Plans 24008.pdf

PDF 5 MB Posted

Attached to
591/24008. AGY; Saginaw East Garage - OH Door Replacement
Solicitation number
RFQ - 171 - 240000000349
Issued by
Saginaw County, St. Louis City, Michigan

About this file

This document appears to be related to a state and local contract opportunity for the replacement of overhead doors at the Saginaw East Garage facility in Michigan. The contract requires the contractor to remove existing doors, replace them with new doors, operators, torsion shafts, and guard rails, and perform weatherstripping and sealing as needed. The project involves a total of eight doors, four on each side of the building. The contractor is required to comply with the manufacturer's instructions and recommendations for installation unless more stringent requirements are specified.

The contract opportunity is designated as Contract No. 591/24008 and is being issued by the Michigan Department of Transportation (MDOT) Office of Design and Construction. Bidders must upload their attachments to the SIGMA VSS system, and any questions or issues with the electronic submission process should be directed to the SIGMA Help Desk. Emailed submissions may be accepted on a case-by-case basis with prior approval from the contracting agency.

View the file

Other files

File Type Posted
Specifications 24008.pdf PDF
Advertisement 24008.pdf PDF
Addendum 1 24008.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AdamsS30 Text Box

TSMO FACILITIES ENGINEERING

8885 RICKS ROAD

LANSING, MI. 48917

LusbyM Text Box

1.CONTRACTOR IS OBLIGATED TO VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD.

2.IF THE EXISTING FIELD CONDITIONS DO NOT PERMIT THE INSTALLATION OF THE WORK IN ACCORDANCE WITH THE PLANS, THE CONTRACTOR SHALL NOTIFY THE PROJECT MANAGER IMMEDIATELY AND PROVIDE INFORMATION OF EXISTING CONDITIONS. FINAL INSTRUCTIONS SHALL BE IN ACCORDANCE WITH THE INSTRUCTIONS OF PROJECT MANAGER.

3.REMOVE EXISTING DOORS AS SHOWN IN PLAN AND REPLACE.

4.PROPERLY RE-INSTALL NEW DOORS, OPERATORS, TORSION SHAFTS, AND GUARD RAILS.

5. WEATHERSTRIPPING AND SEALING OF THE DOORS AS NEEDED.

6. COMPLY WITH MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS FOR INSTALLATION UNLESS MORE STRINGENT REQUIREMENTS ARE SPECIFIED.

LusbyM Image

LusbyM Image

LusbyM Image

LusbyM Text Box Eight total doors, four on each side of the building

LusbyM Text Box Replace operator with Liftmaster Model H, and install new torsion shafts and guard rails

LusbyM Length Measurement 14'-0"

LusbyM Length Measurement 16'-0"

File details come from the government source that posted it. Updated .