Summary of Kealakekua Bay State Historical Park Improvements Project Plans
This document comprises mechanical, plumbing, and electrical construction plans for the Kealakekua Bay State Historical Park Improvements project administered by the State of Hawaii Department of Land and Natural Resources. The project encompasses construction of a new paved parking area, interpretive shelter, facility storage building, boardwalk, new asphaltic overlay, renovation of an existing pavilion, installation of a new composting restroom facility with appurtenances, and installation of a new aerobic wastewater treatment system. The plans document specifications for multiple buildings and facilities including the Napoopoo Interpretive Shelter, Equipment Storage Facility, Napoopoo Pavilion, and Compost Lua (composting toilet facility), with detailed mechanical systems including HVAC, ventilation controls, composting tank enclosures, and integrated solar power systems. All work must comply with Hawaii County Building Code, 2021 International Energy Conservation Code, ASHRAE standards, and applicable mechanical, plumbing, and electrical codes.
The plans specify that contractors must provide complete and operating systems as designed, arrange and pay for all permits and fees, and submit materials and equipment for owner approval prior to order release. All materials and equipment must be new and carry manufacturer warranties for one year from acceptance. Field investigations and site verification are mandatory prior to bidding, with all costs to accommodate existing conditions included in contractor bids. Mechanical specifications include seismic restraints per SMACNA standards, firestopping for fire-rated penetrations, and proper installation with manufacturer-recommended clearances. Plumbing work requires compliance with Hawaii County Plumbing Code and the 2021 International Plumbing Code, including pressure testing of water and waste lines and disinfection procedures. Electrical work must conform to the National Electrical Code, with utility coordination required and all electrical components listed or labeled by UL or recognized testing facilities. Record drawings, operation manuals, and maintenance documentation must be submitted upon project completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. PROVIDE COMPLETE AND OPERATING SYSTEMS AS SPECIFIED AND INDICATED ON DRAWINGS. "PROVIDE"
SHALL MEAN "FURNISH AND INSTALL" WHEN USED HEREIN.
2. WORK SHALL COMPLY WITH ALL LOCAL CODES AND ORDINANCES INCLUDING: ANSI B9.1/ASHRAE 15 - SAFETY CODE FOR MECHANICAL REFRIGERATION; HAWAII DOH CHAPTER 39, TITLE 11 - AIR CONDITIONING AND VENTILATION; HAWAII COUNTY BUILDING CODE;ASHRAE 62-2016 - VENTILATION STANDARD; SMACNA HVAC
DUCT CONSTRUCTION STANDARDS; 2021 INTERNATIONAL ENERGY CONSERVATION CODE.
3. CONTRACTOR SHALL ARRANGE AND PAY FOR ALL PERMITS AND FEES.
4. MATERIALS AND EQUIPMENT SHALL BE NEW AND GUARANTEED FOR ONE YEAR FROM THE DATE OF
ACCEPTANCE. MATERIALS AND EQUIPMENT SHALL BE AS SCHEDULED OR EQUAL, MEETING THE
REQUIREMENTS OF THE SPECIFICATION. MATERIALS AND EQUIPMENT SHALL BE SUBMITTED TO THE OWNER'S REPRESENTATIVE FOR APPROVAL PRIOR TO ORDER RELEASE. WORK SHALL BE GUARANTEED AGAINST DEFECTIVE WORKMANSHIP OR MATERIALS FOR A PERIOD OF ONE YEAR AFTER FINAL ACCEPTANCE OF THE PROJECT. WARRANTY WORK SHALL BE COMPLETED AT NO EXTRA CHARGE TO THE OWNER. FURNISH
MANUFACTURER'S PRODUCT WARRANTY CERTIFICATES IN A BINDER.
5. PRIOR TO COMMENCEMENT OF WORK AND ORDERING OF EQUIPMENT, CONTRACTOR SHALL SUBMIT ELECTRONIC PDF DOCUMENTS OF PROPOSED MATERIALS AND EQUIPMENT. RECORD DRAWINGS, OPERATION MANUALS AND MAINTENANCE MANUALS SHALL BE SUBMITTED AS REQUIRED BY OWNER'S REPRESENTATIVE
UPON COMPLETION.
6. PREPARE SUBMITTALS FOR ALL PRODUCTS TO BE FURNISHED BY THE CONTRACTOR, INCLUDING BUT NOT LIMITED TO EQUIPMENT, DUCTWORK, PIPING, AIR TERMINALS, AND SIMILAR ITEMS. SHOULD CONTRACTOR PROCEED WITH ORDERING OR INSTALLING PRODUCTS PRIOR TO SUBMITTAL REVIEW, ALL COSTS REQUIRED TO MODIFY OR REPLACE SUCH PRODUCTS SHALL BE BORNE BY THE CONTRACTOR. THE PROPOSED USE OF ITEMS SPECIFIED ON THESE DRAWINGS DOES NOT ALLEVIATE THE CONTRACTOR FROM ITS RESPONSIBILITY
TO PREPARE SUBMITTALS.
7. DRAWINGS SHALL NOT BE SCALED.
8. PENETRATIONS OF FIRE RATED WALLS OR FLOORS BY PIPE SHALL BE SEALED BY A FIRESTOPPING SYSTEM UL
LISTED FOR THE APPLICATION. INSTALL PENETRATION SEAL MATERIALS IN ACCORDANCE WITH PRINTED
INSTRUCTIONS OF THE UL FIRE RESISTANCE DIRECTORY AND MANUFACTURERS INSTRUCTIONS.
FIRESTOPPING SYSTEM SHALL BE EQUAL TO 3M FIRE BARRIER. FIRESTOPPING MATERIAL SHALL BE CAULK OR PUTTY TYPE. PROVIDE FIRE DAMPERS ON ALL DUCT PENETRATIONS THROUGH FIRE RATED WALLS AS
REQUIRED TO PRESERVE THE FIRE RATING OF THE STRUCTURE.
9. MECHANICAL EQUIPMENT SHALL BE SECURED AND INSTALLED PER MANUFACTURERS RECOMMENDATIONS AND APPLICABLE SECTIONS OF THE INTERNATIONAL BUILDING CODE AND INTERNATIONAL MECHANICAL CODE.
10. ELECTRICAL CHARACTERISTICS OF MECHANICAL EQUIPMENT SHALL BE VERIFIED WITH ELECTRICAL DRAWINGS PRIOR TO ORDER RELEASE. ADDITIONAL ELECTRICAL WORK RESULTING FROM EQUIPMENT
SUBSTITUTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
11. DUCTWORK, PIPING AND EQUIPMENT SHALL BE PROVIDED WITH SEISMIC RESTRAINTS IN ACCORDANCE WITH
THE SMACNA SEISMIC RESTRAINT MANUAL - GUIDELINES FOR MECHANICAL SYSTEMS.
12. ELECTRICAL: CONFORM TO THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE. CONTRACTOR SHALL REVIEW DRAWINGS AND SPECIFICATIONS BY ALL OTHER DIVISIONS. CONTRACTOR SHALL NOTIFY OTHER CONTRACTORS OF ANY ADDITIONAL WORK REQUIRED UNDER OTHER DIVISIONS TO COMPLETE OWN WORK.
OBTAIN EQUIPMENT MANUFACTURER'S CONTROL WIRING DIAGRAMS FOR THE EQUIPMENT FURNISHED.
ELECTRICAL EQUIPMENT SHALL BE FURNISHED WITH WEATHER PROOF (NEMA 4X WHEN POSSIBLE)
ENCLOSURES FOR OUTDOOR INSTALLATIONS AND OTHERWISE AS INDICATED ON PLANS.
13. FIELD INVESTIGATIONS: CONTRACTOR SHALL VISIT WORK-SITE TO VERIFY AND BECOME FULLY AWARE OF ALL EXISTING CONDITIONS. EXISTING CONDITIONS PRIOR TO BID. ALL COSTS REQUIRED TO ACCOMMODATE EXISTING CONDITIONS SHALL BE INCLUDED IN THE CONTRACTOR'S BID. NO ADDITIONAL ALLOWANCE AFTER BID WILL BE CONSIDERED DUE TO LACK OF SUCH DUE DILIGENCE OR FIELD EXAMINATION. INVESTIGATE THE CONTRACT DOCUMENTS AND MAKE PROPER PROVISIONS TO AVOID INTERFERENCES OR CONSTRUCTION DELAYS. DETERMINE THE EXACT ROUTE OF EACH DUCT AND PIPE. ANY DISCREPANCY SHALL BE
IMMEDIATELY BROUGHT TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE.
14. WORK CONDITIONS: FIELD VERIFY CONDITIONS AND DIMENSIONS FOR INTERFERENCES. INSTALLED WORK SHALL BE PROTECTED DURING CONSTRUCTION AND CLEANED FOR FINAL INSPECTION. TOUCH-UP PAINT ALL RAW EDGES OF METAL EXPOSED TO WEATHER. COORDINATE WITH OTHER TRADES FOR PIPE SLEEVES AND
INSTALLATION OF EQUIPMENT SUPPORTS.
15. REQUIREMENTS: PERFORM WORK USING PERSONNEL SKILLED IN THE TRADE INVOLVED. PROVIDE COMPETENT SUPERVISION. FURNISH NEW EQUIPMENT, MATERIALS AND ACCESSORIES BEARING THE MANUFACTURER'S IDENTIFICATION AND CONFORMING TO THE RECOGNIZED COMMERCIAL STANDARDS.
16. EQUIPMENT INSTALLATION: INSTALL EQUIPMENT IN THE SPACE ALLOTTED WITH SUFFICIENT CLEARANCE FOR PROPER OPERATION AND MAINTENANCE AND WITH SUFFICIENT HEAD CLEARANCE ACCORDING TO THE BUILDING CODE. WHERE EQUIPMENT DIFFERS IN ARRANGEMENT OR CONNECTIONS FROM THOSE SHOWN, PROVIDE ALL REQUIRED CHANGES IN PIPING, SUPPORTS AND APPURTENANCES. PROVIDE ACCESS PANELS
WHERE REQUIRED FOR MAINTENANCE ACCESS TO EQUIPMENT.
GENERAL MECHANICAL SPECIFICATIONS
VD
CO2
M#.#
MECHANICAL SYMBOLS
SD
SUPPLY OR OA DUCT ELBOW
DOWN
DEMOLITION
DUCTWORK TRANSITION
SHEET METAL DUCTWORK
RETURN OR EXHAUST DUCT ELBOW
DOWN
45° BOOT BRANCH TAKEOFF
ELBOW WITH TURNING VANES
SUPPLY OR OA DUCT UP
RETURN AIR OR EXHAUST DUCT UP
EXHAUST AIR DUCT UP
SUPPLY AIR DIFFUSER
RETURN AIR OR EXHAUST
REGISTER
VOLUME DAMPER
EQUIPMENT TAG
CO2 SENSOR MOUNTED IN DUCT
SMOKE DETECTOR MOUNTED IN DUCT
DETAIL DESIGNATION
CEILING ACCESS PANEL
PIPE RISER TO UPPER LEVEL
CAPPED LINE
PIPE ELBOW UP/DOWN
PIPE BRANCH TOP CONNECTION
PIPE BRANCH BOTTOM CONNECTION
PIPE UNION
POINT OF CONNECTION
POINT OF DISCONNECTION
DUCT CONTINUATION
BDD BACKDRAFT DAMPER
RS/RL REFRIGERANT PIPES (SUCTION
AND LIQUID)
NAME: ELI B. WALTZ
TITLE: LICENSE NO.:
04/28/26
I CERTIFY THAT, TO THE BEST OF KNOWLEDGE, THIS PROJECTS DESIGN
SUBSTANTIALLY CONFORMS TO THE BUILDING ENERGY EFFICIENCY
STANDARDS PERTAINING TO THE COMMERCIAL PROVISIONS FOR
MECHANICAL SYSTEMS (C403, C404, & C405) OF THE 2021 IECC
COMPLIANCE METHOD
INFORMATION IN CONSTRUCTION DOCUMENTS
HVAC SYSTEMS
EQUIPMENT CAPACITY AND EFFICIENCY.
THERMOSTATIC CONTROLS.
VENTILATION RATE.
DEMAND CONTROL VENTILATION CONTROLS.
ENCLOSED PARKING GARAGE VENTILATION CONTROL.
ENERGY RECOVERY VENTILATION SYSTEM.
KITCHEN EXHAUST SYSTEM.
DUCT AND PLENUM INSULATION THICKNESS/R-VALUE.
DUCT AND PLENUM SEALING REQUIREMENTS.
PIPE INSULATION THICKNESS/R-VALUE.
FAN MOTOR HORSEPOWER.
FAN EFFICIENCY.
FAN MOTOR EFFICIENCY.
YES N/A
PUMP MOTOR EFFICIENCY.
VARIABLE-FLOW FAN CONTROL.
STATIC PRESSURE SENSOR LOCATION.
STATIC PRESSURE RESET CONTROL.
CHILLED WATER VARIABLE FLOW CONTROL.
CHILLER ISOLATION.
COOLING TOWER FAN CONTROL.
TERMINAL UNIT MINIMUM AND MAXIMUM AIRFLOW.
COMMISSIONING REQUIREMENTS.
REFRIGERATION
REFRIGERATION EQUIPMENT EFFICIENCY.
WALK-IN COOLERS AND FREEZERS.
REFRIGERATED DISPLAY CASES.
SERVICE WATER HEATING
HEAT RECOVERY FOR SERVICE WATER HEATING.
EQUIPMENT CAPACITY AND EFFICIENCY.
PIPE INSULATION.
HOT WATER PIPE LENGTH/VOLUME.
HOT WATER CIRCULATION CONTROLS.
HEATED POOL AND SPA COVERS.
COMMISSIONING REQUIREMENTS.
DATE:
SIGNATURE:
MECHANICAL ENGINEER 18572-M
X X X X X X X X X X X X X X X X X X X X X X
X
X X
NOTES:
X
X X X X
X X
X
COMMERCIAL BUILDING ENERGY EFFICIENCY STANDARDS
HAWAII COUNTY ENERGY CODE
2021 IECC, HAWAII REVISED STATUTES HRS 107-24 TO 28
2021 IECC AS AMENDED. MANDATORY AND PRESCRIPTIVE
2021 IECC AS AMENDED.
MANDATORY AND TOTAL BUILDING PERFORMANCE
ASHRAE STANDARD 90.1-2019. MANDATORY AND PRESCRIPTIVE
ASHRAE STANDARD 90.1-2019.
MANDATORY AND ENERGY COST BUDGET
STATE AMENDMENTS: UNAMENDED
COUNTY AMENDMENTS: PENDING
ELECTIVE USE OF 2021 CODES TO BEGIN 01/29/2025
STATE OR HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
KEALAKEKUA BAY STATE HISTORICAL
PARK IMPROVEMENTS
SYM. DESCRIPTION DATE APPROVEDREVISION
NO. SYM. DESCRIPTION SHT./OF DATE
ENGINEERING PARTNERS, INC
DESIGNED:
DRAWN:
CHECKED:
APPROVED:
SUBMITTED:
DATE:
SCALE: AS NOTED
CHIEF ENGINEER: DATE:
DRAWING NO.
SHEET NO. OF 143 SHEETSJOB NO.: F14C728D
KE
AL
AK
EK
U A
BA
Y
H
IS
TO
R
IC
AL
P
AR
K
SI
TE
IM
PR
O
VE
M
EN
TS
J O
B N
O . F
C
8D
ENGINEERING DIVISIONE
L I B . W A L T Z
SIGNATURE
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION,
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION.
AAH
W A
UI,I S. . .
LICENSED
PROFESSIONAL
ENGINEER
Exp. 04/30/28 No. 18572-M
MECHANICAL SYMBOLS,NOTES. & IECC
CF
CF
EW
ML-001
'LQD�/DX
(�VLJQHG�����������������30�+67
GLQD�X�ODX#KDZDLL�JRY
6WDWH�RI�+DZDLL
&LYLO�(QJLQHHU
AutoCAD SHX Text M:\EO Projects\2025 Projects\12005-25-03 Kealakekua Bay Historical Park Impr\4-Dwg\Mechanical\M-X_Compost Lua.dwg
AutoCAD SHX Text 05/05/2026 4:32 pm https://stateofhawaii.na1.adobesign.com/verifier?tx=CBJCHBCAABAA2Jg8ITczUj0yvS7afLGVZGmhv_7Hlkga https://stateofhawaii.na1.adobesign.com/verifier?tx=CBJCHBCAABAA2Jg8ITczUj0yvS7afLGVZGmhv_7Hlkga
UP
BA
COMPOSTING
TANK
ENCLOSURE
BA
4" PVC VENT PIPE TO WEATHER CAP. CONNECT TO
COMPOSTER INTEGRAL VENTILATION FAN. SEE B/ML-101.
COMPOSTER SYSTEM
UP
BA
UNISEX
TOILET
UNISEX
TOILET
UNCOVERED
LANAI
PIPE
CHASE/STO
4" PVC VENT PIPE TO WEATHER CAP. CONNECT TO
COMPOSTER INTEGRAL VENTILATION FAN. SEE A/ML-101.
NATURAL VENTILATION. SEE
ARCHITECTURAL DRAWINGS.
NATURAL VENTILATION. SEE
ARCHITECTURAL DRAWINGS.
SCALE: 1/2" = 1'-0" 0 2' 4' NA VENTILATION PLAN - LOWER FLOOR
SCALE: 1/2" = 1'-0" 0 2' 4' NB VENTILATION PLAN - MAIN FLOOR
THIMBLE
FLASHING CONE
ROOF CONSTRUCTION
DWGS. ROOF TIE-IN BY
REFER TO ARCHITECTURAL
G.C.
COLLAR
THIMBLE
PAINT TO MATCH ROOF
BIRD PROOF CAP
RAIN PROOF &
FLAT TO 9/12
ROOF PITCH
OVER 10/12 TO 12/12
OVER 9/12 TO 10/12
DISTANCE "X"
2.0 FT.
4.0 FT.
3.0 FT.
"X
NO SCALE1 WEATHER CAP DETAIL
NOTICES
1. ALL ATTACHMENT HARDWARE FOR ANCHORING OUTDOOR PIPING AND EQUIPMENT SHALL
BE STAINLESS STEEL 316 CONSTRUCTION, INCLUDING NUTS, BOLTS, PIPE CLAMPS, AND
HANGERS. ALL SLOTTED STEEL CHANNELS SHALL BE STAINLESS STEEL 316
CONSTRUCTION.
2. ALL EXPOSED EQUIPMENT, PIPING, AND SUPPORTS SHALL BE PAINTED WITH CORROSION
RESISTANT COATINGS. COLOR TO MATCH SURROUNDINGS.
STATE OR HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
KEALAKEKUA BAY STATE HISTORICAL
PARK IMPROVEMENTS
SYM. DESCRIPTION DATE APPROVEDREVISION
NO. SYM. DESCRIPTION SHT./OF DATE
ENGINEERING PARTNERS, INC
DESIGNED:
DRAWN:
CHECKED:
APPROVED:
SUBMITTED:
DATE:
SCALE: AS NOTED
CHIEF ENGINEER: DATE:
DRAWING NO.
SHEET NO. OF 143 SHEETSJOB NO.: F14C728D
KE
AL
AK
EK
U A
BA
Y
H
IS
TO
R
IC
AL
P
AR
K
SI
TE
IM
PR
O
VE
M
EN
TS
J O
B N
O . F
C
8D
ENGINEERING DIVISIONE
L I B . W A L T Z
SIGNATURE
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION,
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION.
AAH
W A
UI,I S. . .
LICENSED
PROFESSIONAL
ENGINEER
Exp. 04/30/28 No. 18572-M
VENTILATION PLANS - LOWER AND MAIN FLOOR
CF
CF
EW
ML-101
'LQD�/DX
(�VLJQHG�����������������30�+67
GLQD�X�ODX#KDZDLL�JRY
6WDWH�RI�+DZDLL
&LYLO�(QJLQHHU
AutoCAD SHX Text M:\EO Projects\2025 Projects\12005-25-03 Kealakekua Bay Historical Park Impr\4-Dwg\Mechanical\M-X_Compost Lua.dwg
AutoCAD SHX Text 05/05/2026 4:32 pm
G
PLUMBING SYMBOLS
1. PROVIDE COMPLETE PLUMBING SYSTEM AS SPECIFIED AND INDICATED ON DRAWINGS. "PROVIDE" SHALL MEAN "FURNISH AND INSTALL" WHEN
USED HEREIN.
2. THESE DRAWINGS ARE DIAGRAMMATIC TO SHOW WORK SCOPE, NOT SHOP DRAWINGS SHOWING ALL CONDITIONS OF EXISTING WORK.
CONTRACTOR MAY MODIFY TO SUIT CONDITIONS.
3. WORK SHALL COMPLY WITH ALL LOCAL CODES AND ORDINANCES INCLUDING: HAWAII COUNTY PLUMBING CODE, 2021 INTERNATIONAL PLUMBING CODE, HAWAII COUNTY BUILDING CODE, AND ALL OTHER APPLICABLE STANDARDS AND CODES.
4. CONTRACTOR SHALL ARRANGE AND PAY FOR ALL PERMITS AND FEES.
5. WORK SHALL BE COORDINATED WITH THE WORK OF OTHER TRADES. WORK SHALL BE GUARANTEED AGAINST DEFECTIVE WORKMANSHIP OR MATERIALS FOR A PERIOD OF ONE YEAR AFTER FINAL ACCEPTANCE OF THE PROJECT. WARRANTY WORK SHALL BE COMPLETED AT NO EXTRA CHARGE TO THE OWNERS. FURNISH MANUFACTURER'S PRODUCT WARRANTY CERTIFICATES IN A BINDER.
6. MATERIALS AND EQUIPMENT SHALL BE NEW AND GUARANTEED FOR ONE YEAR FROM THE DATE OF ACCEPTANCE. MATERIALS AND EQUIPMENT SHALL BE AS SCHEDULED OR EQUAL, MEETING THE REQUIREMENTS OF THE SPECIFICATION. MATERIALS AND EQUIPMENT SHALL
BE SUBMITTED TO THE ARCHITECT FOR APPROVAL PRIOR TO ORDER RELEASE.
7. RECORD DRAWINGS, OPERATION MANUALS AND MAINTENANCE MANUALS SHALL BE SUBMITTED AS REQUIRED BY ARCHITECT UPON
COMPLETION.
8. DRAWINGS SHALL NOT BE SCALED.
9. PENETRATIONS OF FIRE RATED WALLS OR FLOORS BY PIPE SHALL BE SEALED BY A FIRESTOPPING SYSTEM UL LISTED FOR THE APPLICATION.
INSTALL PENETRATION SEAL MATERIALS IN ACCORDANCE WITH PRINTED INSTRUCTIONS OF THE UL FIRE RESISTANCE DIRECTORY AND MANUFACTURERS INSTRUCTIONS. FIRESTOPPING SYSTEM SHALL BE EQUAL TO 3M FIRE BARRIER. FIRESTOPPING MATERIAL SHALL BE CAULK
OR PUTTY TYPE.
10. EQUIPMENT SHALL BE SECURED AND INSTALLED PER MANUFACTURERS RECOMMENDATIONS AND APPLICABLE SECTIONS OF THE UNIFORM
BUILDING CODE AND UNIFORM MECHANICAL CODE.
11. EQUIPMENT SHALL BE IDENTIFIED WITH BAKELITE NAMEPLATES. COLOR CODING OF NAMEPLATES AND IDENTIFICATION INFORMATION SHALL
BE COORDINATED WITH THE OWNER.
12. ELECTRICAL CHARACTERISTICS OF EQUIPMENT SHALL BE VERIFIED WITH ELECTRICAL DRAWINGS PRIOR TO ORDER RELEASE. ADDITIONAL ELECTRICAL WORK RESULTING FROM EQUIPMENT SUBSTITUTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
13. THE OWNER SHALL BE NOTIFIED IN WRITING OF SHUTDOWN OF UTILITIES REQUIRED BY THE EXECUTION OF THIS CONTRACT.
14. INSPECTIONS: ARRANGE FOR INSPECTIONS BY ADMINISTRATIVE AUTHORITY.
15. ELECTRICAL: CONFORM TO THE REQUIREMENTS OF ANSI, AND NATIONAL ELECTRICAL CODE. OBTAIN EQUIPMENT MANUFACTURER'S
CONTROL WIRING DIAGRAMS FOR THE EQUIPMENT FURNISHED.
16. FIELD INVESTIGATIONS: VISIT THE WORK-SITE AND BECOME FULLY AWARE OF ALL EXISTING CONDITIONS. INVESTIGATE THE CONTRACT DOCUMENTS AND MAKE PROPER PROVISIONS TO AVOID INTERFERENCES OR CONSTRUCTION DELAYS. EXISTING UTILITY LOCATIONS SHALL BE FIELD-VERIFIED. UNFORESEEN OBSTRUCTIONS OR LACK OF INVERT DEPTH SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT.
17. REQUIREMENTS: PERFORM WORK USING PERSONNEL SKILLED IN THE TRADE INVOLVED. PROVIDE COMPETENT SUPERVISION. FURNISH NEW EQUIPMENT, MATERIALS AND ACCESSORIES BEARING THE MANUFACTURER'S IDENTIFICATION AND CONFORMING TO THE RECOGNIZED COMMERCIAL STANDARDS. COORDINATE WITH OTHER TRADES FOR PIPE SLEEVES AND INSTALLATION OF EQUIPMENT SUPPORTS
18. EQUIPMENT INSTALLATION: INSTALL EQUIPMENT IN THE SPACE ALLOTTED WITH SUFFICIENT CLEARANCE FOR PROPER OPERATION AND MAINTENANCE AND WITH SUFFICIENT HEAD CLEARANCE ACCORDING TO THE BUILDING CODE. WHERE EQUIPMENT DIFFERS IN ARRANGEMENT OR CONNECTIONS FROM THOSE SHOWN, PROVIDE ALL REQUIRED CHANGES IN PIPING, SUPPORTS AND APPURTENANCES. INSTALLED WORK SHALL BE PROTECTED DURING CONSTRUCTION AND CLEANED FOR FINAL INSPECTION. TOUCH-UP PAINT ALL RAW EDGES OF METAL EXPOSED
TO WEATHER.
19. PIPING: INSPECT FOR AND REMOVE ALL INTERIOR OBSTRUCTIONS AND BURRS BEFORE INSTALLATION. SLOPE DRAINS AT 14" PER FOOT.
PERFORATED STRAP AND WIRES ARE NOT ACCEPTABLE HANGERS.
20. FERROUS PIPING SHALL HAVE A PROTECTIVE COATING OF AN APPROVED TYPE; MACHINE APPLIED IN ACCORDANCE WITH RECOGNIZED
STANDARDS. APPROVED NONFERROUS PIPING SHALL NOT BE REQUIRED TO BE WRAPPED.
21. WATER LINES: PROTECT AGAINST ELECTROLYSIS WITH TWO LAYERS OF ANTI-CORROSION TAPE WHERE THEY CONTACT FERROUS METAL.
22. PRESSURIZE ROUGH-IN WATER LINES TO 125 PSI FOR 3 HOURS AND INSPECT FOR LEAKS BEFORE BEING CLOSED UP. RETEST LINES AT 75 PSI AFTER FIXTURES ARE CONNECTED. TEST WASTE LINES TO HOLD 10' WATER HEAD FOR 15 MINUTES WITHOUT LOSS.
23. FLUSH OUT AND DISINFECT WATER LINES WITH 50 PPM CHLORINE FOR 6 HOURS OR 100PPM FOR TWO UNLESS WAIVED BY THE OWNER IN
WRITING. FLUSH PIPES UNTIL RESIDUAL IS DOWN TO 0.3 PPM.
24. INSTALL INSULATION SYSTEM IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS USING TRADESMAN SKILLED IN THIS TRADE AND APPROVED BY THE INSULATION MANUFACTURER. PROVIDE INSULATION PRODUCTS WITH A COMPOSITE (INSULATION, JACKET AND ADHESIVE) FIRE AND SMOKE HAZARD RATING AS TESTED UNDER ASTM E84, NFPA 255 AND UL 723, NOT EXCEEDING A FLAME SPREAD OF 25 AND SMOKE
DEVELOPED OF 50.
25. EXPANSION CLEARANCES: AT POINTS WHERE PIPE WILL MOVE DURING EXPANSION AND CONTRACTION (EXPANSION JOINTS, Z-BENDS, EXPANSION LOOPS AND ELLS), CLEARANCES BETWEEN THE PIPE AND ENCASED INSULATION SHALL BE SIZED TO PERMIT FULL PIPE
MOVEMENT WITHOUT CRACKING OR DAMAGING INSULATION AND JACKET.
26. WATER HAMMER ARRESTOR(S): BUILDING WATER SUPPLY SYSTEMS WHERE QUICK-ACTING VALVES ARE INSTALLED SHALL BE PROVIDED WITH WATER HAMMER ARRESTOR(S) TO ABSORB HIGH PRESSURES RESULTING FROM THE QUICK CLOSING OF THESE VALVE PER UPC 609.11.
GENERAL PLUMBING NOTES
SANITARY LINE
PLUMBING VENT
COLD WATER LINE
HOT WATER LINE
HOT WATER RETURN LINE
GAS LINE
DEMOLITION
PIPE RISER TO UPPER LEVEL
CAPPED LINE
PIPE ELBOW UP/DOWN
PIPE BRANCH TOP CONNECTION
PIPE BRANCH BOTTOM CONNECTION
PIPE UNION
BALL VALVE
CHECK VALVE
GATE VALVE
PRESSURE REDUCING VALVE
EMERGENCY GAS SHUT-OFF VALVE
EQUIPMENT TAG
PLUMBING ABBREVIATIONS
HERTZ
KILOWATT
LAVATORY
MANUFACTURER
MAXIMUM
MECHANICAL
MINIMUM
MOUNTED
NOMINAL
NET POSITIVE SUCTION HEAD
PHASE
PLUMBING
PRESSURE REDUCING VALVE
QUANTITY
ROOF DRAIN
REQUIRED
REDUCING PRESSURE BACKFLOW
PREVENTOR
ROOM
SANITARY
SHOWER DRAIN
SHOWER
SERVICE SINK
SQUARE
TEMPERATURE AND PRESSURE
TOTAL DISCHARGE HEAD
TEMPERATURE
TRAP PRIMER
TYPICAL
URINAL
VENT
VACUUM BREAKER
VENT TO ROOF
WITH
WATER CLOSET
WALL CLEANOUT
HZ
KW
LAV
MANUF
MAX
MECH
MIN
MTD
NOM
NPSH
PH
PLMB
PRV
QTY
RD
REQ'D
RPBP
RM
S
SD
SHWR
SS
SQ
T&P
TDH
TEMP
TP
TYP
UR
V
VB
VTR
W/
WC
WCO
EXISTING
DEMOLITION
NEW
RELOCATED
ABOVE
ADJUSTABLE
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
APPROXIMATELY
ARCHITECT
BUILDING
BRAKE HORSEPOWER
BRITISH THERMAL UNITS
BALL VALVE
CAPACITY
CEILING
CONCRETE
CONNECT
CONTINUATION
CLEANOUT TO GRADE
COLD WATER
DRINKING FOUNTAIN
DOWN
EACH
ELECTRICAL
EXISTING
FLOOR DRAIN
FLOOR CLEANOUT
FLOOR
FLOOR SINK
GALLONS
GALLONS PER MINUTE
HOSE BIBB
FLEXIBLE
FLOOR
FEET
HEATER
ABV
ADJ
AFF
AFG
APPROX
ARCH
BLDG
BHP
BTU
BV
CAP
CLG
CONC
CONN
CONT'N
COTG
CW
DF
DN
EA
ELEC
EXIST
FD
FCO
FLR
FS
GAL
GPM
HB
FLEX
FLR
FT
HTR
(E) (D) (N) (R)
STATE OR HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
KEALAKEKUA BAY STATE HISTORICAL
PARK IMPROVEMENTS
SYM. DESCRIPTION DATE APPROVEDREVISION
NO. SYM. DESCRIPTION SHT./OF DATE
ENGINEERING PARTNERS, INC
DESIGNED:
DRAWN:
CHECKED:
APPROVED:
SUBMITTED:
DATE:
SCALE: AS NOTED
CHIEF ENGINEER: DATE:
DRAWING NO.
SHEET NO. OF 143 SHEETSJOB NO.: F14C728D
KE
AL
AK
EK
U A
BA
Y
H
IS
TO
R
IC
AL
P
AR
K
SI
TE
IM
PR
O
VE
M
EN
TS
J O
B N
O . F
C
8D
ENGINEERING DIVISIONE
L I B . W A L T Z
SIGNATURE
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION,
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION.
AAH
W A
UI,I S. . .
LICENSED
PROFESSIONAL
ENGINEER
Exp. 04/30/28 No. 18572-M
P-001
PLUMBING SYMBOLS & NOTES
MS
MS
EW
'LQD�/DX
(�VLJQHG�����������������30�+67
GLQD�X�ODX#KDZDLL�JRY
6WDWH�RI�+DZDLL
&LYLO�(QJLQHHU
AutoCAD SHX Text M:\EO Projects\2025 Projects\12005-25-03 Kealakekua Bay Historical Park Impr\4-Dwg\Plumbing\Napoopoo Interpretive Shelter\P-X_Interpretive Shelter.dwg
AutoCAD SHX Text 05/05/2026 4:44 pm
X
X
X
X
X
X
X cotg cotg
AeccDbGrading (AeccLand130)
AeccDbGrading (AeccLand130) cotg cotg
STATE OR HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
KEALAKEKUA BAY STATE HISTORICAL
PARK IMPROVEMENTS
SYM. DESCRIPTION DATE APPROVEDREVISION
NO. SYM. DESCRIPTION SHT./OF DATE
ENGINEERING PARTNERS, INC
DESIGNED:
DRAWN:
CHECKED:
APPROVED:
SUBMITTED:
DATE:
SCALE: AS NOTED
CHIEF ENGINEER: DATE:
DRAWING NO.
SHEET NO. OF 143 SHEETSJOB NO.: F14C728D
KE
AL
AK
EK
U A
BA
Y
H
IS
TO
R
IC
AL
P
AR
K
SI
TE
IM
PR
O
VE
M
EN
TS
J O
B N
O . F
C
8D
ENGINEERING DIVISIONE
L I B . W A L T Z
SIGNATURE
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION,
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION.
AAH
W A
UI,I S. . .
LICENSED
PROFESSIONAL
ENGINEER
Exp. 04/30/28 No. 18572-M
PK-101
OVERALL PLUMBING SITE PLAN
SCALE: 1" = 20' 0 20' 40' NA OVERALL PLUMBING SITE PLAN
SEE A
PK-201
PLUMBING PLAN
MS
MS
EW
'LQD�/DX
(�VLJQHG�����������������30�+67
GLQD�X�ODX#KDZDLL�JRY
6WDWH�RI�+DZDLL
&LYLO�(QJLQHHU
AutoCAD SHX Text M:\EO Projects\2025 Projects\12005-25-03 Kealakekua Bay Historical Park Impr\4-Dwg\Plumbing\Napoopoo Interpretive Shelter\P-X_Interpretive Shelter.dwg
AutoCAD SHX Text 05/05/2026 4:44 pm
EXHIBIT
AREA
COVERED
LANAI
UNISEX
RESTROOM
UTILITY
FAMILY
RESTROOM
WC-2
SS
WC-1
L-1
L-2
EWC
2"WCO
4"WCO
4"WCO
4"VTR
4"S, SEE CIVIL
DWGS FOR
CONT'N.
1-1/2" CW SUPPLY, SEE
CIVIL DWGS FOR CONT'N.
1-1/2" BALL VALVE & PRV,
SET PRV @ 60 PSI
4"S, SEE CIVIL
DWGS FOR
CONT'N.
WC-1
WC-2
L-2
L-1
SS
EWC
2" 2"
2"
2"2" 2"
2"
2"
4"
4" 4"
4"4"WCO
4" WCO
2" WCO 4"
4" VTR
4" WC-2
L-2
SS
EWC WC-1
L-1 1-1/2" BALL VALVE & PRV,
SET PRV @ 60 PSI
1-1/2" CW SUPPLY, SEE
CIVIL DWGS FOR CONT'N.
112" 112"
112"
1" 12"
12" 12"
12"
12" 1"
112"114"
114"
STATE OR HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
KEALAKEKUA BAY STATE HISTORICAL
PARK IMPROVEMENTS
SYM. DESCRIPTION DATE APPROVEDREVISION
NO. SYM. DESCRIPTION SHT./OF DATE
ENGINEERING PARTNERS, INC
DESIGNED:
DRAWN:
CHECKED:
APPROVED:
SUBMITTED:
DATE:
SCALE: AS NOTED
CHIEF ENGINEER: DATE:
DRAWING NO.
SHEET NO. OF 143 SHEETSJOB NO.: F14C728D
KE
AL
AK
EK
U A
BA
Y
H
IS
TO
R
IC
AL
P
AR
K
SI
TE
IM
PR
O
VE
M
EN
TS
J O
B N
O . F
C
8D
ENGINEERING DIVISIONE
L I B . W A L T Z
SIGNATURE
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION,
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION.
AAH
W A
UI,I S. . .
LICENSED
PROFESSIONAL
ENGINEER
Exp. 04/30/28 No. 18572-M
PK-201
PLUMBING PLAN, DIAGRAMS & DETAILS
SCALE: 1/4" = 1'-0" 0 4' 8' NA PLUMBING PLAN
NO SCALE1 SANITARY PIPING DIAGRAM
NO SCALE2 WATER PIPING DIAGRAM
FINISH FLOOR
MAY EXTEND AS WASTE OR
VENT PIPING
PROVIDE CAST BRONZE
TAPER THREAD PLUG WITH
STAINLESS STEEL ROUND
COVER AND SCREW
REFER TO SPECIFICATIONS
FOR EXACT PIPING
MATERIALS AND COUPLING
TYPE (TYPICAL)
COMBINATION WYE AND 1/8
BEND IF CLEANOUT OCCURS
MIDSTREAM
FOR WALL CONSTRUCTION
REFER TO ARCHITECTURAL
DRAWINGS
PROVIDE SANITARY TAP TEE OR
TEST TEE WITH TAP ON TOP AS
REQUIRED OR CONTRACTOR
MAY CHOSE TO PROVIDE
MANUFACTURED CLEANOUT TEE
WITH COUNTERSUNK PLUG
PROVIDE 1/4 BEND LONG SWEEP (90° EXTRA
LONG ELBOW) FITTING IF CLEANOUT OCCURS
AT END OF LINE
VENT PIPE
METAL ROOFING
1" ANNULAR SPACE
ALL AROUND VENT
PIPE
SILICONE SEALANT
6" M
IN
ROOF FASTENERS
SILICONE FLASHING BOOT
SQUARE BASE FLASHING
EPDM RUBBER OR
NO SCALE4 VENT THRU ROOF DETAIL
NO SCALE3 WALL CLEANOUT DETAIL
MS
MS
EW
'LQD�/DX
(�VLJQHG�����������������30�+67
GLQD�X�ODX#KDZDLL�JRY
6WDWH�RI�+DZDLL
&LYLO�(QJLQHHU
AutoCAD SHX Text M:\EO Projects\2025 Projects\12005-25-03 Kealakekua Bay Historical Park Impr\4-Dwg\Plumbing\Napoopoo Interpretive Shelter\P-X_Interpretive Shelter.dwg
AutoCAD SHX Text 05/05/2026 4:44 pm
X
X
X
X
X
X cotg cotg
AeccDbGrading (AeccLand130)
AeccDbGrading (AeccLand130) cotg cotg
STATE OR HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
KEALAKEKUA BAY STATE HISTORICAL
PARK IMPROVEMENTS
SYM. DESCRIPTION DATE APPROVEDREVISION
NO. SYM. DESCRIPTION SHT./OF DATE
ENGINEERING PARTNERS, INC
DESIGNED:
DRAWN:
CHECKED:
APPROVED:
SUBMITTED:
DATE:
SCALE: AS NOTED
CHIEF ENGINEER: DATE:
DRAWING NO.
SHEET NO. OF 143 SHEETSJOB NO.: F14C728D
KE
AL
AK
EK
U A
BA
Y
H
IS
TO
R
IC
AL
P
AR
K
SI
TE
IM
PR
O
VE
M
EN
TS
J O
B N
O . F
C
8D
ENGINEERING DIVISIONE
L I B . W A L T Z
SIGNATURE
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION,
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION.
AAH
W A
UI,I S. . .
LICENSED
PROFESSIONAL
ENGINEER
Exp. 04/30/28 No. 18572-M
PS-101
OVERALL PLUMBING SITE PLAN
SCALE: 1" = 20' 0 20' 40' NA OVERALL PLUMBING SITE PLAN
SEE A
PS-201
PLUMBING PLAN
MS
MS
EW
'LQD�/DX
(�VLJQHG�����������������30�+67
GLQD�X�ODX#KDZDLL�JRY
6WDWH�RI�+DZDLL
&LYLO�(QJLQHHU
AutoCAD SHX Text M:\EO Projects\2025 Projects\12005-25-03 Kealakekua Bay Historical Park Impr\4-Dwg\Plumbing\Napoopoo Equipment Storage Facility\P-X_Equipment Storage.dwg
AutoCAD SHX Text 05/05/2026 4:46 pm
XX XX XX XXXX XX XX XXXX XX XX XX
X
X X
X X
X
XX
X X
X X
X X
X X
XOFFICE
UTIL./STO.
ACC
RESTROOM
CARPORT
WC-1
L-1
3"WCO
3"VTR
SS
3"S, SEE CIVIL
DWGS FOR
CONT'N.
1-1/4"CW SUPPLY, SEE
CIVIL DWGS FOR CONT'N.
1-1/4" BALL VALVE & PRV,
SET PRV @ 60 PSI
3"S, SEE CIVIL
DWGS FOR
CONT'N.
L-1
SS
WC-1
3"VTR
3"
3"
3" 2"
2" 2"
2"
3"WCO
1-1/4"CW SUPPLY, SEE
CIVIL DWGS FOR CONT'N.
WC-1
L-1
SS
1-1/4" BALL VALVE & PRV,
SET PRV @ 60 PSI
114" 114"
1"
12" 12"
STATE OR HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
KEALAKEKUA BAY STATE HISTORICAL
PARK IMPROVEMENTS
SYM. DESCRIPTION DATE APPROVEDREVISION
NO. SYM. DESCRIPTION SHT./OF DATE
ENGINEERING PARTNERS, INC
DESIGNED:
DRAWN:
CHECKED:
APPROVED:
SUBMITTED:
DATE:
SCALE: AS NOTED
CHIEF ENGINEER: DATE:
DRAWING NO.
SHEET NO. OF 143 SHEETSJOB NO.: F14C728D
KE
AL
AK
EK
U A
BA
Y
H
IS
TO
R
IC
AL
P
AR
K
SI
TE
IM
PR
O
VE
M
EN
TS
J O
B N
O . F
C
8D
ENGINEERING DIVISIONE
L I B . W A L T Z
SIGNATURE
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION,
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION.
AAH
W A
UI,I S. . .
LICENSED
PROFESSIONAL
ENGINEER
Exp. 04/30/28 No. 18572-M
PS-201
PLUMBING PLAN, DIAGRAMS & DETAILS
SCALE: 1/4" = 1'-0" 0 4' 8' NA PLUMBING PLAN
NO SCALE1 SANITARY PIPING DIAGRAM
NO SCALE2 WATER PIPING DIAGRAM
FINISH FLOOR
MAY EXTEND AS WASTE OR
VENT PIPING
PROVIDE CAST BRONZE
TAPER THREAD PLUG WITH
STAINLESS STEEL ROUND
COVER AND SCREW
REFER TO SPECIFICATIONS
FOR EXACT PIPING
MATERIALS AND COUPLING
TYPE (TYPICAL)
COMBINATION WYE AND 1/8
BEND IF CLEANOUT OCCURS
MIDSTREAM
FOR WALL CONSTRUCTION
REFER TO ARCHITECTURAL
DRAWINGS
PROVIDE SANITARY TAP TEE OR
TEST TEE WITH TAP ON TOP AS
REQUIRED OR CONTRACTOR
MAY CHOSE TO PROVIDE
MANUFACTURED CLEANOUT TEE
WITH COUNTERSUNK PLUG
PROVIDE 1/4 BEND LONG SWEEP (90° EXTRA
LONG ELBOW) FITTING IF CLEANOUT OCCURS
AT END OF LINE
VENT PIPE
METAL ROOFING
1" ANNULAR SPACE
ALL AROUND VENT
PIPE
SILICONE SEALANT
6" M
IN
ROOF FASTENERS
SILICONE FLASHING BOOT
SQUARE BASE FLASHING
EPDM RUBBER OR
NO SCALE4 VENT THRU ROOF DETAIL
NO SCALE3 WALL CLEANOUT DETAIL
MS
MS
EW
'LQD�/DX
(�VLJQHG�����������������30�+67
GLQD�X�ODX#KDZDLL�JRY
6WDWH�RI�+DZDLL
&LYLO�(QJLQHHU
AutoCAD SHX Text M:\EO Projects\2025 Projects\12005-25-03 Kealakekua Bay Historical Park Impr\4-Dwg\Plumbing\Napoopoo Equipment Storage Facility\P-X_Equipment Storage.dwg
AutoCAD SHX Text 05/05/2026 4:46 pm
LOADING/UNLOADING ONLY
LOADING/UNLOADING ONLY
X
X
X
X
X
X
X
X
D
AeccDbGrading (AeccLand130)
STATE OR HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
KEALAKEKUA BAY STATE HISTORICAL
PARK IMPROVEMENTS
SYM. DESCRIPTION DATE APPROVEDREVISION
NO. SYM. DESCRIPTION SHT./OF DATE
ENGINEERING PARTNERS, INC
DESIGNED:
DRAWN:
CHECKED:
APPROVED:
SUBMITTED:
DATE:
SCALE: AS NOTED
CHIEF ENGINEER: DATE:
DRAWING NO.
SHEET NO. OF 143 SHEETSJOB NO.: F14C728D
KE
AL
AK
EK
U A
BA
Y
H
IS
TO
R
IC
AL
P
AR
K
SI
TE
IM
PR
O
VE
M
EN
TS
J O
B N
O . F
C
8D
ENGINEERING DIVISIONE
L I B . W A L T Z
SIGNATURE
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION,
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION.
AAH
W A
UI,I S. . .
LICENSED
PROFESSIONAL
ENGINEER
Exp. 04/30/28 No. 18572-M
PP-101
OVERALL PLUMBING SITE PLAN
SCALE: 1" = 20' 0 20' 40' NA OVERALL PLUMBING SITE PLAN
SEE A
PP-201
EXISTING/DEMOLITION PLUMBING PLAN
SEE A
PP-202
EXISTING/NEW PLUMBING PLAN
MS
MS
EW
'LQD�/DX
(�VLJQHG�����������������30�+67
GLQD�X�ODX#KDZDLL�JRY
6WDWH�RI�+DZDLL
&LYLO�(QJLQHHU
AutoCAD SHX Text
TMK(3)8-2-05:19
AutoCAD SHX Text M:\EO Projects\2025 Projects\12005-25-03 Kealakekua Bay Historical Park Impr\4-Dwg\Plumbing\Napoopoo Pavilion\P-X_Napoopoo Pavilion.dwg
AutoCAD SHX Text 05/05/2026 4:43 pm
B CA D
(E) Util./Sto.
(E) Women's Restroom
(E) Open Pavilion
(E) Men's Restroom
(D)SHOWER, SEE
CIVIL DWGS
(E)DF
(D)LAV
(D)LAV
(D)WC
(D)WC
(D)WC
(D)WC
(D)UR
STATE OR HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
KEALAKEKUA BAY STATE HISTORICAL
PARK IMPROVEMENTS
SYM. DESCRIPTION DATE APPROVEDREVISION
NO. SYM. DESCRIPTION SHT./OF DATE
ENGINEERING PARTNERS, INC
DESIGNED:
DRAWN:
CHECKED:
APPROVED:
SUBMITTED:
DATE:
SCALE: AS NOTED
CHIEF ENGINEER: DATE:
DRAWING NO.
SHEET NO. OF 143 SHEETSJOB NO.: F14C728D
KE
AL
AK
EK
U A
BA
Y
H
IS
TO
R
IC
AL
P
AR
K
SI
TE
IM
PR
O
VE
M
EN
TS
J O
B N
O . F
C
8D
ENGINEERING DIVISIONE
L I B . W A L T Z
SIGNATURE
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION,
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION.
AAH
W A
UI,I S. . .
LICENSED
PROFESSIONAL
ENGINEER
Exp. 04/30/28 No. 18572-M
PP-201
EXISTING/ DEMOLITION PLUMBING PLAN
SCALE: 1/4" = 1'-0" 0 4' 8' NA EXISTING/ DEMOLITION PLUMBING PLAN
MS
MS
EW
'LQD�/DX
(�VLJQHG�����������������30�+67
GLQD�X�ODX#KDZDLL�JRY
6WDWH�RI�+DZDLL
&LYLO�(QJLQHHU
AutoCAD SHX Text M:\EO Projects\2025 Projects\12005-25-03 Kealakekua Bay Historical Park Impr\4-Dwg\Plumbing\Napoopoo Pavilion\P-X_Napoopoo Pavilion.dwg
AutoCAD SHX Text 05/05/2026 4:43 pm
B CA D
(E) Util./Sto.
(E) Women's Restroom
(E) Open Pavilion
(E) Men's Restroom
(N)SHOWER, SEE
CIVIL DWGS
(E)DF
(N)L-1
(N)UR
(N)WC-1
(N)L-1
(N)WC-1
(N)WC-2
(N)WC-2
STATE OR HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
KEALAKEKUA BAY STATE HISTORICAL
PARK IMPROVEMENTS
SYM. DESCRIPTION DATE APPROVEDREVISION
NO. SYM. DESCRIPTION SHT./OF DATE
ENGINEERING PARTNERS, INC
DESIGNED:
DRAWN:
CHECKED:
APPROVED:
SUBMITTED:
DATE:
SCALE: AS NOTED
CHIEF ENGINEER: DATE:
DRAWING NO.
SHEET NO. OF 143 SHEETSJOB NO.: F14C728D
KE
AL
AK
EK
U A
BA
Y
H
IS
TO
R
IC
AL
P
AR
K
SI
TE
IM
PR
O
VE
M
EN
TS
J O
B N
O . F
C
8D
ENGINEERING DIVISIONE
L I B . W A L T Z
SIGNATURE
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION,
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION.
AAH
W A
UI,I S. . .
LICENSED
PROFESSIONAL
ENGINEER
Exp. 04/30/28 No. 18572-M
PP-202
EXISTING/ NEW PLUMBING PLAN
SCALE: 1/4" = 1'-0" 0 4' 8' NA EXISTING/ NEW PLUMBING PLAN
MS
MS
EW
'LQD�/DX
(�VLJQHG�����������������30�+67
GLQD�X�ODX#KDZDLL�JRY
6WDWH�RI�+DZDLL
&LYLO�(QJLQHHU
AutoCAD SHX Text M:\EO Projects\2025 Projects\12005-25-03 Kealakekua Bay Historical Park Impr\4-Dwg\Plumbing\Napoopoo Pavilion\P-X_Napoopoo Pavilion.dwg
AutoCAD SHX Text 05/05/2026 4:43 pm
STATE OR HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
KEALAKEKUA BAY STATE HISTORICAL
PARK IMPROVEMENTS
SYM. DESCRIPTION DATE APPROVEDREVISION
NO. SYM. DESCRIPTION SHT./OF DATE
ENGINEERING PARTNERS, INC
DESIGNED:
DRAWN:
CHECKED:
APPROVED:
SUBMITTED:
DATE:
SCALE: AS NOTED
CHIEF ENGINEER: DATE:
DRAWING NO.
SHEET NO. OF 143 SHEETSJOB NO.: F14C728D
KE
AL
AK
EK
U A
BA
Y
H
IS
TO
R
IC
AL
P
AR
K
SI
TE
IM
PR
O
VE
M
EN
TS
J O
B N
O . F
C
8D
ENGINEERING DIVISIONE
L I B . W A L T Z
SIGNATURE
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION,
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION.
AAH
W A
UI,I S. . .
LICENSED
PROFESSIONAL
ENGINEER
Exp. 04/30/28 No. 18572-E
ELECTRICAL SYMBOLS, NOTES & IECC
CF
CF
EW
EK-001
PC
a
M
HOMERUN CONDUIT - STROKES INDICATE
QUANTITY OF CONDUCTORS
CONDUIT/WIRE CONCEALED IN WALL OR ABOVE CEILING EXCEPT IN EXPOSED
STRUCTURE AREAS 1/2"-2 #12 & 1 #12 GND THWN U.N.O.
CONDUIT AND/OR WIRE BELOW FLOOR OR GRADE
3/4"-2 #12 & 1 #12 GND THWN UNLESS NOTED
EXISTING CONDUIT AND/OR CONDUCTORS
TO REMAIN (SHOWN LIGHT)
SPECIAL RECEPTACLE @ +18" TO CENTER UNLESS NOTED
IF a:
R = RELAY
C = CONTACTOR
P = POWER SUPPLY
CEILING MOUNTED VACANCY SENSOR
PHOTOCELL (INSTALL ON ROOF FACING NORTH)
ELECTRICAL SYMBOLS
a b
A a b a J a
A
SWITCH BANK (IDENTIFIED WITH UPPERCASE)
IF b:
F = 3 SPEED SWITCH
2 = 2 POLE SWITCH
3 = 3-WAY SWITCH
D = DIMMER SWITCH
K = KEY OPERATED SWITCH
M = VACANCY SENSOR SWITCH
SINGLE RECEPTACLE @ +18" TO CENTER UNLESS NOTED
WALL MOUNTED DUPLEX RECEPTACLE @ +18" TO CENTER U.N.O.
= RECEPTACLE PROTECTED BY GFCI BREAKER, OR GFCI TYPE
RECEPTACLE INSTALLED PER NEC 210.8.
= DOUBLE DUPLEX RECEPTACLE
= 1/2 SWITCHED (BOTTOM HALF) DUPLEX RECEPTACLE
IF a:
C = RECEPTACLE INSTALLED ABOVE COUNTER
H = RECEPTACLE INSTALLED HORIZONTALLY
IF b:
MOUNTING HEIGHT IN INCHES TO TOP OF RECEPTACLE
FLOOR MOUNT RECEPTACLE
JUNCTION BOX, IF a:
CF = CEILING FAN
S = SIGNAGE
WH = WATER HEATER
LUMINAIRE IDENTIFICATION
A = LUMINAIRE DESIGNATION (UPPERCASE)
a = SWITCH DESIGNATION (LOWERCASE)
LAY-IN/RECESSED TROFFER
SURFACE MOUNT TROFFER
LUMINAIRE ON EMERGENCY CIRCUIT OR
INTEGRAL BATTERY BACK-UP
SUSPENDED LUMINAIRE
DOWNLIGHT LUMINAIRE
ELECTRICAL DEMOLITION. REMOVE EQUIPMENT AND
APPURTENANCES IN THEIR ENTIRETY U.N.O.
COORDINATE WORK RESTRICTIONS PRIOR TO
DEMOLITION.
(D) or
CEILING MOUNT RECEPTACLE
N
F
SURFACE MOUNTED PANELBOARD
FLUSH MOUNTED PANELBOARD
MAIN SWITCHBOARD, MOTOR CONTROL
CENTER OR DISTRIBUTION BOARD
CONCRETE PULLBOX WITH HEAVY DUTY STEEL
TRAFFIC COVER
UTILITY PULLBOX
METER
NON-FUSED DISCONNECT SWITCH
FUSED DISCONNECT SWITCH
SINGLE POLE SWITCH @ +48" TO TOP UNLESS NOTED
a = DEVICE SWITCH IDENTIFICATION (LOWERCASE)
M
HP
M
AUTOMATIC TRANSFER SWITCH
MOTOR LOAD
SINGLE METER WITH CT,
FUSIBLE SWITCH
CIRCUIT BREAKER
TRANSFORMER
COMBINATION METER/MAIN
GENERAL ELECTRICAL SPECIFICATIONS
1. CONTRACTOR SHALL COMPLY WITH VERSION OF NFPA 70 CURRENTLY ADOPTED AND ENFORCED BY THE AUTHORITY HAVING JURISDICTION.
2. DO NOT SCALE DRAWINGS. VERIFY DIMENSIONS IN FIELD PRIOR TO BID.
3. THE ELECTRICAL DRAWINGS ARE DIAGRAMMATIC IN NATURE. ROUTE CONDUITS AND LOCATE EQUIPMENT BASED ON THE INTENT IDENTIFIED ON DRAWINGS, MODIFY TO SUITE FIELD CONDITIONS. PROVIDE ALL CONDUITS, FITTINGS, BOXES, WIRING, CONDUIT SEALS, ETC., AS REQUIRED FOR COMPLETION OF THE RACEWAY SYSTEM IN COMPLIANCE WITH THE NEC AND THE CONTRACT DOCUMENTS.
4. FINAL CONNECTIONS & ROUGH-IN REQUIREMENTS TO EQUIPMENT SHALL BE PER MANUFACTURER'S APPROVED WIRING DIAGRAMS, DETAILS AND INSTRUCTIONS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE MATERIALS AND EQUIPMENT COMPATIBLE WITH EQUIPMENT
ACTUALLY SUPPLIED.
5. CONTRACTOR SHALL REVIEW DRAWINGS AND SPECIFICATIONS BY ALL OTHER DIVISIONS. ELECTRICAL WORK NOTED OR OTHERWISE REQUIRED UNDER OTHER DIVISIONS SHALL BE REVIEWED AND INCLUDED UNDER THE ELECTRICAL CONTRACTOR'S SCOPE.
6. CONTRACTOR SHALL VISIT SITE AND VERIFY EXISTING CONDITIONS PRIOR TO BID. ALL COSTS REQUIRED TO ACCOMMODATE EXISTING CONDITIONS SHALL BE INCLUDED IN THE CONTRACTOR'S BID. NO ADDITIONAL ALLOWANCE AFTER BID WILL BE CONSIDERED DUE TO LACK OF
SUCH DUE DILIGENCE OR FIELD EXAMINATION.
7. WORK SHALL BE PERFORMED IN A WORKMANLIKE MANNER TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE.
8. WORK, MATERIALS AND EQUIPMENT SHALL CONFORM TO THE LATEST EDITIONS OF LOCAL, STATE AND NATIONAL CODES AND ORDINANCES, OR
THOSE CURRENTLY ADOPTED BY THE LOCAL JURISDICTION.
9. ALL ELECTRICAL SYSTEMS COMPONENTS SHALL BE LISTED OR LABELED BY U.L. OR OTHER RECOGNIZED TESTING FACILITY.
10. PROVIDE PERMITS AND INSPECTIONS REQUIRED.
11. PREPARE SUBMITTALS FOR ALL PRODUCTS TO BE FURNISHED BY THE CONTRACTOR, INCLUDING BUT NOT LIMITED TO EQUIPMENT, RACEWAYS AND BOXES, WIRING, LIGHT FIXTURES, AND SIMILAR ITEMS. SHOULD CONTRACTOR PROCEED WITH ORDERING OR INSTALLING PRODUCTS PRIOR TO SUBMITTAL REVIEW, ALL COSTS REQUIRED TO MODIFY OR REPLACE SUCH PRODUCTS SHALL BE BORNE BY THE CONTRACTOR. THE PROPOSED USE OF ITEMS SPECIFIED ON THESE DRAWINGS DOES NOT ALLEVIATE THE CONTRACTOR FROM ITS RESPONSIBILITY TO PREPARE
SUBMITTALS.
17. SYSTEMS SHALL BE COMPLETE, OPERABLE AND READY FOR CONTINUOUS OPERATION. GUARANTEE THE INSTALLATION AGAINST DEFECTS IN MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR. START OF GUARANTEE PERIOD SHALL COMMENCE AFTER 30 DAYS OF TROUBLE FREE OPERATION AFTER AFTER PROJECT ACCEPTANCE. DEFECTS SHALL BE PROMPTLY REMEDIED WITHOUT ADDITIONAL COST.
18. PROVIDE RECORD DRAWINGS AND ALL OTHER CLOSEOUT MATERIALS REQUIRED AS A PART OF THIS CONTRACT. RECORD DRAWINGS SHALL
INCLUDE ALL ADDENDUM ITEMS, CHANGE ORDERS, ALTERATIONS, REROUTINGS, ETC.
19. VERIFY EXACT LOCATION AND ELECTRICAL CHARACTERISTICS OF EQUIPMENT TO BE FURNISHED BY OTHER DISCIPLINES PRIOR TO ROUGH-IN.
20. SYSTEMS SHALL BE TESTED FOR PROPER OPERATION. IF TESTS SHOW THAT WORK IS DEFECTIVE, CONTRACTOR SHALL MAKE CORRECTIONS
NECESSARY AT NO ADDITIONAL COST.
21. CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING EQUIPMENT WHICH IS DAMAGED DUE TO INCORRECT FIELD WIRING PROVIDED UNDER
THIS SECTION OR FACTORY WIRING IN EQUIPMENT PROVIDED UNDER THIS SECTION.
22. CONTRACTOR'S FAILURE TO ORDER OR RELEASE ORDER FOR MATERIALS AND/OR EQUIPMENT WILL NOT BE ACCEPTED AS A REASON TO
SUBSTITUTE ALTERNATE MATERIALS OR EQUIPMENT.
23. PENETRATIONS OF FIRE RATED WALLS OR FLOORS BY PIPE SHALL BE SEALED BY A FIRESTOPPING SYSTEM UL LISTED FOR THE APPLICATION.
INSTALL PENETRATION SEAL MATERIALS IN ACCORDANCE WITH PRINTED INSTRUCTIONS OF THE UL FIRE RESISTANCE DIRECTORY AND MANUFACTURERS INSTRUCTIONS. FIRESTOPPING SYSTEM SHALL BE EQUAL TO 3M FIRE BARRIER. FIRESTOPPING MATERIAL SHALL BE CAULK OR PUTTY TYPE. FIRESTOP ALL PENETRATIONS THROUGH FIRE RATED WALLS AS REQUIRED TO PRESERVE THE FIRE RATING OF THE STRUCTURE.
24. PROTRUDING OBJECTS SHALL COMPLY WITH ADAAG 307. WALL MOUNTED FIXTURES OR SIMILAR WALL MOUNTED DEVICES SHALL NOT PROTRUDE MORE THAN 4" HORIZONTALLY INTO THE CIRCULATION PATH, OR OTHERWISE SHALL BE INSTALLED 80" MINIMUM TO THE BOTTOM OF
THE FIXTURE.
25. WHERE PROJECT WORK INVOLVES COORDINATION WITH THE LOCAL UTILITY, IMMEDIATELY UPON AWARD OF CONTRACT CONTRACTOR SHALL CONTACT UTILITY TO ENSURE ALL UTILITY AGREEMENTS, PROPOSAL, AND UTILITY DRAWINGS ARE COMPLETE AND APPROVED. PROVIDE PROPOSED DATE OF ENERGIZING SERVICE IN ORDER TO FACILITATE PROPER SCHEDULING WITH THE UTILITY SERVICE.
OH OH OVERHEAD POWER LINES
EMERGENCY BATTERY LIGHTING UNIT WITH TWIN HEADS
AND EXIT SIGN
EMERGENCY BATTERY LIGHTING UNIT WITH TWIN HEADS
WALL MOUNTED LUMINAIRE
CONDUIT RISER UP/DOWN
CONDUIT STUB OUT
TELEPHONE/DATA OUTLET
(X) 4-PAIR CAT-6 CABLES (TYPE 'H')
PROVIDE CORRESPONDING FACEPLATE WITH QTY OF PORTS
AS REQUIRED, WHERE "X" INDICATED NUMBER OF PORTS.
CB = CIRCUIT BREAKER
TS = TIMESWITCH
PB = PUSH BUTTON TYPE
CONTROL STATION
x
COMPLIANCE METHOD
NAME: ELI B. WALTZ
TITLE:
LICENSE NO.:
COMPLIANCE METHOD
2021 IECC AS AMENDED. MANDATORY AND PRESCRIPTIVE
2021 IECC AS AMENDED. MANDATORY AND TOTAL BUILDING PERFORMANCE
ASHRAE STANDARD 90.1-2013. MANDATORY AND PRESCRIPTIVE
ASHRAE STANDARD 90.1-2013. MANDATORY AND TOTAL BUILDING PERFORMANCE
INFORMATION IN CONSTRUCTION DOCUMENTS
INTERIOR LIGHTING
OCCUPANT SENSOR CONTROLS
TIME SWITCH CONTROLS
DAYLIGHT RESPONSIVE CONTROLS
DAYLIGHT ZONES ON PLANS
GUEST ROOM CONTROLS
INTERIOR LIGHTING FIXTURE SCHEDULE
INTERIOR LIGHTING POWER ALLOWANCES
INTERIOR LIGHTING FIXTURE LOCATIONS
LIGHTING CONTROL FUNCTIONAL PERFORMANCE
TESTING REQUIREMENT
EXTERIOR LIGHTING CONTROLS
EXTERIOR LIGHTING FIXTURE SCHEDULE
EXTERIOR LIGHTING POWER ALLOWANCES
YES N/A
C405.2.1 C405.2.2 C405.2.3
C405.2.3.2 & C405.2.3.3 C405.2.4
C405.3.2
C408.3
C405.2.6
EXTERIOR LIGHTING FIXTURE LOCATIONS
ELECTRICAL TRANSFORMER EFFICIENCY C405.6
ELECTRICAL MOTOR EFFICIENCY C405.7
DATE: 04/28/2026
SIGNATURE:
ELECTRICAL ENGINEER
18572-E
X
X
X X X X
X X X X X
X X X X
X X
NOTES:
EXTERIOR LIGHTING
ELECTRICAL
I CERTIFY THAT, TO THE BEST OF MY KNOWLEDGE, THIS
PROJECTS DESIGN SUBSTANTIALLY CONFORMS TO THE
BUILDING ENERGY EFFICIENCY STANDARDS
PERTAINING TO THE COMMERCIAL PROVISIONS FOR
ELECTRICAL & LIGHTING SYSTEMS (C405, & C408) OF
THE 2021 IECC WITH AMENDMENTS PER HAR 3-181.1:
C405.4.2
VOLTAGE DROP LESS THAN 5%
TENANT SUBMETERING
C405.9 C405.10
X X
HAWAII COUNTY ENERGY CODE 2021 IECC, HAWAII REVISED
STATUTES HRS 107-24 TO 28 & HAWAII ADMINISTRATIVE
RULES
CHAPTER HAR 3-181.1 COMMERCIAL BUILDING ENERGY
EFFICIENCY STANDARDS
ELECTRICAL ABBREVIATIONS
+18" INDICATES MOUNTING HEIGHTS ARE TO CENTERLINE OF
DEVICE AFF OR AFG
AF AMP FUSE (FOR FUSES), AMP FRAME (FOR CIRCUIT
BREAKERS)
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ LOCAL AUTHORITY HAVING JURISDICTION
AT AMP TRIP
ATS AUTOMATIC TRANSFER SWITCH
MTS MANUAL TRANSFER SWITCH
C CONDUIT
CONT CONTINUATION
CU COPPER
CW COLD WATER PIPE
FACP FIRE ALARM CONTROL PANEL
AFCI INDICATES ARC FAULT CIRCUIT INTERRUPTER WITH
DEDICATED NEUTRAL
GFCI GROUND FAULT CIRCUIT INTERRUPTER WITH DEDICATED
NEUTRAL
GFP GROUND FAULT PROTECTION
GND GROUND
HELCO ELECTRICAL UTILITY COMPANY
IWP IN-USE WEATHER-PROOF (NEMA 3R)
LO LUGS ONLY (SEE ALSO MLO)
MCB MAIN CIRCUIT BREAKER
MLO MAIN LUGS ONLY
NEC NATIONAL ELECTRICAL CODE, AS ADOPTED BY THE AHJ
P POLE
PFFB PROVISION FOR FUTURE BREAKER
PH PHASE
PNL INDICATES PANEL
TYP TYPICAL
UPS UNINTERRUPTIBLE POWER SYSTEM
WP WEATHER-PROOF (NEMA 3R)
XFMR TRANSFORMER
UNO UNLESS NOTED OTHERWISE
(D) DEMOLITION
(E) EXISTING
(N) NEW
(R) RELOCATE/RELOCATED
TRACK LIGHT WITH FIXTURE HEADS
'LQD�/DX
(�VLJQHG�����������������30�+67
GLQD�X�ODX#KDZDLL�JRY
6WDWH�RI�+DZDLL
&LYLO�(QJLQHHU
AutoCAD SHX Text M:\EO Projects\2025 Projects\12005-25-03 Kealakekua Bay Historical Park Impr\4-Dwg\Electrical\Napoopoo Interpretive Kiosk\E-X_Interpretive Kiosk.dwg
AutoCAD SHX Text 05/05/2026 4:51 pm
X
X
X
X
X
X
S
S
W
(N) METER POLE (UNDER SEPARATE PERMIT)
(N)CMU WALL (UNDER SEPARATE PERMIT)
SCALE: 1" = 40' 0 40' 80' NA OVERALL ELECTRICAL SITE PLAN
GENERAL NOTES
1. ALL CONDUIT WITHIN AREAS SUBJECT TO VEHICULAR TRAFFIC
SHALL BE CONCRETE ENCASED PER DETAIL 3/EK-302.
2. CONDUIT NOT SUBJECT TO VEHICULAR TRAFFIC MAY BE DIRECT
BURIED PER DETAIL 4/EK-302.
STATE OR HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
KEALAKEKUA BAY STATE HISTORICAL
PARK IMPROVEMENTS
SYM. DESCRIPTION DATE APPROVEDREVISION
NO. SYM. DESCRIPTION SHT./OF DATE
ENGINEERING PARTNERS, INC
DESIGNED:
DRAWN:
CHECKED:
APPROVED:
SUBMITTED:
DATE:
SCALE: AS NOTED
CHIEF ENGINEER: DATE:
DRAWING NO.
SHEET NO. OF 143 SHEETSJOB NO.: F14C728D
KE
AL
AK
EK
U A
BA
Y
H
IS
TO
R
IC
AL
P
AR
K
SI
TE
IM
PR
O
VE
M
EN
TS
J O
B N
O . F
C
8D
ENGINEERING DIVISIONE
L I B . W A L T Z
SIGNATURE
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION,
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION.
AAH
W A
UI,I S. . .
LICENSED
PROFESSIONAL
ENGINEER
Exp. 04/30/28 No. 18572-E
OVERALL ELECTRICAL SITE PLAN
CF
CF
EW
SEE A
EK-201
POWER PLAN
SEE B
EK-201
LIGHTING PLAN
EK-101
UTILITY COORDINATION
A. ELECTRICAL SERVICE:
1. COORDINATE WITH THE UTILITY COMPANIES TO PROVIDE SERVICE.
2. FURNISH MATERIALS IN ACCORDANCE WITH THE APPLICABLE REQUIREMENTS OF THE UTILITIES AND THESE SPECIFICATIONS.
3. IT IS THE CONTRACTOR'S RESPONSIBILITY FOR SCHEDULING AND COORDINATING THE WORK OF SUBCONTRACTORS, SUPPLIERS, AND OTHER INDIVIDUALS OR ENTITIES PERFORMING OR FURNISHING ANY OF CONTRACTOR'S WORK.
4. PROVIDE ALL WORK AND MATERIALS AND BEAR ALL COSTS FOR PROVIDING TEMPORARY CONSTRUCTION POWER AND THE
PERMANENT ELECTRICAL SERVICE, INCLUDING BUT NOT LIMITED TO:
a. ALL WORK AND MATERIALS NOT PROVIDED BY THE ELECTRIC UTILITY.
b. ALL PERMITS AND FEES REQUIRED BY THE ELECTRIC UTILITY.
5. PROVIDE ELECTRICAL DUCTS, RACEWAYS, CONDUCTORS AND CONNECTIONS INDICATED ON THE DRAWINGS, AND ALL OTHER WORK AND MATERIALS REQUIRED FOR A COMPLETE ELECTRICAL SERVICE, INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
a. ELECTRICAL SERVICE CONDUITS AND CONDUCTORS FROM THE POINT OF ELECTRIC UTILITY CONNECTION TO THE SERVICE
ENTRANCE EQUIPMENT.
b. METERING CONDUITS FROM THE INSTRUMENT TRANSFORMERS TO THE METER.
B. TELEPHONE/CATV SERVICE:
1. PROVIDE ALL WORK AND MATERIALS AND BEAR ALL COSTS FOR THE TELEPHONE/CATV SERVICE DURING CONSTRUCTION.
2. PROVIDE THE TELEPHONE/CATV ENTRANCE CONDUIT(S) FROM THE TERMINAL POLE TO THE TELEPHONE BOARD, AND ALL OTHER
WORK AND MATERIALS REQUIRED FOR A COMPLETE TELEPHONE/CATV SERVICE.
3. COORDINATE AND OBTAIN INSPECTIONS AND FINAL INSTALLATION APPROVAL FROM SERVING UTILITIES AND OTHER AUTHORITIES
HAVING JURISDICTION.
4. BEFORE COMMENCING WORK, COORDINATE COMPLETE TELEPHONE/CATV SERVICE:
a. VERIFY COMPLIANCE WITH TELEPHONE/CATV UTILITY REQUIREMENTS.
b. VERIFY EXACT LOCATION OF EACH SERVICE POINT AND TYPE OF SERVICE.
c. PAY ANY CHARGES REQUIRED BY THE TELEPHONE/CATV UTILITY FOR CONNECTION AND TURN-ON.
5. COORDINATE COMPLETE TELEPHONE/CATV LINE CONNECTIONS AT LOCATIONS INDICATED ON THE DRAWINGS WITH THE LOCAL
TELEPHONE UTILITY.
C. CERTIFICATION:
1. PRIOR TO EQUIPMENT PROCUREMENT, SUBMIT CERTIFICATION THAT THE INTENDED INSTALLATION HAS BEEN COORDINATED WITH
THE UTILITY COMPANIES AND MEETS ALL UTILITY REQUIREMENTS.
2. BEFORE START OF SITE WORK, MAKE ARRANGEMENTS FOR TEMPORARY TELEPHONE AND ELECTRICAL SERVICE AS REQUIRED.
3. BEFORE BIDDING, THE ELECTRICAL CONTRACTOR SHALL CONTACT THE UTILITIES TO DETERMINE THE WORK AND MATERIALS THAT
WILL BE REQUIRED FROM THE CONTRACTOR, AND ALL FEES AND PERMITS THAT WILL BE REQUIRED, SO THAT ALL UTILITY
SYSTEMS FURNISHED BY THE CONTRACTOR WILL BE INCLUDED IN THE BID.
4. COORDINATE WORK WITH ENGINEER TO MINIMIZE DOWNTIME OF EXISTING OPERATING EQUIPMENT AND ELECTRICAL
DISTRIBUTION SYSTEMS AND TO PRECLUDE UNSAFE OPERATION:
a. NOTIFY OWNER 10 DAYS BEFORE POWER INTERRUPTIONS.
b. COORDINATE DOWNTIME WITH OWNER AND LOCAL ELECTRIC UTILITY.
5. BEFORE COMMENCING WORK, COORDINATE ELECTRIC SERVICE ENTRANCE REQUIREMENTS WITH LOCAL ELECTRIC UTILITY TO ASSURE THAT THE INSTALLATION WILL BE COMPLETE IN ACCORDANCE WITH THESE SPECIFICATIONS AND UTILITY COMPANY
REQUIREMENTS:
a. ENSURE POWER TRANSFORMER SIZE, ELECTRICAL CHARACTERISTICS, AND LOCATION ARE CONSISTENT WITH THE DESIGN
AND SERVICE VOLTAGE PROVIDED BY THE ELECTRIC UTILITY COORDINATED WITH OTHER TRADES.
b. ARRANGE FOR UTILITY REVENUE METER.
c. COORDINATE INSTALLATION OF METERING C.T.'S AND P.T.'S FURNISHED BY THE ELECTRIC UTILITY.
d. PAY ANY CHARGES REQUIRED BY THE ELECTRIC UTILITY FOR CONNECTION AND TURN-ON.
6. DURING THE CONSTRUCTION OF THE PROJECT, THE EXISTING ELECTRICAL SERVICE MUST REMAIN FULLY FUNCTIONAL IN ORDER TO SUPPLY UNINTERRUPTED ELECTRICAL POWER TO THE FACILITY AND ITS ANCILLARY BUILDINGS AND STRUCTURES.
D. BEFORE COMMENCING SITE WORK, COORDINATE UNDERGROUND CONDUIT INSTALLATIONS WITH OTHER WORK TO ELIMINATE
CONFLICTS AND AVOID INTERFERENCES WITH OTHER UNDERGROUND SYSTEMS.
NAPOOPOO ROAD
EK-302
'LQD�/DX
(�VLJQHG�����������������30�+67
GLQD�X�ODX#KDZDLL�JRY
6WDWH�RI�+DZDLL
&LYLO�(QJLQHHU
AutoCAD SHX Text M:\EO Projects\2025 Projects\12005-25-03 Kealakekua Bay Historical Park Impr\4-Dwg\Electrical\Napoopoo Interpretive Kiosk\E-X_Interpretive Kiosk.dwg
AutoCAD SHX Text 05/05/2026 4:51 pm
(N) A
(N)
Ba
(N)
B
(N) A
(N) A
(N) A(N) B
(N)
B
(N)
Ba CF J
AK-6
AK-7
M M
Ma F
J
J
J
J
AK-9
AK-11
AK-13
AK-15
AK-5
Cb Cc
C
Cd
Mb Mc
Md
EXHIBIT
AREA
COVERED
LANAI
UNISEX
RESTROOM
UTILITY
FAMILY
RESTROOM
(N)PANEL 'AK'(N)
(N)
(N)FUJICLEAN CONTROL PANEL
N 30A/2P
NEMA 4X
AK-2,4
3/4"C -(2)#10
& #1- GND
(N)
(N)
AK-3
AK-1
SCALE: 1/4" = 1'-0" 0 4' 8' NB LIGHTING PLAN
STATE OR HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
KEALAKEKUA BAY STATE HISTORICAL
PARK IMPROVEMENTS
SYM. DESCRIPTION DATE APPROVEDREVISION
NO. SYM. DESCRIPTION SHT./OF DATE
ENGINEERING PARTNERS, INC
DESIGNED:
DRAWN:
CHECKED:
APPROVED:
SUBMITTED:
DATE:
SCALE: AS NOTED
CHIEF ENGINEER: DATE:
DRAWING NO.
SHEET NO. OF 143 SHEETSJOB NO.: F14C728D
KE
AL
AK
EK
U A
BA
Y
H
IS
TO
R
IC
AL
P
AR
K
SI
TE
IM
PR
O
VE
M
EN
TS
J O
B N
O . F
C
8D
ENGINEERING DIVISIONE
L I B . W A L T Z
SIGNATURE
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION,
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION.
AAH
W A
UI,I S. . .
LICENSED
PROFESSIONAL
ENGINEER
Exp. 04/30/28 No. 18572-E
SCALE: 1/4" = 1'-0" 0 4' 8' NA POWER PLAN
POWER & LIGHTING PLANS
CF
CF
EW
EK-201
SHEET NOTES
PROVIDE DISCONNECT TO FUJICLEAN CEN10 SYSTEM IF
CONTROL PANEL DOES NOT PROVIDE INTEGRAL DISCONNECT.
SEE CIVIL DRAWINGS.
PROVIDE WIRING PER MANUFACTURER'S REQUIREMENTS.
CIRCUIT VIA PHOTOCELL/ TIMECLOCK, SEE DETAIL 2/EK-302.
CONNECT NEW EMERGENCY FIXTURE TO NEAREST
UNSWITCHED PORTION OF LIGHTING CIRCUIT.
PC
'LQD�/DX
(�VLJQHG�����������������30�+67
GLQD�X�ODX#KDZDLL�JRY
6WDWH�RI�+DZDLL
&LYLO�(QJLQHHU
AutoCAD SHX Text M:\EO Projects\2025 Projects\12005-25-03 Kealakekua Bay Historical Park Impr\4-Dwg\Electrical\Napoopoo Interpretive Kiosk\E-X_Interpretive Kiosk.dwg
AutoCAD SHX Text 05/05/2026 4:51 pm
NO SCALE1 SINGLE LINE DIAGRAM
DEPARTMENT OF LAND AND NATURAL RESOURCES
KEALAKEKUA BAY STATE HISTORICAL
PARK IMPROVEMENTS
SYM. DESCRIPTION DATE APPROVEDREVISION
NO. SYM. DESCRIPTION SHT./OF DATE
ENGINEERING PARTNERS, INC
DESIGNED:
DRAWN:
CHECKED:
APPROVED:
SUBMITTED:
DATE:
SCALE: AS NOTED
CHIEF ENGINEER: DATE:
DRAWING NO.
SHEET NO. OF 143 SHEETSJOB NO.: F14C728D
KE
AL
AK
EK
U A
BA
Y
H
IS
TO
R
IC
AL
P
AR
K
SI
TE
IM
PR
O
VE
M
EN
TS
J O
B N
O . F
C
8D
ENGINEERING DIVISIONE
L I B . W A L T Z
SIGNATURE
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION,
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION.
AAH
W A
UI,I S. . .
LICENSED
PROFESSIONAL
ENGINEER
Exp. 04/30/28 No. 18572-E
ELECTRICAL SINGLE LINE, SCHEDULES & DETAILS
CF
CF
EW
EK-301
M
(N)1.25"C-(3)#4 & #10 GND
TO NEW OVERHEAD
HELCO SERVICE
ELECTRICAL LOAD CALCULATIONS
PANEL 'AK'
(60A, 120/240V, 1Ø, 3W)
LOAD = 9.3 KVA
TOTAL = 9.3 KVA
/240 V , 1 Ø = 38.8 A
SERVICE / LOAD DATA
A. ELECTRIC
1. SERVICE VOLTAGE: 1PH, 240/120V., 3W
2. LOAD DATA: CONNECTED KVA:9.3 KVA , ESTIMATED DEMAND KVA: 6.5 KVA
3. SERVICE CONDUCTORS: 1 SET OF #4
4. METERING: HAWAIIAN ELECTRICSTD. B-5; RATE G
5. TYPE OF SERVICE: OVERHEAD
6. BILLING ADDRESS: DEPARTMENT OF LAND AND NATURAL RESOURCES
LUMINAIRE SCHEDULE
FIXTURE
TYPE
MANUFACTURER VOLT
AMPS MOUNTING LAMP TYPE REMARKS VOLT
NAME CATALOG NUMBER
A NLS LIGHTING FLW-1-T4-16L-35-30K-UNV-WM-BRZ-COHI 25 WALL LED OUTDOOR LED SCONCE, 3000K, FULL CUT OFF. 2% OR LESS
BLUE LIGHT. COUNTY OF HAWAII APPROVED. 120/277
B LITHONIA FEM-L48-3000LM-LPACL-MD-MVOLT-GZ10-30K-90CRI 18 SURFACE LED 4' LED SURFACE MOUNT, 3000 LUMEN, 3000K. WET LOCATION, LOW PROFILE LENS. 120/277
C ALCON 13313 H BK 20/HEAD WALL LED TRACK LIGHTING. PROVIDE 8 HEADS PER 8' TRACK. 120/277
LITHONIA LHQM-LED-R-SD 5 UNIVERSAL LED EXIT SIGN WITH LED HEAD COMBO AND EMERGENCY 90
MINUTE BATTERY BACK UP OPTION. 120
#6
(E)6"X6"X30" WIREWAY
NEMA 4X
M
UNDER SEPARATE
PERMIT
(E)2"C-(3)#1
100A METER/MAIN
METER STD. B-5
4 JAW, CL100 METER
RATE SCHEDULE G
120/240V-1Ø-3W
NEMA 3R S.S.
BOND TO ALL AVAILABLE
GEC PER NEC 250.32
#6
60A/2P
(N)1.25"C-(3)#4 & #10 GND
PANEL
AK
NEW
PANEL: AK VOLTAGE: 240 / 120 1Ø 3W CIRCUIT CODE: blank or N: NON-CONTINUOUS
BUS: 125A L: LONG-CONTINUOUS
DATE: 4/13/26 6:42 PM MAINS: 60A LOCATION:INTERIOR R: DEMANDABLE RECEPTACLES
JOB: 12005-25-03 AIC RATING:10,000 MOUNTING:SURFACE K: KITCHEN NO. OF EQUIPMENT: 0
CK
T
NO
CO
DE
TR
IP
PO
LE
LOAD DESIGNATION C O N N E C T E D V A LOAD DESIGNATION
TR
IP
PO
LE
CO
DE
CK
T
NO
DESCRIPTION (NOTE)M R L ØA ØB A B ØA ØB L R M (NOTE) DESCRIPTION
1 R 20 1 RECEPTS - EXHIBIT AREA & UTILITY 540 • 960 WASTE WATER TREATMENT 20 N 2
3 R 20 1 DRINKING FOUNTAIN 500 • 960 -- 2 N 4
5 L 20 1 LIGHTS - INTERIOR 125 • 100 CEILING FAN 20 1 L 6
7 L 20 1 LIGHTS - EXTERIOR 80 • SPARE 20 1 8
9 L 20 1 LIGHTS - NORTH TRACK 1200 • SPARE 20 1 10
11 L 20 1 LIGHTS - SOUTH TRACK 1200 • PFFB 12
13 L 20 1 LGHTS - LONG TRACK 1 1200 • PFFB 14
15 L 20 1 LGHTS - LONG TRACK 2 1200 • PFFB 16
17 PFFB • PFFB 18
19 PFFB • PFFB 20
21 PFFB • PFFB 22
23 PFFB • PFFB 24
25 PFFB • PFFB 26
27 PFFB • PFFB 28
29 PFFB • PFFB 30
31 • 32 33 • 34 35 • 36 37 • 38 39 • 40 41 • 42
PANEL NOTES: PHASE TOTALS ØA: 4125 ØB: 3940 TOTAL CONNECTED VA 8065
CONNECTED VA (CODE N) 1920
CONNECTED VA (CODE L) 5105
CONNECTED VA (CODE R) 1040
CONNECTED VA (CODE K) 0
PANEL CONNECTED KVA 8.1
PANEL DEMAND KVA 9.3
30 CIRCUIT PANEL PANEL DEMAND AMPS 38.9
HIGH Ø AMPS w/ DEMAND 39.8
'LQD�/DX
(�VLJQHG�����������������30�+67
GLQD�X�ODX#KDZDLL�JRY
6WDWH�RI�+DZDLL
&LYLO�(QJLQHHU
AutoCAD SHX Text M:\EO Projects\2025 Projects\12005-25-03 Kealakekua Bay Historical Park Impr\4-Dwg\Electrical\Napoopoo Interpretive Kiosk\E-X_Interpretive Kiosk.dwg
AutoCAD SHX Text 05/05/2026 4:51 pm
5'- 5"
(T
YP
5'-
0" M
IN
. A
ND
6'
-0 " M
AX
2'-0"
(MIN)
4'- 0"
6" (M
IN
TO HELCO
SERVICE VIA
METER POLE
METER/MAIN
(UNDER
SEPARATE
PERMIT)
METER POLE RISER CONDUIT
STRAPPED TO POLE
6" INSIDE DIAMETER
SCHEDULE 40
GALVANIZED PIPE
EQUIPMENT
GROUNDING CLAMP
5/8" X 8'
GROUND RODS
6'-0" (MIN)
SERVICE ATTACHMENT PROVIDED BY
HELCO. INSTALLED BY CUSTOMER
TO
EXISTING
UTILITY
POLE
(E)6"X6"30" WIREWAY NEMA 4X
GALVANIZED CAP
HELCO SERVICE DROPSERVICE WEATHERHEAD
S.S. STRAPS
' (M
IN
' (M
IN
12" (MIN)
2,500 PSI CONCRETE
FOOTING
(E)CMU WALL
METER/MAIN
STATE OR HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
KEALAKEKUA BAY STATE HISTORICAL
PARK…
This is the start of the file's text. The full file is on GovTribe.