About this file
This file consists of construction drawings and HVAC specifications for the Camden Center Chiller Replacement project located in Kingsland, Georgia, prepared by NBP Engineers, Inc. under Project Number CCGA-2201. The project involves the replacement of Chiller #2 (CHR-2) and its associated chilled water pump (CP-2) on the Camden Campus. The drawings are dated September 13, 2021, and stamped as 100% Construction Documents. The scope of work includes demolition of existing HVAC equipment, installation of new chiller and pump equipment with associated piping connections, electrical modifications including new circuit breakers and starters, and coordination with existing building systems in the mechanical room (Room 131H). The drawings provide detailed mechanical room layouts, piping schedules, HVAC legends and abbreviations, and specifications for pump and chiller equipment, including a centrifugal chiller rated at 200 tons with specific performance parameters for entering and leaving water temperatures, water flow rates, and pressure drop specifications.
The construction documents indicate that existing chilled water pump CP-2 (10 HP) will be replaced in-place with reuse of existing conductors where possible. New electrical infrastructure includes a 350A/3P circuit breaker routed through existing 3-inch conduit in the main switchboard located in Electrical Room 131I, with a new combination starter installed within line of sight of the equipment. The project requires coordination with multiple building systems including heating water supply and return lines, condenser water piping, and expansion tanks. The drawings reference NBP Engineers' COA number PEF000774 with an expiration date of June 30, 2022, and are marked as the property of the engineer with restrictions on reproduction without written permission.
Text of this file
PROJECT CONSULTANTS
INDEX OF
DRAWINGS
TITLESHEET NO.
316 CORPORATE PARKWAY MACON, GEORGIA
NBP ENGINEERS, INC.
CONSULTANTS
Project No. CCGA-2201
CCGA - Camden Center Chiller Replacement
M302
M301
M001 ABBREVIATIONS, LEGEND, & SCHEDULES - HVAC
LARGE SCALE - MECHANICAL ROOM - DEMOLITION - HVAC
LARGE SCALE - MECHANICAL ROOM - NEW WORK - HVAC
Kingsland, Georgia
M002 DETAILS - HVAC
09.13.21 100% CONSTRUCTION DOCUMENTS
SEAL
SCALE:
FILE PATH:
P:\21090\21090m001.dgn
DATE PLOTTED
DGN FILE
13-SEP-2021
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\21090\21090m001.dgn
AS SHOWN
09.13.21
21090
WSH
LTF
WSH
C O
N S T
R U
C T
IO
N
D
C U
M E
N T S
P ro je c t
N o C
C G
A -2
C C
G A C a m d e n C e n te r
C h il le r
R e p la c e m e n t
K in g s la n d
G e o rg ia
NBP Engineers, Inc. COA#PEF000774
COA Expiration: 6.30.2022
M001
HVAC
SCHEDULES -
LEGEND, &
ABBREVIATIONS,
CHS CHR
HWS HWR
CR
D
SPF
HTWS HTWR
DTS DTR
CHILLED WATER SUPPLY CHILLED WATER RETURN
HEATING WATER SUPPLY HEATING WATER RETURN
CONDENSER WATER SUPPLY CONDENSER WATER RETURN
CONDENSATE DRAIN
FIRE PROTECTION MAIN STANDPIPE
HIGH TEMP. SUPPLY HIGH TEMP. RETURN
DUAL TEMP. SUPPLY DUAL TEMP. RETURN
R REFRIGERANT PIPING
RL REFRIGERANT LIQUID
CONDENSATE DRAIN
CS
RS REFRIGERANT SUCTION
RG REFRIGERANT HOT GAS
HIGH PRESSURE STEAM
LOW PRESSURE STEAM
(15 PSIG. MAX)
CR CONDENSATE RETURN (LP)
PC PUMPED CONDENSATE
50#
STEAM
(PRESSURE INDICATED)
SOLENOID VALVE RELIEF VALVE
GATE VALVE WITH
3/4" HOSE END
NEEDLE VALVE
OS&Y GATE VALVE .
