This document comprises the mechanical plans and specifications for the Building Automation System (BAS) Upgrade project at the Jack Hatchell Administration Building in McKinney, Texas, prepared for Collin County. The project involves the complete installation of a Building Automation System upgrade including HVAC modifications, controls integration, and mechanical system enhancements across multiple floors of the administration building. The scope encompasses Air Handling Units (AHUs), Variable Air Volume (VAV) boxes, Fan Coil Units (FCUs), Control and Readiness Air Conditioning (CRAC) units, and associated ductwork, piping, and control systems distributed across the first, second, third, and fourth floors plus the roof. The plans include floor plans, mechanical legends, general notes, and detailed installation requirements referencing SMACNA standards and the 2024 International Mechanical Code. The contractor is responsible for verifying existing conditions prior to bidding, with any discrepancies discovered post-bid to be absorbed by the contractor at no additional cost to the owner.
The probable construction cost is $450,000.00, with bid security required at five percent of the total bid plus alternates. All mechanical work must comply with national, state, and local codes, including the 2024 International Energy Conservation Code and International Building Code. The contractor must coordinate with all trades, provide temporary heating or cooling during construction if equipment cannot be operated, and maintain minimal disruption to neighboring tenants. Key specifications address ductwork design guidelines, fire damper requirements, acoustic insulation requirements, vibration isolation, flexible connections for motor-driven equipment, smoke detector installation, and control system wire compliance with the National Electric Code. The project requires comprehensive coordination among mechanical, architectural, structural, civil, and electrical trades, with detailed provisions for equipment clearances, maintenance access, and system balancing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Building_Automation_System_Upgrade_(BAS)_for_Administration_Building.pdf | ||
| Legal_Notice.docx | DOCX document | |
| Maintenance_Bond.pdf | ||
| Payment_Bond.pdf | ||
| SAMPLE_Construction_Agreement_Engineer.pdf | ||
| Performance_Bond.pdf | ||
| W9.pdf | ||
| CIQ_Form.pdf | ||
| SPECIFICATIONS_2026.06.30_Collin_County_BAS_System_Specifications_Book.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Te xa s Re g is te re d F irm N o
F
-7
W e st
TH
S t.
Su it e
Pl a no
TX
9.
7.
Em a il:
m d e ng c a m d
-e ng
.c o m Pr o je c t N um b e r:
Revisions:
Sheet No.
C ol lin C o.
B
A S
U pg ra de
F or
M cK in ne y, T ex as
B lo om da le R oa d
Ja ck
H at ch el A dm in ist ra tio n
Bu ild in gCOLLIN COUNTY ADMINISTRATION
BUILDING AUTOMATION
SYSTEM UPGRADE FOR JACK
HATCHELL ADMINISTRATION
BUILDING
McKinney, TX 75071
June 30, 2026
COVER
SHEET
INDEX OF DRAWINGS
6/30/2026
ASHRAE CO
700 PPM ---- 15 CFM/PERSON
500 PPM ---- 20 CFM/PERSON
350 PPM ---- 30 CFM/PERSON
C
C 1
2C
2 DIFFERENTIAL
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR
REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL
SYSTEM AS INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS
REQUIRED BY ALL NATIONAL, STATE AND LOCAL CODES.
2. CONTRACT DRAWINGS FOR MECHANICAL WORK (HVAC, PLUMBING, AND
FIRE PROTECTION) ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY
SCOPE AND GENERAL ARRANGEMENT ONLY. IT IS THE CONTRACTORS
RESPONSIBILITY FOR INSTALLING ALL MATERIALS PER SMACNA
STANDARDS AND THE MANUFACTURER'S STANDARDS.
3. ALL EXISTING SYSTEM INFORMATION AND/OR LOCATIONS ARE PROVIDED
BY THE OWNER OR BY A 3RD PARTY. IT IS THE CONTRACTORS
RESPONSIBILITY TO VERIFY ALL MEP SERVICES ARE LOCATED AS
DESIGNED BEFORE BIDDING THE PROJECT. IN OCCURRENCES WHERE
EXISTING DOES NOT MATCH DESIGNED, IT IS THE CONTRACTORS
RESPONSIBILITY TO NOTIFY THE OWNER, ARCHITECT, & ENGINEER
BEFORE PROCEEDING. IF ANY DISCREPANCIES ARE NOT IDENTIFIED AT
BIDDING, THE COST SHALL BE ABSORBED BY THE CONTRACTOR AND
NOT PASSED ONTO THE OWNER OR ENGINEER OF RECORD.
4. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH
ARCHITECTURAL, STRUCTURAL, CIVIL, ELECTRICAL WORK, ETC., SHOWN
ON THE OTHER CONTRACT DRAWINGS.
5. WHEN TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE
REQUIRED, THE PRODUCT OF ONE MANUFACTURE SHALL BE USED.
6. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE LATEST
EDITION NATIONAL ELECTRIC CODE AND DIVISION 23 OF THE
SPECIFICATION.
7. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER
INSTALLATION AND AS SHOWN IN DETAILS FOR PIPING, DUCTWORK, AND
EQUIPMENT (UNLESS OTHERWISE NOTED) SHALL BE FURNISHED AND
INSTALLED BY THE MECHANICAL CONTRACTOR.
8. MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING SHALL NOT BE
SUPPORTED FROM METAL DECK.
9. LOCATION AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL
BE COORDINATED WITH ALL OTHER TRADES.
10. PROVIDE REMOTE BALANCING DAMPERS SIMILAR TO 'YOUNG
CONCEALED REGULATORS' FOR ALL TAPS MADE ABOVE INACCESSIBLE
CEILINGS OR WALLS. FINISH CONCEALMENT COVERS PER ARCHITECTS
RECOMMENDATIONS.
11. ALL AHU AND FCU FANS SHALL OPERATE CONTINUOUSLY DURING THE
OCCUPIED MODE OF OPERATION WITH ASSOCIATED OUTSIDE AIR
MOTORIZED DAMPERS IN THE FULL OPEN POSITION (UNLESS NOTED
OTHERWISE OR DCV SYSTEM). DAMPER SHALL BE CLOSED WITH THE
FANS OPERATIONAL IN THE MORNING WARM UP OR COOL DOWN
MODES.
12. CONTRACTOR SHALL MAINTAIN A MINIMUM CLEARANCE OF 10'-0"
BETWEEN OUTSIDE AIR INTAKE POINTS AND ANY EXHAUST AIR,
CONTAMINATED RELIEF AIR OR PLUMBING VENT TERMINATION POINTS.
13. CONDENSATE PIPING DOWN TO A PLUMBING FIXTURE SHALL BE FULLY
INSULATED WITHIN WALL. PROVIDE ESCUTCHEON PLATE AT WALL.
PIPING SHALL NOT BE ROUTED EXPOSED TO VIEW.
14. PRESSURIZED LIQUID, GAS, AIR SYSTEM PIPE AND ELECTRICAL CONDUIT
SHALL NOT BE ROUTED BENEATH ANY SUSPENDED EQUIPMENT. FIRE
PROTECTION, ELECTRICAL AND MECHANICAL CONTRACTORS SHALL
COORDINATE TRADES.
15. ALL REMOTE MOUNTED DISCONNECT SWITCHES FOR MECHANICAL
EQUIPMENT SHALL HAVE I.D. NAME PLATES.
16. PIPING ON ROOF - CONTRACTOR SHALL PROVIDE ROOF PIPE SUPPORTS
ON 5'-0" CENTERS, EACH CHANGE IN DIRECTION, EACH ROOFTOP UNIT
AND EACH PIPE PENETRATION THROUGH ROOF. REFER TO MECHANICAL
SPECIFICATIONS FOR REQUIRED OFFSETS OR LOOPS FOR PIPE
EXPANSION.
17. ALL DEMOLITION ACTIVITIES SHALL BE PERFORMED SO AS TO PROVIDE
MINIMAL DISRUPTION TO THE NEIGHBORING TENANTS.
18. ALL SAW CUTTING SHALL BE PERFORMED AFTER HOURS SO THAT
OPERATION DOES NOT DISTURB NEIGHBORING TENANTS. THERE SHALL
BE NO GAS POWERED EQUIPMENT IN TENANT AREAS.
GENERAL PROJECT NOTES:GENERAL HVAC NOTES:
FLOOR CONTROL VALVE
TEE
TEE, UP
TEE, DOWN
SINGLE SWEEP TEE
CROSS
LATERAL
45 DEGREE ELBOW
90 DEGREE ELBOW
90 DEGREE ELBOW UP
CAP
HVAC VALVE
VENT THRU ROOF
BUTTERFLY VALVE
SOLENOID VALVE
EXPANSION JOINT
FLOAT AND THERM. TRAP
BUCKET STEAM TRAP
FLOOR CLEAN OUT
FIRE HOSE CABINET
PRESSURE RELIEF VALVE
CONTROL, 2 WAY VALVE
CONTROL, 3 WAY VALVE
STRAINER & BLOW OFF VALVE
PRESSURE GAUGE & COCK
UNION OR COMPANION FLANGES
PRESSURE & TEMPERATURE TAP (PETES PLUG)
MANUAL AIR VENT
TEMPERATURE SENSOR
PRESSURE SENSOR
THERMOMETER & WELL
HOSE END DRAIN
AUTOMATIC AIR VENT
FLOW METER
T S
F FLOW SWITCH
ANCHOR (PIPE)
HOSE BIBB
B
B
T
H
F
F.H.C.
D.S.
CO
CO
OR
R.D.
V.T.R.
HUMIDISTAT
CLEAN OUT
GATE VALVE
FLOOR DRAIN
HUB DRAIN
DOWN SPOUT
ROOF DRAIN
CHECK VALVE
GLOBE VALVE
BALL VALVE
PLUG VALVE
THERMOMETER
THERMOSTAT
OS & Y VALVE
& FITTINGS SYMBOLS
ALL SYMBOLS ON THIS LIST ARE NOT NECESSARILY USED ON THIS JOB.
BALANCING VALVE (WITH PETE'S PLUG EITHER SIDE)
SINGLE W.F. LATERAL STUB
DOUBLE W.F. LATERAL STUB
DOUBLE W.F. LAT & TRAP
FLOOR DRAIN RISER W/TRAP
SINGLE W.F. LAT. & TRAP
O.D. OVERFLOW ROOF DRAIN
PIPE GUIDE
COMPRESSED AIR TAP
MOTORIZED ISOLATION VALVE (2-POSITION-24v)
MANUALLY CALIBRATED BALANCING VALVE
AUTOMATIC FLOW CONTROL VALVE
PIPE SIZE REDUCER (CONCENTRIC)
90 DEGREE ELBOW DOWN
ANGLE GATE VALVE
ANGLE GLOBE VALVE
PIPE SIZE REDUCER (ECCENTRIC)
MOTORIZED CONTROL VALVE (MODULATING-24v)
DIRECTION OF FLOW
EQUIP. OR FIXTURE DRAIN LINE
SYMBOL DESCRIPTION
RL
RS
CD
PC
D
STATIC PRESSURE SENSOR
R/A GRILLE OR REGISTER
4-WAY THROW (U.N.O.)
S/A GRILLE/REGISTER W/ SQUARE NECK.
MOTORIZED DAMPER (WITH END SW.)
THERMOSTAT OR TEMP SENSOR)/
FIRE/SMOKE DAMPER (WITH SM. DET.)
VOLUME DAMPER
FIRE DAMPER
FLEX CONNECTION. 4-WAY THROW (U.N.O.)
S/A GRILLE/REGISTER W/ ROUND NECK &
FSD
FD
90 DEGREE S/A ELBOW DOWN
90 DEGREE S/A ELBOW UP
90 DEGREE R/A ELBOW UP
90 DEGREE R/A ELBOW DOWN
SIDEWALL SUPPLY GRILLE OR
REGISTER WITH AIR EXTRACTOR
SPIN-IN TAP WITH DAMPER
VANES & SPLITTER DAMPER
SQUARE ELBOW WITH DOUBLE
TEE WITH SQUARE ELBOWS, TURNING
BRANCH TAKE-OFF
WITH VANED EXTRACTOR
RADIUS ELBOW (R=1.5 MIN.)
ACCESS DOORAD AD
SHEET METAL DUCT 16"x12"
DIRECTION OF FLOW
SUPPLY DUCT SECTION UP
WYE JUNCTION
BRANCH TAKE-OFF
FLEXIBLE DUCT CONN. WITH DAMPER
SIZE OR SHAPE TRANSITION
45 DEGREE ELBOW (R=1.5 MIN.)
RADIUS ELBOW (R=1.5 MIN.)
ROUND ELBOW UP (R/A SIMILAR)
ROUND ELBOW DOWN (R/A SIMILAR)
HIDDEN SHEET METAL DUCT
INTERNALLY INSULATED SHEET METAL
DUCT
EXHAUST DUCT SECTION DOWN
16X12
16"x12"
M
SP
FSD
FD
M
SP
T
AFAF AIRFLOW MEASURE STATION
SMOKE DAMPER (WITH SM. DET.) SDSD
DUCTWORK LEGEND
WALL TURNING VANES
H C/ /
HUMIDISTAT/CARBON DIOXIDE SENSOR
ALL SYMBOLS ON THIS LIST ARE NOT NECESSARILY USED ON THIS PROJECT.
16"x12"
DUCT MOUNTED SMOKE DETECTOR
(TUBE SENSING TYPE)
P P
COUNTER WEIGHTED BACKDRAFT DAMPERBD BD
ABOVE
ALTERNATING CURRENT
AIR CONDITIONER
ABOVE FINISHED FLOOR
ABOVE GRADE AND GFI
AIR HANDLING UNIT
ALTERNATE
AMPERE
APPROXIMATELY
ARCHITECTURAL
AVERAGE
BOILER
BAROMETRIC RELIEF DAMPER
BRITISH THERMAL UNIT
CUBIC FEET PER MINUTE
CONSTRUCTION DOCUMENTS
CHILLER
CHEMICAL
CHILLED WATER PUMP
CEILING
COMPRESSOR
COOLING TOWER
CONDENSER WATER PUMP
DRY BULB
DETAIL
DIAMETER
DIMENSION
DESIGN DEVELOPMENT
ENTERING DRY BULB
ELECTRICAL
ELEVATION
ENTERING WET BULB
ENTERING WATER TEMPERATURE
EXHAUST
EXISTING
DEGREES FAHRENHEIT
GROUND FAULT INTERRUPTER
GALLONS PER MINUTE
FEET PER MINUTE
FEET PER SECOND
FOOT OR FEET
HEAD
HEAT PUMP UNIT
HOUR(S)
HEIGHT
HEATER
HEAT,VENT AND AIR CONDITIONING
HOT WATER PUMP
HEAT EXCHANGER
FREQUENCY (HERTZ)
INSIDE DIAMETER OR DIMENSION
INCHES
KILOWATT
KILOWATT HOUR
MAXIMUM
LEAVING WATER TEMPERATURE
1000 BTU PER HOUR
MECHANICAL
MANUFACTURER
MINIMUM
NUMBER
NOT APPLICABLE
NOISE CRITERIA
NECK DIMENSION
OPPOSED BLADE DAMPER
OUTSIDE DIAMETER
OUTSIDE AIR
ORIGINAL
PHASE
POWERED MIXING BOX
PLUMBING
PRESSURE
PANEL
REFERENCE
RETURN AIR
RETURN AIR GRILLE
ROOF TOP UNIT
STAND ALONE DIGITAL CONTROLLER
SENSIBLE
SQUARE
SUPPLY AIR
STATIC PRESSURE
SINGLE SPEED MOTOR
START/STOP/STATUS
TEMPERATURE
VOLT
VARIABLE AIR VALVE
VELOCITY
WATT
WITH
WEATHERPROOF
WATER PRESSURE DROP
WEATHERPROOF GFI
TRANSFORMER
ABV.
AC
A/C
AFF
AG
AHU
ALT.
AMP.
APPROX.
ARCH.
AVG.
B
BRD
BTU
CFM
CD
CH.
CHEM.
CHP
CLG.
CMPR.
CT
CWP
DB
DET.
DIA.
DIM.
DD
EDB
ELEC.
ELEV.
EWB
EWT
EXH.
EXIST.
DEG. F
GFI
GPM
FPM
FPS
FT.
HD.
HPU
HR.
HT.
HTR.
HVAC
HWP
HX
HZ.
ID
IN.
KW
KWH
MAX.
LWT
MBH
MECH.
MFR.
MIN.
NO.
N/A
NC
NK
OBD
OD
OA
ORIG.
PH.
PMB
PLBG.
PRESS.
PNL.
RE.
RA
RAG
RTU
SDC
SENS.
SQ.
SA
SP
S/S S/S/S
TEMP.
V
VAV
VEL.
W W/
WP.
WPD
WPG
XFMR.
AFG ABOVE FINISHED GRADE
CKT. CIRCUIT
DEFL. DEFLECTION
MVD MANUAL VOLUME DAMPER
WB WET BULB
MEP ABBREVIATIONS
WITHOUTW/O
UNO UNLESS NOTED OTHERWISE
UH UNIT HEATER
SAG SUPPLY AIR GRILLE
LAT LEAVING AIR TEMPERATURE
HP HORSE POWER
FLR. FLOOR
FAN COIL UNITFCU
EF EXHAUST FAN
CONDENSING UNITCU
RD. RADIUS
HOA HANDS/OFF/AUTO. MOTOR STARTER
HTG. HEATING
EA EXHAUST AIR
F/A FREE AREA OPENING (SQ. FT.)
ABOVE FINISHED CEILINGAFC
NOT IN CONSTRUCTIONNIC
W.G. WATER GAUGE
TOTAL STATIC PRESSURE (IN. W.G.)T.S.P.
MOTOR STARTERSTR.
SEER SEASON ENERGY EFFICIENCY RATIO
AMB. AMBIENT TEMPERATURE (F. DEGREE)
BUILDING MANAGEMENT SYSTEM BMS
CUBIC FEET PER HOURCFH
DISC. DISCONNECT SWITCH
ENERGY MGMT. CONTROL SYSTEM
EXTERNAL STATIC PRESS. (IN. W.G.)E.S.P.
EMCS.
P.D. PRESSURE DROP (FT)
RPM REVOLUTIONS PER MINUTE
FRACTIONAL HORSE POWERFHP
COIL FINS PER INCH.FPI
MCA
MOCP
MINIMUM CURRENT AMPS.
MAX. OVER CURRENT PROTECTION
BELOW GRADEB.G.
AHAP AS HIGH AS POSSIBLE
OWNERS AUTHORIZED REPRESENTATIVEOAR
OWNER FURNISHED CONTRACTOR INSTALLEDOFCI
REFRIGERANT LIQUID LINE
REFRIGERATED SUCTION LINE
CONDENSATE DRAIN LINE (HVAC)
PUMPED CONDENSATE
REFRIGERANT SUCTION & LIQUID LINES
REFRIG. SUCTION, LIQUID, HOT GAS LINES
RS/L
RS/L/H
AIAI AIRFLOW IONIZER STATION
SECTION
DETAIL SYMBOL
(ALL SYMBOLS MAY NOT APPEAR ON DRAWINGS)
DRAWING SYMBOLS
NOTE BY SYMBOL
AIR DISTRIBUTION DEVICE
SUBTITLE
X
XX
XX
XX
XX
XX XX
NUMBER
DESCRIPTION
SCALE
DETAIL #
DRAWING NO. TO REFER TO
ARROWS INDICATE
THROW PATTERN
DRAWING NUMBER WHERE
SECTION IS LOCATED
SECTION NUMBER
GAS PRESSURE REDUCING VALVE
WATER PRESSURE REDUCING VALVE
T H C/ /
ELEVATION/ RISER DIAGRAM SYMBOL
XX
XX
DRAWING NUMBER
POINTS TO ELEVATION/ RISER AREA
ELEVATION/ RISER #
(ALL DESIGNATIONS MAY NOT APPEAR ON DRAWINGS.)
PIPING DESIGNATIONS
1. WITHOUT PRIOR APPROVAL FROM ENGINEER AND OWNER, ALL MECHANICAL
EQUIPMENT SHALL NOT BE OPERATED DURING CONSTRUCTION OF THE
BUILDING PER MANUFACTURER RECOMMENDATIONS. MECHANICAL
CONTRACTOR IS RESPONSIBLE TO PROVIDE TEMPORARY HEATING OR COOLING
AS NEEDED TO CLIMATIZE THE BUILDING.
2. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED
WITHIN FURRED CHASES OR ABOVE SUSPENDED CEILINGS.
3. ALL DUCTWORK SIZES ARE PROVIDED IN CLEAR INSIDE AIRSTREAM
DIMENSIONS. INCREASE DUCT SIZES TO ACCOMMODATE ANY INTERNAL
INSULATION REQUIREMENTS (AS SPECIFIED). PROVIDE A MINIMUM OF 15 LINEAR
FT. OF INTERNAL ACOUSTIC LINER ON SUPPLY AND RETURN AIR DUCTWORK
FROM ANY FCU, AHU, AC, OR RTU (UNO). PROVIDE 8LF INTERNAL LINER FOR
MIXING OR VAV BOXES.
4. PROVIDE FLEXIBLE CONNECTIONS AT THE INTAKE AND DISCHARGE OF ALL
MOTOR DRIVEN EQUIPMENT.
5. PROVIDE VIBRATION ISOLATORS FOR MOTOR-DRIVEN MECHANICAL EQUIPMENT.
6. ALL FLEXIBLE DUCTWORK SHALL HAVE A MAXIMUM DEVELOPED LENGTH OF (5)
FIVE FT.
7. CONTRACTOR SHALL REFER TO THE ARCHITECTURAL REFLECTED CEILING
PLANS FOR THE EXACT LOCATION OF ALL CEILING MOUNTED M/E/P DEVICES
INCLUDING BUT NOT LIMITED TO LIGHTS, DIFFUSERS, GRILLES ETC..
8. AIR DEVICE DUCT SIZES SHALL BE THE SAME SIZE AS SHOWN ON THE
DRAWINGS UNLESS NOTED OTHERWISE. REFER TO THE SCHEDULES FOR THE
CFM RANGES. PROVIDE A TRANSITION FROM THE NECK SIZE TO THE REQUIRED
DUCT SIZE SHOWN.
9. CONTRACTOR SHALL VERIFY THE EQUIPMENT CLEARANCE REQUIREMENTS
WITH THE MANUFACTURER'S RECOMMENDATIONS. EXACT LOCATION OF
SELECTED EQUIPMENT SHALL BE COORDINATED WITH THE STRUCTURE TO
PROVIDE RECOMMENDED CLEARANCES FOR MAINTENANCE.
10. PROVIDE FIRE DAMPERS, FIRE/SMOKE DAMPERS AND FIRE STOP AS REQUIRED
BY CODE AUTHORITIES FOR DUCT PENETRATIONS THROUGH FIRE OR SMOKE
RATED WALL AND CEILINGS. REFER TO ARCHITECTURAL DRAWINGS FOR WALL
TYPES.
11. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED MAINTENANCE
ACCESS FOR ALL UNIT ACCESS PANELS, CONTROLS AND VALVING.
12. SMOKE DETECTORS SHALL BE FURNISHED BY THE FIRE ALARM CONTRACTOR
AND WIRED BY THE ELECTRICAL CONTRACTOR. THE MECHANICAL CONTRACTOR
SHALL BE RESPONSIBLE FOR MOUNTING THE SMOKE DETECTOR IN THE
DUCTWORK AS SHOWN ON THE DRAWINGS AND IN ACCORDANCE WITH THE
MANUFACTURER'S PRINTED INSTRUCTIONS. DETECTORS SHALL BE PROVIDED IN
THE SUPPLY AND THE RETURN DUCTWORK (PRIOR TO MIXING WITH THE
OUTSIDE AIR) FOR ANY AIR HANDLING UNIT SYSTEM 2000 CFM SUPPLY AIR AND
ABOVE. THE DETECTOR SHALL BE HARDWIRED TO THE UNITS STARTER TO SHUT
DOWN THE FAN UPON DETECTION OF PRODUCTS OF COMBUSTION AS WELL AS
SEND A SUPERVISORY ALARM SIGNAL TO THE FIRE ALARM PANEL (IF PROVIDED -
IF NOT PROVIDE VISUAL/ AUDIBLE ALARM IN A SUPERVISORY/ APPROVED
LOCATION). FOR VAV SYSTEMS THE BMS SHALL DISABLE ASSOCIATED MIXING
BOX FANS UPON DETECTION OF SMOKE AT EITHER OF THE AHU'S SMOKE
DETECTORS. ENABLE MIXING BOX FANS UPON SMOKE SIGNAL CLEAR.
13. FINISH ALL EXPOSED TO VIEW DUCTWORK AND WALL LOUVERS PER
ARCHITECTS RECOMMENDATIONS. ALL EXPOSED ROUND DUCT SHALL BE
INTERNALLY SEALED AND MANUFACTURED FROM SPIRAL WOUND PAINT GRIP
STEEL.
14. ALL FLOOR BRANCHES OF PIPE RISERS SHALL BE PROVIDED WITH SHUT OFF
VALVES AND DRAIN CONNECTION.
15. UNLESS OTHERWISE SHOWN, LOCATE ALL ROOM THERMOSTATS, HUMIDISTAT
AND CO2 SENSORS 4'-0" (CENTERLINE) ABOVE FINISHED FLOOR. NOTIFY THE
ARCHITECT/ ENGINEER OF ANY ROOMS WHERE THE ABOVE LOCATION CAN NOT
BE MAINTAINED OR WHERE THERE IS A QUESTION ON PROPER LOCATION.
16. DUCTWORK AND ITS CONSTRUCTION WILL BE GALVANIZED SHEET METAL AND
CONSTRUCTED ACCORDING TO THE LATEST SMACNA STANDARDS.
17. ALL DUCTWORK IS SHOWN IN SCHEMATIC FORM. DUCT RISES AND DROPS ARE
NOT SHOWN. PROVIDE OFFSETS AS REQUIRED TO MEET SPACE REQUIREMENTS
AND TO AVOID INTERFERENCE WITH OTHER TRADES. EACH TRADE SHALL BE
RESPONSIBLE FOR COORDINATION WITH OTHER TRADES.
18. PIPING IS SHOWN IN SCHEMATIC FORM. ROUTE PIPING AS REQUIRED FOR
CLEARANCE WITH STRUCTURAL CONDITIONS. COORDINATE WITH OTHER
TRADES AS REQUIRED. PIPING SHALL BE INSTALLED WITH ADEQUATE SLOPE AS
REQUIRED FOR EACH PARTICULAR SYSTEM.
19. DOUBLE NUT LOCK DOWN FOR MULTI-VANE DAMPERS INSTALLED IN HIGH
VELOCITY DUCTWORK/SMOKE REMOVAL DUCTWORK.
20. ALL RADIUS TURNS SHALL BE SMOOTH WALL WITH A RADIUS OF R = 1.5D.
21. ACCESS DOORS SERVING FIRE/SMOKE DAMPERS, SMOKE DAMPERS OR FIRE
DAMPERS SHALL BE IDENTIFIED WHERE EASILY READ BY A LABEL HAVING
LETTERS NO LESS THAN 1/2" IN HEIGHT READING "FIRE/SMOKE DAMPER",
"SMOKE DAMPER" OR "FIRE DAMPER".
ZONE DAMPERZD ZD
EXISTING CONDITIONS GENERAL NOTES
THE EXISTING CONDITIONS INDICATED IN THE CONTRACT DOCUMENTS WERE TAKEN FROM SITE OBSERVATIONS AND THE OWNER'S RECORD DRAWINGS (IF AVAILABLE). IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND EACH SUBCONTRACTOR TO VISIT THE SITE PRIOR TO THE BID DATE AND ASCERTAIN THE EXACT CONDITIONS. HE SHALL NOTIFY THE ENGINEER IMMEDIATELY OF ANY ACTUAL CONDITIONS THAT ARE IN CONFLICT AND ADJUST HIS PROPOSAL ACCORDINGLY. AFTER THE BID DATE IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND EACH SUBCONTRACTOR TO PROVIDE ADDITIONAL LABOR AND MATERIALS DUE TO EXISTING CONDITIONS WHICH MAY BE REQUIRED TO PROVIDE COMPLETE OPERABLE SYSTEMS AT NO ADDITIONAL COST
TO THE OWNER AND OR ENGINEER.
AIR DEVICE DESCRIPTION
X"Ø
XXX AIR DEVICE NECK SIZE
CFM
AIR DEVICE TAG
NOMINAL CFM
RANGE
UP TO 38
MECHANICAL DUCTWORK DESIGN GUIDELINES
OPTIONAL FOR CONTRACTOR SELECTION LOW VELOCITY SYSTEM DUCTWORK (SIZES IN INCHES)
OPTIONAL, NET CLEAR INSIDE DUCT SIZE, SELECTIONS NOMINAL
DIAMETERNO 1. NO 2. NO 3. NO 4. NO 5.
39 TO 50
51 TO 70
71 TO 90
91 TO 110
111 TO 160
161 TO 230
231 TO 320
321 TO 420
421 TO 540
541 TO 700
701 TO 850
851 TO 1000
1001 TO 1300
1301 TO 1500
1501 TO 1700
1701 TO 2000
2001 TO 2600
2601 TO 3500
3501 TO 4400
4401 TO 6000
6001 TO 7600
DO NOT EXCEED (IN ANY DIRECTION) ASPECT RATIOS OF MORE THAN FOUR TO ONE, UNLESS FULL LENGTH INTERNAL DIVIDERS ARE INCORPORATED. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CONFIRM AND UTILIZE THE SIZE APPLICABLE TO THE ACTUAL AVAILABLE SPACE, BASED UPON THE OPTIONAL SELECTION SIZES AS LISTED ABOVE FOR LOW VELOCITY AIR DISTRIBUTION SYSTEMS, PRIOR TO THE FABRICATION OR INSTALLATION OF ANY DUCTWORK SYSTEMS. THE INITIAL SIZES THAT MAY BE INDICATED UPON THE DRAWINGS ARE
FOR GENERAL REFERENCE ONLY. ALSO PROVIDE OFFSETS AND TRANSITIONS AS NEEDED.
NOTE:
4 DIA.
4-1/2 DIA.
5 DIA.
5-1/2 DIA.
6 DIA.
7 DIA.
8 x 6-1/2
9 x 7-1/2
9-1/2 x 9
10 x 10
11 x 11
12 x 12
14 x 12
16 x 12
18 x 12
21 x 12
19 x 14
24 x 14
25 x 16
30 x 16
32 x 18
30 x 20
9 x 6
10 x 7
10 x 8-1/2
11 x 9
12 x 10
13 x 11
15 x 11
17 x 11
20 x 11
23 x 11
22 x 13
26 x 13
30 x 14
36 x 14
36 x 16
37 x 18
11 x 5
12 x 6
12 x 7
13 x 8
14 x 9
14 x 10
16-1/2 x 10
19 x 10
23 x 10
26 x 10
24 x 12
29 x 12
33 x 13
40 x 13
43 x 14
51 x 14
14 x 4
14 x 5
15 x 6
15 x 7
16 x 8
16 x 9
19 x 9
22 x 9
25 x 9
30 x 9
26 x 11
33 x 11
36 x 12
44 x 12
47 x 13
56 x 13
17 x 3-1/2
20 x 4
19 x 5
18 x 6
18-1/2 x 7
19 x 8
22 x 8
26 x 8
30 x 8
35 x 8
28 x 10
37 x 10
40 x 11
50 x 11
54 x 12
70 x 12
4 x 3-1/2
5 x 3-1/2
5 x 4
5 x 5
6 x 5
7 x 6
4-1/2 x 3
6 x 3
5 x 3-1/2
6-1/2 x 4
7-1/2 x 4
8-1/2 x 5
7 x 3
9 x 3
11 x 3
11 x 4
13 x 3-1/2
7601 TO 9000
9001 TO 11000
11001 TO 12000
12001 TO 14000
14001 TO 16000
30 x 25
35 x 25
44 x 25
47 x 26
48 x 28
35 x 22
40 x 22
40 x 28
50 x 24
52 x 26
38 x 20
45 x 20
50 x 22
56 x 22
56 x 24
43 x 18
50 x 18
60 x 18
62 x 20
61 x 22
60 x 14
60 x 16
70 x 17
70 x 19
70 x 21
CONNECT NEW TO EXISTING
DEMO TO THIS POINT
EAT ENTERING AIR TEMPERATURE
UNDERCUT DOORU
ALL MECHANICAL EQUIPMENT AND INSTALLATIONS SHALL CONFORM WITH THE
REQUIREMENTS OF THE 2024 INTERNATIONAL MECHANICAL CODE, THE 2024
INTERNATIONAL ENERGY CONSERVATION CODE, THE 2024 INTERNATIONAL
BUILDING CODE, STATE AND LOCAL AMENDMENTS, NATIONAL FIRE PROTECTION
ASSOCIATION, UNDERWRITERS LABORATORIES (OR ETL), AND ALL APPLICABLE
LOCAL CODES AND ORDINANCES AND ANY APPLICABLE OWNER STANDARDS.
PROJECT APPLICABLE CODES
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CHS
CHR
Te xa s Re g is te re d F irm N
W e st
TH
S t.
Su it e
Pl a no
7.
Em e ng c a m d
-e ng
.c o m Pr o je c t N um b e r:
Revisions:
Sheet No.
C ol lin C o.
B
A S
U pg ra de
F or
M cK in ne y, T ex as
B lo om da le R oa d
Ja ck
H at ch el A dm in ist ra tio n
Bu ild in g
M0.00
LEGEND AND
GENERAL NOTES
- MECHANICAL
CRAC-1B
FPB1-1
FPB1-2
FPB1-3
FPB1-4
FPB1-5
FPB1-6
FPB1-7
FPB1-8
FPB1-9
FPB1-10
FPB1-11
VAV1-4
VAV1-5
VAV1-6
VAV1-7
VAV1-9
VAV1-3
VAV1-1
VAV1-2
VAV1-10
AHU1-1
FSNPlan
VAV1-8
CRAC-1A
VAV1-11
VAV
FIRE
CONTROLLERS
GENERAL NOTES
DESIGNATES EQUIPMENT.
1. COORDINATE WITH ALL TRADES BEFORE INSTALLING ANY EQUIPMENT.
2. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED
MAINTENANCE ACCESS FOR ALL UNIT ACCESS PANELS, CONTROLS, AND
VALVING.
3. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR
REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEM
AS INDICATED ON THE DRAWINGS AS SPECIFIED AND AS REQUIRED BY
ALL NATIONAL, STATE, AND LOCAL CODES.
4. ALL EXISTING SYSTEM INFORMATION AND/OR LOCATIONS ARE PROVIDED
BY THE OWNER. IT IS THE CONTRACTORS' RESPONSIBILITY TO VERIFY
ALL MEP SERVICES ARE LOCATED AS DESIGNED BEFORE BIDDING THE
PROJECT. IN OCCURRENCES WHERE EXISTING DOES NOT MATCH
DESIGNED, IT IS THE CONTRACTORS' RESPONSIBILITY TO NOTIFY THE
OWNER, ARCHITECT, & ENGINEER BEFORE PROCEEDING. IF ANY
DISCREPANCIES ARE NOT IDENTIFIED AT BIDDING, THE COST SHALL BE
ABSORBED BY THE CONTRACTOR AND NOT PASSED ONTO THE OWNER
OR ENGINEER OF RECORD.
5. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE LATEST
EDITION NATIONAL ELECTRIC CODE SPECIFICATIONS. REPLACE WIRE IF
CURRENT WIRE IS DAMAGED OR NON-COMPLIANT.
6. THE MECHANICAL SERVICE TO AREAS NOT WITHIN THE DEMOLITION
SCOPE OF WORK SHALL NOT LOSE FUNCTION UNLESS SCHEDULED AND
AGREED TO BY THE OWNER.
7. ALL DEMOLITION ACTIVITIES SHALL BE PERFORMED SO AS TO PROVIDE
MINIMAL DISRUPTION TO THE NEIGHBORING TENANTS.
GENERAL NOTES
DESIGNATES EQUIPMENT.
Te xa s Re g is te re d F irm N
W e st
TH
S t.
Su it e
Pl a no
7.
Em e ng c a m d
-e ng
.c o m Pr o je c t N um b e r:
Revisions:
Sheet No.
C ol lin C o.
B
A S
U pg ra de
F or
M cK in ne y, T ex as
B lo om da le R oa d
Ja ck
H at ch el A dm in ist ra tio n
Bu ild in g
M1.1AFIRST FLOOR PLAN - ADMIN01 SCALE: 1/8"=1'-0"
FLOOR PLAN -
ADMIN - FIRST
ALTERNATE
SA2-2
RA2-2
AHU2-2
FPB2-14
FPB2-13
FPB2-4
FPB2-3
FPB2-2
FPB2-1
FPB2-15
VAV2-1
VAV2-2
VAV2-7
VAV2-8
VAV2-9
VAV2-10
VAV2-11
VAV2-12
VAV2-13
VAV2-14 VAV2-15
FPB2-12
VAV2-19
FPB2-19
M1.8AM1.7A
M1.8AM1.7A
VAV2-7
CRAC 2
GENERAL NOTES
DESIGNATES EQUIPMENT.
1. COORDINATE WITH ALL TRADES BEFORE INSTALLING ANY EQUIPMENT.
2. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED
MAINTENANCE ACCESS FOR ALL UNIT ACCESS PANELS, CONTROLS, AND
VALVING.
3. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR
REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEM
AS INDICATED ON THE DRAWINGS AS SPECIFIED AND AS REQUIRED BY
ALL NATIONAL, STATE, AND LOCAL CODES.
4. ALL EXISTING SYSTEM INFORMATION AND/OR LOCATIONS ARE PROVIDED
BY THE OWNER. IT IS THE CONTRACTORS' RESPONSIBILITY TO VERIFY
ALL MEP SERVICES ARE LOCATED AS DESIGNED BEFORE BIDDING THE
PROJECT. IN OCCURRENCES WHERE EXISTING DOES NOT MATCH
DESIGNED, IT IS THE CONTRACTORS' RESPONSIBILITY TO NOTIFY THE
OWNER, ARCHITECT, & ENGINEER BEFORE PROCEEDING. IF ANY
DISCREPANCIES ARE NOT IDENTIFIED AT BIDDING, THE COST SHALL BE
ABSORBED BY THE CONTRACTOR AND NOT PASSED ONTO THE OWNER
OR ENGINEER OF RECORD.
5. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE LATEST
EDITION NATIONAL ELECTRIC CODE SPECIFICATIONS. REPLACE WIRE IF
CURRENT WIRE IS DAMAGED OR NON-COMPLIANT.
6. THE MECHANICAL SERVICE TO AREAS NOT WITHIN THE DEMOLITION
SCOPE OF WORK SHALL NOT LOSE FUNCTION UNLESS SCHEDULED AND
AGREED TO BY THE OWNER.
7. ALL DEMOLITION ACTIVITIES SHALL BE PERFORMED SO AS TO PROVIDE
MINIMAL DISRUPTION TO THE NEIGHBORING TENANTS.
GENERAL NOTES
DESIGNATES EQUIPMENT.
Te xa s Re g is te re d F irm N
W e st
TH
S t.
Su it e
Pl a no
7.
Em e ng c a m d
-e ng
.c o m Pr o je c t N um b e r:
Revisions:
Sheet No.
C ol lin C o.
B
A S
U pg ra de
F or
M cK in ne y, T ex as
B lo om da le R oa d
Ja ck
H at ch el A dm in ist ra tio n
Bu ild in g
M1.2A
FLOOR PLAN -
SECOND FLOOR PLAN NORTH - ADMIN - ALTERNATE01 SCALE: 1/8"=1'-0"
ADMIN - SECOND
SA2-1
RA2-1
FPB2-11
FPB2-10
FPB2-9
FPB2-8
FPB2-7
FPB2-6
FPB2-5
VAV2-2
VAV2-3
VAV2-4
VAV2-6VAV2-7
VAV2-14
VAV2-16
VAV2-17
VAV2-15
FPB2-16
FPB2-17
FPB2-18
VAV2-5
VAV2-18
M1.8AM1.7A
M1.8AM1.7A
AHU2-1
GENERAL NOTES
DESIGNATES EQUIPMENT.
1. COORDINATE WITH ALL TRADES BEFORE INSTALLING ANY EQUIPMENT.
2. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED
MAINTENANCE ACCESS FOR ALL UNIT ACCESS PANELS, CONTROLS, AND
VALVING.
3. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR
REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEM
AS INDICATED ON THE DRAWINGS AS SPECIFIED AND AS REQUIRED BY
ALL NATIONAL, STATE, AND LOCAL CODES.
4. ALL EXISTING SYSTEM INFORMATION AND/OR LOCATIONS ARE PROVIDED
BY THE OWNER. IT IS THE CONTRACTORS' RESPONSIBILITY TO VERIFY
ALL MEP SERVICES ARE LOCATED AS DESIGNED BEFORE BIDDING THE
PROJECT. IN OCCURRENCES WHERE EXISTING DOES NOT MATCH
DESIGNED, IT IS THE CONTRACTORS' RESPONSIBILITY TO NOTIFY THE
OWNER, ARCHITECT, & ENGINEER BEFORE PROCEEDING. IF ANY
DISCREPANCIES ARE NOT IDENTIFIED AT BIDDING, THE COST SHALL BE
ABSORBED BY THE CONTRACTOR AND NOT PASSED ONTO THE OWNER
OR ENGINEER OF RECORD.
5. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE LATEST
EDITION NATIONAL ELECTRIC CODE SPECIFICATIONS. REPLACE WIRE IF
CURRENT WIRE IS DAMAGED OR NON-COMPLIANT.
6. THE MECHANICAL SERVICE TO AREAS NOT WITHIN THE DEMOLITION
SCOPE OF WORK SHALL NOT LOSE FUNCTION UNLESS SCHEDULED AND
AGREED TO BY THE OWNER.
7. ALL DEMOLITION ACTIVITIES SHALL BE PERFORMED SO AS TO PROVIDE
MINIMAL DISRUPTION TO THE NEIGHBORING TENANTS.
GENERAL NOTES
DESIGNATES EQUIPMENT.
Te xa s Re g is te re d F irm N
W e st
TH
S t.
Su it e
Pl a no
7.
Em e ng c a m d
-e ng
.c o m Pr o je c t N um b e r:
Revisions:
Sheet No.
C ol lin C o.
B
A S
U pg ra de
F or
M cK in ne y, T ex as
B lo om da le R oa d
Ja ck
H at ch el A dm in ist ra tio n
Bu ild in g
M1.3A
FLOOR PLAN -
SECOND FLOOR PLAN SOUTH - ADMIN - ALTERNATE01 SCALE: 1/8"=1'-0"
ADMIN - SECOND
SA3-2
RA3-2
FPB3-2
FPB3-3
FPB3-4
FPB3-16FPB3-17
FPB3-18
FPB3-19
VAV3-1
VAV3-2 VAV3-3
VAV3-4
VAV3-8
VAV3-9
VAV3-10
VAV3-11
VAV3-13
FPB3-1
VAV3-17
CRAC-3
VAV3-12
M1.10AM1.9A
M1.10AM1.9A
AHU3-2
GENERAL NOTES
DESIGNATES EQUIPMENT.
1. COORDINATE WITH ALL TRADES BEFORE INSTALLING ANY EQUIPMENT.
2. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED
MAINTENANCE ACCESS FOR ALL UNIT ACCESS PANELS, CONTROLS, AND
VALVING.
3. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR
REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEM
AS INDICATED ON THE DRAWINGS AS SPECIFIED AND AS REQUIRED BY
ALL NATIONAL, STATE, AND LOCAL CODES.
4. ALL EXISTING SYSTEM INFORMATION AND/OR LOCATIONS ARE PROVIDED
BY THE OWNER. IT IS THE CONTRACTORS' RESPONSIBILITY TO VERIFY
ALL MEP SERVICES ARE LOCATED AS DESIGNED BEFORE BIDDING THE
PROJECT. IN OCCURRENCES WHERE EXISTING DOES NOT MATCH
DESIGNED, IT IS THE CONTRACTORS' RESPONSIBILITY TO NOTIFY THE
OWNER, ARCHITECT, & ENGINEER BEFORE PROCEEDING. IF ANY
DISCREPANCIES ARE NOT IDENTIFIED AT BIDDING, THE COST SHALL BE
ABSORBED BY THE CONTRACTOR AND NOT PASSED ONTO THE OWNER
OR ENGINEER OF RECORD.
5. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE LATEST
EDITION NATIONAL ELECTRIC CODE SPECIFICATIONS. REPLACE WIRE IF
CURRENT WIRE IS DAMAGED OR NON-COMPLIANT.
6. THE MECHANICAL SERVICE TO AREAS NOT WITHIN THE DEMOLITION
SCOPE OF WORK SHALL NOT LOSE FUNCTION UNLESS SCHEDULED AND
AGREED TO BY THE OWNER.
7. ALL DEMOLITION ACTIVITIES SHALL BE PERFORMED SO AS TO PROVIDE
MINIMAL DISRUPTION TO THE NEIGHBORING TENANTS.
GENERAL NOTES
DESIGNATES EQUIPMENT.
Te xa s Re g is te re d F irm N
W e st
TH
S t.
Su it e
Pl a no
7.
Em e ng c a m d
-e ng
.c o m Pr o je c t N um b e r:
Revisions:
Sheet No.
C ol lin C o.
B
A S
U pg ra de
F or
M cK in ne y, T ex as
B lo om da le R oa d
Ja ck
H at ch el A dm in ist ra tio n
Bu ild in g
M1.4ATHIRD FLOOR PLAN NORTH - ADMIN - ALTERNATE01 SCALE: 1/8"=1'-0"
FLOOR PLAN -
ADMIN - THIRD
SA3-1
FPB3-5
FPB3-6
FPB3-7
FPB3-8
FPB3-9
FPB3-10
FPB3-11
FPB3-12
FPB3-13
FPB3-14FPB3-15
VAV3-4
VAV3-5
VAV3-6
VAV3-7
VAV3-8
VAV3-14 VAV3-15
VAV3-16
RA3-1CRAC-3
M1.10AM1.9A
M1.10AM1.9A
AHU3-1
GENERAL NOTES
DESIGNATES EQUIPMENT.
1. COORDINATE WITH ALL TRADES BEFORE INSTALLING ANY EQUIPMENT.
2. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED
MAINTENANCE ACCESS FOR ALL UNIT ACCESS PANELS, CONTROLS, AND
VALVING.
3. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR
REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEM
AS INDICATED ON THE DRAWINGS AS SPECIFIED AND AS REQUIRED BY
ALL NATIONAL, STATE, AND LOCAL CODES.
4. ALL EXISTING SYSTEM INFORMATION AND/OR LOCATIONS ARE PROVIDED
BY THE OWNER. IT IS THE CONTRACTORS' RESPONSIBILITY TO VERIFY
ALL MEP SERVICES ARE LOCATED AS DESIGNED BEFORE BIDDING THE
PROJECT. IN OCCURRENCES WHERE EXISTING DOES NOT MATCH
DESIGNED, IT IS THE CONTRACTORS' RESPONSIBILITY TO NOTIFY THE
OWNER, ARCHITECT, & ENGINEER BEFORE PROCEEDING. IF ANY
DISCREPANCIES ARE NOT IDENTIFIED AT BIDDING, THE COST SHALL BE
ABSORBED BY THE CONTRACTOR AND NOT PASSED ONTO THE OWNER
OR ENGINEER OF RECORD.
5. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE LATEST
EDITION NATIONAL ELECTRIC CODE SPECIFICATIONS. REPLACE WIRE IF
CURRENT WIRE IS DAMAGED OR NON-COMPLIANT.
6. THE MECHANICAL SERVICE TO AREAS NOT WITHIN THE DEMOLITION
SCOPE OF WORK SHALL NOT LOSE FUNCTION UNLESS SCHEDULED AND
AGREED TO BY THE OWNER.
7. ALL DEMOLITION ACTIVITIES SHALL BE PERFORMED SO AS TO PROVIDE
MINIMAL DISRUPTION TO THE NEIGHBORING TENANTS.
GENERAL NOTES
DESIGNATES EQUIPMENT.
Te xa s Re g is te re d F irm N
W e st
TH
S t.
Su it e
Pl a no
7.
Em e ng c a m d
-e ng
.c o m Pr o je c t N um b e r:
Revisions:
Sheet No.
C ol lin C o.
B
A S
U pg ra de
F or
M cK in ne y, T ex as
B lo om da le R oa d
Ja ck
H at ch el A dm in ist ra tio n
Bu ild in g
M1.5ATHIRD FLOOR PLAN SOUTH - ADMIN - ALTERNATE01 SCALE: 1/8"=1'-0"
FLOOR PLAN -
ADMIN - THIRD
SA4-1
RA4-1
AHU4-1
FPB4-1
FPB4-2
FPB4-3 FPB4-4
FPB4-5
FPB4-6
FPB4-7
FPB4-8
FPB4-10
FPB4-9FPB4-11FPB4-12FPB4-13
FPB4-14
FPB4-15
VAV4-1
VAV4-2
VAV4-3
VAV4-4
VAV4-5
VAV4-6VAV4-7
VAV4-8
VAV4-9
VAV4-10
VAV4-11VAV4-12
VAV4-13
VAV4-14
VAV4-15
EF-1
FC4-1
ABOVE
DOOR
FC4-2
ABOVE
DOOR
GENERAL NOTES
DESIGNATES EQUIPMENT.
1. COORDINATE WITH ALL TRADES BEFORE INSTALLING ANY EQUIPMENT.
2. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED
MAINTENANCE ACCESS FOR ALL UNIT ACCESS PANELS, CONTROLS, AND
VALVING.
3. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR
REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEM
AS INDICATED ON THE DRAWINGS AS SPECIFIED AND AS REQUIRED BY
ALL NATIONAL, STATE, AND LOCAL CODES.
4. ALL EXISTING SYSTEM INFORMATION AND/OR LOCATIONS ARE PROVIDED
BY THE OWNER. IT IS THE CONTRACTORS' RESPONSIBILITY TO VERIFY
ALL MEP SERVICES ARE LOCATED AS DESIGNED BEFORE BIDDING THE
PROJECT. IN OCCURRENCES WHERE EXISTING DOES NOT MATCH
DESIGNED, IT IS THE CONTRACTORS' RESPONSIBILITY TO NOTIFY THE
OWNER, ARCHITECT, & ENGINEER BEFORE PROCEEDING. IF ANY
DISCREPANCIES ARE NOT IDENTIFIED AT BIDDING, THE COST SHALL BE
ABSORBED BY THE CONTRACTOR AND NOT PASSED ONTO THE OWNER
OR ENGINEER OF RECORD.
5. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE LATEST
EDITION NATIONAL ELECTRIC CODE SPECIFICATIONS. REPLACE WIRE IF
CURRENT WIRE IS DAMAGED OR NON-COMPLIANT.
6. THE MECHANICAL SERVICE TO AREAS NOT WITHIN THE DEMOLITION
SCOPE OF WORK SHALL NOT LOSE FUNCTION UNLESS SCHEDULED AND
AGREED TO BY THE OWNER.
7. ALL DEMOLITION ACTIVITIES SHALL BE PERFORMED SO AS TO PROVIDE
MINIMAL DISRUPTION TO THE NEIGHBORING TENANTS.
GENERAL NOTES
DESIGNATES EQUIPMENT.
Te xa s Re g is te re d F irm N
W e st
TH
S t.
Su it e
Pl a no
7.
Em e ng c a m d
-e ng
.c o m Pr o je c t N um b e r:
Revisions:
Sheet No.
C ol lin C o.
B
A S
U pg ra de
F or
M cK in ne y, T ex as
B lo om da le R oa d
Ja ck
H at ch el A dm in ist ra tio n
Bu ild in g
M1.6AFOURTH FLOOR PLAN - ADMIN - ALTERNATE01 SCALE: 1/8"=1'-0"
FLOOR PLAN -
ADMIN - FOURTH
FCU-1
FCU-2
OUTDOOR
AIR
(SOUTH)OUTDOOR
AIR
(NORTH)
GENERAL NOTES
DESIGNATES EQUIPMENT.
1. COORDINATE WITH ALL TRADES BEFORE INSTALLING ANY EQUIPMENT.
2. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED
MAINTENANCE ACCESS FOR ALL UNIT ACCESS PANELS, CONTROLS, AND
VALVING.
3. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR
REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEM
AS INDICATED ON THE DRAWINGS AS SPECIFIED AND AS REQUIRED BY
ALL NATIONAL, STATE, AND LOCAL CODES.
4. ALL EXISTING SYSTEM INFORMATION AND/OR LOCATIONS ARE PROVIDED
BY THE OWNER. IT IS THE CONTRACTORS' RESPONSIBILITY TO VERIFY
ALL MEP SERVICES ARE LOCATED AS DESIGNED BEFORE BIDDING THE
PROJECT. IN OCCURRENCES WHERE EXISTING DOES NOT MATCH
DESIGNED, IT IS THE CONTRACTORS' RESPONSIBILITY TO NOTIFY THE
OWNER, ARCHITECT, & ENGINEER BEFORE PROCEEDING. IF ANY
DISCREPANCIES ARE NOT IDENTIFIED AT BIDDING, THE COST SHALL BE
ABSORBED BY THE CONTRACTOR AND NOT PASSED ONTO THE OWNER
OR ENGINEER OF RECORD.
5. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE LATEST
EDITION NATIONAL ELECTRIC CODE SPECIFICATIONS. REPLACE WIRE IF
CURRENT WIRE IS DAMAGED OR NON-COMPLIANT.
6. THE MECHANICAL SERVICE TO AREAS NOT WITHIN THE DEMOLITION
SCOPE OF WORK SHALL NOT LOSE FUNCTION UNLESS SCHEDULED AND
AGREED TO BY THE OWNER.
7. ALL DEMOLITION ACTIVITIES SHALL BE PERFORMED SO AS TO PROVIDE
MINIMAL DISRUPTION TO THE NEIGHBORING TENANTS.
GENERAL NOTES
DESIGNATES EQUIPMENT.
Te xa s Re g is te re d F irm N
W e st
TH
S t.
Su it e
Pl a no
7.
Em e ng c a m d
-e ng
.c o m Pr o je c t N um b e r:
Revisions:
Sheet No.
C ol lin C o.
B
A S
U pg ra de
F or
M cK in ne y, T ex as
B lo om da le R oa d
Ja ck
H at ch el A dm in ist ra tio n
Bu ild in g
M1.7AROOF PLAN - ADMIN - ALTERNATE01 SCALE: 1/8"=1'-0"
ROOF PLAN -
ADMIN -
| Sheets and Views |
| 251778 - COVER SHEET |
File details come from the government source that posted it. Updated .