STP-011-2(046) VOLCANO RD REHAB, OSHIRO RD TO ALII KOA ST
Solicitation number
B27000729
Issued by
Maui County, Hawaii

About this file

This addendum document is issued by the Hawaii Department of Transportation, Highways Division for Federal-Aid Project No. STP-011-2(046), which involves the rehabilitation of Volcano Road from Oshiro Road to Alii Koa Street in Maui County. The scope of work includes cold planing and resurfacing, reconstruction of weakened pavement areas, pavement marking and striping, guardrail improvements, and installation of milled rumble strips across approximately 2.77 miles (Station 310+00 to Station 587+00) in Hawaii's District 53. Final specifications and plans were posted on November 6, 2026, and bids were due on December 4, 2026. The project encompasses six reconstruction areas of varying types with approximate areas ranging from 30,800 to 536,800 square feet depending on type and location. Contractors must acknowledge receipt of this Addendum No. 1 by recording the date of receipt on PAGE P-4 of the Proposal.

Contractors are required to comply with Hawaii Department of Transportation Standard Specifications and applicable ASTM standards for asphalt mix design, pavement quality, rumble strip surface friction, and guardrail structural installation. The contractor assumes full responsibility for permits, licenses, utility verification, traffic control, environmental compliance including NPDES permits, survey monument restoration under licensed surveyor supervision, and community noise permits. Liquidated damages of up to $27,500 per day apply for non-compliance with water pollution and erosion control provisions. Traffic control requires coordination with the Hawaii District Police Department Special Duty Section and a minimum of two police officers per work zone location. Excavation activities require notice to the Hawaii One Call Center at least five working days in advance. All work is subject to inspection and testing before final acceptance and payment authorization, with daily inspection reports submitted to the project engineer.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please acknowledge receipt of this ADDENDUM NO. 1 by recording the date of its receipt in the space provided on PAGE P-4 of the Proposal.