 0002 - NP ROCR 910(1).pdf PDF
RFP Solicitation - NP ROCR 910(1).pdf PDF
FP14_Eng.pdf PDF
Bridge Inspection Report_3450-033P2833.pdf PDF
Geotech Report_Aug 2023.pdf PDF
Subcontracting Plan - NP ROCR 910(1).doc DOC document
VETS-4212 Form.pdf PDF
Categorical Exlclusion Form (NEPA).pdf PDF
ADV_Offerors Qualifications Form.doc DOC document
Plans - NP ROCR 910(1) .pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

693C7325R000051 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ASHBURN VA 20147

ATTN: Construction

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

ASHBURN VA 20147

ATTN: Acquisitions

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

See Block 1405/16/20250001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/16/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

NP ROCR 910(1):

The purpose of this Amendment is to:

1) Provide a summary of responses to questions/clarifications asked by interested offerors.

2) Provide amended plan sheet M-05.

3) Revise the Special Contract Requirements (J Pages) Subsection 108.01(a).

4) Provide existing bridge drawings.

5) Provide a blank Past Performance Questionnaire.

6) Extend the proposal due date to Tuesday, June 3, 2025, at 2:00 p.m. EDT.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Amendment No. 0001 Project NP ROCR 910 (1)

Replacement of Edgewater Stable Access Bridge (Structure No. 3450-033P) Solicitation: 693C73-25-R-000051

The purpose of this Amendment is to:

1) Provide a summary of responses to questions/clarifications asked by interested offerors.

2) Provide amended plan sheet M-05.

3) Revise the Special Contract Requirements (J Pages) Subsection 108.01(a).

4) Provide existing bridge drawings.

5) Provide a blank Past Performance Questionnaire.

6) Extend the proposal due date to Tuesday, June 3, 2025, at 2:00 p.m. EDT.

Questions / Clarifications

The following questions and issues were submitted to EFLHD at eflhd.conracts@dot.gov. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included. The Government’s direct response to the sender may also have been updated below for better clarity.

1. Is an LUP Permit required? Response: Yes.

2. Do liquidated damages apply? If so, please provide amount per day. Response: See FP- 14 Subsection 108.04.

3. Does the Contractor have to pay any fee for using the SAM database requirement for payment? Response: Contractors do not use SAM.gov for contract invoice payments. The SAM.gov website is not affiliated with FHWA or Eastern Federal Lands Highway Division (EFLHD).

4. In case of Rock Excavation, is Blasting allowed as a means and method? Response:

Blasting is not permitted.

5. Does the contractor have to include any vibration monitoring or any special control measures due to the existing structures close to the new bridge? Response: The contractor is responsible for protecting existing structures in place.

6. If we encounter contaminated soil/hazardous materials during excavation, how will the contractor be compensated? Response: No contaminated soil/hazardous materials are anticipated. See FP-14 Subsection 109.05 for Scope of Payment information.

7. Are there any incentives, disincentives, or penalization fees related with lane closures or similar to VDOT regulations? Response: See Subsection 635.04(g) of the Special Contract Requirements.

8. Per the Temporary Traffic Control Narrative plan, we have to close traffic to the bridge during bridge construction. Please clarify how the Edgewater Stables will have access, and what is the planned detour for that specific access? Response: If needed, the National Park Service will access the stables on foot. No vehicle access is required.

9. It appears that Sheet M-05 of the Erosion and Sediment Control plans is missing. Sheet M-04 is duplicated. Could you please provide the missing plan sheet? Response:

Revised plan sheet is provided.

10. Please provide as built plans of the structure to be removed. Response: Existing bridge drawings are provided.

11. Can the FHWA or the project engineer offer some clarification on the testing requirements? For one, there are discrepancies within the drawings as to what is needed for testing. The specification provided calls out dynamic testing which would involve hitting the piles with an impact hammer (This is something that will damage not only the newly installed concrete set piles, but also the hammer itself.) The tabulation of quantities calls out for static load tests… Which is and of itself a challenge because Static compression testing requires four additional reactionary or “anchor piles” for the testing frame. An added challenge to that is the need to test one of the piles in the Pier which will be down inside and coffer dam in which our testing frame will not fit. I also haven’t seen load requirements for the piles anywhere in the docs. Response: Dynamic load testing is not specified in the contract documents. Design loads are provided on Sheet R05

12. Is the expectation that the pier piles will be installed from the bottom of footer elevation or that they will be installed from a higher elevation and trimmed later? It can surely be done either way bit there will be cost considerations wither way. Response: It is up to the contractor to determine the method of installation.

13. Is there a plan to access/ a construction road across the waterway during construction that is not shown on the plans? Based on what is in the drawing it seems that they only show access out to the near side of the coffer dam. I do not see how we would access the stable side abutment for. Response: No construction road across the waterway in the stream is permitted.

14. RFP page 19, Factors 2(a) and 2(b) Experience. For the Offeror and Subcontractor projects, is there an Experience Form we need to use, or should we just provide brief descriptions and point of contact information? Response: There is no specific format for the submitted information provided in Factors 2(a) and 2(b).

15. RFP page 21, Factor 3 – Past Performance, says: “Provide past performance evaluations for at least three (3) projects that are of similar type, size, and complexity to the requirements listed in the RFP within the past five (5) years.” Is there a past performance questionnaire we need to send to customers, or do we just describe the projects and provide a customer reference person, whom FHWA may decide to contact? Response:

There is no specific format for the past performance evaluations. The past performance evaluations should be complete and filled out by previous customers.

A blank Past Performance Questionnaire has been provided with Amendment No.

0001 for your convenience.

16. Does the Offeror's Qualifications Form go into the Technical Proposal? If so, do its pages count against the 40-page limit? Response: Provide the Offeror’s Qualification form separately as part of the proposal document package.

17. In addition to the Proposal Schedule, do the SF1442, Bid Bond, Fill-in Clauses, and VETS-4212 go into the Price Proposal? Response: Yes. Please be sure to acknowledge all amendments.

18. Both the Offeror Qualifications form and Technical Factor 2 call for resumes. Is it permissible to put them in Factor 2 and insert a cross-reference in the Qualifications form? Response: Include the resumes in both the Offeror Qualification and Technical Factor 2.

19. RFP p. 18. Factor 1 Planned Approach. Please clarify the difference between the narrative required in (a) and the narrative required in (b). They both talk about staging and sequencing. Response: Item (a) requires the offeror to provide an approach to meeting the overall project schedule. Item (b) requires the offeror to provide an approach to meeting the bridge closure duration requirements.

20. The timeline for projects in Factor 2 Prior Experience, Para. (a) (RFP p. 19), goes back 10 years. But the timeline for projects in Factor 3 Past Performance (RFP p. 21) goes back only 5 years. Can they both be 10 years? Response: The requirement for Factor 3 can be extended to 10 years.

21. The bridge substructure needs to be removed fully or to a certain distance from the mudline? If they need to be removed fully, would the FHWA be open to assess this as Value Engineering? Response: Value Engineering proposals will be evaluated according to FP-14 Subsection 103.03.

22. The new bridge footings are shown as precast elements. Can the new abutment footing be constructed as Cast-in-place as long as the contractor can complete the entire bridge structure within or earlier then the 160 Calander Day closure period? Response: Cast-in-place footing is allowed for the new abutment as long as the contractor can complete the entire bridge structure within or earlier than the 160 Calander Day closure period.

23. The new bridge stem and wingwalls are shown as precast elements. Can the new abutment stems and wingwalls be constructed as Cast-in-place as long as the contractor can complete the entire bridge structure within or earlier than the 160 Calander Day closure period? Response: Please see Item #22. Cast-in-place substructures are allowed as long as the contractor can complete the entire bridge structure within or earlier than the 160 Calendar Day closure period.

24. Are As-built drawings available for the existing bridge? Response: Existing bridge drawings are provided.

25. Special Provisions Section 108, Prosecution and Progress, 108.01, a and b. Notation a states that only November 15 through March 31 is available for bridge removal. When you overlap Notation B, the bridge pier removal must be complete by February 14. Is it the government’s intention that the closure period of the bridge begins in November of 2025? There is not enough time to source and fabricate materials for the new bridge and have a closure starting in November 2024. Response: The Government anticipates the bridge closure to begin in 2026.

26. Special Provisions Section 108, Prosecution and Progress, 108.01, b. Notation b states that instream work is prohibited during the period of February 15 through June 15. What is considered instream work? Specifically Installing cofferdams, working behind/inside of cofferdams, removal of cofferdams, installation and removal of access pads?

Response: Any work below the Ordinary High Water Mark (OHWM) is considered instream work. This includes work behind or inside a cofferdam.

27. Will the government allow an additional temporary access pad on the Southeast corner of the bridge? Response: Permits have been obtained based on what is shown on the plans. If the contractor wants to deviate from what is shown on the plans, the contractor is responsible for coordination with the permit agencies and obtaining approval and the required permits.

28. Special Provision page 144 of 144 has a title sheet that says “Permits Obtained for this Project but there are no permits included. Please provide the permits that have been attained for the project to the bidders so we can know any permit limitations and account for them in our bids and technical submission. Response: Permits are provided in the RFP Solicitation pdf document (pages 147 – 319) located on SAM.gov.

29. Is there a restriction on how low to the stream a debris shield can be hung under the existing bridge? Response: The contractor is responsible for determining the height restriction for the debris shield.

30. Bridge Plan sheet 11 of 32, and other sheets that reference Grouted Couplers. Is the precast fabricator permitted to use a coupler manufacturer and type of their choosing?

Response: The Contractor needs to submit the supplement materials specifications to CO and gets the approval.

31. Bridge Plan sheet 7 of 32, Detail A. There is no reference to where this detail occurs. The detail descriptors say it is a detail of the pile cap, but the pile cap only has two mats of rebar and this detail shows 8+ mats of rebar. Please clarify. Response: Detail A is showing the Cast-in-place Closure Pour at corners between the wingwall footings and the abutment footing.

32. Can the rock cores shown in the Soils and Foundation Report be made available for personal inspection should any of the drilling subcontractor desire to see them?

Response: No.

33. Bridge Plan sheet 3 of 32, shows the use of supersacks as temporary cofferdams. Detail E157-08A shows concrete barrier for three of the details and no barrier on the fourth detail. All four details have notes that point to “regular” sandbags as being supersacks.

Can the contractor propose for government acceptance what materials and methods they plan to use for the cofferdams and not be obligated to use these details referenced?

Response: Please refer to the Note #1 on Sheet S03 with Detail E157-08A.

34. Bridge Plan sheet 15 of 32, Note 1. Note 1 states to provide a minimum cover of 2’ over the new footing? Is this intended to be material excavated from the river; as part of the footing construction; stockpiled, and placed back in the river? Response: Please follow FP-14 Section 704.

35. Bridge Plan sheet 13 of 32. The section view shows 4” diameter plastic pipe and the pipe layout view shows 5” diameter plastic pipe. Please clarify which diameter is correct.

Response: 4” diameter perforated plastic pipe should be used.

36. I see that there is a scope for a coffer dam on this project. Do you have that scope covered or would you like us to submit pricing for the design, materials, and installation/extraction of the coffer dam? Response: See pay item A0380 20815-0000 Cofferdams and associated specifications for cofferdam requirements and payment.

37. Is the expectation that the pier piles will be installed from the bottom of footer elevation or that they will be installed from a higher elevation and trimmed later? Response: It is up to the contractor to determine the method of installation.

38. Please describe the extent of demolition of existing structures, including foundations or piles if they exist. Response: See FP-14 and the Special Contract Requirements Section 203 for removal requirements.

Special Contract Requirements (J Pages) changes

1. Delete Subsection 108.01(a) and replace with the following:

(a) Conduct all tree trimming, tree removal and bridge removal activities between September 15 and March 31, and after approval by CO.

Plans Sheet Revision

1. Remove the second M04 sheet and replace with M05 sheet.

GAS VALVE

HYDRANT

FIRE

MANHOLE

SEWER

GAS VALVE

MANHOLE

SEWER

FLAG POLE

UNK CONCRETE SLABS

MANHOLES

SEWER

MANHOLE

ELEC. MANHOLE

LP

LP

ELEC. MANHOLE

UNK UTILITY

LP

MANHOLE

UNK UTILITY

UNK UTILITY

BUILDING

PIE

R

O V E R H E A D B

R

ID

G E

PIE

R

O V E R H E A D B

R

ID

G E

N

E 1298000

5 3

F B

F B

F B

F B

N

Beach Drive

B ri d g e

E d g e w a te r S ta b le

N

Beach Drive

B ri d g e

E d g e w a te r S ta b le

Disturbance Limits of Roadway

Disturbance Limits of Roadway

Detail E626-01 removed trees replace any disturbed or Proposed Staging Area

Proposed Staging Area

OHWM

Existing

OHWM

Existing

Detail E157-02 Install Silt Fence

Detail E157-02 Install Silt Fence

Detail E157-08A 37 L.F.

Diversion Install Sandbag (supersack)

Detail E157-10 Place filter bag

Detail E157-10 Place filter bag facility repair plans in indluded bioretention bioretention facility as shown

Protect and repair existing

51 LF each

Temporary culvert

SF

class 4, 344

Riprap apron, Temporary

Detail E157-01

Construction Exit, Stabilized

Detail E157-01

Construction Exit, Stabilized

Detail E157-02

Intall Silt Fence

Do not disturb existing culvert

6 existing trees remove and replace

90'

Disturbance Limits of Roadway see sheet R04 Temporary access pad

AMD #1 - Add plan sheet M05

NO. DATE BY REVISIONS

05/14/25

CB

OFFICE OF FEDERAL LANDS HIGHWAY

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

SCALE IN FEET

0 20 40

(STRUCTURE NO. 3450-033P)

EDGEWATER STABLE ACCESS BRIDGE

CONTROL PLAN

EROSION AND SEDIMENT

ROCK CREEK PARK

STAGE 2

Sheet 3 of 4

AMENDMENT NO. 1 1

directed by the CO.

Install replacement trees according to section 626 and as 3.

o a minimum of +/- 35% of exisiting channel width.t

Limit reduction of channel width as stated in Hydraulic memo 2.

construction.

Protect all existing pipes and culverts prior to and during 1.

NOTES:

:2

A

M

M a y

M

S h e e t

M

P R

O J E

C T

S \r o c r\

(1

P ro j_

D e v \C

A D

D \A m e n d M

-M

X

-R O

C R

(1 p ln

.d g n

STATE PROJECT

NUMBER

SHEET

DC NP ROCR 910(1) M05

NPS Drwg. No. 821-177658 PMIS No. 245035 repair plans included bioretention facility bioretention facility as shown in Protect and repair existing

PAST PERFORMANCE EVALUATION QUESTIONNAIRE

Firms Name and Project Number:

Today’s date:

Reference’s name, phone number, and title

Name of Firm:

Project Name and what agency was the work performed for:

Nature of work performed:

Date work was performed and if completed with in original work schedule:

Was this Contractor the Prime or Sub on this contract:

If Prime, were Subs used:

If Subs used, Type and Extent of Subcontracting:

Did the Prime have good relations and control of subs:

Were there problems on the project?

Was the contractor cooperative in addressing problems and changes? In what ways?

Did they submit many claims?

Evaluate the firm as outstanding, above average, satisfactory, marginal, or unsatisfactory in the following areas:

Thoroughness of site investigations

Project management and adherence to schedules

Meeting cost limits/cost control

Cooperativeness and responsiveness

Quality assurance and quality control

Overall ranking (Exceptional, Very Good, Satisfactory, marginal, or Unsatisfactory)

If you had the opportunity, would you want to work with this contractor again? Why?

Why not?

Would you recommend this firm for future work? With or without reservations?

Any additional comments: