This is a Safety and Site Security Scope of Work document for the McIntosh Park Wetland Construction project administered by the City of Plant City, Florida. The contractor is required to provide, install, and maintain a complete site security monitoring system throughout the construction period, specifically utilizing DEFEND 360 security cameras strategically deployed across the project site to monitor active work areas, material staging zones, access points, and other locations as necessary. The camera system must operate continuously on a 24/7 basis and deliver real-time monitoring, motion alerts, and video recording capabilities. The contractor bears full responsibility for ensuring proper power supply, connectivity, and maintenance of all devices for the entire duration of construction.

The City of Plant City shall retain full access to the DEFEND 360 camera system at all times, including live viewing and recorded footage capabilities. The contractor must provide login credentials, user permissions, and any required software or web portal access to enable remote monitoring by the City. All equipment shall be installed in a manner that does not interfere with construction operations and must comply with applicable safety standards and contractual requirements. The McIntosh Park project is partially funded through a State of Florida Department of Environmental Protection grant (Grant Agreement No. LPA0038), and all work and expenditures must be conducted in accordance with the terms and conditions of this grant agreement.

View the file

Other files

File Type Posted
McIntosh_Park_Wetland_Construction_(Addendum_#8_Revision).pdf PDF
Question#94_WHEELSTOP_DETAIL.pdf PDF
Army_Corps_permit_SAJ-2024-04226(SP-CM)_-_December_19_2025.pdf PDF
CSX_Permit_CSX022389_-_dated_Sept_13,_2023.pdf PDF
Environmental_Resource_Permit_no._43044733.003_-_December_27,_2025.pdf PDF
Hillsborough_County_EPC_review_no.79173_-_February_12,_2025.pdf PDF
MCINTOSH_PARK_INTEGRATED_WATER_MANAGEMENT_PLAN_60%_WETLAND_DESIGN.txt TXT text file
2013RevisedDesignerManual_-_Part2_2152afa2d9.png PNG image
50183029_SURVEY_CONTROL_SHEET.dwg DWG drawing
COVER_SHEET.dwg DWG drawing
Dewberry-Title_Block_22x34_2705.dwg DWG drawing
EXISTING_CONDITIONS_PLAN.dwg DWG drawing
GENERAL_NOTES_AND_LEGEND.dwg DWG drawing
HIL2020_468223.sid SID file
KEY_SHEET.dwg DWG drawing
OP2017_NC_468223_24.sid SID file
OP2017_NC_468224_24.sid SID file
PLANTING_PLAN.dwg DWG drawing
PLAN_VIEW_RWM_ONLY.dwg DWG drawing
PRC#13013_McINTOSH_PRESERVE_12.17.24.pdf PDF
Sitework.Planting.Grass.Short.bump.jpg JPG image
Sitework.Planting.Grass.Thick.jpg JPG image
dewberry-master_template_22x34.dwt —
x-LIDAR_COPY.dwg DWG drawing
x-LIDAR_COPY_final_design_Parking_Water.dwg DWG drawing
x-MCINTOSH_PARKING_LOT.dwg DWG drawing
x-asbuilt_trails.dwg DWG drawing
x-existing_culverts.dwg DWG drawing
x-proposed_contours100%_final_design.dwg DWG drawing
50183029_COVER_SHEET.dwg DWG drawing
E-58-39_e-SHEET.pdf PDF
GRADING_AND_DRAINAGE_PLANS.dwg DWG drawing
HIL2020_468523.sid SID file
McIntosh_Preserve_Logo.jpg JPG image
OP2017_NC_468524_24.sid SID file
Concrete.Cast-In-Place.Flat.Broom.Grey.jpg JPG image
Hydrangea_Blue_Wave_01.jpg JPG image
S601.1.gif GIF image
Concrete.Precast_Structural_Concrete.Smooth.jpg JPG image
HIL2023_468223.sid SID file
Pre_Bid_Sign_In_-_26-048UO-IFB_-_Signed.pdf PDF
McIntosh_Preserve_Tierra_Report_2025-03-11.pdf PDF
2022-02-03_LPA0038_Amendment_1.pdf PDF
2020-06-03_-_LPA0038_-_Agreement_(executed_06.03.20)_(3).pdf PDF
USAC_SAJ-2024-04226(SP-CM)_McIntoshPreserve.pdf PDF
McIntosh_Park_100%_Wetland_Design_with_Electrical_061325.pdf PDF
BidSheet_071626.xlsx XLSX spreadsheet
Polk_County_-_Bid_23-127_Bid_Package.pdf PDF
2020-05-13_McIntosh_Park_Integrated_Water_Master_Plan_(Q125).pdf PDF
2020-06-03_-_LPA0038_-_Agreement_(executed_06.03.20).pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Safety and Site Security Scope of Work The Contractor shall provide, install, and maintain a complete site‑security monitoring system throughout the duration of construction. This includes the deployment of DEFEND 360° security cameras (Attached the specification) strategically placed across the project site to monitor all active work areas, material staging zones, access points, and any other locations necessary to ensure safety and protection of City assets.

The camera system shall operate continuously (24/7) and provide real‑time monitoring, motion alerts, and video recording. The Contractor is responsible for ensuring proper power supply, connectivity, and maintenance of all devices for the entire construction period.

The City of Plant City shall be granted full access to the DEFEND 360 camera system, including live viewing and recorded footage, at all times. Contractor shall provide login credentials, user permissions, and any required software or web portal access to enable the City to remotely monitor site safety and security.

All equipment shall be installed in a manner that does not interfere with construction operations and shall comply with applicable safety standards and contractual requirements.