Plans 24008.pdf
PDF 5 MB Posted
- Solicitation number
- RFQ - 171 - 240000000349
- Issued by
- Saginaw County, St. Louis City, Michigan
About this file
This document appears to be related to a state and local contract opportunity for the replacement of overhead doors at the Saginaw East Garage facility in Michigan. The contract requires the contractor to remove existing doors, replace them with new doors, operators, torsion shafts, and guard rails, and perform weatherstripping and sealing as needed. The project involves a total of eight doors, four on each side of the building. The contractor is required to comply with the manufacturer's instructions and recommendations for installation unless more stringent requirements are specified.
The contract opportunity is designated as Contract No. 591/24008 and is being issued by the Michigan Department of Transportation (MDOT) Office of Design and Construction. Bidders must upload their attachments to the SIGMA VSS system, and any questions or issues with the electronic submission process should be directed to the SIGMA Help Desk. Emailed submissions may be accepted on a case-by-case basis with prior approval from the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specifications 24008.pdf | ||
| Advertisement 24008.pdf | ||
| Addendum 1 24008.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AdamsS30 Text Box
TSMO FACILITIES ENGINEERING
8885 RICKS ROAD
LANSING, MI. 48917
LusbyM Text Box
1.CONTRACTOR IS OBLIGATED TO VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD.
2.IF THE EXISTING FIELD CONDITIONS DO NOT PERMIT THE INSTALLATION OF THE WORK IN ACCORDANCE WITH THE PLANS, THE CONTRACTOR SHALL NOTIFY THE PROJECT MANAGER IMMEDIATELY AND PROVIDE INFORMATION OF EXISTING CONDITIONS. FINAL INSTRUCTIONS SHALL BE IN ACCORDANCE WITH THE INSTRUCTIONS OF PROJECT MANAGER.
3.REMOVE EXISTING DOORS AS SHOWN IN PLAN AND REPLACE.
4.PROPERLY RE-INSTALL NEW DOORS, OPERATORS, TORSION SHAFTS, AND GUARD RAILS.
5. WEATHERSTRIPPING AND SEALING OF THE DOORS AS NEEDED.
6. COMPLY WITH MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS FOR INSTALLATION UNLESS MORE STRINGENT REQUIREMENTS ARE SPECIFIED.
LusbyM Image
LusbyM Image
LusbyM Image
LusbyM Text Box Eight total doors, four on each side of the building
LusbyM Text Box Replace operator with Liftmaster Model H, and install new torsion shafts and guard rails
LusbyM Length Measurement 14'-0"
LusbyM Length Measurement 16'-0"
File details come from the government source that posted it. Updated .