GAS COCK
AUTOMATIC AIR VENTAAV
GAUGE WITH COCK
BOILER DRAIN PIPE TEST PLUG
FLEX. PIPE CONN. BACKFLOW PREVENTER
MANUAL AIR VENT
STRAINER
ELBOW UP ELBOW DOWN
BRANCH OUT BOTTOM BRANCH OUT TOP
TEE OUT BOTTOM TEE OUT TOP
SCREWED UNION FLANGED UNION
PIPE CAP BLIND FLANGE
PIPE SLEEVE
CONCENTRIC REDUCER
PIPE ANCHOR
HVAC LEGEND
BALANCE VALVE
SCREWED & FLANGED
SCREWED & FLANGED
SCREWED & FLANGED
SCREWED & FLANGED
SCREWED & FLANGED
GLOBE VALVE
CHECK VALVE
2-WAY CONTROL VALVE
CONTROL VALVE
PLAN VIEW
ECCENTRIC REDUCER
GAUGE COCK
3-WAY MIXING
VALVE IN VALVE BOX
CONTROL VALVE
HPS
THERMOMETER IN WELL
SEPARABLE SOCKET WELL
LPS
PLUG VALVE
A COMPRESSED AIR
AAV AUTOMATIC AIR VENT
ACD ACCESS DOOR
AD AREA DRAIN
AF AIR FOIL
-AFF ABOVE FINISHED FLOOR
AV ACID VENT
AW ACID WASTE
-AC ABOVE CEILING
AH- AIR HANDLING UNIT
BBD BOILER BLOW DOWN
BE BOTTOM ELEVATION
BOL BOTTOM OF LINE (UNINSULATED)
BOD BOTTOM OF DUCT
BP- BOOSTER PUMP
BTUH BRITISH THERMAL UNIT PER HOUR
-BF BELOW FLOOR
BFP BACK FLOW PREVENTOR
C CONDUIT
CC COOLING COIL
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CR CONDENSER WATER RETURN
CS CONDENSER WATER SUPPLY
CW DOMESTIC COLD WATER
CAB CABINET FAN
CF CENTRIFICAL FAN
CFM CUBIC FEET PER MINUTE
CFP CHEMICAL FEED PUMP
CFT CHEMICAL FEED TANK
CH CABINET HEATER
CHR CHILLER
CL CENTER LINE
CO CLEANOUT
CP CHILLER PUMP
CPHB CHROME PLATED HOSE BIBB
CT COOLING TOWER
CU COPPER
CV- CONVECTOR
Cv VALVE COEFFICIENT
D DRAIN
DDC DIRECT DIGITAL CONTROL
DHW DOMESTIC HOT WATER
DN DOWN
DP DIFFERENTIAL PRESSURE
DS DOWN SPOUT
DSO DOWN SPOUT OVER FLOW
DX DIRECT EXCHANGE
EAT ENTERING AIR TEMPERATURE
EDB ENTERING DRY BULB
EWB ENTERING WET BULB
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EQT EQUIPMENT TRAP SET
EWT ENTERING WATER TEMPERATURE
EX EXPANSION TANK LINE
EXT EXTERNAL
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
BPD BYPASS DAMPER
EAL EXHAUST AIR LOUVER
ECH ELECTRIC CABINET HEATER
ABBREVIATIONS
EUH ELECTRIC UNIT HEATER
DHR DOMESTIC HOT WATER CIRCULATING
CAB CABINET FAN
CLG CEILING FAN
AVD AUTOMATIC VOLUME CONTROL DAMPER
CU-# CONDENSING UNIT
EAD EXHAUST AIR CONTROL DAMPER
ELL ELBOW
ERG EXISTING RETURN GRILLE
ESG EXISTING SUPPLY DIFFUSER
ES END SUCTION
BTD BACK-TOP DISCHARGE(FAN)
DPT DIFFERENTIAL PRESSURE TRANSMITTER
FC FAN COIL UNIT
FD FIRE DAMPER
FF FOULING FACTOR
FF- FLY FAN
FF FINISHED FLOOR
FF FINAL FILTER
FFM FIRE FLOW METER
FLEX FLEXIBLE
FM FIRE MAIN
FOR FUEL OIL RETURN
FOV FUEL OIL VENT
FOP FUEL OIL PUMP
FP FIRE PUMP
FP- FAN POWERED
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FEET
G LOW PRESSURE GAS
GA GAUGE
GPM GALLONS PER MINUTE
GT GREASE TRAP
GTH GRAND TOTAL HEAT
H HEIGHT
HC HEATING COIL
HB HOSE BIBB
HBT HORIZONTAL BLOW THROUGH
HD HUB DRAIN
HDT HORIZONTAL DRAW THROUGH
HPA HIGH PRESSURE AIR
HPG HIGH PRESSURE GAS
HPS HIGH PRESSURE STEAM
FPR FINNED PIPE RADIATION
FRT FLOW RATE TRANSDUCER
FLRD FLOOR DRAIN
FMS FLOW MEASURING STATION
FM FLOW METER
HP HORSEPOWER
HP HIGH PRESSURE
FTD FRONT-TOP DISCHARGE(FAN)
F&BP FACE & BYPASS
HPWS HEAT PUMP WATER SUPPLY
HPWR HEAT PUMP WATER RETURN
HSC HORIZONTAL SPLIT CASE
HWG HOT WATER GENERATOR
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
ILC IN-LINE CENTRIFICAL
IT INTERVAL TIMER
IN INCHES
INV INVERT
JB JUNCTION BOX
L LENGTH
LR LONG RADIUS
LAT LEAVING AIR TEMPERATURE
LCP LOCAL CONTROL PANEL
LDB LEAVING DRY BULB
LN LIQUID NITROGEN
LWB LEAVING WET BULB
LWT LEAVING WATER TEMPERATURE
LPS LOW PRESSURE STEAM
MAV MANUAL AIR VENT
MVD MANUAL VOLUME DAMPER
MAX MAXIMUM
MBH ONE THOUSAND BTU PER HOUR
MCC MOTOR CONTROL CENTER
MIN MINIMUM
MH MAN HOLE
MP SUMP (MUD) PUMP
MPS MEDIUM PRESSURE STEAM
MPR MEDIUM PRESSURE RETURN
MTS MEDIUM TEMPERATURE SUPPLY
MTR MEDIUM TEMPERATURE RETURN
MUA MAKE-UP AIR
MUW MAKE-UP WATER
MZ MULTIZONE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
ODT OUTDOOR TEMPERATURE
PC PUMP CONDENSATE
PD PRESSURE DROP
PRV PRESSURE REDUCING VALVE
PWF PROPELLER WALL FAN
R REFRIGERANT
RA RETURN AIR
RAS RELIEF AIR SUPPLY
RP RECIRCULATING PUMP
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
RD ROOF DRAIN
RV RELIEF VALVE
OAL OUTSIDE AIR LOUVER
SAN SANITARY SEWER
SC SILL COCK
SCIM STANDARD CUBIC INCHES PER MINUTE
SD STORM DRAIN
SD SMOKE DETECTOR
SF SQUARE FEET
SDO STORM DRAIN OVERFLOW
SHC SENSIBLE HEAT CAPACITY
SP STAND PIPE
SP SUMP PUMP
O2 OXYGEN
SP STATIC PRESSURE
SP SPRINKLER PIPE
SG SPECIALTY GAS
PRF PROPELLER ROOF FAN
RF ROOF FAN
RSF ROOF SUPPLY FAN
OAD OUTSIDE AIR CONTROL DAMPER
REF RANGE EXHAUST FAN
RAD RETURN AIR CONTROL DAMPER
SCD SMOKE CONTROL DAMPER
SA SUPPLY AIR
SAF SUPPLY AIR FAN
SMBH SENSIBLE MBH
RAF RETURN AIR FAN
WM WATER METER
WL WATER LINE
WH WATER HEATER
WG WATER GAUGE
MARK SERVICE TYPE GPM
MAX. MIN.
EFF.%2
MANUFACTURERS
REMARKS
DYNAMIC MIN.
HEAD
SHUT OFF
TACO
RPM
HP B&G PATTERSONFT. H O
PUMP SCHEDULE
MINIMUM
CAPACITY-MBH
RATING
EWT LWT
WATER
FLOW-GPM
EVAPORATOR DATA
MAXIMUM PRESSURE
DROP-FT-H O
FOULING
FACTOR
MAX. TOTAL
INPUT
ELECTRICAL DATA
KW
MARK VOLTAGE/PHASE/HERTZ REMARKS
CENTRIFUGAL CHILLER SCHEDULE
MIN. NPLV
CHR-2
EWT LWT
WATER
FLOW-GPM
MAXIMUM PRESSURE
DROP-FT-H O
FOULING
FACTOR
CONDENSER DATA
(TONS)
CP-2 CHR-2 ES 480 45 50 1750 10 77 4BD 5x4x7.25 5x4x9.5
0.3720480/3/601200.000251360085950.00011348044542400 (200)
SEAL
SCALE:
FILE PATH:
P:\21090\21090m002.dgn
DATE PLOTTED
DGN FILE
13-SEP-2021
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\21090\21090m002.dgn
AS SHOWN
09.13.21
21090
WSH
LTF
WSH
N S T
R U
C T
C U
M E
N T S
P ro je c t
N o C
C G
A -2
C C
G A C a m d e n C e n te r
C h il le r
R e p la c e m e n t
K in g s la n d
G e o rg ia
NBP Engineers, Inc. COA#PEF000774
COA Expiration: 6.30.2022
M002
HVAC
DETAILS -
HANGER ROD - SEE SPECIFICATIONS
SECTION OF RIGID INSULATION
SPECIFIED INSULATION
PIPE
• ROUND BEARING PLATE
PLATE WASHER
CUT ROD ABOVE ANGLE LEG
1" MIN.
TRAPEZE HANGER
LONG LEG VERTICAL
SEE SPECIFICATIONS
DOUBLE HEX NUTS
NOT TO SCALE
TRAPEZE PIPE HANGER
NOT TO SCALE
TYPICAL DRAIN VALVE CONNECTION
ELEVATION
THREADED PIPING
ELEVATION
WELDED PIPING
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
ƒ" GATE VALVE
ADAPTER TO ƒ" HOSE THREAD
PROVIDE HOSE CAP NUT
NOTES:
DRAIN ALL LOW POINTS AS INDICATED ABOVE.1.
2.WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS
AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.
VENT
VENT
DRAIN
DRAIN
RUN TO FLOOR DRAIN
RELIEF VENT
TO OUTSIDE
INDUSTRIAL HOSE
CS
CR
CHS
CHR
NOT TO SCALE
CHILLER PIPING SPECIALITIES DETAIL
FLEXIBLE CONNECTION
FLEXIBLE COUPLING AND
COUPLING GUARD
PIPE INSULATION
PRESSURE GAUGE
TEST PLUG ‚" BALL VALVE, TYPICAL
ADJUSTABLE FOOT
FULL SIZE BLOWDOWN
‚" DRAIN
HOUSEKEEPING PAD
ISOLATION
TO FLOOR DRAIN
2"
1"
INERTIA PAD
SUCTION DIFFUSER
WITH STRAINER
•" DRAIN TAPPING
PIPE TO FLOOR DRAIN.
18 GA. S.S. DRIP
PAN (CHILLED
WATER PUMP(S) ONLY
NOT TO SCALE
ELEVATION
TYPICAL END SUCTION PUMP-
(BASE SHOWN IS FOR ABOVE
SLAB PUMPS. REFER TO 15010
FOR BASES.) 5
3"
NOT TO SCALE
MANUAL AIR VENT
2•"
WELDED PIPE
PIPING
6"MAX.
VALVE FOR VERTICAL DOWN DISCHARGE.
HERE, UNLESS NOTED OTHERWISE AND POSITION
CEILING. LOCATE VALVE AND TERMINATE DRAIN
WHERE AIR VENTS OCCUR ABOVE ACCESSIBLE
•" PIPE SAME MATERIAL AS SYSTEM PIPE.
PIPE SUPPORT
VERTICAL
WALL
THREADED/BRAISED
WITH LIMITED CLEARANCE.
ARRANGEMENT FOR LOCATIONS
GATE VALVE (CONCEALED)
BALL VALVE (EXPOSED) OR
CONNECTION 18" ABOVE FLOOR.
TERMINATE DRAIN WITH HOSE END
3"
UP
CONC. LOADING DOCK
R
S
T
V
Q
U
46 47 48 49
MECHANICAL
ROOM
131H
PLAN
ROOM
131G
CORRIDOR
TOILET
131J
ELECTRICAL
ROOM
131I
SEAL
SCALE:
FILE PATH:
P:\21090\21090m301.dgn
DATE PLOTTED
DGN FILE
13-SEP-2021
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\21090\21090m301.dgn
AS SHOWN
09.13.21
21090
WSH
LTF
WSH
N S T
R U
C T
C U
M E
N T S
P ro je c t
N o C
C G
A -2
C C
G A C a m d e n C e n te r
C h il le r
R e p la c e m e n t
K in g s la n d
G e o rg ia
NBP Engineers, Inc. COA#PEF000774
COA Expiration: 6.30.2022
CHR-1
BLR-1
BLR-2
WH
FUTURE CHILLER
CP-1
CP-2
SP-2
SP-1
CHR-2
BHP-1
BHP-2
HP-1&2
FUT. CP
VFD-4 VFD-3
AH-4
REFRIGERANT MONITOR
T
SAF-4
UH-1
FILTER F-3
10"{
8"{
EF-12
EF-13
T
M301
DEMOLITION - HVAC
MECHANICAL ROOM -
LARGE SCALE -
G
T
225KVA
T
30KVA
HLS
ATS-Q
ES
HX
C
HGQ
B
A
MAIN
LX
LM
LGQ
HX
XLGQ
XLM
ATS-LS
EXISTING PIPES-IN
TUBE SPACE
TUBE SPACE
AIR SEPARATOR
ROOF TO CAP
16"{ THRU
FD
AP 3
FM
FM
FM
CONC. PAD
FM
3"
3"DN
M U
W
MUW
ABOVE DOOR
OAL
72"X42"
STARTERS(2)
STACKED
MVD
B.E. @12'0"
FRT
6" DN
6" DN
CH BYPASS FEED (4/M503)
PLG.
GAS IN
AP
FD
(B.E. @ 8" A.F.F.)
24"x24" LOUVER
METAL PLENUM
12" DEEP
P L
U M
B
IN
G
F P
ACP-CH/HW
CHW EXPANSION TANK
HW EXPANSION TANK
SD
FD
24"x16" OPENING W/FD
C H S
C H
R
C H
R
C S
C S
C R
C S
C R
H W
S
H W
R
R V
R V
6"CHS
C S
C S
C R
"H
W S
C H
R
2" CHS
4"HWR
4"HWS
8"CHR
8"CHR 8"CHS
"H
W R
"H
W S
6"CR
H W
R
6"CHS
8"CHR
"C
H S
GAS METER
T UH-1
SAF-4
ON WALL
TREAT
CT CHEM
HW BYPASS FEED
LARGE SCALE - MECHANICAL ROOM - DEMOLITION - HVAC
SCALE:
= 1'-0
4 0 2 4 8
PURGE SWITCH
EXISTING MANUAL
REFRIGERANT LEAK INDICATOR
EXISTING SURFACE MOUNTED REMOTE
RA
36/18 RA
OA DUCT
12"{
STARTERS(2)
STACKED
LINE LEGEND
EXISTING TO REMAIN
DEMOLITION
SEE FIRE
C H S
NOTES:(THIS SHEET ONLY)
CONDUCTORS FROM THE EXISTING CONDUIT.
BE REUSED. REMOVE THE SERVING CIRUIT BREAKER AND THE
EXISTING SWITCHBOARD LOCATED IN ELECTRICAL ROOM 1311 CAN
WITH NEW CHILLER. THE EXISTING FEEDER CONDUIT FROM THE
EXISTING CHILLER NO. 2 TO BE REMOVED AND REPLACED IN PLACE
STARTER.
1311. REMOVE EXISTING STARTER AND PROVIDE NEW COMBINATION
EXISTING ELECTRICAL CIRCUIT FROM PANEL HX IN ELECTRICAL ROOM
IN PLACE WITH A NEW 10 HP PUMP. DISCONNECT AND RECONNECT
EXISTING CHILLED WATER PUMP CP-2 (10 HP) IS BEING REPLACED
UP
CONC. LOADING DOCK
R
S
T
V
Q
U
46 47 48 49
MECHANICAL
ROOM
131H
PLAN
ROOM
131G
CORRIDOR
TOILET
131J
ELECTRICAL
ROOM
131I
SEAL
SCALE:
FILE PATH:
P:\21090\21090m302.dgn
DATE PLOTTED
DGN FILE
13-SEP-2021
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\21090\21090m302.dgn
AS SHOWN
09.13.21
21090
WSH
LTF
WSH
N S T
R U
C T
C U
M E
N T S
P ro je c t
N o C
C G
A -2
C C
G A C a m d e n C e n te r
C h il le r
R e p la c e m e n t
K in g s la n d
G e o rg ia
NBP Engineers, Inc. COA#PEF000774
COA Expiration: 6.30.2022
CHR-1
BLR-1
BLR-2
WH
FUTURE CHILLER
CP-1
SP-2
SP-1
BHP-1
BHP-2
HP-1&2
FUT. CP
VFD-4 VFD-3
AH-4
REFRIGERANT MONITOR
T
SAF-4
UH-1
FILTER F-3
10"{
8"{
EF-12
EF-13
T
G
T
225KVA
T
30KVA
HLS
ATS-Q
ES
HX
C
HGQ
B
A
MAIN
LX
LM
LGQ
HX
XLGQ
XLM
ATS-LS
EXISTING PIPES-IN
TUBE SPACE
AIR SEPARATOR
ROOF TO CAP
16"{ THRU
FD
AP 3
FM
FM
FM
CONC. PAD
FM
3"
3"DN
M U
W
MUW
ABOVE DOOR
OAL
72"X42"
STARTERS(2)
STACKED
MVD
B.E. @12'0"
FRT
6" DN
6" DN
CH BYPASS FEED (4/M503)
AP
FD
(B.E. @ 8" A.F.F.)
24"x24" LOUVER
METAL PLENUM
12" DEEP ACP-CH/HW
CHW EXPANSION TANK
HW EXPANSION TANK
SD
FD
24"x16" OPENING W/FD
C H S
C H
R
C H
R
C S
C S
C R
C S
C R
H W
S
H W
R
R V
R V
6"CHS
C S
C S
C R
"H
W S
C H
R
2" CHS
4"HWR
4"HWS
8"CHR
8"CHR 8"CHS
"H
W R
"H
W S
6"CR
H W
R
6"CHS
8"CHR
"C
H S
GAS METER
T UH-1
SAF-4
ON WALL
TREAT
CT CHEM
HW BYPASS FEED
PURGE SWITCH
EXISTING MANUAL
REFRIGERANT LEAK INDICATOR
EXISTING SURFACE MOUNTED REMOTE
RA
36/18 RA
OA DUCT
12"{
STARTERS(2)
STACKED
C H S
M302
SCALE:
= 1'-0
4 0 2 4 8
NEW WORK - HVAC
MECHANICAL ROOM -
LARGE SCALE -
LARGE SCALE - MECHANICAL ROOM - NEW WORK - HVAC
LINE LEGEND
POINT OF CONNECTION
EXISTING TO REMAIN
NEW WORK
NEW
CP-2
NEW
CHR-2
6"
6"
NOTES:(THIS SHEET ONLY)
MATCH THE AIC RATING OF THE MAIN CIRCUIT BREAKER.
IN THE EXISTING MAIN SWITCHBOARD. NEW CIRCUIT BREAKER SHALL
NEW CHILLER STARTER. PROVIDE NEW 350A/3P CIRCUIT BREAKER
3#500 KCMIL, 1#2G IN EXISTING 3" CONDUIT. ROUTE CIRCUIT THRU
MAKE ALL FINAL CONNECTIONS TO NEW CHILLER. PROVIDE NEW
CONDUCTORS AS REQUIRED.
PUMP. REUSE EXISTING CONDUCTORS WHERE POSSIBLE. EXTEND
PROVIDE A NEW COMBINATION STARTER WITHIN LINE OF SIGHT OF
MAKE ALL FINAL CONNECTIONS TO THE NEW CHILLED WATER PUMP.
| 21090aCov |
| 21090m001 |
| References |
| tb, 21090tb.dgn |
| 21090m002 |
| References |
| tb, 21090tb.dgn |
| 21090m301 |
| References |
| afp, 21090a1.dgn |
| tb, 21090tb.dgn |
| 21090m302 |
| References |
| afp, 21090a1.dgn |
| tb, 21090tb.dgn |
| existing, 21090m301.dgn |
Other files
| File | Type | Posted |
|---|---|---|
| Addendum #2 | — | |
| Addendum #1 | — | |
| Addendum #1 Drawing | — | |
| Project Manual | — | |
| Invitation to Bid | — | |
| Award Information | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .