About this file

This document provides details for a federal solicitation seeking demolition services. The U.S. Army Corps of Engineers, New England District is issuing an unrestricted Invitation for Bid for the demolition and disposal of the India Point Bridge over the Seekonk River in Providence, Rhode Island. The project consists of demolishing the remaining portion of the 181-foot long, 36-foot wide steel and concrete bridge down to roughly two feet below the mudline, including removal of five circular supports and abandoned supports except for the granite rock abutment. Demolition of the steel superstructure and timber pilings and fender system is required. The period of performance is 180 calendar days with all work to be completed within a six-month period. The solicitation number is W912WJ22B0020 and is available through the System for Award Management and Procurement Integrated Enterprise Environment websites. A site visit is scheduled for September 26, 2022 at 10:00 am.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
W912WJ22B0020 Amendment 0002.pdf PDF
PT190.pdf PDF
W912WJ22B0020 Amendment 0001.pdf PDF
W912WJ22B0020.pdf PDF
Specs September 2022.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

New England District

SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND APPROVAL

OF ALL DRAWINGS IN THIS SET AS INDEXED ON THIS SHEET

APPROVED FOR TECHNICAL ADEQUACY BY:

TECHNICAL LEAD ENGINEER DATE

DATE

DATE

DATE

DATE

APPROVED BY:

APPROVAL RECOMMENDED BY:

CHIEF, ENGINEERING DIVISION

This project was designed by the U.S. Army Corps of Engineers. The initials or signatures and registration designations of individuals appear on these project documents, within the scope of their employment as required by ER 1110-1-8152.

REVIEWED BY:

CHIEF, GEOTECHNICAL/WATER RESOURCES BRANCH

REVIEWED BY:

CHIEF, DESIGN BRANCH

CHIEF, GEO-ENVIRONMENTAL ENGINEERING BRANCH

DATE

APPROVED BY:

CHIEF, TECHNICAL SUPPORT BRANCH/DEPUTY CHIEF ENG DIV

DEMOLITION OF INDIA POINT RAILROAD BRIDGE

SEEKONK RIVER

PROVIDENCE, RHODE ISLAND

W912WJ22B0002

JUNE 2022

EXISTING CONDITIONS AND HYDROGRAPHIC SURVEY

DEMOLITION SITE PLAN

DESIGN FILESHEET NO.

G-001

INDEX TO DRAWINGS

SHEET TITLE

C-101

C-102

PT-198_G-001.DWG COVER SHEET AND INDEX

PT-198_C-101.DWG

PT-198_C-102.DWG

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C T

N

O

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers

U S

A

R M

Y

C

O R

P S

F

E

N G

I N

E E

R S

N E

W

E

N G

L A

D

I S

T R

I C

T

V

I R

G I N

A

R

A

D

C O

N C

O R

D

M

A

S C

A L E

S

H E

E T

D R

A W

I N

G

C

O D

E

O F

D E

M O

L I T

I O

N

O

F

I N

D

I N

T

R

A I L R

O A

D

B

R I D

G E

S E

E K

O N

K

R

I V

E R

P R

O V

I D

E N

C E

R

H O

E

L A

N D

P T

G-001

C O

V E

R

S

H E

D E

X

B M

J A

F A

R I

B M

J A

F A

R I

L T

H I B

O D

E A

U

L

T

H I B

O D

E A

U

A N

S I

D

J U

LOCATION MAP

VICINITY MAP

NOT TO SCALE

NOT TO SCALE

PROJECT LOCATION

SEEKONK RIVER

NNNN

DESIGN FILESHEET NO.

REFERENCE DRAWINGS

TITLE

PT-190 DEMOLITION OF INDIA POINT RAILROAD BRIDGE - 3 SHEETS

W W

J B

BANGOR

CANADA

MAINE

AUGUSTA

PORTLAND

HAMPSHIRE

NEW

CONCORD

PORTSMOUTH

ATLANTIC

OCEAN

PROJECT

LOCATION

CONN.

HARTFORD

MASSACHUSETTS

VT.

BOSTON

PROV.

R.I.

AutoCAD SHX Text

CAPE

AutoCAD SHX Text

COD

E6EPDLPT

Typewritten Text

LPT

E6EPDLPT

Typewritten Text N/A

E6EPDLPT

Typewritten Text N/A

E6EPDLPT

Typewritten Text N/A

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

CABLE TOWER

M

A

U

R

V

E

N

U

E

P

I

A

D

E

A

O

V

I D

E

N

C

E

Y

A

C

H

L

U

B

EAST PROVIDENCE

INDIA POINT

O

V

E

R

H

E

W

B

U

C

A

B

P

L

I

E

A

S

E

E

K

O

K

V

E

R

W

A

T

E

R

F

R

O

F

L

O

O

D

E

B

B

CABLE TOWER

17.2

23.1

24.8

7.7

13.8

14.2

16.2

25.1

23.0

19.8

12.2

18.4

15.8

21.8

12.9

18.3

24.9

6.7

23.2

20.2

11.6

17.4

14.5

11.6

25.1

20.3

23.1

19.3

6.4

23.3

21.5

10.7

16.9

23.1

23.6

24.8

23.1

21.3

15.0

20.7

19.6

12.6

10.1

6.0

17.3

23.0

24.7

24.1

22.0

22.8

15.3

12.4

14.2

10.7

21.4

19.2

23.7

14.8

21.7

5.4

21.8

24.7

17.6

12.7

17.2

22.9

10.0

24.9

22.0

16.4

23.9

5.0

18.8

23.0

20.0

14.2

8.7

23.9

21.8

18.0

14.2

20.8

22.7

6.2

23.4

11.6

22.0

15.7

24.2

8.3

17.6

22.6

20.2

21.3

8.6

23.3

22.8

24.0

12.8

8.7

14.0

22.9

18.3

23.3

17.2

9.8

24.6

24.4

7.7

23.3

16.6

19.8

20.8

23.5

21.8

21.9

23.1

14.7

11.4

16.9

26.2

6.8

19.7

24.6

20.7

23.4

25.0

18.0

26.9

21.7

25.8

17.7

11.9

25.7

15.3

20.1

23.1

23.3

23.1

4.4

18.6

28.2

12.6

17.2

22.2

26.7

27.5

22.3

22.4

4.1

20.9

24.6

17.4

13.5

17.4

23.7

28.2

19.2

16.3

29.4

4.4

22.6

18.7

20.8

22.2

14.3

26.5

24.6

23.8

4.4

17.4

18.6

24.9

5.8

19.6

28.1

17.5

21.8

7.4

23.3

25.6

21.1

23.3

26.1

29.4

14.1

14.9

19.1

26.4

11.6

17.8

4.1

25.8

18.9

22.7

4.9

5.9

18.5

20.4

23.4

17.6

15.4

21.6

28.4

6.0

14.8

27.7

26.0

6.7

23.8

15.4

26.0

21.5

15.6

28.9

27.3

11.6

17.2

16.3

19.4

13.6

28.2

24.4

24.5

23.1

10.4

21.3

24.0

25.4

20.2

21.8

21.0

23.6

17.3

6.0

29.7

26.0

17.0

10.3

11.7

19.8

11.8

6.7

23.2

21.5

23.1

8.0

16.6

22.3

26.3

22.8

24.3

18.6

22.6

18.5

12.8

8.2

9.7

24.9

12.4

20.2

28.7

19.8

21.9

24.2

11.0

31.1

23.2

17.9

16.5

25.1

20.0

24.3

24.9

20.1

14.9

21.5

21.5

18.5

15.0

16.4

25.0

10.1

17.3

18.0

23.9

18.5

27.2

15.1

19.3

21.6

32.5

19.1

26.4

29.9

18.5

19.5

24.2

19.0

27.6

18.0

25.4

23.9

26.8

19.6

9.8

22.7

24.9

21.2

25.2

24.6

15.4

30.8

18.9

30.2

26.6

20.0

25.5

26.3

30.4

18.0

30.2

31.0

19.3

10.5

14.2

21.4

26.2

17.3

27.5

32.0

25.3

27.6

26.4

24.9

32.1

30.8

24.3

11.1

33.0

19.4

23.5

25.9

15.4

25.3

26.1

27.7

27.4

18.3

11.4

28.0

34.3

19.6

30.7

28.2

18.6

30.4

22.9

15.9

11.7

22.3

20.4

17.6

26.9

27.8

19.7

25.8

15.7

27.3

15.8

33.4

12.1

27.1

25.6

20.4

16.7

23.1

26.0

18.0

26.2

12.1

14.4

22.1

26.5

18.6

23.0

13.1

14.0

26.3

15.2

25.7

26.3

28.1

24.3

24.6

25.6

25.0

25.2

23.6

26.2

22.6

24.8

24.1

23.9

22.0

23.0

22.9

23.8

22.2

20.8

21.5

23.0

23.6

18.9

21.2

22.0

19.9

21.2

20.2

18.8

20.0

18.0

18.8

19.2

18.2

16.0

32.7

9.6

8.5

23.6

17.8

28.1

31.3

32.7

19.3

25.8

20.8

21.5

33.6

22.3

30.4

26.7

28.0

30.5

25.4

22.8

21.8

25.2

32.6

24.3

27.3

32.0

26.5

26.3

25.3

27.4

24.6

22.2

23.2

20.1

29.3

28.0

29.9

23.3

21.6

21.8

21.5

27.4

19.2

24.4

29.3

24.8

24.8

28.9

23.5

25.2

28.1

26.0

27.4

18.3

26.5

20.5

17.9

17.0

19.1

18.9

25.2

25.3

23.6

16.2

18.7

16.3

19.6

18.2

16.0

20.6

23.4

22.0

23.9

19.4

19.6

19.2

14.2

20.1

20.1

24.8

21.5

12.3

18.1

12.5

12.3

20.4

23.4

19.4

23.6

24.2

22.7

24.9

24.7

18.1

19.8

17.4

18.3

21.8

9.4

18.4

23.7

16.1

11.9

23.3

18.1

9.9

12.3

10.3

10.5

21.1

20.2

19.6

17.2

18.7

10.5

10.6

14.8

18.2

9.6

20.5

10.4

10.6

19.3

17.2

10.8

19.0

10.6

16.4

9.4

10.1

13.0

17.9

9.8

18.2

9.9

10.4

16.8

18.1

18.4

14.3

7.2

8.9

15.1

5.4

16.4

6.9

8.8

9.9

11.7

7.1

14.7

14.1

12.6

10.1

6.6

4.4

4.1

4.0

8.6

10.0

4.1

8.0

2.5

7.6

7.5

7.5

2.4

2.7

4.2

3.6

3.2

3.4

3.6

3.7

3.8

3.5

2.9

4.8

7.1

8.0

7.4

7.9

3.0

3.3

3.6

R

A

I L

R

O

B

I D

G

E

PHOTO DIRECTION AND LOCATION

INDICATOR (TYP); SEE PHOTOS IN

SPECIFICATIONS

N

GENERAL NOTES:

1. SOUNDINGS ARE IN FEET AND ARE REFERENCED FROM MEAN

LOWER LOW WATER (MLLW) PLANE.

2. THE SOUNDING INFORMATION ON THIS MAP REPRESENTS THE

SHOALEST SOUNDINGS OF THOSE OBTAINED FROM THE

HYDROGRAPHIC SURVEY.

3. HORIZONTAL COORDINATE SYSTEM REFERENCES RHODE ISLAND

STATE PLANE COORDINATE SYSTEM NAD83.

4. THE INFORMATION ON THIS MAP CAN ONLY BE CONSIDERED AS

GENERAL EXISTING CONDITIONS AT THE TIME OF SURVEY DATED

01-22-2020.

5. CABLE AUTH CL 130 REFERENCES MLW DATUM. THE DIFFERENCE

BETWEEN MLLW AND MLW IN THIS LOCATION IS 0.17 FEET.

EXISTING CONDITIONS AND HYDROGRAPHIC SURVEY

SCALE: 1" = 50'

A7

50' 100'0

N 267500

N 267000

E

E

E

N 267000

N 267500

E

E

C-101

X

I S

T I N

G

C

O N

D I T

I O

D

H Y

D R

O G

R A

P H

R

V E

Y

B M

J A

F A

R I

B M

J A

F A

R I

L T

H I B

O D

E A

U

L

T

H I B

O D

E A

U

N

S I

D

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

N E

W

E

N G

L A

S

T R

I C

T

V

I R

G I N

A

D

C O

N C

O R

D

M

A

S C

A L

E

S H

E E

T

D R

A W

I N

G

C

O D

E

O F

D E

M O

L I T

I O

N

O

F

I N

D

I N

T

R

A I L

R O

I D

G E

S E

E K

O N

K

R

I V

E R

P R

O V

I D

E N

C E

R

H O

L A

N D

P T

W

W J

B

J U

E6EPDLPT

LPT

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

CABLE TOWER

M

A

U

R

V

E

N

U

E

P

I

A

D

E

A

O

V

I D

E

N

C

E

Y

A

C

U

B

EAST PROVIDENCE

INDIA POINT

O

V

E

R

H

E

W

B

C

A

B

P

L

I

E

A

S

E

E

K

O

K

V

E

R

W

A

T

E

R

F

R

O

F

L

O

O

D

E

B

B

CABLE TOWER

A5

SCALE: 1" = 50'

DEMOLITION SITE PLAN

50' 100'0

LIMITS OF STRUCTURAL REMOVAL

LIMITS OF WORK

C-102

D E

M O

L I T

I O

N

S

I T

E

P

L A

N

B M

J A

F A

R I

B M

J A

F A

R I

L T

H I B

O D

E A

U

L

T

H I B

O D

E A

U

N

S I

D

N

LEGEND

KEY NOTES

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

N E

W

E

N G

L A

S

T R

I C

T

V

I R

G I N

A

D

C O

N C

O R

D

M

A

S C

A L

E

S H

E E

T

D R

A W

I N

G

C

O D

E

O F

D E

M O

L I T

I O

N

O

F

I N

D

I N

T

R

A I L

R O

I D

G E

S E

E K

O N

K

R

I V

E R

P R

O V

I D

E N

C E

R

H O

L A

N D

P T

1 LIMITS OF WORK FOR UNDERWATER DEBRIS REMOVAL ASSOCIATED WITH

THE DEMOLITION OF THE BRIDGE AND PIERS.

2 REMOVE STEEL TRUSS SUPERSTRUCTURE.

3 REMOVE NORTHERLY AND SOUTHERLY TIMBER PILING AND FENDER

SYSTEMS.

4 GRANITE BLOCK ABUTMENT REMAINS IN PLACE.

5 CONTRACTOR'S LIMIT OF WORK (140,000 SF).

6 REMOVE THE EXISTING FOUR BRIDGE PIERS (15' LONG X 6' WIDE). REFER

TO SPECIFICATIONS SECTION 01 11 00 FOR REQUIRED LIMITS OF

REMOVAL.

7 REMOVE THE EXISTING FIVE CIRCULAR SUPPORTS (5' DIAMETER). REFER

TO SPECIFICATIONS SECTION 01 11 00 FOR REQUIRED LIMITS OF

REMOVAL.

8 FLOATS AND PILES WITHIN THE LIMIT OF WORK WILL BE REMOVED PRIOR

TO THE START OF WORK. SEE SPECIFICATIONS SECTION 01 11 00, 1.1

FOR MORE INFORMATION.

E

E

N 267000

N 267500

E

E

W

W J

B

J U

E6EPDLPT

LPT

Sheets and Views
ANSI D
C-101.pdf
Sheets and Views
C-101
Sheet 1
C-102.pdf
Sheets and Views
C-102
Sheet 1
PT-198_C-101-C-101.pdf
Sheets and Views
C-101
Sheet 1
PT-198_C-102-C-102.pdf
Sheets and Views
C-102
Sheet 1
2022-06-08T13:28:17-0400
THIBODEAU.LEE.P.1501071680
Date2_af_date: 6/8/22
Date3_af_date: 6/8/2022
Date4_af_date: 6/15/22
2022-06-08T13:39:38-0400
TESSIER.MATTHEW.E.1377053253
I am approving this document
2022-06-15T13:38:52-0400
MARGOLIS.DAVID.I.1228573805

File details come from the government source that posted it. Updated .