Plans 16464.pdf

PDF 3 MB Posted

Attached to
751/16464. SMD; Sturgeon Pt SP- Lighthouse Elec Improvements
Solicitation number
RFQ 171 190000000673 3
Issued by
Alcona County, Michigan

About this file

This is a set of architectural plans documentation for a construction project identified as 2019-1523-E. The plans include three primary deliverables: a Site Plan (Model 1), a Demolition Plan (Model 1), and a Revised Electrical Plan (Model 1). The documentation provides the technical specifications and layouts required for the project's design and implementation phases. The plans appear to establish the baseline requirements for site preparation, structural demolition work, and electrical system installation or modifications necessary to complete the overall project scope.

The file does not contain information regarding pricing terms, contract award dates, bidder meeting schedules, response deadlines, funding sources, or other procurement-related details. This documentation serves primarily as the technical design component of the project and would typically be used in conjunction with a separate request for proposals or bid documents that would outline timeline requirements, budget parameters, and contract terms for interested contractors.

View the file

Other files

File Type Posted
AD-1 Final PDF.pdf PDF
Specifications 16464.pdf PDF
Scan Sep0419sturgeon.pdf PDF
16464-Addendum1.pdf PDF
Advertisment 16464.pdf PDF
Updated Copy February 13, 2018.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2019-1523-E-SE1- SITE PLAN Model (1)

2019-1523-E-E1- DEMOLITION PLAN Model (1)
2019-1523-E-E2- REVISED ELECTRICAL PLAN Model (1)

File details come from the government source that posted it. Updated .