Plan_Set_Playhouse_Park_Permit_(E)_Set.pdf
PDF 11 MB Posted
- Solicitation number
- 2025-IFB-LM-0708
- Issued by
- Los Angeles County, California
About this file
The provided document is an electrical plan set for the Playhouse Park Electric Vehicle Supply Equipment (EVSE) project by the City of Pasadena, California. The plan set includes detailed electrical drawings, symbols legends, general electrical notes, panel schedules, electrical single line diagrams, and specific installation details for electrical infrastructure. The drawings are dated January 29, 2021, and prepared by AHBE MIG Integral Group, covering comprehensive electrical design specifications for the project's charging station implementation.
The electrical plans specify the installation of 24 Level 2 electric vehicle charging stations, with technical requirements including 240V operation, standard J1772 charging ports, 6.2kW nameplate charging rate, and a load management system compatible with the existing 400A at 120/240V service capacity. The charging stations will be pole-mounted with retractable cable management, Wi-Fi connectivity, data collection capabilities for energy and usage tracking, and credit card payment functionality. The design includes provisions for back-office software with a 5-year service term, and detailed technical specifications for electrical infrastructure, grounding, conduit routing, and component installations across various site locations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .