Plans-FINAL PLANS STP 011 2 046.pdf

PDF 13 MB Posted

Attached to
STP-011-2(046) VOLCANO RD REHAB, OSHIRO RD TO ALII KOA ST
Solicitation number
B27000729
Issued by
Maui County, Hawaii

About this file

This is a final plans document for a federal-aid highway rehabilitation project issued by the Hawaii Department of Transportation, Highways Division, for Federal-Aid Project No. STP-011-2(046), titled "Volcano Road Rehabilitation, Oshiro Road to Alii Koa Street." The scope of work encompasses cold planing and resurfacing of existing pavement, reconstruction of weakened pavement areas, pavement marking and striping installation, guardrail improvements, and installation of milled rumble strips along Volcano Road from Station 310+00 to Station 587+00, spanning approximately 2.77 miles in Hawaii's District 53. The project includes six reconstruction areas of varying types (Types A, B, and C) with total approximate areas ranging from 30,800 to 536,800 square feet, depending on the reconstruction type and location. The plans contain comprehensive details on typical sections, guardrail installations, pavement markings, traffic control signage, erosion and sediment control measures, and utility coordination requirements. All work is subject to Hawaii State law, standard specifications, and special provisions outlined in the contract documents, with the contractor assuming full responsibility for permits, licenses, utility verification, traffic control, and environmental compliance.

The project documents establish stringent requirements for contractor performance, including provisions for water pollution and erosion control with potential liquidated damages of up to $27,500 per day for non-compliance. Contractors must coordinate with the Hawaii One Call Center at least five working days before excavation, obtain necessary NPDES permits for construction activities, and comply with all utility protection protocols. Traffic control requirements mandate coordination with the Hawaii District Police Department Special Duty Section and provision of a minimum of two police officers for each work zone location. Safety and environmental protections include specifications for site-specific best management practices, dust control measures, concrete washout areas, hazardous material management, and protection of adjacent properties and existing structures. The contractor bears full liability for any damages to existing facilities, utilities, and landscaping, with restoration required at the contractor's expense. Additional requirements include survey monument restoration under licensed surveyor supervision, community noise permits, and daily inspection reports submitted to the project engineer.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTE:

STANDARD PLANS APPLICABLE TO THIS

PROJECT ARE INDICATED BY A " "

NEXT TO THE STANDARD PLAN NO.

(FOR EXAMPLE: D-07 )

TYPE B CATCH BASIN

TYPE C CATCH BASIN

CATCH BASIN SECTIONS

TYPE D1 CATCH BASIN

05/31/07 05/31/07 05/31/07

05/31/07

05/31/07

CATTLE GATE

05/31/07

05/31/07

CHAIN LINK FENCE WITH TOPRAIL 05/31/07

CHAIN LINK FENCE WITHOUT TOPRAIL

WIRE FENCE WITH METAL POSTS 05/31/07

TYPICAL DETAILS OF CURBS AND/OR GUTTERS 05/31/07

TYPICAL DETAIL OF REINFORCED CONCRETE DROP DRIVEWAY05/31/07

CENTERLINE AND REFERENCE SURVEY MONUMENTS 05/31/07

STREET SURVEY MONUMENT 05/31/07

CONCRETE SIDEWALK 05/31/07

P.C.C. BUS PAD 05/31/07

P.C.C. BUS PAD 05/31/07

P.C.C. PAVEMENT LAYOUT 05/31/07

P.C.C. PAVEMENT W/ PERMEABLE BASE JOINT DETAILS 05/31/07

P.C.C. PAVEMENT W/ PERMEABLE BASE JOINT DETAILS 05/31/07

05/31/07P.C.C. LONGITUDINAL JOINT DETAILS

05/31/07 05/31/07

P.C.C. CONNECTION TO CURBS AND GUTTERS

JOINTS

TYPE A CATCH BASIN

TYPE D CATCH BASIN

TYPE A1 CATCH BASIN

TYPE B2 CATCH BASIN

TYPE C1 CATCH BASIN

CATCH BASIN SECTION

TYPE A,B, AND C STORM DRAIN MANHOLE

TYPE D STORM DRAIN MANHOLE

TYPICAL REINFORCING DETAILS FOR DRAINAGE STRUCTURES

TYPICAL REINFORCING DETAILS FOR DRAINAGE STRUCTURES

CATCH BASIN AND MANHOLE CASTINGS

TYPE 1A-9 AND 1A-9P GRATED DROP INLET

TYPE 2A-9 AND 2A-9P GRATED DROP INLET

TYPE A-9 OR A-9P STEEL FRAMES

TYPE A-9 AND A-9P STEEL GRATES

TYPE 61614P AND 1211214P GRATED DROP INLET

TYPE 61616P AND 1211216P GRATED DROP INLET

TYPE 61214P GRATED DROP INLET

B-01

D-01 D-02 D-03 D-04 D-05 D-06 D-07 D-08

B-03 B-12

B-12A

D-15 D-16 D-17 D-18 D-19 D-20 D-21 D-22 D-23

H-01A H-01B H-01C H-01D H-01E H-02A H-02B H-02C H-02D H-02E H-03 H-04 H-05 H-06 H-07 H-08 H-09 H-10 H-11 H-12 H-13 H-14 H-15

BACKFILL DETAILS AT EARTH RETAINING STRUCTURES

NOTES & MISCELLANEOUS DETAILS

PRESTRESSED CONCRETE PILES & COMPRESSION SPLICE

CAN DETAILS

B-12B B-13

PILE INTERACTION DIAGRAM

PRESTRESSED CONCRETE PILE BUILD-UP DETAILS

PRESTRESSED CONCRETE PILES, PILE & COMPRESSION

SPLICE CAN DETAILS & NOTES

05/31/07

05/31/07

H-16

TYPE 1211214, 1211214P, 1211216, 1211216P STEEL

05/31/07 05/31/07

05/31/07 05/31/07 05/31/07 05/31/07 05/31/07 05/31/07 05/31/07 05/31/07 05/31/07 05/31/07 05/31/07 05/31/07 05/31/07 05/31/07

05/31/07

05/31/07 05/31/07

05/31/07

05/31/07

05/31/07 05/31/07

TYPE 61214 STEEL FRAMES AND GRATES

TYPE 61214P STEEL GRATES

TYPE 61614B STEEL FRAME AND GRATES

CEMENT RUBBLE MASONRY STRUCTURES

CONCRETE AND CEMENT RUBBLE MASONRY STRUCTURES

INLET/OUTLET STRUCTURE

H-17 H-18 H-19 H-20 H-21 H-22

TYPE 61614, 61614P, 61616, 61616P STEEL FRAME

AND GRATES

05/31/07 05/31/07 05/31/07 05/31/07 05/31/07 05/31/07

H-23 H-24 H-25 H-26 H-27 H-28 H-29 H-30

INLET/OUTLET STRUCTURE

FLARED END SECTION FOR CULVERTS

FLARED END SECTION FOR CULVERTS

CONCRETE SPILLWAY INLET

CAP COUPLING DETAILS STANDARD JOINT

REINFORCED CONCRETE COLLAR & JACKET

UNDERDRAIN CLEANOUT STEEL FRAME AND COVER

UNDERDRAIN CONNECTION TO DRAINAGE STRUCTURE

05/31/07 05/31/07 05/31/07 05/31/07 05/31/07 05/31/07 05/31/07 05/31/07

IRRIGATION NOTES

TREE PLANTING

TREE PLANTING

TREE TRANSPLANTING

PALM PLANTING

SHRUB PLANTING

LANDSCAPE DETAILS

LANDSCAPE DETAILS

LANDSCAPE DETAILS

LANDSCAPE DETAILS

LANDSCAPE DETAILS

PLANTING NOTES

IRRIGATION DETAILS

IRRIGATION DETAILS

IRRIGATION DETAILS

IRRIGATION DETAILS

IRRIGATION DETAILS

IRRIGATION DETAILS

IRRIGATION DETAILS

IRRIGATION DETAILS

IRRIGATION DETAILS

IRRIGATION DETAILS

IRRIGATION DETAILS

IRRIGATION DETAILS

L-01 L-02 L-03 L-04 L-05 L-06 L-07 L-08 L-09 L-10 L-11 L-12 L-13 L-14 L-15 L-16 L-17 L-18 L-19 L-20 L-21 L-22 L-23 L-24

08/16/06 08/16/06 08/16/06 08/16/06 08/16/06 08/16/06 08/16/06 08/16/06 08/16/06 08/16/06 08/16/06 08/16/06

08/16/06 08/16/06 08/16/06 08/16/06 08/16/06 08/16/06

08/16/06

08/16/06 08/16/06 08/16/06 08/16/06

08/16/06

REGULATORY SIGNS

TE-01 SIGN HEIGHT AND LOCATION

TE-1A SIGN INSTALLATION

TE-02A GALVANIZED FLANGED CHANNEL SIGN POST MOUNTING

TE-02B GALVANIZED FLANGED CHANNEL SIGN POST MOUNTING

TE-02C GALVANIZED FLANGED CHANNEL SIGN POST MOUNTING

TE-03A GALVANIZED SQUARE TUBE SIGN POST MOUNTING

TE-03B GALVANIZED SQUARE TUBE SIGN POST MOUNTING

TE-04

TE-05 WARNING SIGNS

07/11/08 07/11/08 05/31/07 05/31/07 05/31/07 05/31/07 05/31/07 07/11/08 07/11/08

TE-06 MISCELLANEOUS SIGNS

TE-07 CONSTRUCTION SIGNS

TE-08

TE-09

TE-10

TE-11

TE-12

TE-12A

TE-13

TE-14

TE-15

TE-16

INTERSTATE ROUTE MARKER

STATE ROUTE MARKER AND AUXILIARY MARKERS

ROUTE SIGN ASSEMBLIES

STREET NAME SIGN ON MAST ARM

MISCELLANEOUS REFLECTOR MARKERS

OBJECT MARKERS

MILE POSTS

MISCELLANEOUS INTERSECTION SIGNS

BIKE ROUTE SIGN & SUPPLEMENTARY PLATES

STATE ROUTE MARKER AND BORDER DETAIL FOR

GUIDE SIGNS

07/11/08 07/11/08 07/11/08

07/11/08 07/11/08 07/11/08 07/11/08

07/11/08 07/11/08 07/11/08 07/11/08 07/11/08

TE-17A

TE-17B

TE-17C

TE-17D

TE-17E

05/31/07 05/31/07 05/31/07

TE-18A

TE-18B

TE-18C

TE-18D

TE-18E

05/31/07 05/31/07 05/31/07 05/31/07 05/31/07

TE-19A

TE-19B

TE-19C

TE-19D

05/31/07 05/31/07 05/31/07 05/31/07 05/31/07

TE-19E

05/31/07 05/31/07 05/31/07 05/31/07 05/31/07

TE-19F

TE-19G

TE-19H

TE-19J

TE-19K

05/31/07

TE-19L

TE-19M

TE-20

TE-20A

TE-20B

CANTILEVER OVERHEAD SIGN ELEVATION & DETAILS 05/31/07

CANTILEVER SIGN FRAME DETAIL AND SECTION

CANTILEVER SIGN FRAME DETAIL

CANTILEVER SIGN FRAME SECTION

05/31/07

CANTILEVER SIGN FRAME DETAILS

TWO POST SIGN FRAMING PLAN SECTION

TWO POST SIGN FRAMING SECTIONS AND DETAILS

TWO POST OVERHEAD SIGN FRAME ELEVATIONS

TWO POST SIGN FRAME DETAILS

TWO POST SIGN FRAME DETAILS

OVERHEAD SIGN FRAMING SCHEDULE

SIGN POST DRILLED SHAFT FOUNDATION

SPREAD FOOTING

SIGN FRAME FOUNDATION SCHEDULE

TE-19D.1 SIGN FRAME FOUNDATION SCHEDULE

SIGN FRAME FOUNDATION SCHEDULE

SIGN FRAME FOUNDATION SCHEDULE

SIGN FRAME FOUNDATION SCHEDULE

SIGN FRAME FOUNDATION SCHEDULE

TE-19D.2

TE-19D.3

TE-19D.4

TE-19D.5

ANCHORAGE DETAILS

ANCHORAGE DETAILS

LUMINAIRE WALKWAY SUPPORT

MISCELLANEOUS SIGN DETAILS

MISCELLANEOUS SIGN DETAILS

05/31/07 05/31/07 05/31/07 05/31/07 05/31/07 05/31/07 05/31/07 05/31/07 05/31/07

TE-20C

TE-21A

05/31/07 05/31/07

MISCELLANEOUS SIGN FRAME DETAILS

FIXED MESSAGE LUMINAIRE SUPPORT

MISCELLANEOUS SIGN FRAME DETAILS

SUPPORTS FOR GROUND MOUNTED GUIDE SIGN

SUPPORTS FOR GROUND MOUNTED GUIDE SIGN

SUPPORTS FOR GROUND MOUNTED GUIDE SIGN

SUPPORTS FOR GROUND MOUNTED GUIDE SIGN

SIGN BREAKAWAY MOUNTS

TE-22

TE-23

TE-24

TE-25

TE-26

TE-27

TE-28

TE-28A

TE-29

TE-30

TE-31

GUIDE SIGNS LUMINAIRE MOUNTINGS

05/31/07

05/31/07

05/31/07 07/11/08 07/11/08 07/11/08 07/11/08 07/11/08 07/11/08 07/11/08

TE-21B SIGN BREAKAWAY MOUNTS

LAMINATED ALUMINUM SIGN PANELS (OVERHEAD)

LAMINATED ALUMINUM SIGN PANELS (GROUND MOUNTED)

SOLID ALUMINUM EXTRUDED SIGN PANEL AND

ACCESSORY DETAILS

07/11/08

RAISED PAVEMENT MARKERS AND STRIPING

RAISED PAVEMENT MARKERS AND STRIPING

ENTRANCE AND EXIT PAVEMENT MARKINGS

PAVEMENT ARROWS AND SYMBOLS

MISCELLANEOUS PAVEMENT MARKINGS

PAVEMENT ALPHABETS, NUMBERS & SYMBOLS

PAVEMENT ALPHABETS, NUMBERS & SYMBOLS

TE-32

TE-33

TE-34

TYPE II TRAFFIC SIGNAL STANDARD

07/11/08

TE-37

TE-37A

TE-37B

05/31/07 05/31/07

TE-37C

TE-37D

TE-37E

TE-37F

TE-37G

05/31/07 05/31/07 05/31/07 05/31/07 05/31/07

TE-37H

TE-37J

TE-38

05/31/07 05/31/07 05/31/07 05/31/07 05/31/07

TE-42

05/31/07 05/31/07 05/31/07

TE-43

TE-44

05/31/07

TRAFFIC PULLBOX COVER AND DETAILS

TE-38A.2

07/11/08

TYPE I & II TRAFFIC SIGNAL SYSTEM MISC. DETAILS

TYPE II TRAFFIC SIGNAL SYSTEM 08/16/06

TE-33A.1 05/31/07

TE-33A.2 TYPE II TRAFFIC SIGNAL STANDARD 05/31/07

LOOP DETECTOR DETAILS

PULLBOX & COVER DETAILS 07/11/08

TYPE "A" TRAFFIC PULLBOX

TYPE "A" TRAFFIC PULLBOX REINFORCING

TYPE "B" TRAFFIC PULLBOX

TYPE "B" TRAFFIC PULLBOX REINFORCING

TYPE "B" TRAFFIC PULLBOX FOUNDATION

TYPE "C" TRAFFIC PULLBOX

TYPE "C" TRAFFIC PULLBOX REINFORCING

TYPE "C" TRAFFIC PULLBOX FOUNDATION

TYPE III TRAFFIC SIGNAL STANDARD

TE-38A.1 TYPE III TRAFFIC SIGNAL STANDARD

TYPE III TRAFFIC SIGNAL STANDARD

TE-39 METAL GUARDRAIL CONNECTION TO CONCRETE BARRIER 07/11/08

TE-40 CONCRETE BARRIER TRANSITION 05/31/07

TE-40A CONCRETE BARRIER TRANSITION SECTIONS

TE-41 GUARDRAIL TYPE 4 (RIGID BARRIER)

PORTABLE CONCRETE BARRIER

PORTABLE CONCRETE BARRIER

GUARDRAIL TYPE 4 MISCELLANEOUS DETAILS

TE-46

TE-47

TE-45 BARRICADES

DELINEATION & PAVEMENT MARKINGS AT NARROW BRIDGES

HIGHWAY LIGHT STANDARD 05/31/07

07/11/08 07/11/08

FRAME AND GRATES

05/31/07

05/31/07

92.16

99.98

99.68

STANDARD PLANS SUMMARY

DATEPLAN NO.

STANDARD

TITLE DATEPLAN NO.

STANDARD

TITLE DATEPLAN NO.

STANDARD

TITLE DATEPLAN NO.

STANDARD

TITLE

STANDARD PLANS SUMMARY

2026 53

FEDERAL-AID PROJECT NO. STP-011-2(046)

OSHIRO ROAD TO ALII KOA STREET

Date: September 2026

VOLCANO ROAD REHABILITATION,

FED. ROAD

HAWAII HAW.

STATE

PROJ. NO.

FISCAL

YEAR

SHEET

NO.

TOTAL

SHEETSDIST. NO.

DEPARTMENT OF TRANSPORTATION

STATE OF HAWAII

SHEET No. OF SHEETS

HIGHWAYS DIVISION

FED. AID

STP-011-2(046)

GENERAL NOTES AND LEGEND

92.16

99.98

99.68

2026 533

GENERAL NOTES

FEDERAL-AID PROJECT NO. STP-011-2(046)

STP-011-2(046)

OSHIRO ROAD TO ALII KOA STREET

Date: March 2026

VOLCANO ROAD REHABILITATION,

1. The scope of work includes cold planing, resurfacing; reconstruction of weakened pavement areas; pavement marking and striping;

guardrail improvements; and installation of milled rumble strips.

2. The location and existence of underground utilities, manholes, monuments and other structures as shown on the plans are from the latest available data, but the accuracy is not guaranteed. The encountering of other obstacles during the course of work is possible. The Contractor shall make an independent check on the ground by probing and/or checking with the various utility companies and government agencies to verify the exact locations and depths of the existing utilities and obstructions. The Contractor shall exercise proper care excavating and cold planing in the area. Whenever connections of new utilities are shown on the plans, the Contractor shall expose the existing lines at the proposed connections to verify their locations and depths prior to excavating new lines. The Contractor shall be held liable for any damages incurred to the existing facilities and/or improvements as a result of his operations.

All damaged portions shall be replaced or repaired in accordance with the standards and specifications of the affected utility company at the Contractor's expense. Refer to Hawaii Standard Specification Subsection 104.11 Utilities and Services.

3. The Contractor shall verify the presence of existing aerial and underground utilities which may conflict with construction activities and shall coordinate with the utility company for temporary relocations, as necessary. All costs associated with temporary relocations shall be borne by the Contractor.

4. The Contractor shall indemnify and be solely responsible for the protection of adjacent properties, utilities and existing structures from damages due to construction. Repairing any damage shall be at the Contractor's own expense, to the satisfaction of the Engineer.

Refer to Hawaii Standard Specification Subsection 107.12 Protection of Persons and Property.

5. Prior to resurfacing operations, the Contractor shall be responsible for locating, preserving and marking all utility and highway facilities that will require adjustments to the new finished pavement grade.

Additionally, the Contractor shall submit to the Engineer a list of all items, including water, drainage, sewer, electrical, telephone, and cable utilities to be adjusted to the new finished grade.

6. The exact locations and limits of areas to be reconstructed and cold planed shall be determined in the field by the Contractor. The Contractor shall not begin work until the limits of work are verfied and accepted by the Engineer. The Contractor shall provide drawings showing locations including the outlines of the proposed repair areas. The total area of repairs shall be calculated and provided to the Engineer with the drawings. The Contractor shall not begin any repair until the Engineer verifies and accepts the location and size of the area to be repaired.

7. The Contractor shall obtain all permits and licenses required to perform the work prior to start of work. The Contractor assumes exclusive responsiblity for identifying, acquiring and paying for all permits and licenses required to perform the work. Refer to Hawaii Standard Specifications Subsection 107.02 Permits and Licenses.

8. The Contractor shall obtain a Permit to Perform Work Upon State Highways from the Hawaii District Office, State Highways, at 50 Makaala Street, prior to commencement of work within the State's highway right-of-way.

The Permit to Perform Work Upon State Highways may be revoked because of default in any of the following, but not limited to, conditions:

a. Work performed before or after permitted hours.

b. Failure to maintain roadway surfaces in a smooth and safe condition.

c. Failure to clean up construction debris generated from project work.

d. Failure to provide proper traffic control.

e. Failure to replace damaged pavement markings and signs.

Any revocation of the permit shall be at the Contractor's expense and no additional cost to the State and no additional contract time will be added.

9. At the end of each day's work, the Contractor shall remove all equipment and other obstructions to permit free and safe passage of public traffic.

10. The Contractor shall remove and dispose of all existing raised pavement markers and traffic tapes prior to the overlaying of Asphalt Concrete.

11. All holes, depressions and wheel ruts shall be filled and compacted with Hot Mix Asphalt Pavement, Mix No. V prior to resurfacing.

12. The existing drainage system shall be kept functional at all times during construction. The Contractor shall furnish materials, equipment, labor, tools and incidentals necessary to maintain flow.

13. Smooth riding connections shall be constructed at all limits of resurfacing including the beginning and end of project, connecting approaches, side streets, walkways and driveways as shown on the plans and/or as directed by the Engineer.

