PLANS LD7OD_65PCT_DQC_RFI_22x34.pdf
PDF 13 MB Posted
- Attached to
- RFI for Lock & Dam 7 Outdraft Weir Modification
- Solicitation number
- W912ES25RFI0001
About this file
This is a set of detailed engineering drawings and specifications for the Lock & Dam 7 Outdraft Modification project located in La Crescent, MN on the Mississippi River. The drawings, prepared by the US Army Corps of Engineers St. Paul District, include plans for modifying an existing weir and constructing new rock weir structures, with the primary components being a dog-leg weir, parallel weir, and launch rock structures with scour protection.
The drawings provide comprehensive technical details including site plans, cross sections, elevations, and control tables for construction. Key specifications show the dog-leg weir and parallel weir having a top elevation of 639.45 feet, with 30-inch and 45-inch scour protection at elevation 629.45 feet and 630.45 feet respectively. The project includes excavation and rock fill placement at specified slopes (typically 1V:3H and 1V:4H), staging areas on the Minnesota side of the lock, and marine access requirements. The drawings also contain detailed hydrological information including flow duration curves, daily flow hydrographs, and pool elevation data spanning 1949-2024 for Lock and Dam 7.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPECS LD7_Outdraft_Weir_Modification_SPECS_65 DQC_RFI_V2.pdf | ||
| RFI LD7 Rock Weir.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LA CRESCENT, MN
LOCK & DAM 7
MISSISSIPPI RIVER
LOCK & DAM 7 OUTDRAFT MODIFICATION
ST. PAUL DISTRICT
D S
P
D
:2
:4
A
M
/2
/2
L D
O
D
G -0
.d g n
A N
S I
D
D Q
C /R
F I
L A
C R
E S
C E
N T
M
N
L O
C K
D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R
L O
C K
D
A M
O
U T
D R
A F
T M
O D
IF
IC
A T
IO
N
S T
P
A U
L M
IN
N
E S
O T
A
S T
P
A U
L D
IS
T
R
IC
A
-B
U
IL
T N
O
F
IL
E N
A M
E
R M
C G
A R
V E
Y
C O
V E
R S
H E
E T
G-001
T K
O U
G H
R M
C G
A R
V
L
O
D
G -0
.d g n
K
O U
G H
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
APPROVED BY:
APPROVAL RECOMMENDED BY:
CHIEF DIVISIONENGR & CONST
EC-D
CHIEF
CHIEF BRANCH
BRANCH
CHIEF BRANCH
EC-H
EC-G
MENDATION OF ALL DRAWINGS IN THIS SET.
SIGNATURES INDICATE OFFICIAL RECOM-
MENT AS REQUIRED BY ER 1110-1-8152.
WITHIN THE SCOPE OF THEIR EMPLOY-
APPEAR ON THESE PROJECT DOCUMENTS
TRATION DESIGNATIONS OF INDIVIDUALS
THE INITIALS OR SIGNATURES AND REGIS-
PAUL DISTRICT CORPS OF ENGINEERS.
THIS PROJECT WAS DESIGNED BY THE ST.
TECHNICAL LEAD
of Engineers
US Army Corps
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R
S I
D
D Q
C /R
F I
L A
C R
E S
C E
N T
M
N
L O
C K
D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R
L O
C K
D
A M
O
U T
D R
A F
T M
O D
IF
IC
A T
P
A U
L M
IN
N
E S
O T
A
S T
P
A U
L D
IS
T
R
-B
U
IL
T N
O
F
IL
E N
A M
E
R M
C G
A R
V
D S
U R
V E
Y C
O N
T R
O L
T A
B L
E
P R
O J E
C T
L O
C A
T
IO
N M
A P
V
IC
IN
IT
Y
M A
P
G-002
T K
O U
G H
R M
C G
A R
V
O
D
G -0
.d
K
O U
D
M N
S P
C S
S
O U
T H
Z O
N E
-U .S
S
U R
V E
Y F
T
N A
V D
.9
D S
P
D
:5
:1
A
M
/2
/2
L D
O
D
G -0
.d
J1
SCALE: NTS
TABLE - VERTICAL AND HORIZONTAL CONTROL
PROJECT LOCATION MAP
H14
PLAN - VICINITY MAP
SCALE: 1" = 200'
A1
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
640 B
LOCK 7
"194A" LD7
7-706.5-RMT
DAKOTA ISLAND PLACEMENT SITE
STAGING AREA
NO. 7
LOCK AND DAM
M
IS
S
IS
S
IP
P I R
IV
E R
INTERSTATE 90
LA CROSSE
REGIONAL
AIRPORT
F L O
W
FRENCH ISLAND
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
E L
E V
A T
IO
N
D A
T U
M
V E
R T
IC
A
L C
O N
T R
O L
C
O O
R D
IN
A
T E
S Y
S T
E M
H
O R
IZ
O
N T
A L
C O
N T
R O
L
C O
M B
IN
E
D F
A C
T O
R
C F
G E
O
ID
0 4000'2000'
N
LEGEND
RIVERS & LAKES
LOCK AND DAM
NATIONAL BOUNDARIES
DISTRICT BOUNDARIES
STATE BOUNDARIES
L/D
IOWA
SOUTH DAKOTA
NORTH DAKOTA
MINNESOTA
WISCONSIN
DARLING
LAKE
MINOT
S
O S
RU
I
R
FORKS
GRAND
CITY
VALLEY
R
D E
R I V E R
F O
T H E
N O
T R
H
BRAINERD
BEMIDJI LAKE SUPERIOR
MINNEAPOLIS
S.A.F. L/D'S
L/D 1
L/D 2
M I N
NES
O
TA
R
MANKATO
ST. PAUL
L/D 3
L/D 4
L/D 5A L/D 6
L/D 7
L/D 8
EAU CLAIRE
ROCHESTER
L/D 5
L/D 9
L/D 10
MADISON
PORTAGE
WIS
SIN
R
CON
C
HI
P P E
W A
R S T
CROIX
R
I S
SPPI
R
M I S S
I
DULUTH
GRAND RAPIDS
MICHIGAN
LAKE
DEVIL'S
ASHTABULA
LAKE
THE WOODS
LAKE OF
RED LAKE
UPPER
RED LAKE
LOWER
ITASCA
LAKE
LAKE
CASS
WINNIBIGOSHISH
LAKE
LAKE
LEECH
LAKE
LACS
MILLE
TRAVERSE
LAKE
LAKE
BIGSTONE CLOUD
ST.
C A N A D A
LOCATION
PROJECT
PEPIN
LAKE
HEYENNE R
S I
D
D Q
C /R
F I
L A
C R
E S
C E
N T
M
N
L O
C K
D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R
L O
C K
D
A M
O
U T
D R
A F
T M
O D
IF
IC
A T
P
A U
L M
IN
N
E S
O T
A
S T
P
A U
L D
IS
T
R
-B
U
IL
T N
O
F
IL
E N
A M
E
R M
C G
A R
V E
Y
L E
G E
N D
A N
D S
Y M
B O
L S
G E
N E
R A
L N
O T
E S
A
B B
R E
V
IA
T
IO
N S
D R
A W
IN
G
I N
D E
X R
E F
E R
E N
C E
I N
D E
X
G-003
T K
O U
G H
R M
C G
A R
V
O
D
G -0
.d
K
O U
D
M N
S P
C S
S
O U
T H
Z O
N E
-U .S
S
U R
V E
Y F
T
N A
V D
.9
D S
P
D
:1
:5
P
M
/2
/2
L D
O
D
G -0
.d
LD7OD_C-601.dgnCONTROL TABLE C-601
LD7OD_C-501.dgnCIVIL DETAILSC-501
LD7OD_C-314.dgnCROSS SECTION STA D 11+15.47 C-314
LD7OD_C-313.dgnCROSS SECTIONS STA D 10+20 TO D 11+00 C-313
LD7OD_C-312.dgnCROSS SECTIONS STA D 9+20.39 TO D 10+00 C-312
LD7OD_C-311.dgnCROSS SECTIONS STA D 8+15.98 TO D 9+00 C-311
LD7OD_C-310.dgnCROSS SECTIONS STA D 7+10 TO D 8+00 C-310
LD7OD_C-309.dgnCROSS SECTIONS STA D 6+00 TO D 7+00 C-309
LD7OD_C-308.dgnCROSS SECTIONS STA D 5+00 TO D 5+80 C-308
LD7OD_C-307.dgnCROSS SECTIONS STA D 3+80 TO D 4+80 C-307
LD7OD_C-306.dgnCROSS SECTIONS STA D 2+60 TO D 3+60 C-306
LD7OD_C-305.dgnCROSS SECTIONS STA D 1+80 TO D 2+50 C-305
LD7OD_C-304.dgnCROSS SECTIONS STA D 0+69 TO D 1+70 C-304
LD7OD_C-303.dgnTYPICAL SECTIONS 3 OF 3 C-303
LD7OD_C-302.dgnTYPICAL SECTIONS 2 OF 3 C-302
LD7OD_C-301.dgnTYPICAL CROSS SECTIONS 1 OF 3 C-301
LD7OD_C-102.dgnPLAN AND PROFILE STA D 6+30 TO D 11+15.48 C-102
LD7OD_C-101.dgnPLAN AND PROFILE STA D 0+00 TO D 6+30 C-101
CIVIL
LD7OD_G-103.dgnPLAN DAKOTA ISLAND ACCESS G-103
LD7OD_G-102.dgnPLAN LD7 STAGING, ACCESS, AND WORK LIMITSG-102
LD7OD_G-101.dgnKEY PLAN G-101
LD7OD_G-003.dgnDRAWING INDEX, REFERENCE INDEX, GENERAL NOTES, ABBREVIATIONS, LEGEND AND SYMBOLSG-003
LD7OD_G-002.dgnPROJECT LOCATION MAP, VICINITY MAP, AND SURVEY CONTROL TABLE G-002
LD7OD_G-001.dgnCOVER SHEET G-001
GENERAL
FILENAMEDESCRIPTIONSHEET IDRECORD DRAWING NO.
CONSTRUCTION DRAWING INDEX
MISSISSIPPI RIVER POOL DURATION CURVES JULY - DECEMBER 1949 - 2024
MISSISSIPPI RIVER POOL DURATION CURVES JANUARY - JUNE 1949 - 2024
MISSISSIPPI RIVER DAILY POOL ELEVATION HYDROGRAPHS JANUARY 01 - DECEMBER 31 2014 -
MISSISSIPPI RIVER FLOW DURATION CURVES JULY - DECEMBER 1959 - 2024
MISSISSIPPI RIVER FLOW DURATION CURVES JANUARY - JUNE 1959 - 2024
MISSISSIPPI RIVER DAILY FLOW HYDROGRAPHS JANUARY 01 - DECEMBER 31 2014 - 2023
DESCRIPTIONSHEET REF.
REFERENCE DRAWINGS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
E L
E V
A T
IO
N
D A
T U
M
V E
R T
IC
A
L C
O N
T R
O L
C
O O
R D
IN
A
T E
S Y
S T
E M
H
O R
IZ
O
N T
A L
C O
N T
R O
L
C O
M B
IN
E
D F
A C
T O
R
C F
G E
O
ID
EACH VIEW)
UNDER
(CENTERED
VIEW SUBTITLE
GENERAL VIEW SYMBOLS
D1
SCALE:
DETAIL/SECTION
SUPPLEMENTAL INFORMATION
D1
SCALE:1" =XXX'
DETAIL/SECTION
SUPPLEMENTAL INFORMATION
TITLE
SECTION/DETAIL
NTS
N
0 1' 2'
TOP
FRONT SIDE
ELEVATION SECTION A-A
DrawingIdentifier
SheetName
DrawingIdentifier
SheetName
DrawingIdentifier
SheetName
SECTION CUT
DETAIL SYMBOL
LIMITS OF WORK
FILL
CUT
97-41MP.I. POINT
MANHOLE
CATCHBASINCB
WATER VALVE
FIRE HYDRANT
LEVEE
AND NUMBER
DWG OUTLINE
SHEETPILE
SHEET ID X-000
BUILDINGS
REMOVED
GENERAL LEGEND
AND NUMBER
LOCATION
BORING
3 DIMENSIONAL
POINT
CONTROL
2 DIMENSIONAL
POINT
CONTROL
1 DIMENSIONAL
POINT
CONTROL##
RIPRAP (PLAN)
WATER LEVEL
RIPRAP (SECTION)
MATERIAL.
FULLY ACCURATE FOR DISTINGUISHING BETWEEN ROCK AND RIVER BOTTOM
REPRESENTATION IS BASED ON SURVEY DATA COLLECTED BUT MAY NOT BE
IN CROSS SECTIONS FOR INFORMATIONAL PURPOSES. THE
THE EXISTING ROCK FROM PREVIOUS ROCK WEIR CONSTRUCTION IS SHOWN 6.
UTILITIES.
LOCATION OF UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE TO THESE
RESPONSIBLE FOR MAKING THE DETERMINATION AS TO THE TYPE AND
OF UTILITIES MAY NOT BE ACCURATE OR ALL INCLUSIVE. CONTRACTOR IS
THE INFORMATION ON THESE DRAWINGS CONCERNING TYPE AND LOCATION 5.
AND SURVEY IN SEP 2024.
BATHYMETRIC SURVEY DATA IS FROM MULTIPLE SURVEYS IN SPRING 2023 4.
OFFICER UPON CONTRACT AWARD.
CONTROL POINTS ARE AVAILABLE BY REQUEST FROM THE CONTRACTING
TIE DIAGRAMS AND DETAILED DESCRIPTIONS OF HORIZONTAL AND VERTICAL 3.
OFFICER PRIOR TO ANY TEMPORARY BLOCKING OF ACCESS.
ALL TIMES. CONTRACTOR TO COORDINATE WITH THE CONTRACTING
CONDITION. USACE ACCESS TO PARKING AND LOCK WILL BE MAINTAINED AT
CONTRACTING OFFICER. RESTORE AREAS USED TO PRE-PROJECT
7. CONTRACTOR TO COORDINATE USAGE OF ALL STAGING AREAS WITH
THE STAGING AREA IS LOCATED ON THE MINNESOTA SIDE OF LOCK AND DAM 2.
AS REPRESENTED BY THESE PLANS.
CONDITIONS ARE ENCOUNTERED THAT MAY WARRANT CHANGES TO DESIGN
THE CONTRACTOR WILL COORDINATE WITH THE CONTRACTING OFFICER IF 1.
GENERAL NOTES
EXIST
MAX
MIN
SST
TYPEXISTING
FAR FACE
GALVANIZED
INSIDE FACE
MAXIMUM
MINIMUM
MISCELLANEOUS
NEAR FACE
OUTSIDE FACE
ON CENTER
STAINLESS STEEL
TOP AND BOTTOM
TYPICAL
UNDERGROUND
APPROXIMATE
ALTERNATE WITH
ALUMINUM
BITUMINOUS
BOTTOM
CURB & GUTTER
CONSTRUCTION JOINT
CONCRETE
DIAMETER
EACH FACE
BOT
C/L
C&G
CMP CORRUGATED METAL PIPE
EXPANSION JOINT
ELEVATION
EACH WAY
DRAWINGDWG
NUMBER
SAN SANITARY
SPECIFICATIONS
MIRR MIRRORED
* UNLESS OTHERWISE NOTED ON EACH SHEET
APPROX
ALT W/
ALUM
BITUM
CENTER LINE
CLR CLEAR
CJ
CONC
DIA
EF
EJ
EL
EW
FF
GALV
IF
MISC
OF
NO
OC
SPEC
T&B
UNO
UGND
FES FLARED END SECTION
WIDTH
WATER MAINWM
W
RIVERWARDR/W
LOW CONTROL POOL
LANDWARDL/W
LCP
HT HEIGHT
NTS NOT TO SCALE
NF
GENERAL ABBREVIATIONS
OTHERWISE
UNLESS NOTED
STAGING AREA
S I
D
D Q
C /R
F I
L A
C R
E S
C E
N T
M
N
L O
C K
D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R
L O
C K
D
A M
O
U T
D R
A F
T M
O D
IF
IC
A T
P
A U
L M
IN
N
E S
O T
A
S T
P
A U
L D
IS
T
R
-B
U
IL
T N
O
F
IL
E N
A M
E
R M
C G
A R
V
K
Y P
L A
N
G-101
T K
O U
G H
R M
C G
A R
V
O
D
G -1
.d
K
O U
D
M N
S P
C S
S
O U
T H
Z O
N E
-U .S
S
U R
V E
Y F
T
N A
V D
.9
D S
P
D
:1
:3
A
M
/2
/2
L D
O
D
G -1
.d
SCALE: 1" = 200'
PLAN - KEY PLAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
F L O
W M
IS
S
IS
S
IP
P I R
IV
E R
G-102
C -1
C -1
DOG-LEG WEIR
PARALLEL WEIR
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
E L
E V
A T
IO
N
D A
T U
M
V E
R T
IC
A
L C
O N
T R
O L
C
O O
R D
IN
A
T E
S Y
S T
E M
H
O R
IZ
O
N T
A L
C O
N T
R O
L
C O
M B
IN
E
D F
A C
T O
R
C F
G E
O
ID
400'0 200'
S I
D
D Q
C /R
F I
L A
C R
E S
C E
N T
M
N
L O
C K
D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R
L O
C K
D
A M
O
U T
D R
A F
T M
O D
IF
IC
A T
P
A U
L M
IN
N
E S
O T
A
S T
P
A U
L D
IS
T
R
-B
U
IL
T N
O
F
IL
E N
A M
E
R M
C G
A R
V E
Y
A N
D W
O R
K L
IM
IT
S
L D
S
T A
G
IN
G
A C
C E
S S
P L
A N
G-102
T K
O U
G H
R M
C G
A R
V
O
D
G -1
.d
K
O U
D
M N
S P
C S
S
O U
T H
Z O
N E
-U .S
S
U R
V E
Y F
T
N A
V D
.9
D S
P
D
:1
:5
A
M
/2
/2
L D
O
D
G -1
.d
SCALE: 1" = 100'
PLAN - LD7 STAGING, ACCESS, AND WORK LIMITS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A C
C E S S F
R O
M L
O A
D
IN
G D
O C
K T
O N
A V
IG
A T
IO
N C
H A
N N E L
F L O
W M
IS
S
IS
S
IP
P I R
IV
E R
TO LOADING AREA
SHARED USE ACCESS
STAGING AREAS
ON-LAND
STOCKPILE AREA
EXISTING HELIPAD
MAINTAIN USE OF
DOG-LEG WEIR
45" SCOUR PROTECTION
30" SCOUR PROTECTION
DOCK
LD7 LOADING
WORK LIMITS
CONSTRUCTION
ACCESS RD
USACE ROAD AND RIVER
CONTRACTOR ACCESS VIA
STAGING AREA
MARINE
STAGING AREA
MARINE
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
E L
E V
A T
IO
N
D A
T U
M
V E
R T
IC
A
L C
O N
T R
O L
C
O O
R D
IN
A
T E
S Y
S T
E M
H
O R
IZ
O
N T
A L
C O
N T
R O
L
C O
M B
IN
E
D F
A C
T O
R
C F
G E
O
ID
100' 200'0
N
EXISTING DRAINAGE FEATURES WITHIN THIS AREA.
PREDOMINANTLY AGGREGATE. CONTRACTOR MUST MAINTAIN AND PROTECT
SHOWN ON THIS SHEET. SURFACE AT THE STOCKPILE AREA IS
STOCKPILING OF MATERIALS IS ONLY ALLOWED IN THE DESIGNATED AREA 7.
DOCK MUST BE REMOVED WHEN NOT IN USE.
REMAIN OPEN. ANY CONTRACTOR EQUIPMENT UTILIZED AT LD7 LOADING
AREAS DESIGNATED AS SHARED USE ACCESS TO THE LOADING DOCK MUST 6.
DOCK.
MAINTAIN SHARED ACCESS FROM THE ENTRANCE ROAD TO THE LOADING
PARKING LOT AS SHOWN ON THIS SHEET FOR STAGING. CONTRACTOR WILL
CONTRACTOR WILL HAVE ACCESS TO THE DESIGNATED AREAS OF THE 5.
NAVIGATION CHANNEL TO THE LOCK 7 LOADING DOCK.
ACCESS DREDGING TO A DEPTH OF LCP MINUS 9 FEET (EL. 629.5) FROM THE
PRIOR TO COMMENCEMENT OF WORK, THE GOVERNMENT WILL PROVIDE 4.
SPECIFICATIONS FOR WORK RESTRICTIONS ON PRIORITY LOCKAGES.
APPROVED AND PLANNED BY THE CONTRACTING OFFICER. SEE
CONTRACT WORK AND REQUESTS FOR THIS ACTION ARE REQUIRED TO BE
MAY REQUEST LOCK STOPPAGE UP TO 3 HOURS TO ACCOMMODATE
BE APPROVED AND PLANNED BY THE CONTRACTING OFFICER. CONTRACTOR
SEASON. NAVIGATION CLOSURES NECESSARY FOR WORK ARE REQUIRED TO
CONTRACTOR ONLY HAS ACCESS TO LOCK DURING THE NAVIGATION 3.
AREAS.
MATERIALS, OR EQUIPMENT, WILL BE STORED OUTSIDE OF DEFINED STAGING
ARE FOR CONTRACTOR INGRESS AND EGRESS ONLY. NO VEHICLES,
WORK LIMITS SHOWN ON THIS SHEET OUTSIDE OF DEFINED STAGING AREAS 2.
OFFICER PRIOR TO ANY TEMPORARY BLOCKING OF ACCESS.
ALL TIMES. CONTRACTOR TO COORDINATE WITH THE CONTRACTING
CONDITION. USACE ACCESS TO PARKING AND LOCK WILL BE MAINTAINED AT
CONTRACTING OFFICER. RESTORE AREAS USED TO PRE-PROJECT
CONTRACTOR TO COORDINATE USAGE OF ALL STAGING AREAS WITH 1.
GENERAL SHEET NOTES
S I
D
D Q
C /R
F I
L A
C R
E S
C E
N T
M
N
L O
C K
D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R
L O
C K
D
A M
O
U T
D R
A F
T M
O D
IF
IC
A T
P
A U
L D
IS
T
R
IC
T
S T
P
A U
L M
IN
N
E S
O T
A
S T
P
A U
L D
IS
T
R
-B
U
IL
T N
O
F
IL
E N
A M
K O
T A
I S
L A
N D
A C
C E
S S
P L
A
G-103
O
D
G -1
.d
D
M N
S P
C S
S
O U
T H
Z O
N E
-U .S
S
U R
V E
Y F
T
N A
V D
.9
D S
P
D
:2
:2
P
M
/2
/2
L D
O
D
G -1
.d
SCALE: 1"=100'
PLAN - DAKOTA ISLAND
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
AND GRANULAR MATERIAL BORROW SITE
DREDGED MATERIAL PLACEMENT
DAKOTA ISLAND -
F L O
W M
IS
S
IS
S
IP
P I R
IV
E R
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
E L
E V
A T
IO
N
D A
T U
M
V E
R T
IC
A
L C
O N
T R
O L
C
O O
R D
IN
A
T E
S Y
S T
E M
H
O R
IZ
O
N T
A L
C O
N T
R O
L
C O
M B
IN
E
D F
A C
T O
R
C F
G E
O
ID
100' 200'0
N
PLACEMENT AND BORROW DETAILS TBD.1.
GENERAL SHEET NOTES
END CAP
PARALLEL WEIR
PARALLEL WEIREND CAP
PARALLEL WEIR
END CAP
DOG-LEG WEIR
A N
S I
D
D Q
C /R
F I
L A
C R
E S
C E
N T
M
N
L O
C K
D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R
L O
C K
D
A M
O
U T
D R
A F
T M
O D
IF
IC
A T
P
A U
L M
IN
N
E S
O T
A
S T
P
A U
L D
IS
T
R
-B
U
IL
T N
O
F
IL
E N
A M
E
R M
C G
A R
V
A D
T
O D
P L
A N
A N
D P
R O
F
IL
E
C-101
T K
O U
G H
R M
C G
A R
V
O
D C
-1 .d
K
O U
D
M N
S P
C S
S
O U
T H
Z O
N E
-U .S
S
U R
V E
Y F
T
N A
V D
.9
D S
P
D
:4
:0
A
M
/2
/2
L D
O
D
C -1
.d
G1
SCALE: 1" = 30'
PLAN VIEW - STA D 0+00 TO D 6+30
A1
SCALE: 1" = 30' HORIZONTAL, 1" = 10' VERTICAL
PROFILE VIEW - STA D 0+00 TO D 6+30
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
(B K
.0
E
Q N
S
(A
.0
E
Q N
S
,3
,5
.8
,5
.4
N
D -0
.0
S
P
B D
-0
D
D
D
D
D
D
D
M A T
C H L
IN
E S
H E
E T C -1
TOP EL. 639.45'
PARALLEL WEIR
LAUNCH ROCK
TOP EL. 629.45'
SCOUR PROTECTION
30" THICK
TOP EL. 639.45'
DOG-LEG WEIR
EXCAVATE AT 1V:3H
ROCK FILL AT 1V:3H
ROCK FILL AT 1V:3H
V
:2 H
1V:2H
1V:3H
1V:4H
V
:3 H
SLOPES AT 1V:3H
LAUNCH ROCK END CAP
SLOPES AT 1V:3H
PARALLEL WEIR END CAP
SLOPES AT 1V:3H
DOG-LEG WEIR END CAP
SLOPES AT 1V:3H
LAUNCH ROCK END CAP
SLOPES AT 1V:3H
END CAP
PARALLEL WEIR
AT 1V:3H
ROCK FILL
1V:4H
V
:3 H
V
:3 H
1V:4H
1V:4H
STA. D 2+60
SCOUR PROTECTION
30" THICK
START
D -0+00 D 0+30 D 0+60 D 0+90 D 1+20 D 1+50 D 1+80 D 2+10 D 2+40 D 2+70 D 3+00 D 3+30 D 3+60 D 3+90 D 4+20 D 4+50 D 4+80 D 5+10 D 5+40 D 5+70 D 6+00
610 610
620 620
630 630
640 640
650 650
660 660
670 670
680 680
.8
.8
.8
.7
.4
.8
.6
.6
.9
.4
.6
.5
.6
.2
.6
.9
.2
.3
.6
.5
.4
.5
.9
.2
.3
.1
.9
.5
.9
.9
.6
.5
.9
.8
.2
.3
.9
.2
.7
.9
.2
.4
.6
.6
.7
.6
.4
.9
.9
.9
.8
.5
.2
.7
.3
.5
.5
.6
.3
.4
.7
.3
.4
.7
.8
.8
.7
.8
.6
.4
.5
.2
.9
.3
.5
.5
.2
.1
.5
.9
.5
.8
.3
.2
.9
.4
.6
.6
.9
.9
.5
.7
.5
.6
.4
.3
.7
.8
.8
.4
.6
.6
.2
.2
.5
.9
.1
.9
.5
.2
.2
.2
.6
.4
.9
.2
.5
.3
.3
.8
.8
.8
.4
.2
.3
.5
.1
.9
.8
.2
.4
.6
.9
.7
.6
.3
.8
.8
.6
.5
.2
.5
.9
.5
.9
.4
.4
.5
.5
.3
.8
.8
.5
.5
.5
.4
.5
.3
.8
.8
.5
.4
.3
.8
.8
.4
.8
.8
.5
0.00%GRADE
.4
.0
S
V I
E L
.1
S T
A D
.0
P V
I
.4
A D
.1
P V
I
E L
.5
S T
A D
.3
P V
I
E L
.1
S T
A D
.2
P V
I
.4
A D
.0
P V
I
G R
A D E
3.
G R
A D E
3.
G
R A D E 33.33%
DOG-LEG WEIRDOG-LEG WEIR
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
E L
E V
A T
IO
N
D A
T U
M
V E
R T
IC
A
L C
O N
T R
O L
C
O O
R D
IN
A
T E
S Y
S T
E M
H
O R
IZ
O
N T
A L
C O
N T
R O
L
C O
M B
IN
E
D F
A C
T O
R
C F
G E
O
ID10' 20'0
N
30' 60'0
30' 60'0
C-301
A1
C-301
E1
C-301
J1 C-302
A1
C-302
E1
A N
S I
D
D Q
C /R
F I
L A
C R
E S
C E
N T
M
N
L O
C K
D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R
L O
C K
D
A M
O
U T
D R
A F
T M
O D
IF
IC
A T
P
A U
L M
IN
N
E S
O T
A
S T
P
A U
L D
IS
T
R
-B
U
IL
T N
O
F
IL
E N
A M
E
R M
C G
A R
V
A D
T O
D
.4
P L
A N
A N
D P
R O
F
IL
E
C-102
T K
O U
G H
R M
C G
A R
V
O
D C
-1 .d
K
O U
D
M N
S P
C S
S
O U
T H
Z O
N E
-U .S
S
U R
V E
Y F
T
N A
V D
.9
D S
P
D
:5
:1
A
M
/2
/2
L D
O
D
C -1
.d
F1
SCALE: 1" = 30'
PLAN VIEW - STA D 6+30 TO D 11+15.48
A1
SCALE: 1" = 30' HORIZONTAL, 1" = 10' VERTICAL
PLAN VIEW - STA D 6+30 TO D 11+15.48
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
,3
,2
.8
,5
.4
N D
.4
S
E
D
.4
S
T
D
D
D
D
D
D
M A T
C H L
IN
E S
H E
E T C -1
LOCK WALL
EXISTING AUXILIARY
AT 1V:3H
EXCAVATE
AT 1V:3H
EXCAVATE
TOP EL. 629.45
SCOUR PROTECTION
30" THICK
AT 1V:3H
ROCK FILL
TOP EL. 639.45
DOG-LEG WEIR
1V:4H
1V:4H
V :3
H
V :3
H
V :3
H
1V:4H
1V:4H
V :3
H
V :3
H
1V:4H
1V:4H
V :3
H
V :3
H
V :3
H
V :3
H
V :3
H
TOP EL. 630.45
SCOUR PROTECTION
45" THICK
START
TOP EL. 630.45
SCOUR PROTECTION
45" THICK
END
C-302
J1
C-303
A1
C-303
E1
D 6+30 D 6+60 D 6+90 D 7+20 D 7+50 D 7+80 D 8+10 D 8+40 D 8+70 D 9+00 D 9+30 D 9+60 D 9+90 D 10+20 D 10+50 D 10+80 D 11+10 D 11+40 D 11+70 D 12+00
610 610
620 620
630 630
640 640
650 650
660 660
670 670
680 680
.3
.8
.7
.8
.4
.0
.0
.4
.3
.6
.6
.0
.1
.9
.2
.3
.2
.5
.7
.1
.3
.1
.3
.1
.3
.1
.1
.1
.8
.4
.5
.4
.4
.2
.2
.8
.6
.2
.6
.4
.3
.8
.3
.7
.9
.4
.7
.5
.4
.7
.6
.2
.1
.8
.8
.0
.4
.6
.0
.9
.3
.5
.1
.1
.1
.1
.1
.4
.4
.2
.8
.2
.4
.8
.7
.4
.5
.7
.6
.1
.3
.8
.0
.6
.1
.3
.7
.1
.3
.1
.5
.2
.6
.4
.3
.4
.4
.7
.2
.1
.8
.0
.6
.9
.5
.1
.1
.4
.2
.2
.8
.4
.7
.6
.1
.7
.4
.1
.5
.3
.1
.4
.2
.3
.5
.7
.1
.4
.5
.1
.2
.5
.1
.5
.2
.1
.5
.1
.2
0.00%GRADE
-4 .0
G R
A
0.00%GRADE
.0
G R
A
-4 .0
G R
A
.0
G R
A
-4 .0
G R
A
.4
.4
S
I
.4
.9
S
I
.4
.9
S
I
.4
.4
S
I
.4
.3
S
I
.4
.8
S
I
.4
.8
S
I
.4
.3
S
I
.4
.1
S
I
.4
.6
S
I
.4
.4
S
I
EXISTING AUXILIARY LOCK WALL
DOG-LEG WEIR
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
E L
E V
A T
IO
N
D A
T U
M
V E
R T
IC
A
L C
O N
T R
O L
C
O O
R D
IN
A
T E
S Y
S T
E M
H
O R
IZ
O
N T
A L
C O
N T
R O
L
C O
M B
IN
E
D F
A C
T O
R
C F
G E
O
ID10' 20'0
N
30' 60'0
30' 60'0
5'VARIES
148.63'
5'VARIES
148.63'
VARIES
.5
.5
5'VARIES
.5
.5
VARIES
5'
148.63'
A N
S I
D
D Q
C /R
F I
L A
C R
E S
C E
N T
M
N
L O
C K
D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R
L O
C K
D
A M
O
U T
D R
A F
T M
O D
IF
IC
A T
P
A U
L M
IN
N
E S
O T
A
S T
P
A U
L D
IS
T
R
-B
U
IL
T N
O
F
IL
E N
A M
E
R M
C G
A R
V
F
T Y
P
IC
A L
C R
O S
S S
E C
T
IO
N S
C-301
T K
O U
G H
R M
C G
A R
V
O
D C
-3 .d
K
O U
D
M N
S P
C S
S
O U
T H
Z O
N E
-U .S
S
U R
V E
Y F
T
N A
V D
.9
D S
P
D
:2
:3
P
M
/2
/2
L D
O
D
C -3
.d
SCALE: 1" = 20'
TYPICAL CROSS SECTION - STA D 1+00 TO D 2+60
E1
SCALE: 1" = 20'
TYPICAL CROSS SECTION - STA D 2+60 TO D 3+00
J1
SCALE: 1" = 20'
TYPICAL CROSS SECTION - STA D 3+00 TO 3+37.10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
E L
E V
A T
IO
N
D A
T U
M
V E
R T
IC
A
L C
O N
T R
O L
C
O O
R D
IN
A
T E
S Y
S T
E M
H
O R
IZ
O
N T
A L
C O
N T
R O
L
C O
M B
IN
E
D F
A C
T O
R
C F
G E
O
ID
20' 40'0
20' 40'0
20' 40'0
D 2+00
-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100
600 600
620 620
640 640
660 660
LAUNCH ROCK PARALLEL WEIR
EXISTING GRADE
EL. 639.45
EL. VARIES
EL. 638.45
LCP
CL
1V:3H BELOW
EL. 636.45
1V:4H ABOVE
1V:3H BELOW
EL. 636.45
1V:4H ABOVE
D 2+80
-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100
620 620
640 640
660 660
1V:3H BELOW
EL. 636.45
1V:4H ABOVE
1V:3H BELOW
EL. 636.45
1V:4H ABOVE
EL. 639.45
EXISTING GRADE
EL. VARIES
1V :2H
1V:2H
CL
CENTERLINE
PARALLEL WEIR
LAUNCH ROCK PARALLEL WEIR
AT 1V:3H
EXCAVATE
AT 1V:3H
ROCK FILL
TOP EL. 629.45
SCOUR PROTECTION
EL. 638.45
LCP
D 3+20
-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100
620 620
640 640
660 660
1V :2H
1V:2H
1V:3H BELOW
EL. 636.45
1V:4H ABOVE
1V:3H BELOW
EL. 636.45
1V:4H ABOVE
EL. 639.45
EL. VARIES
LAUNCH ROCK PARALLEL WEIR
TOP EL. 629.45
SCOUR PROTECTION
END CAP
DOG-LEG WEIR
EXISTING GRADE
1V:3H BELOW
EL. 636.45
1V:4H ABOVE
1V:3H BELOW
EL. 636.45
1V:4H ABOVE
AT 1V:3H
ROCK FILL
AT 1V:3H
EXCAVATE
EL. VARIES
EL. 638.45
LCP
CL
CENTERLINE
PARALLEL WEIR
10.1' 5' 5'
78.26'
.5
.5
148.63'
.5
5'
.5
.5
0.41'
VARIES
5'
M
IN
.7
A N
S I
D
D Q
C /R
F I
L A
C R
E S
C E
N T
M
N
L O
C K
D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R
L O
C K
D
A M
O
U T
D R
A F
T M
O D
IF
IC
A T
P
A U
L M
IN
N
E S
O T
A
S T
P
A U
L D
IS
T
R
-B
U
IL
T N
O
F
IL
E N
A M
E
R M
C G
A R
V
F
T Y
P
IC
A L
S E
C T
IO
N
S
C-302
T K
O U
G H
R M
C G
A R
V
O
D C
-3 .d
K
O U
D
M N
S P
C S
S
O U
T H
Z O
N E
-U .S
S
U R
V E
Y F
T
N A
V D
.9
D S
P
D
:2
:5
P
M
/2
/2
L D
O
D
C -3
.d
TYPICAL CROSS SECTION - STA D 3+37.10 TO D 5+70
E1
SCALE: 1" = 20'
TYPICAL CROSS SECTION - STA D 5+70 TO D 7+50
J1
SCALE: 1" = 20'
TYPICAL CROSS SECTION - STA D 7+50.00 TO D 7+83.46,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
E L
E V
A T
IO
N
D A
T U
M
V E
R T
IC
A
L C
O N
T R
O L
C
O O
R D
IN
A
T E
S Y
S T
E M
H
O R
IZ
O
N T
A L
C O
N T
R O
L
C O
M B
IN
E
D F
A C
T O
R
C F
G E
O
ID
D 8+58.48 TO D 9+20.39, AND D 9+95.39 TO D 10+53.10
20' 40'0
20' 40'0
20' 40'0
D 4+00
-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100
600 600
620 620
640 640
660 660
EL. VARIES EL. 639.45
1V:3H BELOW
EL. 636.45
1V:4H ABOVE
1V:3H BELOW
EL. 636.45
1V:4H ABOVE 1V:3H BELOW
EL. 636.45
1V:4H ABOVE
1V:3H BELOW
EL. 636.45
1V:4H ABOVE
EL. 639.45
DOG-LEG WEIR
TOP EL. 629.45
SCOUR PROTECTION
PARALLEL WEIR
LAUNCH ROCK
BELOW EL. 626.95
GRANULAR FILL
GRADE
EXISTING
EL. 638.45
LCP
CL
CENTERLINE
PARALLEL WEIR
WEIR ROCK
EXCAVATE EXISTING
D 6+40
-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100
600 600
620 620
640 640
660 660
EL. 639.45
TOP EL. 629.45
SCOUR PROTECTION
AT 1V:3H
ROCK FILL
1V:3H BELOW
EL. 636.45
1V:4H ABOVE
1V:3H BELOW
EL. 636.45
1V:4H ABOVE
WEIR ROCK
EXCAVATE EXISTING
DOG-LEG WEIR
GRADE
EXISTING
CL
EL. 638.45
LCP
D 7+60
-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100
600 600
620 620
640 640
660 660
EL. 639.45
1V:3H BELOW
EL. 636.45
1V:4H ABOVE
1V:3H BELOW
EL. 636.45
1V:4H ABOVE
TOP EL. 630.45
SCOUR PROTECTION
AT 1V:3H
ROCK FILL
EXISTING ROCK WEIR
DOG-LEG WEIR
CL
EXISTING GRADE
EL. 638.45
LCP
VARIES
.7
VARIES
A N
S I
D
D Q
C /R
F I
L A
C R
E S
C E
N T
M
N
L O
C K
D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R
L O
C K
D
A M
O
U T
D R
A F
T M
O D
IF
IC
A T
P
A U
L M
IN
N
E S
O T
A
S T
P
A U
L D
IS
T
R
-B
U
IL
T N
O
F
IL
E N
A M
E
R M
C G
A R
V
F
T Y
P
IC
A L
S E
C T
IO
N
S
C-303
T K
O U
G H
R M
C G
A R
V
O
D C
-3 .d
K
O U
D
M N
S P
C S
S
O U
T H
Z O
N E
-U .S
S
U R
V E
Y F
T
N A
V D
.9
D S
P
D
:3
:1
P
M
/2
/2
L D
O
D
C -3
.d
TYPICAL CROSS SECTION - STA D 8+15.98 TO D 8+25.98 AND
E1
SCALE: 1" = 20'
TYPICAL CROSS SECTION - STA D 10+85.60 TO D 11+15.47
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
E L
E V
A T
IO
N
D A
T U
M
V E
R T
IC
A
L C
O N
T R
O L
C
O O
R D
IN
A
T E
S Y
S T
E M
H
O R
IZ
O
N T
A L
C O
N T
R O
L
C O
M B
IN
E
D F
A C
T O
R
C F
G E
O
ID
STA D 9+52.89 TO D 9+62.89
10' 20'0
10' 20'0
D 8+20
-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100
600 600
620 620
640 640
660 660
SLOPE VARIES
ROCK FILL
TOP EL. 626.45
NOTCH
AT 1V:3H
EXCAVATE
AT 1V:3H
EXCAVATE
AT 1V:3H
ROCK FILL
TOP EL. 626.45
SCOUR PROTECTION
EXISTING GRADE
CL
ROCK WEIR
EXCAVATE EXISTING
EL. 638.45
LCP
WEIR TO EL. 626.45
EXCAVATE EXISTING ROCK
CL
EXISTING ROCK WEIR
EXISTING GRADE
D 11+00
-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100
580 580
600 600
620 620
640 640
660 660
R
M
C G
A R
V
A D
T
O D
C R
O S
S S
E C
T
IO
N S
C-304
T K
O U
G H
R M
C G
A R
V
O
D C
-3 .d
K
O U
D
M N
S P
C S
S
O U
T H
Z O
N E
-U .S
S
U R
V E
Y F
T
N A
V D
.9
D S
P
D
:4
:3
P
M
/2
/2
L D
O
D
C -3
.d
SCALE: 1" = 40'
CROSS SECTIONS - STA D 0+69 TO D 1+70
A N
S I
D
D Q
C /R
F I
L A
C R
E S
C E
N T
M
N
L O
C K
D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R
L O
C K
D
A M
O
U T
D R
A F
T M
O D
IF
IC
A T
P
A U
L M
IN
N
E S
O T
A
S T
P
A U
L D
IS
T
R
-B
U
IL
T N
O
F
IL
E N
A M
E
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
.1
.5
.1
.9
.1
.5
.1
.9
D 0+69
-240 -200 -160 -120 -80 -40 0 40 80
560 560
600 600
640 640
680 680
.1
.1
.1
.8
.1
.1
.1
.8
D 0+70
-240 -200 -160 -120 -80 -40 0 40 80
560 560
600 600
640 640
680 680
.5
.4
.5
.4
.5
.4
.5
.8
.3
.7
.3
.4
.0
.7
.4
.1
.4
.1
.0
.7
.4
.1
.4
.1
.5
.4
.0
.7
.5
.4
.0
.7
2:1 2:13:1
4:1 4:1 3:1
D 1+00
-240 -200 -160 -120 -80 -40 0 40 80
560 560
600 600
640 640
680 680
.0
.9
.0
.9
.0
.9
.8
.0
.6
.9
.6
.6
.3
.8
.4
.1
.4
.1
.3
.8
.4
.1
.4
.1
2:1 2:13:1
4:1 4:1 3:1
D 1+20
-240 -200 -160 -120 -80 -40 0 40 80
560 560
600 600
640 640
680 680
.0
.6
.0
.6
.0
.6
.2
.6
.0
.5
.0
.2
.8
.2
.4
.1
.4
.1
.8
.2
.4
.1
.4
.1
2:1 2:13:1
4:1 4:1 3:1
D 1+40
-240 -200 -160 -120 -80 -40 0 40 80
560 560
600 600
640 640
680 680
.9
.2
.9
.2
.9
.2
.7
.1
.5
.0
.5
.7
.1
.1
.4
.1
.4
.1
.1
.1
.4
.1
.4
.1
2:1 2:1 3:14
:1 4:1
3:1
D 1+70
-240 -200 -160 -120 -80 -40 0 40 80
560 560
600 600
640 640
680 680
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
E L
E V
A T
IO
N
D A
T U
M
V E
R T
IC
A
L C
O N
T R
O L
C
O O
R D
IN
A
T E
S Y
S T
E M
H
O R
IZ
O
N T
A L
C O
N T
R O
L
C O
M B
IN
E
D F
A C
T O
R
C F
G E
O
ID
40' 80'0
S I
D
D Q
C /R
F I
L A
C R
E S
C E
N T
M
N
L O
C K
D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R
L O
C K
D
A M
O
U T
D R
A F
T M
O D
IF
IC
A T
P
A U
L M
IN
N
E S
O T
A
S T
P
A U
L D
IS
T
R
-B
U
IL
T N
O
F
IL
E N
A M
E
R M
C G
A R
V
A D
T
O D
C R
O S
S S
E C
T
IO
N S
C-305
T K
O U
G H
R M
C G
A R
V
O
D C
-3 .d
K
O U
D
M N
S P
C S
S
O U
T H
Z O
N E
-U .S
S
U R
V E
Y F
T
N A
V D
.9
D S
P
D
:4
:5
P
M
/2
/2
L D
O
D
C -3
.d
CROSS SECTIONS - STA D 1+80 TO D 2+50
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
.7
.4
.7
.4
.7
.4
.8
.0
.4
.2
.4
.2
.1
.2
.4
.1
.4
.1
.1
.2
.4
.1
.4
.1
2:1 2:1
3:1 4:1
4:1 3:1
D 1+80
-240 -200 -160 -120 -80 -40 0 40 80
560 560
600 600
640 640
680 680
.6
.6
.6
.6
.6
.6
.0
.2
.8
.1
.8
.8
.7
.9
.4
.1
.4
.1
.7
.9
.4
.1
.4
.1
2:1 2:1
3:1 4:1 4:1
3:1
D 1+90
-240 -200 -160 -120 -80 -40 0 40 80
560 560
600 600
640 640
680 680
.6
.6
.6
.6
.6
.6
.0
.3
.8
.2
.8
.9
.6
.8
.4
.1
.4
.1
.6
.8
.4
.1
.4
.1
2:1 2:1
3:1 4:1 4:1
3:1
D 2+00
-240 -200 -160 -120 -80 -40 0 40 80
560 560
600 600
640 640
680 680
.3
.7
.3
.7
.3
.7
.5
.8
.3
.7
.3
.4
.9
.7
.4
.1
.4
.1
.9
.7
.4
.1
.4
.1
2:1 2:1
3:1 4:1 4:1
3:1
D 2+20
-240 -200 -160 -120 -80 -40 0 40 80
560 560
600 600
640 640
680 680
.4
.6
.2
.6
.2
.6
.2
.6
.7
.1
.3
.3
.3
.3
.1
.3
.4
.1
.4
.1
.1
.3
.4
.1
.4
.1
2:1 2:1
3:1 4:1 4:1
3:1
D 2+40
-240 -200 -160 -120 -80 -40 0 40 80
560 560
600 600
640 640
680 680
.4
.1
.4
.1
.4
.1
.9
.5
.7
.4
.7
.1
.3
.8
.4
.1
.4
.1
.3
.8
.4
.1
.4
.1
2:1 2:1 3:1
4:1 4:1 3:1
D 2+50
-240 -200 -160 -120 -80 -40 0 40 80
560 560
600 600
640 640
680 680
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
E L
E V
A T
IO
N
D A
T U
M
V E
R T
IC
A
L C
O N
T R
O L
C
O O
R D
IN
A
T E
S Y
S T
E M
H
O R
IZ
O
N T
A L
C O
N T
R O
L
C O
M B
IN
E
D F
A C
T O
R
C F
G E
O
S I
D
D Q
C /R
F I
L A
C R
E S
C E
N T
M
N
L O
C K
D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R
L O
C K
D
A M
O
U T
D R
A F
T M
O D
IF
IC
A T
P
A U
L M
IN
N
E S
O T
A
S T
P
A U
L D
IS
T
R
-B
U
IL
T N
O
F
IL
E N
A M
E
R M
C G
A R
V
A D
T
O D
C R
O S
S S
E C
T
IO
N S
C-306
T K
O U
G H
R M
C G
A R
V
O
D C
-3 .d
K
O U
D
M N
S P
C S
S
O U
T H
Z O
N E
-U .S
S
U R
V E
Y F
T
N A
V D
.9
D S
P
D
:5
:0
P
M
/2
/2
L D
O
D
C -3
.d
CROSS SECTIONS - STA D 2+60 TO D 3+60
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
.9
.2
.9
.2
.9
.2
.7
.1
.5
.0
.5
.7
.4
.1
.4
.1
.4
.0
.4
.1
.4
.1
.4
.1
.9
.2
.9
.2
.5
.0
.5
.7
.4
.1
.4
.1
.4
.1
.4
.1
.4
.1
.4
.6
.4
.1
2:1 2:1
3:1 4:1
4:1 3:1
-9.5%
D 2+60
-240 -200 -160 -120 -80 -40 0 40 80
560 560
600 600
640 640
680 680
.4
.6
.7
.3
.4
.0
.3
.6
.3
.6
.5
.2
.5
.9
.4
.1
.4
.1
.4
.1
.4
.1
.4
.1
.7
.7
.8
.0
.4
.1
2:1 2:13:1
4:1 4:1 3:1
D 2+80
-240 -200 -160 -120 -80 -40 0 40 80
560 560
600 600
640 640
680 680
.2
.8
.4
.6
.8
.7
.8
.7
.2
.9
.2
.8
.4
.1
.4
.1
.4
.1
.4
.1
.4
.1
.8
.7
.4
.1
.0
.5
.0
.5
2:1 2:13:1
4:1 4:1 3:1
3:1
D 3+30
-240 -200 -160 -120 -80 -40 0 40 80
560 560
600 600
640 640
680 680
.4
.6
.1
.5
.4
.5
.4
.5
.4
.5
.4
.5
.1
.0
.4
.1
.4
.1
.4
.1
.4
.1
.3
.3
.9
.5
.9
.3
.4
.6
.4
.0
.1
.5
.9
.3
.1
.9
.9
.3
.4
.5
.8
.7
.8
.7
.1
.0
.1
.9
.4
.1
.4
.1
.4
.1
.4
.1
.4
.1
.3
.1
.4
.1
.4
.1
.4
.1
.1
.5
.4
.5
.1
.5
1.
7:
1 2:13:1
4:1 4:1 3:1
3:11.
2:
:1 4:1
3:1
D 3+37
-240 -200 -160 -120 -80 -40 0 40 80
560 560
600 600
640 640
680 680
.0
.7
.4
.5
.4
.5
.4
.5
.4
.5
.1
.0
.4
.1
.4
.1
.4
.1
.4
.1
.9
.5
.9
.3
.4
.6
.4
.0
.0
.7
.9
.3
.1
.9
.9
.3
.4
.1
.4
.1
2.1 :1 2:13:1
4:1 4:1 3:1 -7.1%
4:1 4:1 3:1
D 3+40
-240 -200 -160 -120 -80 -40 0 40 80
560 560
600 600
640 640
680 680
.2
.0
.4
.5
.4
.5
.4
.5
.4
.5
.0
.5
.4
.1
.4
.1
.4
.1
.4
.1
.8
.0
.2
.6
.2
.0
.2
.6
.0
.4
.2
.6
.4
.1
.4
.1
2.1 :1 2:13:1
4:1 4:1 3:1
4:1 4:1 3:1
D 3+60
-240 -200 -160 -120 -80 -40 0 40 80
560 560
600 600
640 640
680 680
EXISTING ROCK WEIR
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
E L
E V
A T
IO
N
D A
T U
M
V E
R T
IC
A
L C
O N
T R
O L
C
O O
R D
IN
A
T E
S Y
S T
E M
H
O R
IZ
O
N T
A L
C O
N T
R O
L
C O
M B
IN
E
D F
A C
T O
R
C F
G E
O
S I
D
D Q
C /R
F I
L A
C R
E S
C E
N T
M
N
L O
C K
D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R
L O
C K
D
A M
O
U T
D R
A F
T M
O D
IF
IC
A T
P
A U
L M
IN
N
E S
O T
A
S T
P
A U
L D
IS
T
R
-B
U
IL
T N
O
F
IL
E N
A M
E
R M
C G
A R
V
A D
T
O D
C R
O S
S S
E C
T
IO
N S
C-307
T K
O U
G H
R M
C G
A R
V
O
D C
-3 .d
K
O U
D
M N
S P
C S
S
O U
T H
Z O
N E
-U .S
S
U R
V E
Y F
T
N A
V D
.9
D S
P
D
:0
:1
P
M
/2
/2
L D
O
D
C -3
.d
CROSS SECTIONS - STA D 3+80 TO D 4+80
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
.9
.0
.4
.5
.4
.5
.4
.5
.4
.5
.1
.1
.4
.1
.4
.1
.4
.1
.4
.1
.9
.6
.6
.7
.9
.0
.6
.7
.1
.0
.6
.7
.4
.1
.4
.1
2.1 :1 2:1
3:1 4:1 4:1
3:1 4:1 4:1
3:1
D 3+80
-240 -200 -160 -120 -80 -40 0 40 80
560 560
600 600
640 640
680 680
EXISTING ROCK WEIR
.2
.1
.4
.5
.4
.5
.4
.5
.4
.5
.8
.0
.4
.1
.4
.1
.4
.1
.4
.1
.6
.5
.6
.8
.2
.1
.6
.8
.8
.9
.6
.8
.4
.1
.4
.1
2.1 :1 2:13:1
4:1 4:1 3:1
4:1 4:1 3:1
D 4+00
-240 -200 -160 -120 -80 -40 0 40 80
560 560
600 600
640 640
680 680
EXISTING ROCK WEIR
3:1
.8
.1
.4
.5
.4
.5
.4
.5
.4
.5
.6
.7
.4
.1
.4
.1
.4
.1
.4
.1
.4
.2
.7
.7
.8
.1
.7
.7
.6
.6
.7
.7
.4
.1
.4
.1
2:1 2:13:1
4:1 4:1 3:1
4:1 4:1 3:1
D 4+20
-240 -200 -160 -120 -80 -40 0 40 80
560 560
600 600
640 640
680 680
EXISTING ROCK WEIR
3:1
.0
.6
.4
.5
.4
.5
.4
.5
.4
.5
.0
.4
.4
.1
.4
.1
.4
.1
.4
.1
.8
.9
.5
.1
.0
.6
.5
.1
.0
.3
.5
.1
.4
.1
.4
.1
1.9 :1 2:1 3:1
4:1 4:1 3:1
4:1 4:1 3:1
D 4+40
-240 -200 -160 -120 -80 -40 0 40 80
560 560
600 600
640 640
680 680
EXISTING ROCK WEIR
3:1
.7
.7
.4
.5
.4
.5
.4
.5
.4
.5
.0
.4
.4
.1
.4
.1
.4
.1
.4
.1
.8
.9
.0
.9
.7
.7
.0
.9
.0
.3
.0
.9
.4
.1
.4
.1
.3
.8
1.
7:
1 2:1 3:1
4:1 4:1 3:1
4:1 4:1 3:1
D 4+60
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
3:1
ROCK WEIR
EXISTING
.5
.1
.4
.5
.4
.5
.4
.5
.4
.5
.8
.9
.4
.1
.4
.1
.4
.1
.4
.1
.6
.4
.0
.1
.5
.1
.0
.1
.8
.8
.0
.1
.4
.1
.1
.4
1.
7:
1 2:1 3:1
4:1 4:1 3:1 3:1
4:1 4:1 3:1
D 4+80
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
ROCK WEIR
EXISTING
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
E L
E V
A T
IO
N
D A
T U
M
V E
R T
IC
A
L C
O N
T R
O L
C
O O
R D
IN
A
T E
S Y
S T
E M
H
O R
IZ
O
N T
A L
C O
N T
R O
L
C O
M B
IN
E
D F
A C
T O
R
C F
G E
O
S I
D
D Q
C /R
F I
L A
C R
E S
C E
N T
M
N
L O
C K
D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R
L O
C K
D
A M
O
U T
D R
A F
T M
O D
IF
IC
A T
P
A U
L M
IN
N
E S
O T
A
S T
P
A U
L D
IS
T
R
-B
U
IL
T N
O
F
IL
E N
A M
E
R M
C G
A R
V
A D
T
O D
C R
O S
S S
E C
T
IO
N S
C-308
T K
O U
G H
R M
C G
A R
V
O
D C
-3 .d
K
O U
D
M N
S P
C S
S
O U
T H
Z O
N E
-U .S
S
U R
V E
Y F
T
N A
V D
.9
D S
P
D
:5
:0
P
M
/2
/2
L D
O
D
C -3
.d
CROSS SECTIONS - STA D 5+00 TO D 5+80
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
.5
.2
.4
.5
.4
.5
.4
.5
.4
.5
.4
.1
.4
.1
.4
.1
.4
.1
.4
.1
.2
.6
.7
.5
.5
.2
.7
.5
.4
.0
.7
.5
.4
.1
.1
.4
1.
4:
1 2:1 3:1
4:1 4:1 3:1 3:1
4:1 4:1 3:1
D 5+00
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.2
.2
.4
.5
.4
.5
.4
.5
.4
.5
.8
.1
.4
.1
.4
.1
.4
.1
.4
.1
.6
.6
.2
.2
.8
.0
.2
.6
.4
.1
.9
.0
1.
2:
1 2:1 3:1
4:1 4:1 3:1 3:1
4:1 4:1 3:1
D 5+20
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.8
.2
.4
.5
.4
.5
.4
.5
.4
.5
.8
.0
.4
.1
.4
.1
.4
.1
.4
.1
.6
.5
.0
.1
.8
.2
.0
.1
.8
.9
.0
.1
.4
.1
.7
.5
1.
3:
1 2:1 3:1
4:1 4:1 3:1 3:1
4:1 4:1 3:1
D 5+40
-240 -200 -160 -120 -80 -40 0 40 80
560 560
600 600
640 640
680 680
.6
.0
.4
.5
.4
.5
.4
.5
.4
.5
.1
.2
.4
.1
.4
.1
.4
.1
.4
.1
.9
.7
.6
.0
.1
.1
.0
.1
.4
.1
.0
.6
1.
1:
1 2:1 3:1
4:1 4:1 3:1 3:1
4:1 4:1 3:1
D 5+60
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.4
.5
.4
.5
.6
.0
.4
.0
.4
.1
.6
.0
.4
.5
.4
.5
.4
.5
.4
.5
.0
.5
.4
.1
.4
.1
.4
.1
.4
.1
.4
.5
.4
.5
.4
.4
.6
.0
.8
.0
.8
.9
.7
.6
.6
.0
.7
.6
.0
.4
.7
.6
.4
.1
.4
.5
.4
.4
.4
.4
.4
.4
.4
.5
.7
.6
.7
.6
1.
2:
1 2:1 3:1
4:1 4:1 3:1
4:1 4:1 3:1
D 5+70
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.4
.5
.4
.5
.0
.6
.4
.7
.4
.5
.4
.5
.6
.8
.0
.6
.3
.0
.4
.5
.6
.8
.6
.8
.4
.5
.0
.5
.0
.5
3:1 3:1
4:1 4:1 3:1
D 5+80
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
E L
E V
A T
IO
N
D A
T U
M
V E
R T
IC
A
L C
O N
T R
O L
C
O O
R D
IN
A
T E
S Y
S T
E M
H
O R
IZ
O
N T
A L
C O
N T
R O
L
C O
M B
IN
E
D F
A C
T O
R
C F
G E
O
S I
D
D Q
C /R
F I
L A
C R
E S
C E
N T
M
N
L O
C K
D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R
L O
C K
D
A M
O
U T
D R
A F
T M
O D
IF
IC
A T
P
A U
L M
IN
N
E S
O T
A
S T
P
A U
L D
IS
T
R
-B
U
IL
T N
O
F
IL
E N
A M
E
R M
C G
A R
V
A D
T
O D
C R
O S
S S
E C
T
IO
N S
C-309
T K
O U
G H
R M
C G
A R
V
O
D C
-3 .d
K
O U
D
M N
S P
C S
S
O U
T H
Z O
N E
-U .S
S
U R
V E
Y F
T
N A
V D
.9
D S
P
D
:0
:5
P
M
/2
/2
L D
O
D
C -3
.d
CROSS SECTIONS - STA D 6+00 TO D 7+00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
.4
.5
.4
.5
.5
.3
.4
.0
.4
.5
.4
.5
.5
.3
.6
.4
.4
.5
.9
.9
.4
.5
.9
.5
.0
.0
.9
.5
.0
.0
3:1 3:1
3:1 4:1 4:1
3:1
D 6+00
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.4
.5
.4
.5
.3
.7
.4
.2
.4
.5
.4
.5
.0
.7
.3
.7
.8
.1
.4
.5
.0
.7
.0
.7
.4
.5
.9
.4
.3
.5
.9
.4
.3
.5
3:1 3:1
4:1 4:1 3:1
D 6+20
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.4
.5
.4
.5
.4
.4
.4
.5
.4
.5
.4
.5
.3
.9
.4
.4
.2
.2
.4
.5
.3
.9
.3
.9
.4
.5
3:1 3:1
4:1 4:1 3:1
D 6+40
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.4
.5
.4
.5
.4
.6
.4
.8
.4
.5
.4
.5
.2
.0
.4
.6
.0
.0
.4
.5
.2
.0
.2
.0
.4
.5
3:1 3:1
4:1 4:1 3:1
D 6+60
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.4
.5
.4
.5
.1
.3
.4
.0
.4
.5
.4
.5
.6
.9
.1
.3
.5
.9
.4
.5
.6
.9
.6
.9
.4
.5
3:1 3:1
4:1 4:1 3:1
D 6+80
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.4
.5
.4
.5
.9
.1
.4
.3
.4
.5
.4
.5
.2
.0
.9
.1
.7
.3
.2
.0
.2
.0
.4
.5
3:1 3:1
4:1 4:1 3:1
D 7+00
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
E L
E V
A T
IO
N
D A
T U
M
V E
R T
IC
A
L C
O N
T R
O L
C
O O
R D
IN
A
T E
S Y
S T
E M
H
O R
IZ
O
N T
A L
C O
N T
R O
L
C O
M B
IN
E
D F
A C
T O
R
C F
G E
O
S I
D
D Q
C /R
F I
L A
C R
E S
C E
N T
M
N
L O
C K
D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R
L O
C K
D
A M
O
U T
D R
A F
T M
O D
IF
IC
A T
P
A U
L M
IN
N
E S
O T
A
S T
P
A U
L D
IS
T
R
-B
U
IL
T N
O
F
IL
E N
A M
E
R M
C G
A R
V
A D
T
O D
C R
O S
S S
E C
T
IO
N S
C-310
T K
O U
G H
R M
C G
A R
V
O
D C
-3 .d
K
O U
D
M N
S P
C S
S
O U
T H
Z O
N E
-U .S
S
U R
V E
Y F
T
N A
V D
.9
D S
P
D
:0
:4
P
M
/2
/2
L D
O
D
C -3
.d
CROSS SECTIONS - STA D 7+10 TO D 8+00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
.4
.5
.4
.5
.7
.7
.4
.5
.4
.9
.4
.5
.4
.5
.6
.9
.7
.7
.2
.5
.4
.5
.6
.9
.6
.9
.4
.5
3:1 3:1
4:1 4:1 3:1
D 7+10
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.4
.5
.4
.5
.7
.6
.0
.8
.4
.1
.4
.5
.7
.6
.3
.9
.8
.4
4:14.2:1 3.1:1
D 7+40
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.4
.5
.4
.5
.7
.7
.4
.0
.4
.5
.4
.5
.4
.5
.4
.5
.4
.5
.4
.5
.4
.5
.8
.2
.7
.7
.7
.7
.8
.3
.8
.3
.8
.2
5.6%1 :1 .5
3:1 4:1 4:1
3:1
D 7+50
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.4
.5
.4
.5
.1
.4
.4
.5
.4
.5
.4
.5
.4
.5
.1
.4
.7
.5
3:1 3:1
4:1 4:1 3:1
D 7+70
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.4
.5
.1
.5
.4
.5
.4
.5
.4
.5
.4
.5
.4
.5
.4
.5
.5
.2
.1
.4
.5
.2
.1
.4
.5
.5
.5
3:1 3:1
4:1 2.8:1
3:1
D 7+83
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.8
.5
.4
.5
.3
.5
.3
.5
.8
.5
.5
.1
.4
.5
.5
.0
.5
.0
3:1 6.1:18
.1:18.1:1 4.8:1
D 8+00
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
E L
E V
A T
IO
N
D A
T U
M
V E
R T
IC
A
L C
O N
T R
O L
C
O O
R D
IN
A
T E
S Y
S T
E M
H
O R
IZ
O
N T
A L
C O
N T
R O
L
C O
M B
IN
E
D F
A C
T O
R
C F
G E
O
S I
D
D Q
C /R
F I
L A
C R
E S
C E
N T
M
N
L O
C K
D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R
L O
C K
D
A M
O
U T
D R
A F
T M
O D
IF
IC
A T
P
A U
L M
IN
N
E S
O T
A
S T
P
A U
L D
IS
T
R
-B
U
IL
T N
O
F
IL
E N
A M
E
R M
C G
A R
V
A D
.9
T
O D
C R
O S
S S
E C
T
IO
N S
C-311
T K
O U
G H
R M
C G
A R
V
O
D C
-3 .d
K
O U
D
M N
S P
C S
S
O U
T H
Z O
N E
-U .S
S
U R
V E
Y F
T
N A
V D
.9
D S
P
D
:1
:5
P
M
/2
/2
L D
O
D
C -3
.d
CROSS SECTIONS - STA D 8+15.98 TO D 9+00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
.4
.5
.9
.1
.4
.5
.2
.5
.2
.5
3:1
D 8+16
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.4
.5
.2
.0
.4
.5
.4
.4
.4
.4
3:1
D 8+26
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.0
.5
.0
.0
.1
.5
.7
.5
.7
.5
.0
.5
.0
.6
.5
.3
.1
.5
.9
.7
.9
.7
3:1 7:19.3:19.2:1 6.2:1
D 8+40
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.4
.5
.4
.5
.8
.4
.4
.5
.4
.5
.4
.5
.4
.5
.4
.5
.4
.5
.4
.5
.8
.4
.8
.4
.8
.4
.4
.5
.8
.4
.8
.4
3:1 3:1
4:1 4:1 3:1
D 8+58
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.4
.5
.4
.5
.0
.6
.4
.5
.4
.5
.4
.5
.4
.5
.0
.6
.5
.2
3:1
3:1 4:1 4:1
3:1
D 8+80
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.4
.5
.4
.5
.4
.5
.4
.5
.4
.5
.4
.5
.4
.5
.4
.5
.2
.1
3:1
3:1 4:1 4:1
3:1
D 9+00
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
E L
E V
A T
IO
N
D A
T U
M
V E
R T
IC
A
L C
O N
T R
O L
C
O O
R D
IN
A
T E
S Y
S T
E M
H
O R
IZ
O
N T
A L
C O
N T
R O
L
C O
M B
IN
E
D F
A C
T O
R
C F
G E
O
S I
D
D Q
C /R
F I
L A
C R
E S
C E
N T
M
N
L O
C K
D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R
L O
C K
D
A M
O
U T
D R
A F
T M
O D
IF
IC
A T
P
A U
L M
IN
N
E S
O T
A
S T
P
A U
L D
IS
T
R
-B
U
IL
T N
O
F
IL
E N
A M
E
R M
C G
A R
V
A D
.3
T O
D
C R
O S
S S
E C
T
IO
N S
C-312
T K
O U
G H
R M
C G
A R
V
O
D C
-3 .d
K
O U
D
M N
S P
C S
S
O U
T H
Z O
N E
-U .S
S
U R
V E
Y F
T
N A
V D
.9
D S
P
D
:1
:3
P
M
/2
/2
L D
O
D
C -3
.d
CROSS SECTIONS - STA D 9+20.39 TO D 10+00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
.4
.5
.0
.7
.4
.5
.4
.5
.4
.5
.4
.5
.4
.5
.4
.5
.4
.5
.0
.7
.2
.2
.4
.5
.2
.2
.4
.5
.0
.7
.0
.7
3:1
0.0% 3:1 4:1 4:1
3:1
D 9+20
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.6
.5
.0
.5
.4
.5
.4
.5
.6
.5
.9
.7
.0
.5
.3
.2
.3
.2
3:1 7.6:1
-9.9%-9.9% 7.1:1
D 9+40
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.4
.5
.4
.1
.0
.6
.4
.5
3:1
D 9+53
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.4
.5
.4
.7
.4
.5
D 9+63
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.3
.5
.5
.5
.7
.5
.7
.5
.3
.5
.4
.9
.5
.5
.8
.3
.8
.3
5.7:17.7 :17.7:1 6.7:1
D 9+80
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.4
.5
.4
.5
.6
.8
.4
.5
.4
.5
.4
.5
.4
.5
.6
.8
.7
.5
3:1 3:1
4:1 4:1 3:1
D 10+00
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
E L
E V
A T
IO
N
D A
T U
M
V E
R T
IC
A
L C
O N
T R
O L
C
O O
R D
IN
A
T E
S Y
S T
E M
H
O R
IZ
O
N T
A L
C O
N T
R O
L
C O
M B
IN
E
D F
A C
T O
R
C F
G E
O
S I
D
D Q
C /R
F I
L A
C R
E S
C E
N T
M
N
L O
C K
D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R
L O
C K
D
A M
O
U T
D R
A F
T M
O D
IF
IC
A T
P
A U
L M
IN
N
E S
O T
A
S T
P
A U
L D
IS
T
R
-B
U
IL
T N
O
F
IL
E N
A M
E
R M
C G
A R
V
A D
T
O D
C R
O S
S S
E C
T
IO
N S
C-313
T K
O U
G H
R M
C G
A R
V
O
D C
-3 .d
K
O U
D
M N
S P
C S
S
O U
T H
Z O
N E
-U .S
S
U R
V E
Y F
T
N A
V D
.9
D S
P
D
:2
:2
P
M
/2
/2
L D
O
D
C -3
.d
CROSS SECTIONS - STA D 10+20 TO D 11+00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
.4
.5
.4
.5
.0
.7
.4
.5
.4
.5
.4
.5
.4
.5
.0
.7
.7
.5
3:1
3:1 4:1 4:1
3:1
D 10+20
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.4
.5
.4
.5
.7
.4
.4
.5
.4
.5
.4
.5
.4
.5
.7
.4
.8
.2
3:1
3:1 4:1 4:1
3:1
D 10+40
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.4
.5
.4
.5
.4
.5
.4
.5
.4
.5
.3
.6
.4
.5
.4
.5
3:1 4:1 4:1
3:1
D 10+53
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.6
.5
.6
.5
.3
.5
.2
.5
.2
.5
.8
.8
.3
.5
.7
.4
2.5 :1 6.3:18.3:
18.3:16.8:1
D 10+70
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.4
.2
.4
.6
D 10+86
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.4
.7
D 11+00
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
E L
E V
A T
IO
N
D A
T U
M
V E
R T
IC
A
L C
O N
T R
O L
C
O O
R D
IN
A
T E
S Y
S T
E M
H
O R
IZ
O
N T
A L
C O
N T
R O
L
C O
M B
IN
E
D F
A C
T O
R
C F
G E
O
S I
D
D Q
C /R
F I
L A
C R
E S
C E
N T
M
N
L O
C K
D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R
L O
C K
D
A M
O
U T
D R
A F
T M
O D
IF
IC
A T
P
A U
L M
IN
N
E S
O T
A
S T
P
A U
L D
IS
T
R
-B
U
IL
T N
O
F
IL
E N
A M
E
R M
C G
A R
V
A D
.4
C R
O S
S S
E C
T
IO
N
C-314
T K
O U
G H
R M
C G
A R
V
O
D C
-3 .d
K
O U
D
M N
S P
C S
S
O U
T H
Z O
N E
-U .S
S
U R
V E
Y F
T
N A
V D
.9
D S
P
D
:2
:1
P
M
/2
/2
L D
O
D
C -3
.d
CROSS SECTION - STA D 11+15.47
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
.4
.9
D 11+15
-240 -200 -160 -120 -80 -40 0 40 80
520 520
560 560
600 600
640 640
680 680
.0
(6
.4
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
E L
E V
A T
IO
N
D A
T U
M
V E
R T
IC
A
L C
O N
T R
O L
C
O O
R D
IN
A
T E
S Y
S T
E M
H
O R
IZ
O
N T
A L
C O
N T
R O
L
C O
M B
IN
E
D F
A C
T O
R
C F
G E
O
S I
D
D Q
C /R
F I
L A
C R
E S
C E
N T
M
N
L O
C K
D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R
L O
C K
D
A M
O
U T
D R
A F
T M
O D
IF
IC
A T
P
A U
L M
IN
N
E S
O T
A
S T
P
A U
L D
IS
T
R
-B
U
IL
T N
O
F
IL
E N
A M
E
R M
C G
A R
V
C
N T
R O
L T
A B
L E
C-601
T K
O U
G H
R M
C G
A R
V
O
D C
-6 .d
K
O U
D
M N
S P
C S
S
O U
T H
Z O
N E
-U .S
S
U R
V E
Y F
T
N A
V D
.9
D S
P
D
:3
:0
P
M
/2
/2
L D
O
D
C -6
.d
TABLE - CONTROL LINE DATA
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
E L
E V
A T
IO
N
D A
T U
M
V E
R T
IC
A
L C
O N
T R
O L
C
O O
R D
IN
A
T E
S Y
S T
E M
H
O R
IZ
O
N T
A L
C O
N T
R O
L
C O
M B
IN
E
D F
A C
T O
R
C F
G E
2019 2020 2021 2022 2023 2024
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
220,000
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
FL
O
W I
N C
FS
2014 2015 2016 2017 2018 2019
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
220,000
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
FL
O
W I
N C
FS
LOCK AND DAM NO. 7 OUTDRAFT - DOG LEG
WEIR
MISSISSIPPI RIVER
DAILY FLOW HYDROGRAPHS
JANUARY 01 - DECEMBER 31
2014 - 2023
SHEET NUMBER: 1 of 6
LOCK AND DAM 7
HYDROLOGIC INFORMATION
2019 2020 2021 2022 2023 2024
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
220,000
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
FL
O
W
C
FS
2014 2015 2016 2017 2018 2019
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
220,000
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
FL
O
W
C
FS
Notes:
1. The daily flow hydrographs are based on data collected by the U.S. Army Corps of Engineers at Lock and Dam 7. There are 65 years of record (1959-2023). The highest recorded flow occurred on April 21, 1965 (266,000 cfs).
2. These daily flow hydrographs are based on the best information available. These daily flow hydrographs represent the period shown, and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.
LOCK AND DAM NO. 7 OUTDRAFT - DOG
LEG WEIR
MISSISSIPPI RIVER
FLOW DURATION CURVES
JANUARY - JUNE
1959 - 2024
SHEET NUMBER: 2 of 6
LOCK AND DAM 7
HYDROLOGIC INFORMATION
20,000 40,000 60,000 80,000
100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
MARCH
20,000 40,000 60,000 80,000
100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
JUNE
20,000 40,000 60,000 80,000
100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
JANUARY
20,000 40,000 60,000 80,000
100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
APRIL
20,000 40,000 60,000 80,000
100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
FEBRUARY
20,000 40,000 60,000 80,000
100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
MAY
Notes:
1. The monthly flow duration curves were derived using the U.S. Army Corps of Engineers Lock and Dam 7 daily flow data for the period January 1959 through May 2024. The 1965 event (266,000 cfs peak) is the flood of record.
2. These flow duration curves are based on the best information available. These flow duration curves represent the period shown, and do not necessarily represent all possible future conditions. Questions may be addressed to the office
MISSISSIPPI RIVER
FLOW DURATION CURVES
JULY - DECEMBER
1959 - 2024
SHEET NUMBER: 3 of 6
LOCK AND DAM 7
HYDROLOGIC INFORMATION
20,000 40,000 60,000 80,000
100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
SEPTEMBER
20,000 40,000 60,000 80,000
100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
DECEMBER
20,000 40,000 60,000 80,000
100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
JULY
20,000 40,000 60,000 80,000
100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
OCTOBER
20,000 40,000 60,000 80,000
100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
AUGUST
20,000 40,000 60,000 80,000
100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
NOVEMBER
Notes:
1. The monthly flow duration curves were derived using the U.S. Army Corps of Engineers Lock and Dam 7 daily flow data for the period January 1959 through May 2024. The 1965 event (266,000 cfs peak) is the flood of record.
2. These flow duration curves are based on the best information available. These flow duration curves represent the period shown, and do not necessarily represent all possible future conditions. Questions may be addressed to the office
2018 2019 2020 2021 2022 2023
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
FL
O
W I
N C
FS
2013 2014 2015 2016 2017 2018
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
FL
O
W I
N C
FS
LOCK AND DAM NO. 7 OUTDRAFT - DOG LEG
WEIR
MISSISSIPPI RIVER
DAILY POOL ELEVATION HYDROGRAPHS
JANUARY 01 - DECEMBER 31
2014 - 2023
SHEET NUMBER: 4 of 6
LOCK AND DAM 7
HYDROLOGIC INFORMATION
2019 2020 2021 2022 2023 2024
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
2014 2015 2016 2017 2018 2019
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
Notes:
1. The daily pool elevation hydrographs are based on data collected by the U.S. Army Corps of Engineers at Lock and Dam 7. There are 90 years of record (1934-2023). The highest recorded pool elevation occurred on April 21, 1965 (647.65 feet). MSL 1912 - 0.51 ft = NAVD 88 at Lock and Dam 7.
2. These daily pool elevation hydrographs are based on the best information available. These daily pool elevation hydrographs represent the period shown, and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.
MISSISSIPPI RIVER
POOL DURATION CURVES
JANUARY - JUNE
1949 - 2024
SHEET NUMBER: 5 of 6
LOCK AND DAM 7
HYDROLOGIC INFORMATION
0 10 20 30 40 50 60 70 80 90 100
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
MARCH
0 10 20 30 40 50 60 70 80 90 100
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
JUNE
0 10 20 30 40 50 60 70 80 90 100
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
JANUARY
0 10 20 30 40 50 60 70 80 90 100
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
APRIL
0 10 20 30 40 50 60 70 80 90 100
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
FEBRUARY
0 10 20 30 40 50 60 70 80 90 100
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
MAY
Notes:
1. These monthly duration curves were derived using the U.S. Army Corps of Engineers Lock and Dam 7 daily pool elevation data for the period January 1949 through May 2024. MSL 1912 - 0.51 ft = NAVD 88 at Lock and Dam 7. Note pool elevation data exists prior to 1949 but was not used to compute duration curves due to a change in operation that occurred in 1948.
2. These elevation duration curves are based on the best information available. These elevation duration curves represent the period 1949-2024, and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.
MISSISSIPPI RIVER
POOL DURATION CURVES
JULY - DECEMBER
1949 - 2024
SHEET NUMBER: 6 of 6
LOCK AND DAM 7
HYDROLOGIC INFORMATION
0 10 20 30 40 50 60 70 80 90 100
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
SEPTEMBER
0 10 20 30 40 50 60 70 80 90 100
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
DECEMBER
0 10 20 30 40 50 60 70 80
This is the start of the file's text. The full file is on GovTribe.