Plans MC-5265.pdf
PDF 8 MB Posted
- Solicitation number
- UD-26-335
- Issued by
- Los Angeles County, California
About this file
Orange Avenue Transmission Main Improvements (MC-5265)
This document set comprises construction plans prepared by the Long Beach Public Utilities Department for the Orange Avenue Transmission Main Improvements project (MC-5265) in Long Beach, California. The project involves the installation of 22-inch diameter high-density polyethylene (HDPE) pipe with fused joints along Orange Avenue, spanning approximately 3,770 linear feet from Station 10+00 to Station 37+70.56. The plans, designed by DUDEK and dated April 2026, include 12 sheets of detailed construction drawings, profiles, plan views, connection details, and standard specifications. The project encompasses water line alignment modifications, valve installations and relocations, connection details for existing infrastructure, and comprehensive notes regarding materials, construction methodology, and quality assurance requirements. Key project components include four major sections (C-1 through C-4) with varying pipe lengths, multiple valve connections, coordination with existing utilities (Verizon, Edison Company, LB Energy, and Fire Department), and adherence to Long Beach Public Utilities Department standards.
The construction plans specify materials conforming to LBWD standards and include provisions for continuous-feed testing methods, bacteriological sampling, and hydrostatic testing at 150 PSI unless otherwise noted. All ductile iron fittings, gate valves, bolted couplings, and metal surfaces must be coated with No-OX-ID compound and wrapped in 6-inch buried sand washings. The project requires installation of thrust blocks at all points of expected thrusts, removal and replacement of existing pavement, protection of underground utilities during excavation, and restoration of street surfaces per City standards. Specific construction notes detail excavation depths, pipe bursting receiving pit installation, fused coupling connections at HDPE pipe closures, and comprehensive testing and inspection requirements. Record drawings shall be submitted upon project completion, with all work subject to review and approval by LBWD for conformance to design standards and specifications outlined in Long Beach Public Utilities Department requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specifications MC-5265.pdf | ||
| Addendum 1 MC-5265 UD-26-335 Orange Ave.pdf | ||
| Specifications MC-5265 Addendum 01.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I-405
SAN DIEGO FWY
I-7
LO
NG
B
EA
CH
F
W Y
LO
NG
LA
KE
W
OO
D B
LV
D. BE
LL
FL
OW
ER
B
LV
D.
CL
AR
K A
VE
PACIFIC COAST HIGHWAY
STEARNS ST.
WILLOW ST.
CH
ER
RY
A
VE
SPRING ST.
CARSON ST.
7TH ST.
ATHERTON ST.
2ND ST.
OCEAN
SR-91
ARTESIA
FREEWAY
BL
VD
BE
AC
H
BLVD.
7TH ST.
\\d ud ek .in t\d at a\ Pr oj ec ts \1
.E ng in ee rin g\ Lo ng B ea ch
W at er \1
.0 1_
O ra ng e
Av en ue T ra ns m is si on
C
IP
P M
C -5
5\
6- C
AD
\1
.0
SH
-0 to
S H
-0 4_
G -0 to
G -0
4/
/2
8:
A
M
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
APP'D.BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE __/__/__
VARIOUS
DESCRIPTIONDATEREV. SHEET OF 12 SHEETS
MC-5265
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAPM LF
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH
PUBLIC UTILITIES DEPARTMENT
name
_. X_______ __/__/__
FI
LE
N
AM
E:
M c_ dw g D
ES
IG
N B
Y:
N/A
MUNIS PROJECT: 6512040006
ORANGE AVENUE TRANSMISSION MAIN
IMPROVEMENTS
DWG.
LONG BEACH PUBLIC UTILITIES DEPARTMENT
LONG BEACH, CALIFORNIA
PLANS FOR THE CONSTRUCTION OF
ORANGE AVENUE TRANSMISSION
MAIN IMPROVEMENTS
(MC-5265)
WD-01-26
TITLE SHEET, VICINITY MAP AND LOCATION MAP
VICINITY MAP _
PROJECT
VICINITY
LOCATION MAP _
PROJECT
LOCATION
E CARSON STE SAN ANTONIO
DR
PACIFICA AVE
LO
NG
B
EA
CH
B
LV
D.
AT
LA
NT
IC
AV
E
OR
AN
GE
A
VE
CH
ER
RY
A
VE
PA
RA
M
OU
NT
B
LV
D
E SPRING ST
E BIXBY RD
E WARDLOW RD
THOMAS BEKELE - SENIOR DIRECTOR OF ENGINEERING DATE
LONG BEACH PUBLIC UTILITIES DEPARTMENT
APPROVED BY:
AMANDA D. COMBS, P.E. - PROJECT MANAGER R.C.E. 67287 DATE
DUDEK
SUBMITTED BY:
GENERAL MANAGER
B. ANATOLE FALAGÁN
APRIL 2026 E BIXBY RD
E WARDLOW RD
G-01
4/24/20265/19/2026
5/19/2026
\\d ud ek .in t\d at a\ Pr oj ec ts \1
.E ng in ee rin g\ Lo ng B ea ch
W at er \1
.0 1_
O ra ng e
Av en ue T ra ns m is si on
C
IP
P M
C -5
5\
6- C
AD
\1
.0
SH
-0 to
S H
-0 4_
G -0 to
G
/2
8:
A
M
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
APP'D.BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE __/__/__
VARIOUS
DESCRIPTIONDATEREV. SHEET OF 12 SHEETS
MC-5265
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAPM LF
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH
PUBLIC UTILITIES DEPARTMENT
name
_. X_______ __/__/__
FI
LE
N
AM
E:
M c_ dw g D
ES
IG
N B
Y:
N/A
MUNIS PROJECT: 6512040006
ORANGE AVENUE TRANSMISSION MAIN
IMPROVEMENTS
DWG.
SYMBOLS & UNDERGROUND
UTILITY LEGEND
PUBLIC AGENCIES & UTILITIES ABBREVIATIONS
SYMBOLS & UNDERGROUND UTILITY LEGEND,
ABBREVIATIONS AND SHEET INDEX 2
SHEET INDEX
DWG NO. SHEET NO. SHEET TITLE
G-02 ek .in t\d at a\ Pr oj ec ts \1
.E ng in ee rin g\ Lo ng B ea ch
W at er \1
.0 1_
O ra ng e
Av en ue T ra ns m is si on
C
IP
P M
C -5
5\
6- C
AD
\1
.0
SH
-0 to
S H
-0 4_
G -0 to
G
/2
8:
A
M
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
APP'D.BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE __/__/__
VARIOUS
DESCRIPTIONDATEREV. SHEET OF 12 SHEETS
MC-5265
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAPM LF
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH
PUBLIC UTILITIES DEPARTMENT
name
_. X_______ __/__/__
FI
LE
N
AM
E:
M c_ dw g D
ES
IG
N B
Y:
N/A
MUNIS PROJECT: 6512040006
ORANGE AVENUE TRANSMISSION MAIN
IMPROVEMENTS
DWG.
GENERAL NOTES WATER AND METER NOTES DISCLAIMER
GENERAL NOTES, BASIS OF BEARING,
BENCHMARK AND NOTES TO CONTRACTOR 3
BASIS OF BEARINGS
CONSTRUCTION NOTES
G-03 ek .in t\d at a\ Pr oj ec ts \1
.E ng in ee rin g\ Lo ng B ea ch
W at er \1
.0 1_
O ra ng e
Av en ue T ra ns m is si on
C
IP
P M
C -5
5\
6- C
AD
\1
.0
SH
-0 to
S H
-0 4_
G -0 to
G
/2
8:
A
M
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
APP'D.BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE __/__/__
VARIOUS
DESCRIPTIONDATEREV. SHEET OF 12 SHEETS
MC-5265
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAPM LF
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH
PUBLIC UTILITIES DEPARTMENT
name
_. X_______ __/__/__
FI
LE
N
AM
E:
M c_ dw g D
ES
IG
N B
Y:
N/A
MUNIS PROJECT: 6512040006
ORANGE AVENUE TRANSMISSION MAIN
IMPROVEMENTS
DWG.
ORANGE AVE _
WATER LINE ALIGNMENT TABLE
GRAPHIC SCALE
G-04
CONSTRUCTION NOTES
ud ek .in t\d at a\ Pr oj ec ts \1
.E ng in ee rin g\ Lo ng B ea ch
W at er \1
.0 1_
O ra ng e
Av en ue T ra ns m is si on
C
IP
P M
C -5
5\
6- C
AD
\1
.0
SH
-0 to
S H
-0 8_
C -0 to
C
/2
8:
A
M
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
APP'D.BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE __/__/__
VARIOUS
DESCRIPTIONDATEREV. SHEET OF 12 SHEETS
MC-5265
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAPM LF
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH
PUBLIC UTILITIES DEPARTMENT
name
_. X_______ __/__/__
FI
LE
N
AM
E:
M c_ dw g D
ES
IG
N B
Y:
N/A
MUNIS PROJECT: 6512040006
ORANGE AVENUE TRANSMISSION MAIN
IMPROVEMENTS
DWG.
PLAN _
PROFILE _
GRAPHIC SCALE
ORANGE AVE WATER PLAN AND PROFILE
STA. 10+00 TO STA 18+00 5
VALVE INFORMATION TABLE
DIST. FROM
PROP. LINE
DRAWING/FILE NO.EAST - WEST STREETDIST. FROM
CURB
DIST. FROM
CURB
DIST. FROM
PROP. LINE(IN.)
SIZE
(MFG.)
MAKE STEM
DEPTH TURNS
NO. OF PIPE
COVER
NORTH - SOUTH STREET
REMARKS
GIS STRUCTURE
GIS STRUCTURE
ABANDONED VALVE
K25-WVA-059K25-WBO-061 ORANGE AVE4" BIXBY AVE
C-01
MC-5265, BO
ud ek .in t\d at a\ Pr oj ec ts \1
.E ng in ee rin g\ Lo ng B ea ch
W at er \1
.0 1_
O ra ng e
Av en ue T ra ns m is si on
C
IP
P M
C -5
5\
6- C
AD
\1
.0
SH
-0 to
S H
-0 8_
C -0 to
C
/2
8:
A
M
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
APP'D.BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE __/__/__
VARIOUS
DESCRIPTIONDATEREV. SHEET OF 12 SHEETS
MC-5265
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAPM LF
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH
PUBLIC UTILITIES DEPARTMENT
name
_. X_______ __/__/__
FI
LE
N
AM
E:
M c_ dw g D
ES
IG
N B
Y:
N/A
MUNIS PROJECT: 6512040006
ORANGE AVENUE TRANSMISSION MAIN
IMPROVEMENTS
DWG.
GRAPHIC SCALE
PLAN _
PROFILE _
ORANGE AVE WATER PLAN AND PROFILE
STA. 18+00 TO STA 27+00 6
VALVE INFORMATION TABLE
DIST. FROM
PROP. LINE
DRAWING/FILE NO.EAST - WEST STREETDIST. FROM
CURB
DIST. FROM
CURB
DIST. FROM
PROP. LINE(IN.)
SIZE
(MFG.)
MAKE STEM
DEPTH TURNS
NO. OF PIPE
COVER
NORTH - SOUTH STREET
REMARKS
GIS STRUCTURE
GIS STRUCTURE
ABANDONED VALVE
K24-WBO-038K24-WBO-039 ORANGE AVE2" W 36TH STREET
2" ORANGE AVE W 36TH STREET K24-WBO-016
K24-WBO-017
K24-WBO-040
C-02 ud ek .in t\d at a\ Pr oj ec ts \1
.E ng in ee rin g\ Lo ng B ea ch
W at er \1
.0 1_
O ra ng e
Av en ue T ra ns m is si on
C
IP
P M
C -5
5\
6- C
AD
\1
.0
SH
-0 to
S H
-0 8_
C -0 to
C
/2
8:
A
M
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
APP'D.BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE __/__/__
VARIOUS
DESCRIPTIONDATEREV. SHEET OF 12 SHEETS
MC-5265
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAPM LF
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH
PUBLIC UTILITIES DEPARTMENT
name
_. X_______ __/__/__
FI
LE
N
AM
E:
M c_ dw g D
ES
IG
N B
Y:
N/A
MUNIS PROJECT: 6512040006
ORANGE AVENUE TRANSMISSION MAIN
IMPROVEMENTS
DWG.
GRAPHIC SCALE
PLAN _
PROFILE _
ORANGE AVE WATER PLAN AND PROFILE
STA. 27+00 TO STA 36+00 7
VALVE INFORMATION TABLE
DIST. FROM
PROP. LINE
DRAWING/FILE NO.EAST - WEST STREETDIST. FROM
CURB
DIST. FROM
CURB
DIST. FROM
PROP. LINE(IN.)
SIZE
(MFG.)
MAKE STEM
DEPTH TURNS
NO. OF PIPE
COVER
NORTH - SOUTH STREET
REMARKS
GIS STRUCTURE
GIS STRUCTURE
ABANDONED VALVE
C-03 ud ek .in t\d at a\ Pr oj ec ts \1
.E ng in ee rin g\ Lo ng B ea ch
W at er \1
.0 1_
O ra ng e
Av en ue T ra ns m is si on
C
IP
P M
C -5
5\
6- C
AD
\1
.0
SH
-0 to
S H
-0 8_
C -0 to
C
/2
8:
A
M
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
APP'D.BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE __/__/__
VARIOUS
DESCRIPTIONDATEREV. SHEET OF 12 SHEETS
MC-5265
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAPM LF
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH
PUBLIC UTILITIES DEPARTMENT
name
_. X_______ __/__/__
FI
LE
N
AM
E:
M c_ dw g D
ES
IG
N B
Y:
N/A
MUNIS PROJECT: 6512040006
ORANGE AVENUE TRANSMISSION MAIN
IMPROVEMENTS
DWG.
GRAPHIC SCALE
PLAN _
PROFILE _
ORANGE AVE WATER PLAN AND PROFILE
STA. 36+00 TO STA 37+70.56 8C-04
VALVE INFORMATION TABLE
DIST. FROM
PROP. LINE
DRAWING/FILE NO.EAST - WEST STREETDIST. FROM
CURB
DIST. FROM
CURB
DIST. FROM
PROP. LINE(IN.)
SIZE
(MFG.)
MAKE STEM
DEPTH TURNS
NO. OF PIPE
COVER
NORTH - SOUTH STREET
REMARKS
GIS STRUCTURE
GIS STRUCTURE
ABANDONED VALVE
K23-WBO-011K23-WBO-047 ORANGE AVE4" E WARDLOW RD
3"
3"
K23-WRI-012
K23-WVA-018
K23-WVA-01920"
ORANGE AVE
ORANGE AVE
ORANGE AVE
E WARDLOW RD
E WARDLOW RD
E WARDLOW RD
K23-WRI-048
K23-WVA-049
K23-WVA-050
ek .in t\d at a\ Pr oj ec ts \1
.E ng in ee rin g\ Lo ng B ea ch
W at er \1
.0 1_
O ra ng e
Av en ue T ra ns m is si on
C
IP
P M
C -5
5\
6- C
AD
\1
.0
SH
-0 to
S H
-1 1_
C -0 to
C
/2
8:
A
M
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
APP'D.BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE __/__/__
VARIOUS
DESCRIPTIONDATEREV. SHEET OF 12 SHEETS
MC-5265
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAPM LF
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH
PUBLIC UTILITIES DEPARTMENT
name
_. X_______ __/__/__
FI
LE
N
AM
E:
M c_ dw g D
ES
IG
N B
Y:
N/A
MUNIS PROJECT: 6512040006
ORANGE AVENUE TRANSMISSION MAIN
IMPROVEMENTS
DWG.
DETAIL 2
22" HDPE FLANGE DETAIL
DETAIL 1
DETAIL 3 4
CONNECTION DETAILS
9C-05
NOTES:
ek .in t\d at a\ Pr oj ec ts \1
.E ng in ee rin g\ Lo ng B ea ch
W at er \1
.0 1_
O ra ng e
Av en ue T ra ns m is si on
C
IP
P M
C -5
5\
6- C
AD
\1
.0
SH
-0 to
S H
-1 1_
C -0 to
C
/2
8:
A
M
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
APP'D.BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE __/__/__
VARIOUS
DESCRIPTIONDATEREV. SHEET OF 12 SHEETS
MC-5265
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAPM LF
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH
PUBLIC UTILITIES DEPARTMENT
name
_. X_______ __/__/__
FI
LE
N
AM
E:
M c_ dw g D
ES
IG
N B
Y:
N/A
MUNIS PROJECT: 6512040006
ORANGE AVENUE TRANSMISSION MAIN
IMPROVEMENTS
DWG.
STANDARD DETAILS - 1
10C-06 ek .in t\d at a\ Pr oj ec ts \1
.E ng in ee rin g\ Lo ng B ea ch
W at er \1
.0 1_
O ra ng e
Av en ue T ra ns m is si on
C
IP
P M
C -5
5\
6- C
AD
\1
.0
SH
-0 to
S H
-1 1_
C -0 to
C
/2
8:
A
M
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
APP'D.BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE __/__/__
VARIOUS
DESCRIPTIONDATEREV. SHEET OF 12 SHEETS
MC-5265
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAPM LF
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH
PUBLIC UTILITIES DEPARTMENT
name
_. X_______ __/__/__
FI
LE
N
AM
E:
M c_ dw g D
ES
IG
N B
Y:
N/A
MUNIS PROJECT: 6512040006
ORANGE AVENUE TRANSMISSION MAIN
IMPROVEMENTS
DWG.
STANDARD DETAILS - 2
11C-07 ek .in t\d at a\ Pr oj ec ts \1
.E ng in ee rin g\ Lo ng B ea ch
W at er \1
.0 1_
O ra ng e
Av en ue T ra ns m is si on
C
IP
P M
C -5
5\
6- C
AD
\1
.0
SH
-0 to
S H
-1 1_
C -0 to
C
/2
8:
A
M
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
APP'D.BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE __/__/__
VARIOUS
DESCRIPTIONDATEREV. SHEET OF 12 SHEETS
MC-5265
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAPM LF
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH
PUBLIC UTILITIES DEPARTMENT
name
_. X_______ __/__/__
FI
LE
N
AM
E:
M c_ dw g D
ES
IG
N B
Y:
N/A
MUNIS PROJECT: 6512040006
ORANGE AVENUE TRANSMISSION MAIN
IMPROVEMENTS
DWG.
STANDARD DETAILS - 3
12C-08
| Sheets and Views |
| 15566.01 SH-01 to SH-04_G-01 to G-04-G-01 |
| 15566.01 SH-01 to SH-04_G-01 to G-04-G-02 |
| 15566.01 SH-01 to SH-04_G-01 to G-04-G-03 |
| 15566.01 SH-01 to SH-04_G-01 to G-04-G-04 |
| 15566.01 SH-05 to SH-08_C-01 to C-04-C-01 |
| 15566.01 SH-05 to SH-08_C-01 to C-04-C-02 |
| 15566.01 SH-05 to SH-08_C-01 to C-04-C-03 |
| 15566.01 SH-05 to SH-08_C-01 to C-04-C-04 |
| 15566.01 SH-09 to SH-11_C-05 to C-08-C-05 |
| 15566.01 SH-09 to SH-11_C-05 to C-08-C-06 |
| 15566.01 SH-09 to SH-11_C-05 to C-08-C-07 |
| 15566.01 SH-09 to SH-11_C-05 to C-08-C-08 |
File details come from the government source that posted it. Updated .