14. The Contractor shall clean and remove any accumulation of aggregates along the roadside within 10 feet of the edge of pavement.

15. Existing facilities and/or pavement to remain which has been damaged by the Contractor shall be restored to its original condition at no cost to the State.

16. The Contractor shall be held liable for any damages incurred to the existing landscaping as a result of his operations.

17. Contractor shall dispose or deliver any removed material at no cost to the State.

18. After completion of resurfacing, the Contractor and the Engineer will test for and determine ponding areas (i.e. low spots within resurfaced area). It shall be the responsibility of the Contractor to correct and resurface and/or repair all such ponding areas.

Corrective measures shall be approved by the Engineer.

19. The Contractor is to take special measures to reduce dust from cold planing operations including but not limited to use of water misters on cold planing equipment and vacuum sweepers. Use of power brooms to sweep road is not allowed if a dust nuisance is created.

20. The Contractor shall not perform any construction work during periods of heavy rainfall.

21. The vertical riding surface drop-off between adjacent surfaces shall not exceed 3-inches. This shall include differences in height between adjacent pavement surfaces, cold planed surfaces, bridge decks and new concrete slabs. If a vertical riding surface drop-off exists at the end of each day's work, the Contractor shall provide temporary transition tapers with maximum slopes of 48:1 for travel in the longitudinal direction and 6:1 for transverse movements. See detail on Sheet No. 7.

22. The Contractor shall submit Site-Specific Traffic Control Plans, in accordance with Hawaii Standard Specification Section 645 to the Engineer for review and approval, prior to implementation.

23. The Contractor shall coordinate with the Hawaii District Police Department Special Duty Section to hire police officers for traffic control operations and transporting of project equipment to ensure minimal delay due to lane closures. The Contractor shall furnish a minimum of two (2) police officers for each location that requires work zone traffic control, in accordance with Special Provisions Subsection 645.03 Construction.

24. Any Survey Monuments that are disturbed shall be restored under the supervision of a licensed land surveyor registered in the State of Hawaii at no cost to the State. All survey data shall be certified by the surveyor and submitted to the Engineer.

25. The Contractor shall submit requests for detours and lane closures in accordance with Hawaii Standard Specification Subsection 645.03(F) and refer to minimum timeframes required for implementation. Once the request has been approved by the Engineer, the Contractor is required to provide a written Weekly Lane Closure Request to the Engineer at least 1-week ahead of all upcoming work.

26. The Contractor shall provide and maintain for access to and from all existing driveways, sidewalks, ADA access routes complying with 2010 ADAAG Section 206.1, side streets, and cross streets at all times. This work shall be considered incidental to various contract items and will not be paid for separately.

27. Refer to Special Provisions Subsection 645.03(F) Lane Closures.

28. The Contractor shall obtain a Community Noise Permit for all construction activities.

29. All work called for in the contract documents but not itemized in the proposal and all work not called for but required for the construction in the project shall be considered incidental to the various contract items.

30. Contractor shall submit a Daily Inspection Report signed by the Contractor's authorized representative daily to the Engineer and Inspector. Submittal frequency may be changed upon written request and approval from the Engineer.

31. The Contractor shall follow Hawaii Standard Specifications Subsection 105.10 -Construction Stakes, Lines and Grades.

32. The Contractor shall furnish and place HMA Pavement, Mix No. V, Leveling as required to correct existing roadway surface irregularities, including but not limited to depressions, sags, and settlements, to achieve a smooth and uniform longitudinal profile and cross slope, or as directed by the Engineer. The existing pavement may contain surface distortions of varying depth. No additional compensation will be made for leveling required to achieve the specified finished profile and cross slope. Work under this item may include, but is not limited to, development of a revised roadway profile, placement in multiple lifts, cold planing, survey work, and all incidentals necessary to complete the work. The Contractor shall be responsible for field verification of existing roadway conditions prior to bidding. All such work shall be included in and paid for under the contract unit price for HMA Pavement, Mix No. V, Leveling.

FED. ROAD

HAWAII HAW.

STATE

PROJ. NO.

FISCAL

YEAR

SHEET

NO.

TOTAL

SHEETSDIST. NO.

DEPARTMENT OF TRANSPORTATION

STATE OF HAWAII

SHEET No. OF SHEETS

HIGHWAYS DIVISION

GENERAL NOTES AND LEGEND

92.16

99.98

99.68

2026 53

Existing Metal Guardrail es ep

EP

ES New Edge of Shoulder

New Edge of Pavement

Existing edge of shoulder

Existing edge of pavement

Existing Utility Pullbox Existing Lighting Pullbox Existing Traffic Sign Existing Reflector

HAWAII ONE CALL CENTER:

Existing Telephone Manhole

LEGEND

Existing Sewer Manhole

Existing Catch Basin

Existing Joint Pole Existing Power Pole

Existing Electrical Line

Existing Water Valve Box

Existing Storm Drain Manhole

Existing Water Manhole

Existing Grated Drop Inlet

Existing Monument

Existing Highway Lighting Standard

Existing Water Meter

Existing 8" Sewer Line

Existing 12" Water Line Existing 6" Water Line

Existing 36" Drain Line Existing 30" Drain Line Existing 24" Drain Line

Existing 60" Drain Line

Existing 8" Gas Line Existing 6" Gas Line Existing 4" Gas Line Existing 2" Gas Line

Existing Gas Manhole Existing Gas Valve Box

Existing Telephone Line Existing DATS Line Existing Telephone Pole

Existing Electric Manhole

Existing Irrigation Box Existing Fire Hydrant

Existing Traffic Signal Pullbox

Existing 3" Water Line

Existing 42" Water Line

Existing Highway Lighting Standard Pullbox

Reconstruction Type A Reconstruction Type B Reconstruction Type C

ENDANGERED SPECIES NOTES

1. All work lights shall be shielded so the bulb can only be seen from below bulb height, shall contain less than 2% wavelengths less than 500 nm, shall be situated so that light does not shine on reflective surfaces, and shall only be used when construction is occurring in the area illuminated by the light.

2. Woody plants greater than 15 feet tall shall not be disturbed, removed, or trimmed during the Hawaiian hoary bat birthing and pup rearing season, June 1 through September 15.

FEDERAL-AID PROJECT NO. STP-011-2(046)

STP-011-2(046)

OSHIRO ROAD TO ALII KOA STREET

1. Before conduction any excavation in the public right of way or on private property, call the Hawaii One Call Center at least five (5) working days before planning to dig.

Be sure to give them the address and location of the nearest cross street(s) near where digging is planned.

Call 811 toll-free 24 hours a day.

For more information, go to www.callbeforeyoudig.org

2. The Hawaii One Call Center will contact all utility companies to tone, mark or identify the location of their underground utilities for free. Mark the area where the Contractor plans to excavate in white and label all of the other utilites as listed below.

RED Electric power lines, cables, or conduits, and lighting cables.

YELLOW Gas, oil, steam, petroleum or other hazardous liquid or gaseous materials.

ORANGE Communications, cable TV, alarm or signal lines, cables, or conduits.

BLUE Water, irrigation, and slurry lines.

GREEN Sewers, storm sewer facilities or other drain lines.

WHITE Proposed excavation.

PINK Temporary survey markings.

PURPLE Reclaimed water, irrigation and slurry lines.

3. In accordance with Hawaii State Law Section 269E-7, the Hawaii One Call Center (HOCC) shall provide an inquiry identification number and utility marks shall remain valid for not more than twenty-eight (28) calendar days from the date of issuance and after that date shall require the Contractor to submit a new request for HOCC revalidation. The Contractor shall provide all inquiry identification numbers for each location request to the Engineer.

Date: March 2026

VOLCANO ROAD REHABILITATION,

FED. ROAD

HAWAII HAW.

STATE

PROJ. NO.

FISCAL

YEAR

SHEET

NO.

TOTAL

SHEETSDIST. NO.

DEPARTMENT OF TRANSPORTATION

STATE OF HAWAII

SHEET No. OF SHEETS

WATER POLLUTION & EROSION CONTROL NOTES

92.16

99.98

99.68

X

X dd x.

x

X .d gn

/2

3/

WATER POLLUTION AND EROSION CONTROL NOTES:

FEDERAL-AID PROJECT NO. STP-011-2(046)

STP-011-2(046)

OSHIRO ROAD TO ALII KOA STREET

Date: March 2026

VOLCANO ROAD REHABILITATION,

FED. ROAD

HAWAII HAW.

STATE

PROJ. NO.

FISCAL

YEAR

SHEET

NO.

TOTAL

SHEETSDIST. NO.

DEPARTMENT OF TRANSPORTATION

STATE OF HAWAII

SHEET No. OF SHEETS

HIGHWAYS DIVISION

FED. AID

A. GENERAL:

1. See Special Provisions Section 209 - Water Pollution and Erosion Control. Section 209 describes but is not limited to:

submittal requirements; scheduling of a water pollution and erosion control conference with the Engineer; construction requirements; method of measurement; and basis of payment. In addition, Appendix A lists potential pollutant sources and corresponding BMPs used to mitigate the pollutants.

2. Follow the guidelines in the current HDOT Construction Best Management Practices Field Manual in developing, installing and maintaining the Best Management Practices (BMP) for the project. For any conflicting requirements between the Manual and applicable bid documents, the applicable bid documents will govern. Should a requirement not be clearly described within the applicable bid documents, the Contractor shall notify the Engineer immediately for interpretation. For the purposes of clarification under Note A.2, "applicable bid documents" include the construction plans, standard specifications, Special Provisions, Permits, and the Storm Water Pollution Prevention Plan (SWPPP) when applicable.

3. Follow the guidelines in the City & County "Rules Relating to Soil Erosion Standards and Guidelines" along with applicable Soil Erosion Guidelines for projects on Maui, Molokai, Kauai, and Hawaii.

4. The Engineer may assess liquidated damages of up to $27,500 for non-compliance of each BMP requirement and each requirement stated in Section 209 and special provisions, for every day of non-compliance. There is no maximum limit on the amount assessed per day.

5. The Engineer will deduct the cost from the progress payment for all citations received by the Department for non-compliance, or the Contractor shall reimburse the State for the full amount of the outstanding cost incurred by the State.

6. If necessary, install a rain gage prior to any field work including the installation of any site-specific best management practices. The rain gage shall have a tolerance of at least 0.05 inches of rainfall. Install the rain gage on the project site in an area that will not deter rainfall from entering the gage opening. Do not install in a location where rain water may splash into rain gage. The rain gage installation shall be stable and plumbed. Do not begin field work until the rain gage is installed and site-specific best management practices are in-place.

7. Submit Site-Specific BMP Plan to the Engineer along with a completed Site-Specific BMP Review Checklist within 21 calendar days of date of award. The Site-Specific BMP Review Checklist may be obtained from http://www.stormwaterhawaii.com .

B. WASTE DISPOSAL:

1. Waste Materials Collect and store all waste materials in a securely lidded metal dumpster or roll off container with cover to keep rain out or loss of waste during windy conditions. The dumpster shall meet all local and State solid waste management regulations. Deposit all trash and construction debris from the site in the dumpster.

Empty the dumpster weekly or when the container is two-thirds full, whichever is sooner. Do not bury construction waste materials onsite. The Contractor's supervisory personnel shall be instructed regarding the correct procedure for waste disposal. Post notices stating these practices in the office trailer, on a weatherproof bulletin board, or other accessible location acceptable to the Engineer. The Contractor shall be responsible for seeing that these procedures are followed.

Submit the Solid Waste Disclosure Form for Construction Sites to the Engineer within 21 calendar days of date of award.

Provide a copy of all the disposal receipts from the facility permitted by the Department of Health to receive solid waste to the Engineer monthly. This should also include documentation from any intermediary facility where solid waste is handled or processed.

2. Hazardous Waste Dispose all hazardous waste materials in the manner specified by local or State regulations and by the manufacturer. The Contractor's site personnel shall be instructed in these practices and shall be responsible for seeing that these practices are followed.

3. Sanitary Waste Collect all sanitary waste from the portable units a minimum of once per week, or as required. Position sanitary facilities where they are secure and will not be tipped over or knocked down.

C. EROSION AND SEDIMENT CONTROL INSPECTION AND

MAINTENANCE PRACTICES:

1. For projects with an NPDES Permit for Construction Activities, inspect at the following intervals. For construction areas discharging to nutrient or sediment impaired waters, inspect all control measures at least once each week and within 24 hours of any rainfall event of 0.25 inches or greater within a 24 hour period. For construction areas discharging to waters not impaired for nutrient or sediments, inspect all control measures weekly. Inspections are only required during the project's normal working hours. The discharge point water classification may be found in the SWPPP.

2. For projects without an NPDES Permit for Construction Activities, inspect all control measures weekly.

3. Maintain all erosion and sediment control measures in good working order. If repair is necessary, initiate repair immediately and complete by the close of the next work day if the problem does not require significant repair or replacement, or if the problem can be corrected through routine maintenance.

When installation of a new erosion or sediment control or a significant repair is needed, install the new or modified control or complete the repair no later than 7 calendar days from the time of discovery. "Immediately" means the Contractor shall take all reasonable measures to minimize or prevent discharge of pollutants until a permanent solution is installed and made operational. If a problem is identified at a time in the day in which it is too late to initiate repair, initiation of repair shall begin on the following work day.

4. Remove built-up sediment from silt fence when it has reached one-third the height of the fence. Remove sediment from other perimeter sediment control devices when it has reached one-half the height of the device.

5. Inspect silt screen or fence for depth of sediment, tears, to verify that the fabric is securely attached to the fence posts or concrete slab and to verify that the fence posts are firmly in the ground. Inspect and verify the bottom of the silt screen is buried a minimum of 6 inches below the existing ground.

6. Inspect temporary and permanent seeding and planting for bare spots, washouts and healthy growth.

7. Complete and submit to the Engineer a maintenance inspection report within 24 hours after each inspection.

8. Provide a stabilized construction entrance at all points of exit onto paved roads to reduce vehicle tracking of sediments.

Include stabilized construction entrance in the Water Pollution, Dust, and Erosion Control submittals. Minimum length should be 50 feet. Minimum width should be 30 feet. Minimum depth should be 12 inches or as recommended by the soils engineer and underlain with geo-textile fabric. If minimum dimensions cannot be met, provide other stabilization techniques that remove sediment prior to exit. Clean the paved street adjacent to the site entrance daily or as required to remove any excess mud, cold-planed materials, dirt or rock tracked from the site.

Do not hose down the street without containing or vacuuming wash water. Cover dump trucks hauling material from the construction site with a tarpaulin. Remove sediment tracked onto the street, sidewalk, or other paved area by the end of the day in which the track-out occurs.

9. Include designated Concrete Washout Area(s) in the Water Pollution, Dust, and Erosion Control submittals.

10. Submit the name of a specific individual designated responsible for inspections, maintenance and repair activities and filling out the inspection and maintenance report.

11. Personnel selected for the inspection and maintenance responsibilities shall receive training from the Contractor. They shall be trained in all the inspection and maintenance practices necessary for keeping the erosion and sediment controls used onsite in good working order.

92.16

99.98

99.68

X

X dd x.

x

X .d gn

/2

3/

WATER POLLUTION AND EROSION CONTROL NOTES (Cont.):

FEDERAL-AID PROJECT NO. STP-011-2(046)

STP-011-2(046)

OSHIRO ROAD TO ALII KOA STREET

Date: March 2026

VOLCANO ROAD REHABILITATION,

12. Contain, remove, and dispose slurry generated from saw cutting of pavement in accordance with approved BMP practices. Do not allow discharge into the drainage system or State waters.

13. For projects with an NPDES Permit for Construction Activities, immediately initiate stabilizing exposed soil areas upon completion of earth-disturbing activities for areas where earth-disturbing activities have permanently or temporarily ceased.

Earth-disturbing activities have permanently ceased when clearing and excavation within any area of the construction site that will not include permanent structures has been completed. Earth-disturbing activities have temporarily ceased when clearing, grading, and excavation within any area of the site that will not include permanent structures will not resume (i.e., the land will be idle) for a period of 14 or more calendar days, but such activities will resume in the future. For construction areas discharging into waters not impaired for nutrients sediments, complete initial stabilization within 14 calendar days after the temporary or permanent cessation of earth-disturbing activities. For construction areas discharging into nutrient or sediment impaired waters, complete initial stabilization within 7 calendar days after the temporary or permanent cessation of earth-disturbing activities. Classification of water at the discharge point may be found in the SWPPP.

14. For projects without an NPDES Permit for Construction Activities, complete initial stabilization within 14 calendar days after the temporary or permanent cessation of earth-disturbing activities.

D. GOOD HOUSEKEEPING BEST MANAGEMENT PRACTICES:

1. Materials Pollution Prevention Plan

a. Applicable materials or substances listed below are expected to be present onsite during construction. Other materials and substances not listed below shall be added to the inventory.

Concrete Cleaning Solvents Detergents Wood Paints (enamel and latex) Masonry Block Metal Studs Herbicides and Pesticides Tar Curing Compounds Fertilizers

Adhesives Petroleum Based Products

b. Use Material Management Practices to reduce the risk of spills or other accidental exposure of materials and substances to storm water runoff. Make an effort to store only enough product as is required to do the job.

c. Store all materials stored onsite in a neat, orderly manner in their appropriate containers and if possible under a roof or other enclosure.

d. Keep products in their original containers with the original manufacturer's label.

e. Do not mix substances with one another unless recommended by the manufacturer.

f. Whenever possible, use a product up completely before disposing of the container.

g. Follow manufacturer's recommendations for proper use and disposal.

h. Conduct a daily inspection to ensure proper use and disposal of materials onsite.

2. Hazardous Material Pollution Prevention Plan

a. Keep products in original containers unless they are not resealable.

b. Retain original labels and Safety Data Sheets (SDS), formerly Material Safety

Data Sheets (MSDS).

c. Dispose of surplus products according to manufacturers' instructions and local and State regulations.

3. Onsite and Offsite Product Specific Plan The following product specific practices shall be followed onsite:

a. Petroleum Based Products:

Monitor all onsite vehicles for leaks and perform regular preventive maintenance to reduce the chance of leakage. Store petroleum products in tightly sealed containers which are clearly labeled. Apply asphalt substances used onsite according to the manufacturer's recommendation.

b. Fertilizers:

Apply fertilizers used only in the minimum amounts recommended by the manufacturer and federal, state, and local requirements. Avoid applying just before a heavy rain event. Apply at the appropriate time of year for the location, and preferably timed to coincide as closely as possible to the period of maximum vegetation uptake and growth. Once applied, work fertilizer into the soil to limit exposure to storm water. Do not apply to storm conveyance channels with flowing water. Storage shall be in a covered shed or in an area where fertilizer will not come into contact with precipitation or stormwater.

Transfer the contents of any partially used bags of fertilizer to a sealable plastic bin to avoid spills.

c. Paints:

Seal and store all containers when not required for use. Do not discharge excess paint to the drainage system, sanitary sewer system, or State waters.

Dispose properly according to manufacturers' instructions and State and local regulations.

d. Concrete Trucks:

Washout or discharge concrete truck drum wash water only at a designated site as far as practicable from storm drain inlets or State waters. Do not discharge water in the drainage system or State waters. Disposal by percolation is prohibited. Clean disposal site as required or as requested by the Engineer.

4. Spill Control Plan

a. Post a spill prevention plan to include measures to prevent and clean up each spill.

b. The Contractor shall be the spill prevention and cleanup coordinator. Designate at least three site personnel who shall receive spill prevention and cleanup training. These individuals shall each become responsible for a particular phase of prevention and cleanup. Post the names of responsible spill personnel in the material storage area on a weatherproof bulletin board or other accessible location acceptable to the Engineer and in the office trailer onsite.

c. Clearly post manufacturers' recommended methods for spill cleanup. Make site personnel aware of the procedures and the location of the information and cleanup supplies.

d. Keep ample materials and equipment necessary for spill cleanup in the material storage area onsite.

e. Clean up all spills immediately after discovery.

f. Keep the spill area well ventilated. Personnel shall wear appropriate protective clothing to prevent injury from contact with a hazardous substance.

g. Report spills of toxic hazardous material to the appropriate State or local government agency, regardless of the size. Where a leak, spill, or other release containing a hazardous substance or oil in an amount equal to or in excess of a reportable quantity established under either 40 CFR Part 110, 40 CFR Part 117, or 40 CFR Part 302 occurs during a 24-hour period, the Contractor shall notify the Engineer as soon as the Contractor has knowledge of the discharge. The Engineer will notify the National Response Center (NRC) at (800) 424-8802, the Clean Water Branch during regular business hours at 586-4309, and the Hawaii State Hospital Operator at 247-2191 and the Clean Water Branch (DOH-CWB) via email at cleanwaterbranch@doh.hawaii.gov during non-business hours immediately. The Contractor shall also provide to the Engineer, within 7 calendar days of knowledge of the release, a description of the release, the circumstances leading to the release, and the date of the release. The Engineer will provide this information to the DOH-CWB. The Engineer will provide information to the NRC if requested.

FED. ROAD

HAWAII HAW.

STATE

PROJ. NO.

FISCAL

YEAR

SHEET

NO.

TOTAL

SHEETSDIST. NO.

