PLAN_VIEW_RWM_ONLY.dwg
DWG drawing 2 MB Posted
- Attached to
- McIntosh Park Wetland Construction
- Solicitation number
- 26-048UO-IFB
- Issued by
- Hillsborough County, Florida
About this file
This is a design file (AutoCAD drawing) related to the McIntosh Park Wetland Construction project issued by the City of Plant City, Florida under IFB 26-048UO-IFB. The file, designated PLAN_VIEW_RWM_ONLY.dwg, provides plan-view documentation for the 363-acre McIntosh Preserve project, which involves wetland excavation and restoration, on-site soil stacking to create a 50-foot hill shaped like Florida, installation of reclaimed water piping infrastructure with SCADA-controlled discharge valves, and native wetland vegetation planting. The project includes bid alternates for unpaved and handicap-accessible paved parking lots, pre-fabricated restroom and pavilion facilities, boardwalk construction, septic systems, and water well installation. The pre-proposal meeting is scheduled for September 10, 2026 at 10:30 a.m., with questions due by September 14, 2026 and bids due September 24, 2026 at 2:00 p.m. The project is located at 775 East Knights Griffin Road in Hillsborough County, with substantial completion required within 540 calendar days of Notice to Proceed and final completion within 30 days thereafter.
The project is fixed-price with 5% retainage, and the City will award to the lowest responsive and responsible bidder. Bid prices must remain valid for 90 days from submittal. Local preference of up to one percent discount or $2,500 (whichever is less) applies to qualifying bidders. The project is partially funded through a State of Florida Department of Environmental Protection Grant Agreement No. LPA0038, with all work required to comply with grant terms and conditions. The contractor must self-perform a minimum of 30 percent of total project cost, maintain General Contractor and Underground Utility and Excavation Contractor licenses, and provide qualifying experience including three projects involving excavation of 300,000 cubic yards or greater within Florida, three projects involving wastewater or reuse collection systems, and two projects involving wetland planting and boardwalk construction. Liquidated damages range from $1,015 to $10,203 per day, and the contractor must provide 24/7 site security using DEFEND 360 cameras with real-time monitoring.
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .