Plans - NP-BLRI_1M20.pdf
PDF 28 MB Posted
- Attached to
- Roanoke River Bridge Federal contract opportunity
- Solicitation number
- 693C73-21-B-000008
About this file
This federal contract opportunity solicitation is seeking sealed bids for the Rehabilitation of the Roanoke River Ridge near MP 115.0, NP-BLRI 1M20. The work includes installing a drainage system, replacing asphalt concrete pavement, installing lightweight concrete slab, replacing bridge sidewalk and curb, replacing stone masonry at piers, resetting guardwall, milling and overlaying approaches. The project will be split into multiple schedules with a total cost expected between $1,000,000 to $5,000,000. Bids are due by the date specified in Block 13a of the SF 1442 Solicitation. The solicitation is set aside for certified Small Businesses only. Interested vendors must register at www.beta.sam.gov and complete annual Representations and Certifications at that site. The Department of Transportation Federal Highway Administration is the issuing agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - NP-BLRI 1M20.pdf | ||
| Amendment 0002 - NP-BLRI 1M20.pdf | ||
| Amendment 0001 - NP-BLRI 1M20.pdf | ||
| FP14_Eng.pdf | ||
| Report 1_NEPA CE - NP-BLRI 1M20.pdf | ||
| VETS 4212 Form.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| IFB Solicitation - NP-BLRI 1M20.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R01
-S e p -2
:4
A M
M
P R
O J E
C T
S b lr i\ 1m
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d g n
NO. DATE REVISIONS NO. DATE BY REVISIONS
GENERAL NOTES:
SPECIFICATIONS:
Construction:
MATERIALS:
Design:
Concrete:
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.
GENERAL NOTES AND INDEX
A C
T U
A L F I L E R
S
A R
A
B M
S
G N .D
G N
SHEET TITLE
INDEX OF PLAN SHEETS
SHEET NO.SCOPE OF WORK
th AASHTO LRFD Bridge Design Specifications, 8 edition, 2017
Verify locations of utilities in field prior to any work.
Verify all dimensions and locations in field prior to ordering materials.
Miscellaneous:
Paint:
Provide 2 inches concrete cover for reinforcing steel unless otherwise noted.
Furnish reinforcing steel conforming to AASHTO M 31, Grade 60.
No Scale
Concrete Repair
Typical Section
Plan and Elevation
General Notes and Index
- inch unless otherwise noted.4 3Chamfer exposed edges of all concrete
Furnish Class A (AE) concrete with f'c = 4.5 ksi at 28 days.
Furnish Class HES concrete with f'c = 3.0 ksi at 24 hours.
Reinforcing Steel:
riprap class 3.
Remove existing asphalt waterway near north abutment and replace with8.
scuppers 6-inches below the steel girders.
Clean clogged deck scuppers along the curb lines and extend existing 7.
Clean both expansion joints and paint expansion joint on curb only.6.
Clean both drainage pans underneath the two expansion joints.5.
steel stringers, bracings and bridge bearings; except the bridge railings.
Clean and paint all structural steel, including bridge steel girders, floor beams, 4.
asphalt overlay.
Install sprayed on three coat system waterproofing membrane and 2-inches 3.
and spalled) at the top and bottom of the deck and top of piers.
Visually locate and repair all deteriorated concrete (cracked, hollow sounding, 2.
membrane by hydrodemolition.
-inch of asphalt wearing surface and existing waterproofing 2 1Remove remaining
-inches of existing 2-inches asphalt wearing surface on the bridge. 2 1Micro mill 11.
match existing paint on structural steel.
Provide a 3 coat Type 2 paint system on structural steel. Furnish top coat to
Prepare structural steel surfaces according to Subsection 563.08(a), White Blast Cleaning.
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165417 VA NP-BLRI 1M20175115
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
George ChoubahAR/CV/CP JEG/CV/CP MR of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.BRIDGE PLAN SHEET
4 BRP-1272
Structure Number:
BLUE RIDGE PARKWAY
BRIDGE OVER ROANOKE RIVER AND NSC RR
5140-028P
September 2020
R02
Bridge length = 1028'-0"
CL
A C
T U
A L F I L E P
E
D G
N -S e p -2
M
P R
O J E
C T
S b lr i\ 1m
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
PLAN AND ELEVATION
No Scale
" = 1'-0"16 3Scale:
Existing ground
Class 3
Method A, Place Riprap
Class 1, Type A
Geotextile
ABUTMENT RIPRAP
Elev. 838.00
Ordinary High Water right of ground line @ 17'-0"
Approximate existing
(Typ.)
See Note 5
Span 1Span 2Span 3Span 4 Span 5Span 6
CL NSC RR
ELEVATION
filters (Typ.)
weephole
Install
R o a n o k e R iv e r
CL Pier 1 Pier 2CL Pier 3CL Pier 4CL Pier 5CL
141'-6" 170'-0" 220'-0" 220'-0" 170'-0" 106'-6"59'-0" 59'-0"
41'-0"
(See Note 3)
ScupperCL
(See Note 3)
ScupperCL
Mid-span 3
(See Note 3)
ScupperCL
(See Note 3)
ScupperCL
Mid-span 4
41'-0"
CL
CL Structure
Blue Ridge Parkway &
T y p
T y p
(See Note 3)
ScupperCL
22'-0"11'-0"22'-0"11'-0"
PLAN
1'-6"
5'-6"
20'-0"
6'-0"
CL
N Micro mill existing asphalt overlay (See Note 1), Remove and replace waterproofing membrane (See Note 2)
1028'-0"
Begin Bridge
End Bridge
20'-0"
NSC RR.Telegraph
Telephone & bearing seat
Abutment
CL
RIPRAP" detail.
See "ABUTMENT
Method A, class 3.
with riprap asphalt waterway replace existing
Remove and
-0.4%
Elev. 974.74
Sta. 8+11.00
Elev. 970.52
Sta. 18+39.00
3' x 4' column
(South Abutment)
Bearing
(North Abutment)
Bearing expansion joint, according to Section 563.
including bearings, except as noted for
4. Clean and paint all steel surfaces span 3 and span 4.
drainage pipe below the girders on
3. Clean all scuppers and extend scupper
560.
hydrodemolition according to Section waterproofing membrane by asphalt and 2
12. Remove remaining asphalt overlay.
inches of 2
11. Micro mill existing 1
Notes:
on curb only paint expansion joint and drainage pan and
Clean expansion joint on curb only paint expansion joint and drainage pan and
Clean expansion joint
Abutment face weephole filter details.
6. See "CONCRETE REPAIR" sheet, for work.
prior to performing any rehabilitation with locations and quantities to the CO deck and top of piers. Provide sketches and spalled) at the top and bottom of the concrete (cracked, hollow sounding,
5. Visually locate and repair all deteriorated
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
BRIDGE OVER ROANOKE RIVER AND NSC RR
R03
C
T U
A L F I L E T
Y P
X S
.D
G N
-S e p -2
M
P R
O J E
C T
S b lr i\ 1m
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
TYPICAL SECTION
CLStructure
AT PIERS 2, 3, & 4 NEAR MIDSPAN
TYPICAL SECTION
1.56%1.56% surface (See Note 1)
2" Asphalt Wearing
34'-0"
17'-0" 17'-0"
4'-0" 13'-0" 4'-0"13'-0"
24'-0"
See Note 3
C lr
(Typ.)
(See Notes 8 & 9)
(See Note 2)
Concrete deck
C lr
Notes:
outlined in the Special Contract Requirements.
following the micro milling pavement cores requirements information only and will not relieve the contractor from meeting after award. This information will be provided as for span) will be provided to the contractor at the preconstruction
Available pavement cores information (on cross-section per 10.
or M 232.
approval. Galvanize all hardware according to AASHTO M 111 is permitted to steel girder. Submit attachment detail to CO for
Attach scupper extension to steel girder. No drilling or welding 9.
according to Subsection 708.05.
Utilize 4-inch diameter black drainage pipe and fittings
Extend existing scuppers 6-inches below the steel girders. 8.
Clean all the steel surfaces and paint according to Section 563. 7.
Section 552.
hollow sounding, and spalled) at bottom of deck according to
Visually locate and repair all deteriorated concrete (cracked, 6.
surface.
according to Section 559 and install 2-inch asphalt wearing
Install sprayed on three coat system waterproofing membrane 5.
deck condition is approved by the CO.
Do not begin waterproofing membrane installation until the 4.
Section 552.
hollow sounding, and spalled) at top of deck according to
Visually locate and repair all deteriorated concrete (cracked, 3.
hydrodemoltion.
membrane and asphalt mastic not removed during
Shot blast concrete deck surface to remove any leftover old 2.
hydrodemolition.
surface and existing waterproofing membrane by
-inch of asphalt wearing 2 1on the bridge. Remove remaining
-inches of existing 2-inch asphalt wearing surface 2 1Micro mill 1 1.
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
BRIDGE OVER ROANOKE RIVER AND NSC RR
R04
C
T U
A L F I L E C
O N
C R
E T R
E P
A I R P
A R
T I A
L D
E P
T H R
E M
O V
A L .D
G N
-S e p -2
M
P R
O J E
C T
S b lr i\ 1m
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
CONCRETE REPAIR
WEEP HOLE REPAIR PROCEDURE:
weephole
Existing abutment
Face of
WEEP HOLE FILTER
Removable filter
ELEVATION VIEW SECTION A-A
A
A surface
Existing concrete
Epoxy resin
CONCRETE CRACK REPAIR
(Typ.)
Injection port crack
Existing
T y p
Existing reinforcing bars
'' Saw cut4 concrete
Face of existing
Depth of concrete repair reinforcing bar
" Min. clr. above4
OVERHEAD DEEP CONCRETE REPAIR
'' Saw cut4 reinforcing bar
" Min. clr. to4
'' Under cut all sides2 concrete
Face of existing
Existing reinforcing bars
Depth of concrete repair
HORIZONTAL DEEP CONCRETE REPAIR
Depth of concrete repair concrete
Face of existing
'' Saw cut4 reinforcing bar
" Min. clr. below4
Existing reinforcing bars
VERTICAL DEEP CONCRETE REPAIR
Injection and Crack Repair.
Section 561- Structural Concrete
Repair concrete cracks according toNote:
Face of abutment
TYPICAL TOP OF PIER ELEVATION
10'-3"10'-3"
12'-0"12'-0"
24'-0"
3'-6"
'' Under cut all sides2
Zinc anode
Zinc anode
Zinc anode except top cut
'' Under cut all sides 2 concrete
Face of existing material
Concrete repair
Existing concrete
Zinc anode
Existing reinforcing bars
ZINC ANODE INSTALLATION DETAIL
when applicable)
(See note 2 for mortar pocket
Low-resistivity
Notes:
housing Filter recommendations.
Install weep hole filter according to the manufacturer's 3.
inside of the weep holes before installation.
Remove all dirt, laitance, or other loose matter from 2.
to the CO for approval.
Submit details of the filter, including installation techniques, 1.The sketch of the weep hole filter is for illustration only.
class A(AE) concrete Class HES concrete or class A(AE) concrete
Class HES concrete or
(See Note 8) class A(AE) concrete
Class HES concrete or
For concrete repair on top of deck use class HES concrete.8.
the existing concrete in texture, color and appearance.
Provide a surface finish to all concrete repair areas that matches 7.
Match existing reinforcing steel diameter and coating.
Replace reinforcing steel with section loss of 25% or more. 6.
blasting, or water jetting as required according to Section 203.
Clean existing steel and concrete by wire brush, abrasive 5.
without incurring any damage to existing steel reinforcement.
to a depth of at least 1-inch clear of existing reinforcement, Remove loose and deteriorated concrete to sound concrete or 4.
around the designated repair area.
inch deep along a square or rectangular perimeter 4 3Saw cut 3.
substrate concrete and 2-inches beyond the anode on all sides.
15,000 ohm-cm) mortar bed which extends to the sound
2,000 coulombs, encase the anode in a low resistivity (less than repair material is used which has chloride permeability less than to Subsection 552.19, as approved by the CO. If a concrete
Install Anodes for corrosion protection on repair areas according 2.
to the CO prior to performing any rehabilitation work.
and top of piers. Provide sketches with locations and quantities hollow sounding, and spalled) at the top and bottom of the deck
Visually locate and repair all deteriorated concrete (cracked, 1.
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
BRIDGE OVER ROANOKE RIVER AND NSC RR
File details come from the government source that posted it. Updated .