DEPARTMENT OF TRANSPORTATION

STATE OF HAWAII

SHEET No. OF SHEETS

HIGHWAYS DIVISION

92.16

99.98

99.68

X

X dd x.

x

X .d gn

/2

3/

WATER POLLUTION AND EROSION CONTROL NOTES (Cont.):

F. SITE-SPECIFIC BMP REQUIREMENTS:

Each BMP below is referenced to the corresponding section of the current HDOT Construction Best Management Practices Field Manual and appropriate Supplemental Sheets. The Manual may be obtained from the HDOT Statewide Stormwater Management Program Website at http://www.stormwaterhawaii.com/resources/contractors-and-consultants/ under Construction Best Management Practices Field Manual. Supplemental BMP sheets are located at http://www.stormwaterhawaii.com/resources/contractors-and-consultants/storm-water-pollution-prevention-plan-swppp/ under Concrete Curing and Irrigation Water.

The requirements for Water Pollution, Dust, and Erosion Control submittals are included in Section 209 of the Hawaii Standard Specifications for Road and Bridge Construction dated 2005 and applicable Special Provisions. A list of pollutant sources and corresponding BMP used to mitigate the pollutants are included in Section 209 of the Special Provisions under Appendix A.

Follow the requirements below:

1. Protect all Drainage Inlets receiving runoff from disturbed areas (SC-1).

2. Contain on-site runoff using Perimeter Sediment Controls

a. SC-7 Silt Fence or Filter Fabric Fence

b. SC-2 Vegetated Filter Strips and Buffers

c. SC-6 Compost Filter Berm/Sock

d. SC-8 Sandbag Barrier

e. SC-9 Brush or Rock Filter

3. Control offsite runoff from entering construction area

a. EC-3 Run-On Diversion

b. EC-6 Earth Dike, Swales, and Ditches

4. Incorporate applicable Site Management BMP

a. SM-1 Employee Training

b. SM-2 Material Storage and Handling

c. SM-3 Stockpile Management

d. SM-6 Solid Waste Management

e. SM-7 Sanitary Waste Management

f. SM-9 Hazardous Materials and Waste Management

g. SM-10 Spill Prevention and Control

h. SM-11 Vehicle and Equipment Cleaning

i. SM-12 Vehicle and Equipment Maintenance

j. SM-13 Vehicle and Equipment Refueling

k. SM-14 Scheduling

l. SM-15 Location of Potential Sources of Sediment

m. SM-16 Staging Area

n. SM-17 Preservation of Existing Vegetation

o. SM-19 Dust Control

5. Contain pollutants within the Construction Staging/Storage Area BMP with applicable Perimeter Sediment Controls and Site Management BMP. Include a Stabilized Construction Entrance/Exit (SC-11) for all areas which exit onto a paved street. Restrict vehicle access to these points.

6. Manage Concrete Waste including installing a Concrete Washout Area (SM-4) and properly disposing of Concrete Curing Water (California Stormwater BMP Handbook NS-12 Concrete Curing).

7. Remove saw cut slurry and hydrodemolition water from the site by vacuuming. Provide storm drain protection and/or perimeter sediment controls during saw cutting and hydrodemolition work.

FEDERAL-AID PROJECT NO. STP-011-2(046)

STP-011-2(046)

OSHIRO ROAD TO ALII KOA STREET

Date: March 2026

VOLCANO ROAD REHABILITATION,

E. PERMIT REQUIREMENTS:

1. A National Pollutant Discharge Elimination System (NPDES) Permit for Construction Activities of one acre or more of disturbed area is required for this project. If the Contractor requires extra land disturbance, including staging and storage areas, that is not covered by the NPDES Permit obtained by the State, the Contractor shall be responsible for obtaining the required NPDES Construction Activities Permit to cover this additional disturbed area. See Hawaii Administrative Rules Chapter 11-55, Appendix C for definition of land disturbance. The Contractor's attention is directed to the applicable NPDES Permit documents on the bid package compact disc.

2. Comply with all applicable State and Federal Permit conditions.

Permits may include, but not limited to the following:

a. NPDES Permit for Construction Activities

b. NPDES Permit for Construction Dewatering

c. NPDES Permit for Hydrotesting Waters

d. Water Quality Certification

e. Stream Channel Alteration Permit

f. Section 404 Army Corps of Engineer Permit

FED. ROAD

HAWAII HAW.

STATE

PROJ. NO.

FISCAL

YEAR

SHEET

NO.

TOTAL

SHEETSDIST. NO.

DEPARTMENT OF TRANSPORTATION

STATE OF HAWAII

SHEET No. OF SHEETS

HIGHWAYS DIVISION

23.04

TYPICAL SECTIONS & DETAILS

Scale: NTS

2026 53

24.85

STP-011-2(046)

FEDERAL-AID PROJECT NO. STP-011-2(046)

OSHIRO ROAD TO ALII KOA STREET

General Notes:

1. Improvements consists of cold planing section of the existing traveled way; reconstructing a weakened pavement area; resurfacing and levelling the existing pavement; adjusting and reconstructing centerline monuments;

and installing pavement markers, stripping, and marking.

2. Existing pavement resurface variable. Surface indicated on Typical Sections is not intended to represent any specific location.

3. Existing Preformed Pavement Marking Tape shall be removed prior to resurfacing. Removal shall by scraping or the method approved by the Engineer. Payment shall be incidental to Item No. 401.0500-Aspahlt Concrete Pavement. Mix No. V.

4. Asphalt concrete for leveling shall be paid for under Item No.

401.0500-Aspahlt Concrete Pavement. Mix No. V.

5. Smooth and easy riding connections shall be constructed at beginning and ending of project and at the ending of daily work.

6. Initial preparation of shoulder areas shall be done by the State.

Contractor shall be responsible for rolling and maintaining the shoulders thereafter. This work shall be considered incidental to Item No.

401.0500-Aspahlt Concrete Pavement. Mix No. V.

7. All lanes shall be opened to traffic during morning peak hours from 6:00 a.m. to 8:00 a.m. and during afternoon peak hours from 3:30 a.m. to 3:30 p.m. and during off-work hours or as directed by the Engineer. Only one lane or the highway shall be closed during work hours.

8. During work stoppages and on work hours, the Contractor shall restore to smooth-riding condition all pavement drop-offs located within four feet of the travelway.

9. Depths and locations of roadway dips to be leveled with A.C. Mix No. V are approximate. Locations shall be staked out and vertical controls provided by the Engineer in the field.

10. The exact locations and limited of areas to be reconstructed and/or cold planed shall be determined in the field by the Engineer.

11. Recompact Subgrade with at least 10 passes with a 10-ton vibratory roller. Work shall be incidental to the various pavement contract items.

Scale: N.T.S.

east boundwest bound varies (40' min) varies (40' min)

(11'-0") pavement existing slope

R/W Line varying shoulder existing ground

TYPICAL SECTION @

existing slope

(11'-0") pavement varies (5'-0" to 9'-0") varying shoulder existing ground

R/W Line

(7'-0") varying gutter

STA. 310+00 TO STA. 587+00 (VARIES)

New 2" PMA Pavement Mix No. IV

Cold Plane 6" New 4" ACB

Date: March 2026

VOLCANO ROAD REHABILITATION,

FED. ROAD

HAWAII HAW.

STATE

PROJ. NO.

FISCAL

YEAR

SHEET

NO.

TOTAL

SHEETSDIST. NO.

DEPARTMENT OF TRANSPORTATION

STATE OF HAWAII

SHEET No. OF SHEETS

HIGHWAYS DIVISION

FED. AID

varies (5'-0" to 9'-0")

Safety Edge

23.04

TYPICAL SECTIONS & DETAILS

Scale: NTS

2026 53

24.85

STP-011-2(046)

FEDERAL-AID PROJECT NO. STP-011-2(046)

OSHIRO ROAD TO ALII KOA STREET

Reconstruction Area Width

Saw Cut

Scale: N.T.S.

See Reconstruction Schedule

Place Tensar InterAx Filtergrid NX850-FG or Equivalent Place 6" 3 Fine Gravel Place Tensar InterAx NX850 or Equivalent Place 6" Aggregate Base Course

Cold Plane 18"

Place Tensar InterAx NX AC or Equivalent Place 4" ACB

Place 2" PMA Mix IV

Reconstruction Area Width

Saw Cut

See Reconstruction Schedule

Place Tensar InterAx Filtergrid NX850-FG or Equivalent Place 6" Aggregate Base Course

Cold Plane 12"

Place Tensar InterAx NX AC or Equivalent Place 4" ACB

Place 2" PMA Mix IV

Scale: N.T.S.

No. 1 STA. 348±00 TO STA. 355±50 Inbound Direction No. 2 STA. 453±00 TO STA. 456±00 Outbound Direction

No. 3 STA. 476±00 TO STA. 481±00 Outbound Direction No. 4 STA. 487±00 TO STA. 492±00 Inbound Direction

Reconstruction Area Widthtop of existing pavement

Saw Cut

See Reconstruction Schedule

Cold Plane 6"

Place 4" ACB Place 2" PMA Mix IV

Scale: N.T.S.

No. 5 STA. 517±00 TO STA. 531±00 Outbound Direction

Recompact Subgrade with at least 10 passes with 10-ton vibratory roller Place Tensar InterAx FilterGrid NX AC-FG or Equivalent

No. 6 STA. 548±50 TO STA. 550±00 Outbound Direction existing aggregate base/subbase existing aggregate base/subbase existing aggregate base/subbase

RECONSTRUCTION TYPE A

RECONSTRUCTION TYPE B

RECONSTRUCTION TYPE C

Width of Shoulder Width of Shoulder

Mill-and-Fill 2" PMA Mix IV top of existing pavement

Width of Shoulder Width of Shoulder

Mill-and-Fill 2" PMA Mix IV top of existing pavement

Width of Shoulder Width of Shoulder

Mill-and-Fill 2" PMA Mix IV

Date: March 2026

VOLCANO ROAD REHABILITATION,

FED. ROAD

HAWAII HAW.

STATE

PROJ. NO.

FISCAL

YEAR

SHEET

NO.

TOTAL

SHEETSDIST. NO.

DEPARTMENT OF TRANSPORTATION

STATE OF HAWAII

SHEET No. OF SHEETS

HIGHWAYS DIVISION

FED. AID

*Notes:

TYPICAL PAVEMENT EDGE DETAIL

Scale: N.T.S.

*30°

2.0' Min.

Top of New Pavement top of exist.

pavement Slope

Varies travel lane exist.

grade

ESEP

Safety Edge

Paved Shoulder

Shoulder Dressing, 6:1 Max.

*2" Min.

1" Min.

PMA Pavement Mix No. IV (with PG 64E-22)

1. Contractor shall mount a device directly on the paver screed extension to provide a 30° beveled shoulder "safety edge."

2. For shoulder edge grade differences of less than 2", Safety Edge is not required, but shoulder shall be dressed according to detail.

3. The ground under the safety edge shall be compacted.

4. See specs 323, 324, and 325 for details.

92.16

99.98

99.68

2026 53

RECONSTRUCTION SCHEDULE

1 1

Note: See Typical Section Sheets for Reconstruction Type A, B, and C Details.

FEDERAL-AID PROJECT NO. STP-011-2(046)

STP-011-2(046)

OSHIRO ROAD TO ALII KOA STREET

Station Length (Linear Feet)

Width (Linear Feet)

Approximate Area (Square Feet)

From To

Station Length (Linear Feet)

Width (Linear Feet)

Approximate Area (Square Feet)

From To

Reconstruction Area (Inbound) Reconstruction Area (Outbound)

Reconstruction Type A

Reconstruction Type B

Reconstruction Type A

Reconstruction Type B

Reconstruction Type C

Date: March 2026

Typical Section

Typical Section

348+00

487+00

310+00

355+50

492+00

355+50

492+00

348+00

487+00

587+00

453+00

476+00

517+00

548+50

310+00

456+00

481+00

531+00

550+00

456+00

481+00

531+00

550+00

453+00

476+00

517+00

548+50

587+00

13868

13183

16500

11000

305096

290026

209000

24400

11000

30800

536800

44000

79200

38500

81400

VOLCANO ROAD REHABILITATION,

FED. ROAD

HAWAII HAW.

STATE

PROJ. NO.

FISCAL

YEAR

SHEET

NO.

TOTAL

SHEETSDIST. NO.

DEPARTMENT OF TRANSPORTATION

STATE OF HAWAII

SHEET No. OF SHEETS

92.16

99.68

2026 53

GUARDRAIL DETAILS & NOTES

Scale: NTS

1 2

FEDERAL-AID PROJECT NO. STP-011-2(046)

STP-011-2(046)

OSHIRO ROAD TO ALII KOA STREET

GENERAL NOTES

(Rail and washer not shown)

Offset Block or Blockout

STEEL POST AND BLOCK DETAIL

Exploded View

Guardrail

PLAN

ELEVATION

Offset Block or Blockout

Paved Shoulder

H

TYPICAL GUARDRAIL INSTALLATION

Guardrail Post

Slope

2'-0" Min.

Con't.

A

1.0'

1.0'

1"

5"

3" 90°

Slot " X 2"

2ƒ" e.s.

1'-0"

2'-1"

DIMENSION

HGUARDRAIL TYPE A

1'-6" 2'-78"

FBB03 guardrail bolt with recessed nut

Strong Post

(PWE01)

(PWE02)

Guardrail Post

Existing Ground

Parabolic Rounding

Grade & Compact at Fill Area

(See Note No. 7)

Pav't.

Design

Reflector Marker (RM-5) - Reflector Facing Traffic (Mounted on Guardrail Bolt)

A.C.

Filler

Fill/seal around post (See Note No. 6)

Type III or IV Retroreflective Sheeting (High Intensity);

Color of Retroreflective Sheeting shall conform to the color of the adjacent edge line

Prior to installing A.C. Mix. No. IV, level & remove vegetation and compact existing ground to 95% compaction

Fill Slope 2:1 Max.

Break Point

MGS w/ No Blockout MGS w/ Standard 8" Offset Block

4"

Approved Plastic Product

REFLECTOR MARKER (RM-5) DETAIL AND TYPICAL INSTALLATION

Additional Paved Area

1" HMA Pav't., Mix No. IV

Date: March 2026

VOLCANO ROAD REHABILITATION,

FED. ROAD

HAWAII HAW.

STATE

PROJ. NO.

FISCAL

YEAR

SHEET

NO.

TOTAL

SHEETSDIST. NO.

DEPARTMENT OF TRANSPORTATION

STATE OF HAWAII

SHEET No. OF SHEETS

HIGHWAYS DIVISION

FED. AID

1. All hardware, posts and fasteners shall be hot-dip zinc coated galvanized after fabrication. No punching, drilling or cutting will be permitted after galvanizing.

2. Where conditions require, special post lengths in…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .