This is a set of engineering plans and specifications prepared by the City of Mount Airy, North Carolina Engineering Division for the Franklin Street Streetscape Phase II project. The project involves furnishing and installing granite curb, sidewalks, brick pavers, asphalt, conduit, and related materials to improve the streetscape along Franklin Street from Willow Street to South Street in downtown Mount Airy. The scope of work includes demolition of existing concrete sidewalks, curb and gutter, and asphalt; installation of new 10-foot wide scored concrete sidewalks with brick paver banding; placement of granite curb; installation of 9.5c Superpave asphalt; installation of decorative "Teardrop" LED street lights with Style C black fiberglass poles provided by Duke Energy; and installation of decorative street signage with 3-inch smooth black aluminum non-breakaway poles in the "Country Lane" style from Special Lite Products. The plans indicate approximately 43,000 square feet of concrete exists under the existing asphalt with varying depths. The project was prepared in March 2026 with drawings dated March 30-31, 2026, and the plans reference separation of streetscape demolition and construction from parking lot work, with phased public access requirements during each phase of construction.
The contractor is responsible for all utility locating, adjustments, construction stakeout, site security signage, and material testing. The City of Mount Airy will supply granite curb located at the corner of Franklin Street and North South Street, but the contractor must transport it to the project site and provide all labor, gravel, and concrete for installation. All sidewalks must meet a minimum of 6 inches of 3500 psi concrete with 4 inches of compacted ABC stone base. Brick pavers must be "Main Street Tumbled" from Pine Hall Brick or approved equal, with all truncated domes constructed from brick paver material. All asphalt paving must meet NCDOT quality, inspection, and testing standards. The plans include standard details for brick paver banding, scored concrete sidewalks, granite curb installation, decorative signage, LED lighting options, tree grates, handicap ramps, stamped asphalt crosswalks, and compost sock inlet protection measures that must be removed prior to final paving.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contract and Technical Specifications.pdf | ||
| Franklin Street Streetscape Phase 2 ADVERTISEMENT FOR BIDS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FRANKLIN STREET STREETSCAPE: PHASE II
Prepared in the office of:
City of Mount Airy, North Carolina
ENGINEERING DIVISION
William Levi Hiatt P.E., City Engineer Dan Speight, Engineering Technician Tim Kennedy, Engineering Technician Post Office Box 70 Mount Airy, North Carolina 27030 Phone: 336.786.3580 Fax: 336.719.7540 www.mountairy.org
C
IT
Y of MOUNT
AIR
Y
P U
B
LIC
W
ORKS DEPART
M E
N T
Downtown Mount Airy, NORTH CAROLINA
Funded By:Location:
April, 2026
PLANS FOR:
M A
T C
H L
I N
E
CITY OF MOUNT AIRY
502015546661
BP CAPITAL PARTNERS LLC
502015640352THE GREATER MOUNT AIRY AREA
HABITAT FOR HUMANITY INC
502015548107
EXISTING CONCRETE
CURB & GUTTER
(TO BE REMOVED)
EXISTING ASPHALT & CONCRETE
(TO BE REMOVED)
EXISTING ASPHALT & CONCRETE
(TO BE REMOVED)
EXISTING CONCRETE SIDEWALK
(TO BE REMOVED)
EXISTING CONCRETE SIDEWALK
(TO BE REMOVED)
EXISTING 8" WATER
EXISTING 8" WATER
EXISTING
DRIVEWAY
M A
T C
H L
I N
E
FRANKLIN STREET
M A
T C
H L
I N
E
FRANKLIN DEVELOPMENT LLC
502015547502
FRANKLIN STREET DEVELOPMENT LLC
50201554329
FRANKLIN DEVELOPMENT LLC
502015547502
J&E PROPERTIES OF NC
LLC
502015545173
EXISTING CONCRETE
CURB & GUTTER
(TO BE REMOVED)
EXISTING
UTILITY
POLE (TO
REMAIN)
EXISTING 8" WATER
EXISTING CONCRETE SIDEWALK
(TO BE REMOVED)
EXISTING CONCRETE SIDEWALK
(TO BE REMOVED)
EXISTING 48" RCP
N S
O U
T H
S T
R E E T
EXISTING 8" SEWER
EXISTING ASPHALT & CONCRETE
(TO BE REMOVED)
E X
IS
T
IN
G
D R
IV
E
W A
Y
FRANKLIN STREET
E X
IS
T
IN
G
D R
IV
E
W A
Y
CURB & GUTTER PROPERTY LINE
ASPHALT & CONCRETE
STREET
HANDICAP ACCESS RAMP
CIVIL SYMBOLS
FENCE
CONTOURS
DEMOLITION LIMITS
CURB/GRATE INLETS
NOTESFeet 0 10 20
RE
V
IS
IO
N S
N O
D
ES
C
RI
PT
IO
N
D A
TE
BY
C it y o f M o u n t
A ir y E N G
IN
E E R
IN
G
D
IV
IS
IO
N P.
O.
B ox
| M ou nt Ai ry, N
C ww w.
mo un tai ry.
or g
D ra w n by
Sc al e:
in
C he ck ed b y:
A pp ro ve d b y:
Fi le
SH
EE
T N
O
D
RA
W
IN
G D
A
TE
W
.L . H
IA
TT
M .W
IL
LI
A M
S W
.L . H
IA
TT
Do w nt ow n, M ou nt
A ir y S T R E E T E X
IS
T
IN
G C
O N D
IT
IO
N S
D E M
O
Fr an kl in
S tr ee t
St re et sc ap e:
Ph as e
II
-M ar -2
Z:
\S er ve r\ Pr oj ec ts \D ow nt ow n
M ou nt A iry \F ra nk lin S tre et
S tre et sc ap e
Pr oj ec t\
Ph as e
II\
D ra ft Pl an s\
Fr an kl in
S t S tre et sc ap e Ph as e
II
-fo ot si de w al k Pi ec ed
T op o
.d w g
CONTROL
1. Property line information provided by Surry
County
2. Contractor responsible for construction stakeout.
UTILITIES
1. All underground utility locations shown are approximate.
2. Contractor responsible for all utility adjustments (if needed).
3. Contractor shall have all underground utilities located prior to construction. Call
NC811.
DEMOLITION
1. All existing concrete sidewalk shall be removed and hauled off site by the contractor.
2. Existing binder is to remain, other than what needs to be removed to install the proposed granite curb and concrete sidewalks.
3. The concrete under the existing asphalt will need to be removed and replaced with stone as shown in the street detail (ST-104-E).
GENERAL
1. All disturbed asphalt and concrete shall be saw-cut.
2. All sidewalks shall be min. 6" - 3500 psi concrete with 4" compacted ABC stone.
3. The streetscape shall be demolished and constructed separate from the parking lot. The parking lot shall remain open to the public during construction of the streetscape. The street shall be reopened to the public during construction of the parking lot, or vise versa.
4. The street has approximately 43,000 square feet of concrete under the existing asphalt. The depth of the concrete varies.
SITE SECURITY
1. Contractor is responsible for all signage and equipment necessary to secure the site during demolition and construction.
MATERIALS
1. All granite curb will be supplied by the City of Mount Airy and is currently located on the vacant lot at the corner of
Franklin Street and N. South Street. It will be the contractor's responsibility to move the needed granite curb from this lot to the project location. Please note the City will NOT supply the gravel, concrete, or labor needed to install the granite curb.
2. All brick pavers shall be "Main Street Tumbled" from Pine Hall Brick(or approved equal).
3. Decorative street signs shall be a 3-inch smooth black aluminum non-breakaway pole with the "Country Lane" style base, TSB-2 style fluvial, and TSB-205 style sign blade provided by Special Lite Products (specialliteproducts.com)(or approved equal).
4. Decorative street lights shall be "Teardrop" LED with a black fiberglass pole "Style C" provided and installed by Duke Energy.
5. Asphalt shall be 9.5c "Superpave".
6. All truncated domes will be brick paver truncated domes.
7. All material testing will be conducted by the contractor.
.3
1.
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
FRANKLIN STREET
CITY OF MOUNT AIRY
502015642721
CYNTHIA R COOK
502015645458TIMOTHY R & ELLEN
E ADAMS
502015644475
GUADALUPE LUNA &
JUDITH FIGUEROA
LEON 50201644402
FRANKLIN REALITY INC
502015643318
CITY OF MOUNT AIRY
502015642721
EXISTING CONCRETE
CURB & GUTTER
(TO BE REMOVED)
EXISTING CONCRETE SIDEWALK
(TO BE REMOVED)
EXISTING ASPHALT & CONCRETE
(TO BE REMOVED)
EXISTING CONCRETE
CURB & GUTTER
(TO BE REMOVED)
EXISTING ASPHALT & CONCRETE
(TO BE REMOVED)
EXISTING CONCRETE
CURB & GUTTER
(TO BE REMOVED)
E X
IS
T
IN
G
D R
IV
E
W A
Y
E X
IS
T
IN
G
C O
N C
R E
T E
D R
IV
E
W A
Y
E X
IS
T
IN
G
D R
IV
E
W A
Y
EXISTING 8" WATER
EXISTING 8" WATER
M A
T C
H L
I N
E
M A
T C
H L
I N
E
FRANKLIN STREET
CITY OF MOUNT AIRY
502015642721
CITY OF MOUNT AIRY
502015549681
FRANKLIN REALITY INC
502015643318
FRANKLIN VIEW
CONDOMINIUMS
502015641365
BP CAPITAL PARTNERS LLC
EXISTING CONCRETE
CURB & GUTTER
(TO BE REMOVED)
EXISTING ASPHALT
(TO BE REMOVED)
EXISTING CONCRETE SIDEWALK
(TO BE REMOVED)
EXISTING CONCRETE SIDEWALK
(TO BE REMOVED)
EXISTING ASPHALT & CONCRETE
(TO BE REMOVED)
EXISTING 8" WATER
EXISTING 8" WATER
M A
T C
H L
I N
E
M A
T C
H L
I N
E
M C
C A
R G
O
S T
R E
E T
CURB & GUTTER PROPERTY LINE
ASPHALT & CONCRETE
STREET
HANDICAP ACCESS RAMP
CIVIL SYMBOLS
FENCE
CONTOURS
DEMOLITION LIMITS
CURB/GRATE INLETS
RE
V
IS
IO
N S
N O
D
ES
C
RI
PT
IO
N
D A
TE
BY
C it y o f M o u n t
A ir y E N G
IN
E E R
IN
G
D
IV
IS
IO
N P.
O.
B ox
| M ou nt Ai ry, N
C ww w.
mo un tai ry.
or g
D ra w n by
Sc al e:
in
C he ck ed b y:
A pp ro ve d b y:
Fi le
SH
EE
T N
O
D
RA
W
IN
G D
A
TE
W
.L . H
IA
TT
M . W
IL
LI
A M
S W
.L . H
IA
TT
Do w nt ow n, M ou nt
A ir y S T R E E T E X
IS
T
IN
G C
O N D
IT
IO
N S
D E M
O
Fr an kl in
S tr ee t
St re et sc ap e:
Ph as e
II
-M ar -2
Z:
\S er ve r\ Pr oj ec ts \D ow nt ow n
M ou nt A iry \F ra nk lin S tre et
S tre et sc ap e
Pr oj ec t\
Ph as e
II\
D ra ft Pl an s\
Fr an kl in
S t S tre et sc ap e Ph as e
II
-fo ot si de w al k Pi ec ed
T op o
.d w g
NOTES
CONTROL
1. Property line information provided by Surry
County
2. Contractor responsible for construction stakeout.
UTILITIES
1. All underground utility locations shown are approximate.
2. Contractor responsible for all utility adjustments (if needed).
3. Contractor shall have all underground utilities located prior to construction. Call
NC811.
DEMOLITION
1. All existing concrete sidewalk shall be removed and hauled off site by the contractor.
2. Existing binder is to remain, other than what needs to be removed to install the proposed granite curb and concrete sidewalks.
3. The concrete under the existing asphalt will need to be removed and replaced with stone as shown in the street detail (ST-104-E).
GENERAL
1. All disturbed asphalt and concrete shall be saw-cut.
2. All sidewalks shall be min. 6" - 3500 psi concrete with 4" compacted ABC stone.
3. The streetscape shall be demolished and constructed separate from the parking lot. The parking lot shall remain open to the public during construction of the streetscape. The street shall be reopened to the public during construction of the parking lot, or vise versa.
4. The street has approximately 43,000 square feet of concrete under the existing asphalt. The depth of the concrete varies.
SITE SECURITY
1. Contractor is responsible for all signage and equipment necessary to secure the site during demolition and construction.
MATERIALS
1. All granite curb will be supplied by the City of Mount Airy and is currently located on the vacant lot at the corner of
Franklin Street and N. South Street. It will be the contractor's responsibility to move the needed granite curb from this lot to the project location. Please note the City will NOT supply the gravel, concrete, or labor needed to install the granite curb.
2. All brick pavers shall be "Main Street Tumbled" from Pine Hall Brick(or approved equal).
3. Decorative street signs shall be a 3-inch smooth black aluminum non-breakaway pole with the "Country Lane" style base, TSB-2 style fluvial, and TSB-205 style sign blade provided by Special Lite Products (specialliteproducts.com)(or approved equal).
4. Decorative street lights shall be "Teardrop" LED with a black fiberglass pole "Style C" provided and installed by Duke Energy.
5. Asphalt shall be 9.5c "Superpave".
6. All truncated domes will be brick paver truncated domes.
7. All material testing will be conducted by the contractor.
Feet 0 10 20
.3
1.
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
WM
W
IL
L O
W S
T R
E E
T
HILERIO R & ELIZABETH M
TORRES
502015647725
CITY OF MOUNT AIRY
502015646707
MOODY INVESTMENT COMPANY
LLC
502015648565
E X
IS
T
IN
G
W
A T
E R
E X
IS
TI
N G
2"
W A
TE
R
EXISTING
GRANITE CURB
(TO BE
REMOVED)
FRANKLIN STREET
OULOUL
OUL
OUL
OUL
O
UL
OUL
OUL
OUL
OUL
COMMUNICATION
O U
L
O U
L
EXISTING
UTILITY
POLE (TO
REMAIN)
UTC
UTC
UTC
UTC
E X
IS
T
IN
G
C O
N C
R E
T
EWALTER SCOTT & ANITA N
JOHN
502015646551
EXISTING CONCRETE
CURB & GUTTER
(TO BE REMOVED)
EXISTING CONCRETE
CURB & GUTTER
(TO BE REMOVED)
E X
IS
T
IN
G
D R
IV
E
W A
Y
EXISTING 8" WATER
EXISTING 8" WATER
M A
T C
H L
I N
E
CURB & GUTTER PROPERTY LINE
ASPHALT & CONCRETE
STREET
HANDICAP ACCESS RAMP
CIVIL SYMBOLS
FENCE
CONTOURS
DEMOLITION LIMITS
CURB/GRATE INLETS
RE
V
IS
IO
N S
N O
D
ES
C
RI
PT
IO
N
D A
TE
BY
C it y o f M o u n t
A ir y E N G
IN
E E R
IN
G
D
IV
IS
IO
N P.
O.
B ox
| M ou nt Ai ry, N
C ww w.
mo un tai ry.
or g
D ra w n by
Sc al e:
in
C he ck ed b y:
A pp ro ve d b y:
Fi le
SH
EE
T N
O
D
RA
W
IN
G D
A
TE
W
.L . H
IA
TT
M . W
IL
LI
A M
S W
.L . H
IA
TT
Do w nt ow n, M ou nt
A ir y S T R E E T E X
IS
T
IN
G C
O N D
IT
IO
N S
D E M
O
Fr an kl in
S tr ee t
St re et sc ap e:
Ph as e
II
-M ar -2
Z:
\S er ve r\ Pr oj ec ts \D ow nt ow n
M ou nt A iry \F ra nk lin S tre et
S tre et sc ap e
Pr oj ec t\
Ph as e
II\
D ra ft Pl an s\
Fr an kl in
S t S tre et sc ap e Ph as e
II
-fo ot si de w al k Pi ec ed
T op o
.d w g
NOTES
CONTROL
1. Property line information provided by Surry
County
2. Contractor responsible for construction stakeout.
UTILITIES
1. All underground utility locations shown are approximate.
2. Contractor responsible for all utility adjustments (if needed).
3. Contractor shall have all underground utilities located prior to construction. Call
NC811.
DEMOLITION
1. All existing concrete sidewalk shall be removed and hauled off site by the contractor.
2. Existing binder is to remain, other than what needs to be removed to install the proposed granite curb and concrete sidewalks.
3. The concrete under the existing asphalt will need to be removed and replaced with stone as shown in the street detail (ST-104-E).
GENERAL
1. All disturbed asphalt and concrete shall be saw-cut.
2. All sidewalks shall be min. 6" - 3500 psi concrete with 4" compacted ABC stone.
3. The streetscape shall be demolished and constructed separate from the parking lot. The parking lot shall remain open to the public during construction of the streetscape. The street shall be reopened to the public during construction of the parking lot, or vise versa.
4. The street has approximately 43,000 square feet of concrete under the existing asphalt. The depth of the concrete varies.
SITE SECURITY
1. Contractor is responsible for all signage and equipment necessary to secure the site during demolition and construction.
MATERIALS
1. All granite curb will be supplied by the City of Mount Airy and is currently located on the vacant lot at the corner of
Franklin Street and N. South Street. It will be the contractor's responsibility to move the needed granite curb from this lot to the project location. Please note the City will NOT supply the gravel, concrete, or labor needed to install the granite curb.
2. All brick pavers shall be "Main Street Tumbled" from Pine Hall Brick(or approved equal).
3. Decorative street signs shall be a 3-inch smooth black aluminum non-breakaway pole with the "Country Lane" style base, TSB-2 style fluvial, and TSB-205 style sign blade provided by Special Lite Products (specialliteproducts.com)(or approved equal).
4. Decorative street lights shall be "Teardrop" LED with a black fiberglass pole "Style C" provided and installed by Duke Energy.
5. Asphalt shall be 9.5c "Superpave".
6. All truncated domes will be brick paver truncated domes.
7. All material testing will be conducted by the contractor.
Feet 0 10 20
.3
1.
AutoCAD SHX Text G
AutoCAD SHX Text
WM
EXISTING PROPOSED
GRANITE CURB
PROPERTY LINE
PROPOSED ASPHALT
SCORED CONCRETE SIDEWALK
W/ BRICK BANDING
HANDICAP ACCESS RAMP
CIVIL SYMBOLS
CONTOURS
COMPOST SOCK INLET PROTECTION
M A
T C
H L
I N
E
FRANKLIN DEVELOPMENT LLC
502015547502
FRANKLIN STREET DEVELOPMENT LLC
50201554329
FRANKLIN DEVELOPMENT LLC
502015547502
J&E PROPERTIES OF NC
LLC
502015545173
GRANITE CURB FLUSH W/ ASPHALT
(DRIVEWAY APRON)
EXISTING 8" WATER
N S
O U
T H
S T
R E E T
GRANITE CURB
FLUSH W/ ASPHALT
(DRIVEWAY APRON)
UULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUUL
UUL
1040'
145 LF 2-INCH SCHEDULE 40 PVC CONDUIT
150 LF 2-INCH SCHEDULE 40 PVC CONDUIT27.7'
DELUXE ACORN LED LIGHT
WITH STYLE C POLE
(PROVIDED BY DUKE ENERGY)
DELUXE ACORN LED LIGHT
WITH STYLE C POLE
(PROVIDED BY DUKE ENERGY)
GRANITE CURB RAMP
FRANKLIN STREET
7.6' 7.5'
R9.7'
27.1'
6.5'
9.0'
10.0'
6.0'12.4'6.0' 149.6'
R15.9'
R27.2'
235.8'
6.6'6.6'
23.0'
GRANITE CURB
FLUSH W/ ASPHALT
(DRIVEWAY APRON)
GRANITE CURB RAMP
6.0'24.0'6.0' 51.6'
STRIPE NEW PARKING
M A
T C
H L
I N
E
CITY OF MOUNT AIRY
502015546661
BP CAPITAL PARTNERS LLC
502015640352THE GREATER MOUNT AIRY AREA
HABITAT FOR HUMANITY INC
502015548107 GRANITE CURB RAMP
GRANITE CURB
FLUSH W/ ASPHALT
(DRIVEWAY APRON)
EXISTING 8" WATER
EXISTING 8" WATER
M A
T C
H L
I N
E
UULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUUL
1050'
1045'
134 LF 2-INCH SCHEDULE 40 PVC CONDUIT
143 LF 2-INCH SCHEDULE
40 PVC CONDUIT
7.8'
CONCRETE APRON
GRANSTONE CONFERENCE
CENTER
GRANSTONE CONFERENCE
CENTER PARKING LOT
GRANSTONE CONFERENCE
CENTER PARKING LOT
7.6' 7.5'
R9.7'
DELUXE ACORN LED LIGHT
WITH STYLE C POLE
(PROVIDED BY DUKE ENERGY)
DELUXE ACORN LED LIGHT
WITH STYLE C POLE
(PROVIDED BY DUKE ENERGY)
22.1'
14.1'
22.1'
FRANKLIN STREET
21.9'6.0' 6.0'
25.4'
6.5'
9.0'
10.0'
73.9'200.5'
184.1'
18.1'
50.0'6.4' 25.4'
6.6'6.6'
23.0'
R9.5' R30.2' R10.0'
26.1'
13.3'
51.5'
R30.2'
6.5'
4.7'
49.6'
13.8'
R31.8'
R30.2'STRIPE NEW PARKING
GENERAL
1. All disturbed asphalt and concrete shall be saw-cut.
2. All sidewalks shall be min. 6" - 3500 psi concrete with 4" compacted ABC stone.
CONTROL
1. Property line information provided by Surry County
2. Contractor responsible for construction stakeout.
Proposed back of sidewalk to be installed at same vertical elevation as existing.
3. Dimensions shown are to face of curb.
UTILITIES
1. All underground utility locations shown are approximate.
2. Contractor responsible for all utility adjustments.
3. Contractor shall have all underground utilities located prior to construction. Call NC811.
STREET RESURFACING
1. Contractor responsible for all utility adjustments.
2. All asphalt paving must meet NCDOT quality/inspection/testing standards.
3. Compost sock inlet protection measures must be removed before final paving.
NOTESFeet 0 10 20
RE
V
IS
IO
N S
N O
D
ES
C
RI
PT
IO
N
D A
TE
BY
C it y o f M o u n t
A ir y E N G
IN
E E R
IN
G
D
IV
IS
IO
N P.
O.
B ox
| M ou nt Ai ry, N
C ww w.
mo un tai ry.
or g
D ra w n by
Sc al e:
in
C he ck ed b y:
A pp ro ve d b y:
Fi le
SH
EE
T N
O
D
RA
W
IN
G D
A
TE
W
.L . H
IA
TT
M . W
IL
LI
A M
S W
.L . H
IA
TT
Do w nt ow n, M ou nt
A ir y S T R E E T P R O
P O
S E D S
T R E E T S C A P E
Fr an kl in
S tr ee t
St re et sc ap e
Ph as e
II
DEMOLITION
1. All existing sidewalk,asphalt, and concrete street shall be removed and hauled off site by the contractor
-M ar -2
Z:
\S er ve r\ Pr oj ec ts \D ow nt ow n
M ou nt A iry \F ra nk lin S tre et
S tre et sc ap e
Pr oj ec t\
Ph as e
II\
D ra ft Pl an s\
Fr an kl in
S t S tre et sc ap e Ph as e
II
-fo ot si de w al k Pi ec ed
T op o
.d w g
SITE SECURITY
1. Contractor is responsible for all signage and equipment necessary to secure the site during demolition and construction.
MATERIALS
1. All granite curb will be supplied by the City of Mount Airy and is currently located on the vacant lot at the corner of Franklin Street and N. South Street. It will be the contractor's responsibility to move the needed granite curb from this lot to the project location. Please note the City will NOT supply the gravel, concrete, or labor needed to install the granite curb.
2. All brick pavers shall be "Main Street Tumbled" from Pine Hall Brick(or approved equal). All truncated domes will be brick paver truncated domes.
3. Decorative street signs shall be a 3-inch smooth black aluminum non-breakaway pole with the "Country Lane" style base, TSB-2 style fluvial, and TSB-205 style sign blade provided by Special Lite Products (specialliteproducts.com)(or approved equal).
4. Decorative street lights shall be "Teardrop" LED with a black fiberglass pole "Style C" provided and installed by Duke Energy.
5. Asphalt shall be 9.5c "Superpave".
6. All material testing will be conducted by the contractor.
.3
1.
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WM
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
PROPERTY LINE
PROPOSED ASPHALT
SCORED CONCRETE SIDEWALK
W/ BRICK BANDING
HANDICAP ACCESS RAMP
CIVIL SYMBOLS
CONTOURS
COMPOST SOCK INLET PROTECTION
FRANKLIN STREET
CITY OF MOUNT AIRY
502015642721
CITY OF MOUNT AIRY
502015549681
FRANKLIN REALITY INC
502015643318
FRANKLIN VIEW
CONDOMINIUMS
502015641365
BP CAPITAL PARTNERS LLC
EXISTING 8" WATER
EXISTING 8" WATER
M A
T C
H L
I N
E
UUL
UUL
UUL
UUL
UUL
UUL
UULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUUL
1070'
1065'1060'
1055'
161 LF 2-INCH SCHEDULE
40 PVC CONDUIT
170 LF 2-INCH SCHEDULE
40 PVC CONDUIT
M A
T C
H L
I N
E
GRANSTONE CONFERENCE
GRANSTONE CONFERENCE
CENTER
GRANSTONE CONFERENCE
CENTER
GRANSTONE CONFERENCE
CENTER
DELUXE ACORN LED LIGHT
WITH STYLE C POLE
(PROVIDED BY DUKE ENERGY)
DELUXE ACORN LED LIGHT
WITH STYLE C POLE
(PROVIDED BY DUKE ENERGY)
10.3' 8.9'
14.0' 11.6'
M C
C A
R G
O
S T
R E
E T
7.8'
R10.0' 5.4' 5.7'
18.8'
7.7'
206.4'
R9.7' R7.5'
5.4' 5.0'
2.7'
95.0'
59.8' 166.7'26.1'
6.5'
13.3'
52.4'
24.5'
6.6'
9.1'
10.0'
R12.8' 13.2'
7.8' R12.0'30.7'
FRANKLIN STREET
CITY OF MOUNT AIRY
502015642721
CYNTHIA R COOK
502015645458
TIMOTHY R & ELLEN
E ADAMS
502015644475
GUADALUPE LUNA &
JUDITH FIGUEROA
LEON 50201644402
FRANKLIN REALITY INC
502015643318
CITY OF MOUNT AIRY
502015642721
GRANITE CURB RAMPGRANITE CURB RAMPGRANITE CURB RAMP
GRANITE CURB RAMP
TOC
1086.72
GRANITE CURB
FLUSH W/ ASPHALT
(DRIVEWAY APRON)
GRANITE CURB
FLUSH W/ ASPHALT
(DRIVEWAY APRON)
GRANITE CURB
FLUSH W/ ASPHALT
(DRIVEWAY APRON)GRANITE CURB
FLUSH W/ ASPHALT
(DRIVEWAY APRON)
EXISTING 8" WATER EXISTING 8" WATER
UULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUUL
1080'
1075'
154 LF 2-INCH SCHEDULE
40 PVC CONDUIT
134 LF 2-INCH SCHEDULE
40 PVC CONDUIT
CONCRETE APRON
M A
T C
H L
I N
E
M A
T C
H L
I N
E
BALLADEER HOTEL
PARKING LOT
BALLADEER HOTEL
PARKING LOT
GRANSTONE CONFERENCE
CENTER
GRANSTONE CONFERENCE
CENTER/BALLADEER HOTEL
ENTRANCE
DELUXE ACORN LED LIGHT
WITH STYLE C POLE
(PROVIDED BY DUKE ENERGY)
DELUXE ACORN LED LIGHT
WITH STYLE C POLE
(PROVIDED BY DUKE ENERGY)
7.1' 21.9'
14.8'
21.9' 7.1'
3.9' 3.9'
6.5'6.0'10.2'6.0' 6.0'14.7'6.0' 6.0'12.4'6.0' 6.0' 49.1' 61.3'55.7' 16.2'
140.2'
R35.0' R35.0'
58.8'
8.3'
8.1'
43.0'
8.3'
8.1'
9.5'
43.1'
R10.6'
41.3' R33.3' R33.3' R10.6'
41.3'
15.4'
24.0'
6.5'
7.6'
10.2'
7.1'
GENERAL
1. All disturbed asphalt and concrete shall be saw-cut.
2. All sidewalks shall be min. 6" - 3500 psi concrete with 4" compacted ABC stone.
CONTROL
1. Property line information provided by Surry County
2. Contractor responsible for construction stakeout.
Proposed sidewalk to be installed at same vertical elevation as existing.
3. Dimensions shown are to face of curb.
UTILITIES
1. All underground utility locations shown are approximate.
2. Contractor responsible for all utility adjustments.
3. Contractor shall have all underground utilities located prior to construction. Call NC811.
STREET RESURFACING
1. Contractor responsible for all utility adjustments.
2. All asphalt paving must meet NCDOT quality/inspection/testing standards.
3. Compost sock inlet protection measures must be removed before final paving.
NOTESFeet 0 10 20
RE
V
IS
IO
N S
N O
D
ES
C
RI
PT
IO
N
D A
TE
BY
C it y o f M o u n t
A ir y E N G
IN
E E R
IN
G
D
IV
IS
IO
N P.
O.
B ox
| M ou nt Ai ry, N
C ww w.
mo un tai ry.
or g
D ra w n by
Sc al e:
in
C he ck ed b y:
A pp ro ve d b y:
Fi le
SH
EE
T N
O
D
RA
W
IN
G D
A
TE
W
.L . H
IA
TT
M . W
IL
LI
A M
S W
.L . H
IA
TT
Do w nt ow n, M ou nt
A ir y S T R E E T P R O
P O
S E D S
T R E E T S C A P E
Fr an kl in
S tr ee t
St re et sc ap e
Ph as e
II
DEMOLITION
1. All existing sidewalk,asphalt, and concrete street shall be removed and hauled off site by the contractor
-M ar -2
Z:
\S er ve r\ Pr oj ec ts \D ow nt ow n
M ou nt A iry \F ra nk lin S tre et
S tre et sc ap e
Pr oj ec t\
Ph as e
II\
D ra ft Pl an s\
Fr an kl in
S t S tre et sc ap e Ph as e
II
-fo ot si de w al k Pi ec ed
T op o
.d w g
SITE SECURITY
1. Contractor is responsible for all signage and equipment necessary to secure the site during demolition and construction.
MATERIALS
1. All granite curb will be supplied by the City of Mount Airy and is currently located on the vacant lot at the corner of Franklin Street and N. South Street. It will be the contractor's responsibility to move the needed granite curb from this lot to the project location. Please note the City will NOT supply the gravel, concrete, or labor needed to install the granite curb.
2. All brick pavers shall be "Main Street Tumbled" from Pine Hall Brick(or approved equal). All truncated domes will be brick paver truncated domes.
3. Decorative street signs shall be a 3-inch smooth black aluminum non-breakaway pole with the "Country Lane" style base, TSB-2 style fluvial, and TSB-205 style sign blade provided by Special Lite Products (specialliteproducts.com)(or approved equal).
4. Decorative street lights shall be "Teardrop" LED with a black fiberglass pole "Style C" provided and installed by Duke Energy.
5. Asphalt shall be 9.5c "Superpave".
6. All material testing will be conducted by the contractor.
.3
1.
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
PROPERTY LINE
PROPOSED ASPHALT
SCORED CONCRETE SIDEWALK
W/ BRICK BANDING
HANDICAP ACCESS RAMP
CIVIL SYMBOLS
CONTOURS
COMPOST SOCK INLET PROTECTION
W
IL
L O
W S
T R
E E
T
HILERIO R & ELIZABETH M
TORRES
502015647725
CITY OF MOUNT AIRY
502015646707
MOODY INVESTMENT COMPANY
LLC
502015648565
E X
IS
TI
N G
2"
W A
TE
R
FRANKLIN STREET
OUL
OUL
OUL
OUL
OUL
OUL
OUL
O U
L
O U
L
WALTER SCOTT & ANITA N
JOHN
502015646551
1081.10' 1081.22'
GRANITE CURB RAMPGRANITE CURB RAMP
GRANITE CURB
FLUSH W/ ASPHALT
(DRIVEWAY APRON)
GRANITE CURB
FLUSH W/ ASPHALT
(DRIVEWAY APRON)
EXISTING 8" WATER
EXISTING 8" WATER
UULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUULUUL
1080'
2-INCH SCHEDULE
40 PVC CONDUIT 156 LF 2-INCH SCHEDULE
40 PVC CONDUIT
M A
T C
H L
I N
E
CONCRETE APRON
M A
T C
H L
I N
E
CONCRETE APRON
BALLADEER HOTEL
PARKING LOT
BALLADEER HOTEL
PARKING LOT
DELUXE ACORN LED LIGHT
WITH STYLE C POLE
(PROVIDED BY DUKE ENERGY)
DELUXE ACORN LED LIGHT
WITH STYLE C POLE
(PROVIDED BY DUKE ENERGY)
52.9'
6.2' 3.5'
GRANITE CURB RAMP
GRANITE CURB
FLUSH W/ ASPHALT
(DRIVEWAY APRON)
15.4' 3.5'
6.3'6.0' 6.0'6.5'6.0' 6.0' 93.0' 12.8' 58.0'
R42.0'
19.9'42.0'
R5.7'
21.8'
10.0' 24.0'6.0' 6.0'
47.7'
41.0'
R13.6'
R13.6' R5.0'
45.2'
6.0' 23.5' 6.0'
29.3'
6.6'
7.1'
7.2'
9.9' 9.9'
8 Green Vase Japanese Zelkova
3.0-inch Caliper Medium Deciduous
Tree
Vintage Jade Distylium 3-gallon Medium Deciduous
Shrub
Little Lime Punch Hydrangea
3-gallon Medium Deciduous
Shrub
Common Name Planting
Size/GroupCountSymbol
LANDSCAPING SCHEDULE
GENERAL
1. All disturbed asphalt and concrete shall be saw-cut.
2. All sidewalks shall be min. 6" - 3500 psi concrete with 4" compacted ABC stone.
CONTROL
1. Property line information provided by Surry County
2. Contractor responsible for construction stakeout.
Proposed sidewalk to be installed at same vertical elevation as existing.
3. Dimensions shown are to face of curb.
UTILITIES
1. All underground utility locations shown are approximate.
2. Contractor responsible for all utility adjustments.
3. Contractor shall have all underground utilities located prior to construction. Call NC811.
STREET RESURFACING
1. Contractor responsible for all utility adjustments.
2. All asphalt paving must meet NCDOT quality/inspection/testing standards.
3. Compost sock inlet protection measures must be removed before final paving.
NOTESFeet 0 10 20
RE
V
IS
IO
N S
N O
D
ES
C
RI
PT
IO
N
D A
TE
BY
C it y o f M o u n t
A ir y E N G
IN
E E R
IN
G
D
IV
IS
IO
N P.
O.
B ox
| M ou nt Ai ry, N
C ww w.
mo un tai ry.
or g
D ra w n by
Sc al e:
in
C he ck ed b y:
A pp ro ve d b y:
Fi le
SH
EE
T N
O
D
RA
W
IN
G D
A
TE
W
.L . H
IA
TT
M . W
IL
LI
A M
S W
.L . H
IA
TT
Do w nt ow n, M ou nt
A ir y S T R E E T P R O
P O
S E D S
T R E E T S C A P E
Fr an kl in
S tr ee t
St re et sc ap e
Ph as e
II
DEMOLITION
1. All existing sidewalk,asphalt, and concrete street shall be removed and hauled off site by the contractor
-M ar -2
Z:
\S er ve r\ Pr oj ec ts \D ow nt ow n
M ou nt A iry \F ra nk lin S tre et
S tre et sc ap e
Pr oj ec t\
Ph as e
II\
D ra ft Pl an s\
Fr an kl in
S t S tre et sc ap e Ph as e
II
-fo ot si de w al k Pi ec ed
T op o
.d w g
SITE SECURITY
1. Contractor is responsible for all signage and equipment necessary to secure the site during demolition and construction.
MATERIALS
1. All granite curb will be supplied by the City of Mount Airy and is currently located on the vacant lot at the corner of Franklin Street and N. South Street. It will be the contractor's responsibility to move the needed granite curb from this lot to the project location. Please note the City will NOT supply the gravel, concrete, or labor needed to install the granite curb.
2. All brick pavers shall be "Main Street Tumbled" from Pine Hall Brick(or approved equal). All truncated domes will be brick paver truncated domes.
3. Decorative street signs shall be a 3-inch smooth black aluminum non-breakaway pole with the "Country Lane" style base, TSB-2 style fluvial, and TSB-205 style sign blade provided by Special Lite Products (specialliteproducts.com)(or approved equal).
4. Decorative street lights shall be "Teardrop" LED with a black fiberglass pole "Style C" provided and installed by Duke Energy.
5. Asphalt shall be 9.5c "Superpave".
6. All material testing will be conducted by the contractor.
.3
1.
AutoCAD SHX Text G
SLOPE 1/4" PER FT. FOR DRAINAGE
"ENGLISH EDGE FREE RANGE" FROM PINE HALL BRICK
8" x 4" x 2-1/4" BRICK PAVERS WITH POLYMERIC SAND SWEPT
1/16" MIN - 3/16" MAX. SAND FILLED JOINTS
6" 3500 PSI CONCRETE
4" COMPACTED ABC STONE
6"
COMPACTED SUBGRADE
3/4" SAND BED - ASTM C33
REVISIONS:
DATE:
SCALE:
DRAWING NO. OFPost Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org Engineering Division
City of Mount Airy, North Carolina
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B
LIC
WORKS DEPART
M
E N
T ST-114
1 1
BRICK PAVER BANDING
N.T.S.
08/01/2017
JOINTS
FA
C
E O
F
BU
IL
D
IN
G
/B
AC
K O
F W
AL
K
"MOUNT AIRY" GRANITE CURB
BRICK BANDING -1 OR 2 ROWS - SEE PLAN
EXPANSION JOINT
SCORED JOINTS - TYPICAL
4' SQ. TYP. 45°
REVISIONS:
DATE:
SCALE:
DRAWING NO. OFPost Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org Engineering Division
City of Mount Airy, North Carolina
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B
LIC
WORKS DEPART
M
E N
T ST-113
1 1
SCORED CONCRETE SIDEWALK
N.T.S.
08/01/2017
33' BACK/BACK
RIGHT OF WAY WIDTH=60'
C 2" BITUMINOUS CONCRETE H-BINDER, PLACED IMMEDIATELY UPON
FINAL PREPARATIONS OF ABC STONE BASE (EXISTING)
E 2" BITUMINOUS SURFACE - SUPER PAVE 9.5B
A STABILIZED SUBGRADE (EXISTING)
SURFACE SCHEDULE
B 8" COMPACTED ABC STONE BASE (EXISTING)
D TACK COAT
R/W
1/4" PER FT.
B
1/4" PER FT.
E
SEE STANDARD
C
D
2'-6" CURB
AND GUTTER
R/W
10'-0" 2'-6"
1'
1/4" PER FT.
10'-0"
MAX.
1/4" PER FT.
A
6'-0"
WATER MAIN
PROPOSED
IF REQUIRED
5' SIDEWALK
2'-6"PAVEMENT=28'
REVISIONS:
DATE:
SCALE:
DRAWING NO. OFPost Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org Engineering Division
City of Mount Airy, North Carolina
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B
LIC
WORKS DEPART
M
E N
T ST-104
1 1
LOCAL COMMERCIALN.T.S.
08/01/2017
T Y P E
L
5"
6"
2" I-2 ASPHALT
6-8" COMPACTED
ABC STONE
COMPACTED SELECT
6" MIN. CONCRETE
BACKFILL
6" COMPACTED
ABC STONEREINFORCEMENT
REVISIONS:
DATE:
SCALE:
DRAWING NO. OFPost Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org Engineering Division
City of Mount Airy, North Carolina
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B
LIC
WORKS DEPART
M
E N
T ST-115
1 1
GRANITE CURB W/ BRICK PAVERS
N.T.S.
08/01/2017
"MOUNT AIRY" GRANITEBRICK PAVERS
(SEE ST-114)
CONCRETE SIDEWALK
W/ COMPACTED ABC
STONE
16"
RE
V
IS
IO
N S
N O
D
ES
C
RI
PT
IO
N
D A
TE
BY
C it y o f M o u n t
A ir y E N G
IN
E E R
IN
G
D
IV
IS
IO
N P.
O.
B ox
| M ou nt Ai ry, N
C ww w.
mo un tai ry.
or g
D ra w n by
Sc al e:
in
C he ck ed b y:
A pp ro ve d b y:
Fi le
SH
EE
T N
O
D
RA
W
IN
G D
A
TE
W
.L . H
IA
TT
M . W
IL
LI
A M
S W
.L . H
IA
TT
Do w nt ow n, M ou nt
A ir y
D E T A
IL
S
Fr an kl in
S tr ee t
St re et sc ap e:
Ph as e
II
-M ar -2
Z:
\S er ve r\ Pr oj ec ts \D ow nt ow n
M ou nt A iry \F ra nk lin S tre et
S tre et sc ap e
Pr oj ec t\
Ph as e
II\
D ra ft Pl an s\
Fr an kl in
S t S tre et sc ap e Ph as e
II
-fo ot si de w al k Pi ec ed
T op o
.d w g
6" 12"
3" RAD.
6" 1'-6"
1/2" RAD.
1/8" RAD.
12"
1/8" RAD.
1/2"JOINT FILLER
SURFACE OF GUTTER
TOP OF CURB
GENERAL NOTES:
1. CONTRACTION JOINTS SHALL BE SPACED AT 10 FOOT INTERVALS. A 15
FOOT INTERVAL MAY BE USED WHEN THE CURB IS MACHINE PRODUCED,
OR WHEN SATISFACTORY SUPPORT FOR THE FACE CAN BE OBTAINED
WITHOUT THE USE OF TEMPLATES AT THE 10 FOOT INTERVAL.
2. CONTRACTION JOINTS MAY BE INSTALLED BY THE USE OF TEMPLATES
OR FORMED BY OTHER N.C.D.O.T. METHODS. WHERE SUCH JOINTS ARE
NOT FORMED BY TEMPLATES, A MINIMUM DEPTH OF 1 1/2" SHALL BE
OBTAINED.
3. ALL CONTRACTION JOINTS SHALL BE FILLED WITH JOINT SEALER.
4. EXPANSION JOINTS SHALL BE SPACED AT 90 FOOT INTERVALS, AND BE
ADJACENT TO ALL RIGID OBJECTS.
2'-0" CURB & GUTTER
TRAVERSE EXPANSION JOINT
IN CURB & GUTTER
7"
12"
B
A A
B
4" COMPACTED
STABILIZED SUBGRADE
ABC STONE BASE
___________________SURFACE SCHEDULE
Engineering Division City of Mount Airy, North CarolinaREVISIONS:
DATE:
SCALE:
08/01/2017 N.T.S.
DRAWING NO. OF
2' STD. CURB AND GUTTER
ST-106
Post Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
A
IR
Y
P U
B L
IC
W
ORKS DEPART
M E
N T
VARYING LENGTH BACK/BACK
VARRYING ROW WIDTH'
C 2" ASPHALT(EXISTING)
A SUBGRADE (EXISTING)
SURFACE SCHEDULE
B 6" CONCRETE (EXISTING)
R/W
B
C
ASPHALT
R/W
10'-0"
A
2'-6"VARYING PAVEMENT WIDTH'
REVISIONS:
DATE:
SCALE:
DRAWING NO. OFPost Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org Engineering Division
City of Mount Airy, North Carolina
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B
LIC
WORKS DEPART
M
E N
T ST-104-E
1 1
EXISTING STREET N.T.S.
03/24/2026
OVERLAID CURB
& GUTTER
(EXISTING)
GRANITE
CURB
(EXISTING)
NOTE: THIS DETAIL IS AN APPROXIMATION OF THE EXISTING STREET CROSS
SECTION. THE DEPTH OF CONCRETE UNDER THE ASPHALT COULD BE
MORE OR LESS THAN SHOWN ON THE DETAIL.
.3
1.
RE
V
IS
IO
N S
N O
D
ES
C
RI
PT
IO
N
D A
TE
BY
C it y o f M o u n t
A ir y E N G
IN
E E R
IN
G
D
IV
IS
IO
N P.
O.
B ox
| M ou nt Ai ry, N
C ww w.
mo un tai ry.
or g
D ra w n by
Sc al e:
in
C he ck ed b y:
A pp ro ve d b y:
Fi le
SH
EE
T N
O
D
RA
W
IN
G D
A
TE
W
.L . H
IA
TT
M . W
IL
LI
A M
S W
.L . H
IA
TT
Do w nt ow n, M ou nt
A ir y D E T A
IL
S
Fr an kl in
S tr ee t
St re et sc ap e:
Ph as e
II
-M ar -2
Z:
\S er ve r\ Pr oj ec ts \D ow nt ow n
M ou nt A iry \F ra nk lin S tre et
S tre et sc ap e
Pr oj ec t\
Ph as e
II\
D ra ft Pl an s\
Fr an kl in
S t S tre et sc ap e Ph as e
II
-fo ot si de w al k Pi ec ed
T op o
.d w g
GENERAL NOTES:
1. ALL STOP SIGN POLES WILL BE 3" O/D SMOOTH BREAKAWAY POLES, BURIED 2-FT.
2. STOP SIGNS POLES WITH AFFIXED STREET SIGN BLADES WILL BE 12-FT TALL, OR 10-FT
ABOVE GROUND WHEN INSTALLED. OTHERWISE, THEY WILL BE 10-FT TALL, OR 8-FT
ABOVE GROUND WHEN INSTALLED.
3. ALL FLUVIAL TOPPERS FOR STOP SIGN POLES WILL BE THE TSB2 STYLE.
4. ALL SIGN MOUNTS FOR STOP SIGNS WILL BE THE TSB205 STYLE.
5. ALL STOP SIGNS WILL WILL BE AFFIXED WITH A SOLID BLACK BACK PANEL.
6. THE STREET SIGN BLADES AFFIXED TO THE STOP SIGNS SHALL BE AS FOLLOWS:
9" HIGH
DUAL SIDED
FLAT ALUMINUM BLADE
GREEN BACKGROUND AND WHITE LETTERING
FRANKLIN GOTHIC MEDIUM COND FONT.
7. ALL BASES FOR STOP SIGNS WILL BE OF THE COUNTRY LANE STYLE.
Engineering Division City of Mount Airy, North CarolinaREVISIONS:
DATE:
SCALE:
02/27/2025 N.T.S.
DRAWING NO. OF 11
ST-117
Post Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B L
IC
W
ORKS DEPART
M E
N T
FLUVIAL
COMPLETE SIGN
DECORATIVE STOP SIGN
SIGN MOUNT
BASE
GENERAL NOTES:
1. ALL TRAFFIC/PARKING SIGN POLES WILL BE 3" O/D SMOOTH
BREAKAWAY POLES, BURIED 2-FT.
2. ALL FLUVIAL TOPPERS FOR TRAFFIC/PARKING SIGN POLES WILL BE
THE TSB2 STYLE.
3. ALL SIGNS MUST BE NCDOT APPROVED DESIGNS.
4. ALL SIGNS WILL WILL BE AFFIXED WITH A SOLID BLACK BACK PANEL
THAT MATCHES THE SHAPE OF THE SIGN.
5. ALL BASES FOR TRAFFIC/PARKING SIGNS WILL BE OF THE COUNTRY
LANE STYLE.
Engineering Division City of Mount Airy, North CarolinaREVISIONS:
DATE:
SCALE:
02/28/2025 N.T.S.
DRAWING NO. OF 11
ST-118
Post Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B L
IC
W
ORKS DEPART
M E
N T
SIGNS BASE
DECORATIVE TRAFFIC/PARKING SIGNAGE
GENERAL NOTES:
1. MITCHELL OPEN LED LIGHTS ARE TO HAVE POLE STYLE F.
2. TEARDROP LED LIGHTS ARE TO HAVE POLE STYLE C.
3. SHOEBOX LED LIGHTS ARE TO HAVE POLE STYLE A.
4. ALL DECORATIVE LIGHTS WILL BE ORDERED BY THE CITY OF
MOUNT AIRY.
Engineering Division City of Mount Airy, North CarolinaREVISIONS:
DATE:
SCALE:
DRAWING NO. OFPost Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
A
IR
Y
P U
B
LIC
W
ORKS DEPART
M E
N T
MITCHELL OPEN LED
LIGHTING
SHOEBOX LED
ST-119
1 1
N.T.S.
02/27/2025
TEARDROP LED
Engineering Division City of Mount Airy, North CarolinaREVISIONS:
DATE:
SCALE:
DRAWING NO. OFPost Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B L
IC
W
ORKS DEPART
M E
N T
TREE GRATES
ST-120
1 1
N.T.S.
03/12/2025
5'x5' TREE GRATE
COMPACTED SELECT
BACKFILL
COMPACTED
ABC STONE
CONCRETE
SIDEWALK
CURB
(CONCRETE
OR GRANITE)
TREE
SOIL COMPACTION
BASED ON TREE SPECIES
Engineering Division City of Mount Airy, North CarolinaREVISIONS:
DATE:
SCALE:
DRAWING NO. OFPost Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B
LIC
W
ORKS DEPART
M E
N T
STAMPED ASPHALT CROSSWALK
ST-122
1 1
N.T.S.
03/13/2025
4" x 8" STAMPED
BRICK PATTERN
ASPHALT SURFACE
ASPHALT BINDER
COMPACTED
STONE BASE
COMPACTED
SELECT BACKFILL
7" WIDE WHITE
STRIPING
GENERAL NOTES:
1. WHITE STRIPING IS TO BE DONE ON BOTH SIDES OF CROSSWALK, PERPENDICULAR TO THE STREET, USING SHERWIN-WILLIAMS PRO-PARK WHITE PAINT.
2. STAMPED BRICK PATTERN IS TO BE PAINTED WITH SHERWIN-WILLIAMS PRO-PARK RED PAINT BASE
TINTED TO CROSSWALK TERRA COTTA COLOR TO MATCH BRICK STRIPING IN SIDEWALK.
GENERAL NOTES:
1. STEEL TREE
GRATES ARE TO
BE ORDERED
FROM JORDAN
IRON WORKS.
REVISIONS:
DATE:
SCALE:
DRAWING NO. OFPost Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org Engineering Division
City of Mount Airy, North Carolina
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B
LIC
WORKS DEPART
M
E N
T GN-114
1 1
HANDICAP RAMPN.T.S.
08/01/2017
TRUNCATED DOMES
1V:12H MAX.
SIDEWALK SIDEWALK
CURB CURB
1V:10H MAX.
ASPHALT
24"
6"
6"
3' MIN.5' MIN. 5' MIN.
TRANSITION TRANSITION
CURB CURB
.3
1.
RE
V
IS
IO
N S
N O
D
ES
C
RI
PT
IO
N
D A
TE
BY
C it y o f M o u n t
A ir y E N G
IN
E E R
IN
G
D
IV
IS
IO
N P.
O.
B ox
| M ou nt Ai ry, N
C ww w.
mo un tai ry.
or g
D ra w n by
Sc al e:
in
C he ck ed b y:
A pp ro ve d b y:
Fi le
SH
EE
T N
O
D
RA
W
IN
G D
A
TE
W
.L . H
IA
TT
M . W
IL
LI
A M
S W
.L . H
IA
TT
Do w nt ow n, M ou nt
A ir y D E T A
IL
S
Fr an kl in
S tr ee t
St re et sc ap e:
Ph as e
II
-M ar -2
Z:
\S er ve r\ Pr oj ec ts \D ow nt ow n
M ou nt A iry \F ra nk lin S tre et
S tre et sc ap e
Pr oj ec t\
Ph as e
II\
D ra ft Pl an s\
Fr an kl in
S t S tre et sc ap e Ph as e
II
-fo ot si de w al k Pi ec ed
T op o
.d w g
COMPOST SOCK
FLOW
2 IN. X 2 IN.
STAKES
FLOW
WOOD MULCH OR
COMPOST OR #57 STONE
TO 12 HEIGHT OF SOCK
SECTION VIEW
ISOMETRIC VIEW
PLAN VIEW
FLOW
FLO
W
STORM
DRAIN
INLET
FL
OW
Engineering Division City of Mount Airy, North CarolinaREVISIONS:
DATE:
SCALE:
DRAWING NO. OFPost Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B L
IC
W
ORKS DEPART
M E
N T
COMPOST SOCK INLET PROTECTION03/25/2025
N.T.S.
ESC-1
3 IN.
12 IN.
STORM DRAIN
INLET
.3
1.
File details come from the government source that posted it. Updated .