Sedimentation Basin and Flocculator No. 2 Rehabilitation
Solicitation number
26-027NT
Issued by
Manatee County, Florida

About this file

Summary of Construction Drawings for Sedimentation Basin and Flocculator No. 2 Rehabilitation

This file consists of construction drawings prepared by the City of Bradenton Public Works and Utilities Department for the FY 2026 Sedimentation Basin No. 2 Rehabilitation project at the Bradenton Water Treatment Plant (5600 Natalie Way East, Bradenton, FL 34203). The project, identified as Project Number 40859000-563000-26511 and prepared by Professional Engineer Kristofer S. Eccles (PE License No. 99424), encompasses comprehensive rehabilitation of the sedimentation basin and flocculator infrastructure. The scope of work includes removal and reapplication of interior and exterior coatings through abrasive blasting in accordance with Specification 09960 (High Performance Coatings); epoxy injection repair of concrete sidewall cracking per Specification 03930 (Concrete Rehabilitation - Epoxy-Injected Crack Repair); cured-in-place pipe (CIPP) lining of three metal basin and flocculator drain pipes; removal, disassembly, modification, and reinstallation of two sedimentation basin mixer systems with new WesTech gearbox assemblies and steel flanged rake shafts; and removal and replacement of five flocculator mixers with new Anco mixers featuring 316 stainless steel paddles. The drawings include site plans, location maps, foundation plans, sectional details, and specifications detailing inlet baffle walls, drain configurations, mixer assemblies, flocculator components, and concrete encasement requirements.

The construction drawings contain six primary sheets (C-1 through C-6) with detailed design specifications, elevations, and scope notes documenting the contractor's required labor, materials, equipment, and services. The documents note that utilities must be located and marked through Sunshine 811 (www.sunshine811.com) at least two full business days before digging operations commence, and all work must comply with referenced specifications for high-performance coatings and concrete rehabilitation techniques. The drawings were digitally signed and sealed by the Professional Engineer on January 21, 2026, and establish the technical requirements and design parameters that form the basis for the associated construction contract solicitation.

View the file

Other files

File Type Posted
Sedimentation_Basin_and_Flocculator_No._2_Rehabilitation_(Addendum_#2_Revision).pdf PDF
Sedimentation_Basin_and_Flocculator_No._2_Rehabilitation_(Addendum_#1_Revision).pdf PDF
26-027NT_Pre-Bid_Sign-In_Sheet.pdf PDF
Sedimentation_Basin_and_Flocculator_No._2_Rehabilitation.pdf PDF
Technical_Specifications.pdf PDF
Detail_Sedimentation_Mixer_(WesTech)_.pdf PDF
Detail_Sedimentation_Mixer_(WesTech)_.pdf PDF
Detail_Sedimentation_Mixer_(WesTech)_.pdf PDF
Detail_Sedimentation_Mixer_(WesTech)_.pdf PDF
Detail_Flocculator_Mixer_2A_2B_(anco)_.pdf PDF
Detail_Flocculator_Rapid_Mixer_(anco).pdf PDF
Detail_Flocculator_Mixer_2C_2D_(anco).pdf PDF
Inspection_Report_Sedimentation_Basin_2_WTP_.pdf PDF
Detail_Flocculator_Rapid_Mixer_(anco).pdf PDF
Detail_Flocculator_Mixer_2A_2B_(anco)_.pdf PDF
Detail_Flocculator_Mixer_2A_2B_(anco)_.pdf PDF
Detail_Flocculator_Rapid_Mixer_(anco).pdf PDF
Detail_Flocculator_Mixer_2A_2B_(anco)_.pdf PDF
Detail_Flocculator_Mixer_2C_2D_(anco).pdf PDF
Detail_Flocculator_Rapid_Mixer_(anco).pdf PDF
Detail_Flocculator_Mixer_2C_2D_(anco).pdf PDF
Detail_Flocculator_Mixer_2C_2D_(anco).pdf PDF
Other_Contract_Forms.pdf PDF
Plans.pdf PDF
Supplementary_Conditions.pdf PDF
Standard_General_Conditions.pdf PDF
Inspection_Report_-_Sedimentation_Basin_2_-_WTP_-_251008.pdf PDF
Plans_-_Sedimentation_Basin_No._2_Rehab_260121.pdf PDF
Specs_-_Sedimentation_Basin_No_2.pdf PDF
Detail_-_Flocculator_Mixer_2C_2D_(anco).PDF PDF
Detail_-_Flocculator_Rapid_Mixer_(anco).PDF PDF
Detail_-_Flocculator_Mixer_2A_2B_(anco).pdf PDF
Detail_-_Sedimentation_Mixer_(WesTech).pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2025 M icrosoft Corporation © 2025 M axar © CNES (2025) Distribution Airbus DS ©

2025 TM

AP M

O BILITY Earthstar Geographics SIO

CONSTRUCTION DRAWINGS

MANATEE

COUNTY

p

BRADENTON

o o

CITY OF BRADENTON

PREPARED BY:

PUBLIC WORKS and UTILITIES DEPARTMENT

JANUARY, 2026

PROJECT NUMBER: 40859000-563000-26511

LOCATION MAP

SITE VICINITY MAP

FY 2026 SEDIMENTION BASIN No. 2

REHABILITATION

CITY OF BRADENTON

WATER TREATMENT PLANT

PROJECT AREA

5600 NATALIE WAY EAST

BRADENTON, FL 34203

BID DOCUMENTS

KRISTOFER S. ECCLES. P.E.

P.E. NO.: 99424

CITY OF BRADENTON

888 13TH AVENUE EAST

BRADENTON, FL 34208

(941) 708-6300

TH

E O

F F

IC

IA

L

R E C

OR

D O

F T

H

IS

S H E E T

IS

T

H E E

LE

C

TR

ON

IC

F

IL

E D

IG

IT

AL

LY

S

IG

N E D A

N D S

E

AL

E D U

N D E R R

U

LE

1G

-2

3.

4, F

.A .C

F il en am e:

Y

W

AT

E R T

R E

AT

M E N T

P

LA

N T\

E N

GI

N E E R

IN

G\

S

E D

IM

E N T

B

AS

IN

R

E H

AB

\B -D

E S

IG

N \S

E D

IM

E N T

B

AS

IN

R

E H

AB

.D W G

S av ed o n:

/2 1/

:3 6:

A M B y:

S

_S

IB

E R T

D at e P lo tt ed

1/

/2

8:

:1

AM

KR

ISTOFER S. ECCLES

P R

O

FESS I ON A L ENGIN

EE

R

F L O R I D A

L I C E N S E

No 99424

STATE OF

ENGINEER OF RECORD:

THIS ITEM HAS BEEN DIGITALLY

SIGNED AND SEALED BY

KRISTOFER S. ECCLES, PE ON THE

DATE ADJACENT TO THE SEAL.

SIGNATURE MUST BE VERIFIED ON

ANY ELECTRONIC COPIES.

S.R. 70

N

AT

AL

IE

W

AY

E

AS

T

EVERS RESERVOIR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MANATEE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MYAKKA

AutoCAD SHX Text

RIVER

AutoCAD SHX Text

AutoCAD SHX Text

RIVER

AutoCAD SHX Text

© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 TMAP MOBILITY Earthstar Geographics SIO

SITE PLAN

GRAPHIC SCALE

F il en am e:

Y

W

AT

E R T

R E

AT

M E N T

P

LA

N T\

E N

GI

N E E R

IN

G\

S

E D

IM

E N T

B

AS

IN

R

E H

AB

\B -D

E S

IG

N \S

E D

IM

E N T

B

AS

IN

R

E H

AB

.D W G

S av ed o n:

/2 1/

:3 6:

A M B y:

S

_S

IB

E R T

D at e P lo tt ed

1/

/2

8:

:1

AM

Call 811 or www.sunshine811.com two full business days before digging to have utilities located and marked.

Check positive response codes before you dig!

CITY OF BRADENTON

PUBLIC WORKS DEPARTMENT

2026 Sedimentation Basin No. 2 Rehabilitation

SEDIMENTATION AND FLOCCULATOR No. 2

SEDIMENTATION AND FLOCCULATOR No. 1

SEDIMENTATION AND FLOCCULATOR No. 4

SEDIMENTATION AND FLOCCULATOR No. 3 N.I.C.N.I.C.

N.I.C.

THIS ITEM HAS BEEN DIGITALLY

SIGNED AND SEALED BY

KRISTOFER S. ECCLES, PE ON

THE DATE ADJACENT TO THE

SEAL.

SIGNATURE MUST BE VERIFIED

ON ANY ELECTRONIC COPIES.

AutoCAD SHX Text

SCALE

AutoCAD SHX Text 1"=30'

AutoCAD SHX Text

DWG. NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text H

AutoCAD SHX Text 1"=30'

AutoCAD SHX Text C-1

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

BY

AutoCAD SHX Text

KRISTOFER S. ECCLES, P.E.

AutoCAD SHX Text 888 13th AVENUE EAST BRADENTON, FLORIDA 34208 (941) 708-6300

AutoCAD SHX Text

SIBE

AutoCAD SHX Text K.S.E.

AutoCAD SHX Text K.S.E.

AutoCAD SHX Text

MONTH, YEAR

AutoCAD SHX Text 40859000-563000-26511

P.E. NO.: 99424

40'-0"40'-0" 12"

5'-0" 1'-4"

1'-6" 20'-0"

91'-8"

'-0

20'-0" RADIUS

1:12 SL

OPE20'-0" RADIUS

1:12 SL

OPE

'-8

2'-0"

SQ.

91'-8"

1'-6" 9'-0"11'-0"20'-0"20'-0"20'-0"

12" 5'-0"

1'-4"

1'-6"

1'-4"

2'-6"

DIA.

3'-0"

DIA.

12"

DIA.2'

-4

1' -6

SECTION

TYPICAL FOUNDATION PLAN (4 REQ'D)

GROUT THICKNESS

VARIES IN THIS AREA

INLET BAFFLE WALL

'-0

'-0

1' -6

1'

-4

1' -6

" 1' -4

1'-6"

1'-4"

CONCRETE ENCASEMENT

UNDER STRUCTURE

(PIPE ROTATED FOR CLARITY)

ELEVATION 19.61

℄ ELEVATION 21.21

EXISTING GRADE℄= 20.72

SLOPE TO ℄ 21.21

@ PUMP

ROTATED FOR CLARITY

'-0

6" METAL PIPE TO

BE CIPP LINED

(SEE NOTE 1)

6" METAL PIPE TO

BE CIPP LINED

(SEE NOTE 1)

40'-0"

Scope of Work:

Note 1:

Item 3c. Sedimentation Basin / Flocculator Rehabilitation – CIPP Drain Lining - The Contractor shall furnish all labor, materials, equipment, and services necessary to install a Cured-In-Place Pipe (CIPP) lining in the three (3) metal basin / flocculator drains, including but not limited to the following:

Excavate flocculator drain valve for removal and pipe access.

Cleaning and preparation of existing metal drain pipes to remove debris, corrosion, scale, and other obstructions that could interfere with CIPP installation.

Inspection of pipe conditions and identification of pipe defects requiring repair prior to lining.

Installation of a flexible resin-saturated liner designed for CIPP application, sized to match the existing pipe diameter.

Testing and inspection of the lined pipe, including visual inspection, tightness, and verification of structural integrity.

Protection of adjacent structures and surfaces during installation, and proper disposal of debris and waste generated during cleaning and installation.

SEDIMENTATION FOUNDATION

PLANF

il en am e:

Y

W

AT

E R T

R E

AT

M E N T

P

LA

N T\

E N

GI

N E E R

IN

G\

S

E D

IM

E N T

B

AS

IN

R

E H

AB

\B -D

E S

IG

N \S

E D

IM

E N T

B

AS

IN

R

E H

AB

.D W G

S av ed o n:

/2 1/

:3 6:

A M B y:

S

_S

IB

E R T

D at e P lo tt ed

1/

/2

8:

:1

AM

Call 811 or www.sunshine811.com two full business days before digging to have utilities located and marked.

Check positive response codes before you dig!

CITY OF BRADENTON

PUBLIC WORKS DEPARTMENT

THIS ITEM HAS BEEN DIGITALLY

SIGNED AND SEALED BY

KRISTOFER S. ECCLES, PE ON

THE DATE ADJACENT TO THE

SEAL.

SIGNATURE MUST BE VERIFIED

ON ANY ELECTRONIC COPIES.

2026 Sedimentation Basin No. 2 Rehabilitation

AutoCAD SHX Text

SCALE

AutoCAD SHX Text 1"=10'

AutoCAD SHX Text

DWG. NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text C-2

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

BY

AutoCAD SHX Text

MONTH, YEAR

AutoCAD SHX Text 40859000-563000-26511

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

KRISTOFER S. ECCLES, P.E.

AutoCAD SHX Text 888 13th AVENUE EAST BRADENTON, FLORIDA 34208 (941) 708-6300

AutoCAD SHX Text

P.E. NO.: 99424

AutoCAD SHX Text K.S.E.

AutoCAD SHX Text K.S.E.

SIBE

9'-0"11'-0"20'-0"20'-0"20'-0" 12"

5'-0" 1'-4"

1'-6" 1'-4"

2'-6"

DIA.

3'-0"

DIA.

12"

DIA.2'

-4

1' -6

36"

18"

WATER LINE

S.S. SWAY CABLES

S.S. SWAY CABLESLAUNDER

4" Ø SCH.80

ALUM. PIPE

S.S. SWAY CABLES

FLIGHTS

SQUEEGE

CONCENTRATOR

DRIVE UNIT 2B

(SEE NOTE 2)

CONCRETE FOOTING

29'-0"

'-8

28'-0"

WATER LINE

FLOCCULATOR No. 2

SECTION

SEDIMENTATION BASIN No. 2

SECTION

10'-0"

DRIVE UNIT 2A

(SEE NOTE 2)

INSTALL FLANGE

INSTALL FLANGE

INSTALL STAINLESS

STEEL RAKE SHAFT

INSTALL FLANGE

INSTALL FLANGE

INSTALL 6"

STEEL RAKE SHAFT

EXISTING GROUT

MIXER UNITS 2A/2B

(SEE NOTE 1)

MIXER UNITS 2C/2D

(SEE NOTE 1)

4" SLUDGE LINE RAKE ARM

RAPID MIXER 2

12'-6"±

Note 2:

Item 4a. Sedimentation Mixers – Removal and Disassembly - The Contractor shall furnish all labor, materials, equipment, and services necessary to remove and disassemble and the two (2) existing sedimentation basin mixer systems, including but not limited to:

Removal of the existing mixer gearbox and rake arm assemblies from the basin.

Protection of coated and mechanical components during handling and installation, and disposal of removed materials not designated for reuse.

Item 4b. Sedimentation Mixers – Modification and Coating - The Contractor shall furnish all labor, materials, equipment, and services necessary to modify and re-coat two (2) existing sedimentation basin mixer systems as outlined in Specification 09960 – High Performance Coatings, including but not limited to:

Separation of the two bottom rake arm assemblies from the existing shafts.

Installation of steel flanges to the existing rake arms Furnish and install a new steel flanged rake shafts, including all required fasteners and accessories.

Surface preparation and NSF-approved coating of the rake arm assemblies, including abrasive blasting of the bottom rake arm component, in accordance with Specification 09960 – High Performance Coatings.

Item 4c. Sedimentation Mixers – Reinstallation - The Contractor shall furnish all labor, materials, equipment, and services necessary to re-install the two (2) sedimentation basin mixer systems, including but not limited to:

Furnish and install new WesTech gearbox / gear drive assemblies, compatible with the existing mixer system.

Reassembly of the rake arm assembly and associated components following completion of modifications and coating.

Reinstallation of the mixer assembly, including alignment, connection to existing supports, and electrical connections.

Testing, adjustment, and commissioning of the mixer system to verify proper operation.

Protection of coated and mechanical components during handling and installation, and disposal of removed materials not designated for reuse.

Scope of Work:

Note 1:

Item 5. Flocculation Mixers – Replacement - The Contractor shall furnish all labor, materials, equipment, and services necessary to remove and replace the five (5) existing flocculator mixers, including but not limited to:

Removal of the existing mixer geardrives mixer assemblies from the flocculator.

