This document contains architectural drawings and technical specifications for the rehabilitation and expansion of facilities at Puerto Castilla, Honduras, including a workshop (Taller de Motores), barracks (Barracas), and dock infrastructure operated by FEN (Fundación Especial de Naturaleza).

The workshop and barracks remodel specifications detail 12 work items requiring construction of new reinforced concrete masonry unit (CMU) walls with specific reinforcement patterns, wall and structure finishes including exposed concrete block and marine-grade epoxy coating of existing metal structures, installation of PVC/aluminum windows with mosquito mesh, a 5.00 m × 5.00 m double-leaf folding metal gate for workshop access, metal access doors (1.00 m × 2.10 m), one industrial washing sink for mechanical parts, PVC suspended ceiling in the barracks area, complete electrical distribution system with LED luminaires and NEC-compliant controls, Aluzinc corrugated metal cladding (gauge 24) on workshop exterior walls, galvanized cyclone mesh (gauge 24) on interior dorm area elevation, and two-component epoxy primer with polyurethane topcoat (150 µm minimum) for all exposed metal elements. Wall heights are specified at 2.93 m for workshop and 3.25 m for barracks. The dock rehabilitation and extension specifications cover 20 work items addressing approximately 40 linear meters of existing timber dock superstructure refurbishment and 15 meters of new dock extension, including pressure-treated timber piles (30 cm diameter, CCA Class UC5C), transverse and longitudinal timber beams (2"×12" treated pine), cross bracing, decking boards with non-slip finish, galvanized/stainless steel fasteners and connection hardware meeting ASTM standards, two-coat epoxy and polyurethane protective coatings (150 µm minimum DFT), and optional 7.5 cm reinforced concrete topping slab alternative. Additional requirements include pile driving monitoring, dynamic load testing of at least two piles, environmental protection with turbidity curtains, quality control testing and certification, and mobilization/demobilization of marine equipment. All materials must be suitable for high-salinity coastal marine environments, and contractor verification of site conditions with independent design calculations is mandated.

View the file

Other files

File Type Posted
19AQMM26N0287.pdf PDF
SOW FEN dock workshop barrack .pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8.

8.

4.98

FA

C

H

AD

A

LA

TE

R

AL

IZ

Q U

IE

R

D A

EL

EV

AC

IO

N

IN

TE

R

N A

A

TA

LL

ER

M

O

TO

R

ES

m

8.

PE-01

D O

R M

P

ER

SO

N

AS

m

4.84

1.91

1.05

FA

C

H

AD

A

LA

TE

R

AL

D

ER

EC

H A

FACHADA POSTERIOR

FACHADA FRONTAL

PE-02

8.

1 2 3 4 5 6 7 8

A B

C

4.99

8.05 8.04

4.

FACHADA LATERAL IZQUIERDA

ELEVACION INTERNA A

TALLER MOTORES 80 m2

PE

-0

A B C

PE

-0

DORM 8 PERSONAS

40 m2 4.

1.

1.

FACHADA LATERAL DERECHA

8.05

4.

Item Work Description Technical Specifications / Requirements

1 Construction of New Walls

Only the wall enclosures highlighted in the layout shall be built or intervened. Walls shall consist of 6” concrete masonry units (CMU) reinforced vertically every 0.60 m with one ½” rebar embedded in 2500 psi concrete, and horizontally every two courses with two ⅜” rebars. Concrete Ɵe columns (15x20 cm) shall have 4#4 rebars + #4 sƟrrups @20 cm spacing at corners and mid-spans exceeding 2.50 m. Intermediate columns (10x15 cm) at door/window jambs with 2#3 + #3@20.

Three horizontal bond beams (15x20 cm) shall be placed: one at floor level, one at 2.10 m, and one at wall top, all with 4#4 rebars + #4 stirrups @20 cm. Floor-level beam shall be epoxy-anchored to the slab using ½” dowels @40 cm. Wall heights:

2.93 m for workshop, 3.25 m for BARRACKS area. All perimeters reinforced and properly tied.

2 Wall and Structure Finishes All walls shall remain as exposed concrete block, unpainted, with joints cleaned and surfaces polished. All exposed concrete elements shall be smoothed. The entire existing metal structure of the building shall be cleaned of rust, repaired, and coated with marine-grade epoxy paint suitable for saline environments.

3 Windows Install sliding windows in PVC or aluminum, 4 mm thick glass, including mosquito mesh, as indicated in BARRACKSitory area.

Select most economical, corrosion-resistant option locally available. Frames must be sealed against humidity and corrosion.

Double-Leaf Folding Gate (Workshop)

Supply and install a metal double-leaf access gate (5.00 m x 5.00 m) including all frames, subframes, hinges, columns, and anchoring systems. Structure to combine perforated mesh and solid metal panels per contractor’s design, painted with epoxy marine-resistant coating. Include anchoring plates to floor and roof beams, with vertical supports for load-bearing.

5 Access Doors Install metal access doors (1.00 m x 2.10 m) as per layout, including metal frames, hinges, handles, locks, and all accessories.

Doors shall be coated with marine-resistant epoxy paint. Locks shall be single-lever latch sets for exterior entries.

6 Plumbing Fixtures Install one washing sink for mechanical parts in the workshop, including internal piping, valves, accessories, and necessary wall patching. Piping to be PVC or CPVC per local code; fixtures shall be heavy-duty type suitable for industrial use.

7 Ceilings (Dorm Area) Install PVC suspended ceiling in BARRACKS area, including all support framing, hangers, and connection to existing roof structure. Ceiling to be leveled, easily removable for maintenance, and resistant to humidity.

8 Electrical Installations

Provide complete electrical distribution system for workshop and BARRACKS. Use cost-effective, replaceable accessories:

LED luminaires, switches, receptacles, and control panels per NEC standards. Contractor shall include design for circuit routing (surface-mounted conduit or embedded as required), including wiring, breakers, and light fixtures. All materials UL-listed and compliant with Honduran code.

Exterior Metal Cladding (Workshop)

Install Aluzinc corrugated metal panels, gauge 24, on the outer walls as per drawings to prevent rain infiltration. Panels may be screw-fastened to existing framing. Contractor shall provide additional framing if required for proper support. Panels must extend between the new wall and roof structure, ensuring full closure. Apply anti-salinity protective coating to all finishes.

10 Interior Mesh Wall (Dorm Area) On elevation “A”, install galvanized cyclone mesh, gauge 24, to close the gap between new wall and roof structure. Include steel framing for proper support. All finishes must include corrosion protection suitable for coastal areas.

FEN – WORKSHOP AND BARRACKS AREAS REMODEL SPECIFICATIONS

FEN – WORKSHOP AND BARRACKS AREAS REMODEL SPECIFICATIONS

11 Painting and Surface Protection All exposed metal elements (doors, gates, windows, frames, trusses) shall receive a two-component epoxy primer and polyurethane topcoat, total DFT 150 µm minimum. Color per INL approval. Apply by spray or brush, following manufacturer’s technical data sheets.

12 General Notes All drawings, quantities, and layouts are reference only. Contractor shall perform site inspection and submit its own design verification, calculations, and construction methods. Any missing details shall be supplemented as required to ensure full and safe functionality of the facilities.

Spaces @2.50 aprox----40 m existing Dock to refurbish

Spaces @2.50 aprox----15 m Dock to construct

2.50

2.50

2.50

2.50

2.50

2.50

2"x6"x6´ PRESSURE TREATED WOOD DECK WITH EPOXY

PROTECTIVE COATING (EXISTING AND NEW SECTION)

PR

O

PU

ES

TA

D

IS

EÑ

O

Hoja Ref.

PR18

N ot as

C ol on , H on du ra s

Pr oy ec to

TA

LL

ER

D E

M O

TO

R

ES

, M

U

EL

LE

Y

B

AR

R

AC

AS

, F

EN

, P

U

ER

TO

C

AS

TI

LL

A

1 General Scope

The project includes the rehabilitation of approximately 40 linear meters of existing timber dock (superstructure only, retaining piles) and the construction of a 15-meter dock extension with complete new structure (piles, beams, bracing, decking, and hardware). Works shall be executed according to approved drawings, ensuring marine durability and compatibility with existing conditions.

2 Timber Piles (New Section)

Provide and install pressure-treated timber piles, diameter 30 cm, length as required, driven to firm bearing. Timber shall be CCA-treated Southern Pine or equivalent hardwood, AWPA Class UC5C (marine use), with minimum retention 0.96 kg/m³.

Pile heads shall be capped with 6 mm galvanized steel plates and protected with epoxy sealant. Piles shall be installed vertically, aligned, and cut to final elevation. Contractor shall record pile-driving data.

3 Pile Head Connectors Supply and install galvanized or stainless-steel pile head brackets and cap plates, ASTM A36, 6 mm thickness, with through-bolts (Ø19 mm min.) and washers. All exposed steel surfaces shall be hot-dip galvanized or coated with marine-grade epoxy and polyurethane paint.

4 Transverse Beams (Joists) Install 2"x12"x6' transverse timber beams, CCA-treated pine, retention 0.60 kg/m³. Beams shall be anchored to longitudinal members with galvanized steel plates and bolts. Ends sealed with epoxy resin. Ensure correct alignment and spacing per design drawings.

Longitudinal Beams (Main Load Beams)

Install 2"x12"x10' longitudinal timber beams, forming main dock girders. All beams to be pressure-treated, straight, and defect-free. Beams shall be joined with overlapping stainless-steel angles and double through-bolts. Apply marine epoxy coating on all contact surfaces.

6 Cross Bracing Provide and install 2"x8" diagonal timber braces (8' and 10' lengths) between pile rows for lateral stability. Braces shall be CCA-treated and fastened with galvanized clamps and bolts. Ensure tight fit and full contact at joints; no gaps >3 mm.

7 Decking Boards (Timber Option) Install 2"x6"x6' decking planks, pressure-treated pine, CCA 0.60 kg/m³, pre-coated with marine-grade epoxy. Boards shall be installed with 5–8 mm expansion gaps and fixed using stainless steel screws or galvanized bolts. Apply non-slip finish and seal all cut edges.

8 Fasteners and Connection Kits Provide all hardware, bolts, nuts, washers, plates, and clamps required for assembly. Bolts: Ø19 mm min., ASTM A307 galvanized or AISI 316 stainless. All kits shall include washers and locknuts. Contractor to verify quantities per drawing. All hardware to meet ASTM A153/A123 galvanizing standards.

9 Structural Angles and Plates Install 2½"x¼" stainless steel or galvanized angles for central joints and beam intersections. Material: ASTM A36 or AISI 316, thickness 6 mm. All drilling and edges shall be protected with zinc-rich primer and epoxy topcoat.

10 Epoxy and Protective Coatings All exposed timber ends shall be sealed with marine epoxy resin. All metal surfaces shall receive a two-coat system: (1) zinc-rich epoxy primer (75 µm) and (2) aliphatic polyurethane topcoat (75 µm), total DFT ≥150 µm. All coatings shall be suitable for high-salinity marine environments.

Pile Bracing and Stability Enhancements (Existing Dock)

Existing pile supports shall receive additional X-bracing between pile pairs using 2"x8" timber or galvanized round bars Ø25

mm. All connections to be bolted with galvanized hardware. Optional: install mid-level struts if lateral movement is observed.

12 Decking Replacement (Existing Dock) Remove all damaged planks and replace with new treated timber decking, same specifications as Item 7. Level the entire surface, ensuring consistent elevation and safe pedestrian load capacity (min. 2.5 kN/m²).

FEN – DOCK REHABILITATION AND EXTENSION SPECIFICATIONS

FEN – DOCK REHABILITATION AND EXTENSION SPECIFICATIONS

13 Concrete Topping Slab (Optional)

As an alternative to timber decking, provide a 7.5 cm thick reinforced concrete topping slab, cast over existing or new decking, using f’c=21 MPa (3,000 psi) concrete with corrosion inhibitor additive. Reinforcement: galvanized welded wire mesh 6x6–W2.9/W2.9 placed mid-depth. Surface finished with broom texture and marine epoxy sealer. Epoxy bonding agent to be applied to interface. Additional dead load ≤1.0 kN/m².

Formwork and Edge Containment (for concrete option)

Provide temporary or permanent marine plywood form decking as base for concrete topping. Perimeter edges to receive galvanized steel angle 2"x2"x3/16" anchored to beams. Joints every 3.0 m filled with polyurethane marine sealant.

15 Painting and Surface Finish All exposed steel elements (angles, bolts, brackets) shall be coated with epoxy primer + polyurethane topcoat (150–200 µm).

Timber to receive two coats of epoxy sealant + one coat polyurethane varnish. Colors per INL approval.

16 Pile Driving and Testing (New Section) Piles shall be driven using mechanical or hydraulic hammer, monitored for penetration rate and refusal. At least two piles to undergo dynamic load testing (PDA). Submit driving logs for each pile, showing depth, blows, and final set.

17 Mobilization / Demobilization Include all costs for mobilization of barge, crane, equipment, and crew. All fuel, transport, and loading operations shall be included. Demobilization includes cleaning of marine work area and removal of temporary facilities.

Environmental and Safety Requirements

Contractor shall comply with INL and Honduran environmental standards. Install turbidity curtains, collect all debris, and prevent release of oil or chemicals into the water. Life jackets, helmets, and PPE are mandatory for all workers.

19 Quality Control and Testing Contractor shall provide inspection and testing for: timber treatment certificates, galvanizing thickness, coating DFT verification, concrete compression tests, and final alignment inspection. As-built documentation and photographs required at completion.

20 General Notes Quantities and designs provided are indicative. Contractor shall verify all site conditions and adjust Design, dimensions and connections as required. All prices shall include materials, labor, equipment, transport, tools, safety, and installation for a fully operational structure. Any omission shall not relieve the contractor of responsibility for a complete functional system.

TALLER DE MOTORES Y DORMS layout
Sheets and Views
Model
TALLER DE MOTORES layout
Sheets and Views
Model
FEN DORM layout
Sheets and Views
Model
ELEVACION INTERNA A
FACHADA FRONTAL
FACHADA POSTERIOR
FACHADA LATERAL IZQUIERDA
FACHADA LATERAL DERECHA
WORKSHOP AND DORM SPECS
MUELLE FEN-DOCK LAYOUT
Sheets and Views
Model
MUELLE FEN-DECK
Sheets and Views
Model
DOCK SECTION A
DOCK SECTION B
FEN DOCK DETALLES
DOCK SPECS