Furnish five (5) new Anco mixers with 316 Stainless paddles, compatible with the existing mixer system.

Reinstallation of the mixers, including alignment, connection to existing supports, and electrical connections.

Testing, adjustment, and commissioning of the mixers to verify proper operation.

Protection of coated and mechanical components during handling and installation, and disposal of removed materials not designated for reuse

SEDIMENTATION SECTION PLAN

F il en am e:

Y

W

AT

E R T

R E

AT

M E N T

P

LA

N T\

E N

GI

N E E R

IN

G\

S

E D

IM

E N T

B

AS

IN

R

E H

AB

\B -D

E S

IG

N \S

E D

IM

E N T

B

AS

IN

R

E H

AB

.D W G

S av ed o n:

/2 1/

:3 6:

A M B y:

S

_S

IB

E R T

D at e P lo tt ed

1/

/2

8:

:0

AM

Call 811 or www.sunshine811.com two full business days before digging to have utilities located and marked.

Check positive response codes before you dig!

CITY OF BRADENTON

PUBLIC WORKS DEPARTMENT

THIS ITEM HAS BEEN DIGITALLY

SIGNED AND SEALED BY

KRISTOFER S. ECCLES, PE ON

THE DATE ADJACENT TO THE

SEAL.

SIGNATURE MUST BE VERIFIED

ON ANY ELECTRONIC COPIES.

2026 Sedimentation Basin No. 2 Rehabilitation

AutoCAD SHX Text

SCALE

AutoCAD SHX Text 1"=10'

AutoCAD SHX Text

DWG. NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text C-3

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

BY

AutoCAD SHX Text

MONTH, YEAR

AutoCAD SHX Text 40859000-563000-26511

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

KRISTOFER S. ECCLES, P.E.

AutoCAD SHX Text 888 13th AVENUE EAST BRADENTON, FLORIDA 34208 (941) 708-6300

AutoCAD SHX Text

P.E. NO.: 99424

AutoCAD SHX Text K.S.E.

AutoCAD SHX Text K.S.E.

SIBE

FL

O

CC

U

LA

TO

R

LAUNDER

LAUNDER SUPPORT

SQUEEGEE

S.S. SWAY CABLES

S.S. SWAY CABLES

S.S. SWAY CABLES

50'-0"

R O T A T I O N

R O T A T I O N

SQUEEGEE

SITE PLAN

F il en am e:

Y

W

AT

E R T

R E

AT

M E N T

P

LA

N T\

E N

GI

N E E R

IN

G\

S

E D

IM

E N T

B

AS

IN

R

E H

AB

\B -D

E S

IG

N \S

E D

IM

E N T

B

AS

IN

R

E H

AB

.D W G

S av ed o n:

/2 1/

:3 6:

A M B y:

S

_S

IB

E R T

D at e P lo tt ed

1/

/2

8:

:0

AM

Call 811 or www.sunshine811.com two full business days before digging to have utilities located and marked.

Check positive response codes before you dig!

CITY OF BRADENTON

PUBLIC WORKS DEPARTMENT

THIS ITEM HAS BEEN DIGITALLY

SIGNED AND SEALED BY

KRISTOFER S. ECCLES, PE ON

THE DATE ADJACENT TO THE

SEAL.

SIGNATURE MUST BE VERIFIED

ON ANY ELECTRONIC COPIES.

2026 Sedimentation Basin No. 2 Rehabilitation

AutoCAD SHX Text

SCALE

AutoCAD SHX Text 1"=10'

AutoCAD SHX Text

DWG. NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text C-4

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

BY

AutoCAD SHX Text

MONTH, YEAR

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

KRISTOFER S. ECCLES, P.E.

AutoCAD SHX Text 888 13th AVENUE EAST BRADENTON, FLORIDA 34208 (941) 708-6300

AutoCAD SHX Text

P.E. NO.: 99424

AutoCAD SHX Text K.S.E.

AutoCAD SHX Text K.S.E.

AutoCAD SHX Text

SIBE

40859000-563000-26511

FLOCCULATOR No. 2

10'-0"

SEDIMENTATION BASIN No. 236

'-0

80'-0" 12"

5'-0"

'-0

28'-0"

28'-0"

12'-6"24'-0"28'-0"45'-0"49'-6"56'-0"63'-6"

'-0

'-0

'-6

9'-2" 15'-0" 26'-0" 31'-8" 38'-10" 45'-2" 52'-2" 56'-2" 64'-0" 71'-10"

'-0

APPROXIMATE LOCATION OF

CRACKS ON OUTSIDE OF TANK

(TYPICAL)

FLOCCULATOR No. 2 MIXER 2A

FLOCCULATOR No. 2 MIXER 2D

FLOCCULATOR No. 2 MIXER 2B

FLOCCULATOR No. 2 MIXER 2C

RAPID MIXER No. 2

1 1

LINE 4" DRAIN PIPE

Scope of Work:

Note 1:

Item 3a. Sedimentation Basin / Flocculator Rehabilitation – Coating Removal - The Contractor shall furnish all labor, materials, equipment, and services necessary to prepare the existing structure as outlined in Specification 09960 – High Performance Coatings, including but not limited to:

Removal of existing interior coatings and contaminants through abrasive blasting.

Removal of loose or failing exterior coatings Surface preparation of exterior piping, including both metal and PVC piping Protection of adjacent surfaces and proper disposal of waste materials generated during repair operations.

Item 3d. Sedimentation Basin / Flocculator Rehabilitation – Interior Coating - The Contractor shall furnish all labor, materials, equipment, and services necessary to re-coat the basin as outlined in Specification 09960 – High Performance Coatings, including but not limited to:

Application of a NSF-approved coatings to prepared interior concrete sidewalls.

Verification of surface preparation prior to coating application Performance of quality control activities, including wet film thickness measurements.

Protection of adjacent surfaces during coating operations and final cleaning, touch-up, and restoration of coated surfaces to a uniform, continuous, and defect-free condition.

Note 2:

Item 3e. Sedimentation Basin / Flocculator Rehabilitation – Exterior Coating - The Contractor shall furnish all labor, materials, equipment, and services necessary to re-coat the basin as outlined in Specification 09960 – High Performance Coatings, including but not limited to:

Application of coatings to prepared exterior concrete, steel, and piping surfaces, including both metal and PVC.

Exterior coating colors shall match the existing color of adjacent surfaces. Color matching shall be verified and approved prior to application.

Verification of surface preparation prior to coating application

Note 3:

Item 3b. Sedimentation Basin / Flocculator Rehabilitation – Sidewall Crack Repair - The Contractor shall furnish all labor, materials, equipment, and services necessary to repair concrete basin sidewall cracking by epoxy injection as outlined in Specification 03930 – Concrete Rehabilitation – Epoxy-Injected Crack Repair, including but not limited to:

Evaluation, cleaning, and preparation of cracks designated for repair, including removal of contaminants, coatings, and debris.

Injection of an approved, low-viscosity, moisture-tolerant structural epoxy suitable for the crack width and service conditions, injected under controlled pressure to ensure full penetration through the depth of the crack.

Removal of surface seals and injection ports after epoxy curing, and preparation of repaired areas to receive subsequent coatings in accordance with Specification 09960 – High Performance Coatings.

Protection of adjacent surfaces and proper disposal of waste materials generated during repair operations.

Performance of quality control activities, including wet film thickness measurements.

Protection of adjacent surfaces during coating operations and final cleaning, touch-up, and restoration of coated surfaces to a uniform, continuous, and defect-free condition.

SITE PLAN

F il en am e:

Y

W

AT

E R T

R E

AT

M E N T

P

LA

N T\

E N

GI

N E E R

IN

G\

S

E D

IM

E N T

B

AS

IN

R

E H

AB

\B -D

E S

IG

N \S

E D

IM

E N T

B

AS

IN

R

E H

AB

.D W G

S av ed o n:

/2 1/

:3 6:

A M B y:

S

_S

IB

E R T

D at e P lo tt ed

1/

/2

8:

:5

AM

Call 811 or www.sunshine811.com two full business days before digging to have utilities located and marked.

Check positive response codes before you dig!

CITY OF BRADENTON

PUBLIC WORKS DEPARTMENT

THIS ITEM HAS BEEN DIGITALLY

SIGNED AND SEALED BY

KRISTOFER S. ECCLES, PE ON

THE DATE ADJACENT TO THE

SEAL.

SIGNATURE MUST BE VERIFIED

ON ANY ELECTRONIC COPIES.

2026 Sedimentation Basin No. 2 Rehabilitation

AutoCAD SHX Text

SCALE

AutoCAD SHX Text 1"=10'

AutoCAD SHX Text

DWG. NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text C-5

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

BY

AutoCAD SHX Text

MONTH, YEAR

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

KRISTOFER S. ECCLES, P.E.

AutoCAD SHX Text 888 13th AVENUE EAST BRADENTON, FLORIDA 34208 (941) 708-6300

AutoCAD SHX Text

P.E. NO.: 99424

AutoCAD SHX Text K.S.E.

AutoCAD SHX Text K.S.E.

AutoCAD SHX Text

SIBE

31'-0"

'-8

29'-0"

'-8

4'-0"

4" SLUDGE LINE

29'-0"

'-8

28'-0"

WATER LINE

2'-6"2'-6"

2' -0

2' -0

2'-6"

2' -0

WATER LINE

4' WALKWAY 4' WALKWAY

FLOCCULATOR 2 SECTION - 1

FLOCCULATOR 2 SECTION - 2

FLOCCULATOR 2 SECTION - 3

8"

6" ℄ ELEVATION 23.48

ELEVATION 26.32

FLOCCULATOR DRAIN

DETAIL

SEDIMENTATION BASIN

DRAIN DETAIL

CONCRETE ENCASEMENT

UNDER STRUCTURE

(TYPICAL)

℄= 20.72

SLOPE TO ℄ 21.21

@ PUMP

12'±

EXCAVATE AND REMOVE

EXISTING VALVE FOR CIPP

LINING OF 4" PIPE.

REPLACE VALVE WHEN

LINING IS COMPLETE

PORTION OF PIPE

TO BE CIPP LINED

FLOCCULATOR SECTION PLAN

GRAPHIC SCALE

F il en am e:

Y

W

AT

E R T

R E

AT

M E N T

P

LA

N T\

E N

GI

N E E R

IN

G\

S

E D

IM

E N T

B

AS

IN

R

E H

AB

\B -D

E S

IG

N \S

E D

IM

E N T

B

AS

IN

R

E H

AB

.D W G

S av ed o n:

/2 1/

:3 6:

A M B y:

S

_S

IB

E R T

D at e P lo tt ed

1/

/2

8:

:5

AM

Call 811 or www.sunshine811.com two full business days before digging to have utilities located and marked.

Check positive response codes before you dig!

CITY OF BRADENTON

PUBLIC WORKS DEPARTMENT

THIS ITEM HAS BEEN DIGITALLY

SIGNED AND SEALED BY

KRISTOFER S. ECCLES, PE ON

THE DATE ADJACENT TO THE

SEAL.

SIGNATURE MUST BE VERIFIED

ON ANY ELECTRONIC COPIES.

2026 Sedimentation Basin No. 2 Rehabilitation

AutoCAD SHX Text

SCALE

AutoCAD SHX Text 1"=10'

AutoCAD SHX Text

DWG. NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text H

AutoCAD SHX Text 1"=10'

AutoCAD SHX Text C-6

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

BY

AutoCAD SHX Text

MONTH, YEAR

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

KRISTOFER S. ECCLES, P.E.

AutoCAD SHX Text 888 13th AVENUE EAST BRADENTON, FLORIDA 34208 (941) 708-6300

AutoCAD SHX Text

P.E. NO.: 99424

AutoCAD SHX Text K.S.E.

AutoCAD SHX Text K.S.E.

AutoCAD SHX Text

SIBE

Sheets and Views
Sediment Basin Rehab-G-1 COVER
Sediment Basin Rehab-C-1
Sediment Basin Rehab-C-2
Sediment Basin Rehab-C-3
Sediment Basin Rehab-C-4
Sediment Basin Rehab-C-5
Sediment Basin Rehab-C-6