Plan Set.pdf
PDF 9 MB Posted
- Attached to
- 26PW16 - 2026 Storm Water Improvements
- Solicitation number
- S-KR1079-00018476
- Issued by
- Oregon
About this file
This is a Plan Set document for the 2026 Storm Water Improvements Project #26PW16 prepared by the City of Roseburg Public Works Department, with civil engineering design by Jesten Brenner, P.E. The project involves installation of storm water drainage infrastructure consisting of High-Density Polyethylene (HDPE) storm water pipe ranging from 8 to 12 inches in diameter, storm water manholes, catch basins with inlet filters, and associated appurtenances across two project areas (Schedule A and Schedule B). Schedule A encompasses improvements along Susan Sharp and New Walker Court, while Schedule B extends along Walker Court. The project includes removal of existing concrete pipe, installation of new curb and gutter, asphalt paving, erosion control measures, and coordination with existing utilities including water, sanitary sewer, gas, and electrical systems. Project documentation includes detailed plan and profile drawings with station-by-station specifications, standard detail references to Oregon Standard Drawings, and comprehensive general notes addressing construction procedures, utility coordination, testing requirements, and traffic control protocols.
Pricing and contracting terms are not specified in this Plan Set document. The project requires contractor compliance with current Oregon Standard Specifications for Construction as amended by City of Roseburg Public Works Standards. All work must be performed within the public right-of-way or public easements subject to Public Works permits. The contractor is responsible for procurement of all applicable permits and licenses, verification of utility locations through potholing prior to construction, notification to the Oregon Utility Notification Center at least two business days before excavation, hydrostatic testing and chlorination of water mainlines (where applicable), and coordination with utility companies for any necessary relocations. Construction hours are restricted to 7:30 AM to 5:00 PM, Monday through Friday, with no work permitted on Saturday, Sunday, or government holidays. The contractor must maintain an approved set of plans on-site at all times and provide 48-hour advance notice before beginning construction and 24-hour notice prior to testing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OR Standard Drawing Set.pdf | ||
| Specification Documents~2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2026 STORM WATER IMPROVEMENTS
PROJECT #26PW16
Call before you dig.
Know what's below.
ATTENTION:
OWNER:
CITY OF ROSEBURG
900 SE DOUGLAS AVE
ROSEBURG OR, 97490
CIVIL ENGINEER:
CITY OF ROSEBURG
PUBLIC WORKS DEPARTMENT
JESTEN BRENNER, P.E.
541-492-6730
JBRENNER@ROSEBURGOR.GOV
UTILITIES:
PACIFIC POWER
CLAYTON BRELAGE
541-679-3604
AVISTA UTILITIES
RYAN FORSLOFF
541-440-1162
ROSEBURG URBAN SANITARY AUTHORITY (RUSA)
RYON KERSHNER
541-672-1551
LINE IS 1 INCH
AT FULL SCALE
DESIGNED: DRAWN: REVISIONS
IF NOT 1-INCH - SCALE ACCORDINGLY
DRAWING NO.
SHEET NO.
OF
DATE
PROJECT NO.
CITY OF ROSEBURG
Public Works Department
900 SE Douglas Ave.
Roseburg OR 97470
2026 STORM WATER
10COVER
IMPROVEMENTS
COV
NOV 2026
26PW16JDB & ABJDB
GENERAL
VICINITY MAP
Not To Scale
GENERAL
CIVIL
OREGON STANDARD DRAWING REFERENCE
DRAWING INDEX
DETAILS
SCHEDULE B
PROJECT AREA
SCHEDULE A
PROJECT AREA
/E
XE
IP R S 21
72/31
83982PE
OREGON
E
E
GN
I N
E
R
REG
ISTERED PROFESS IONAL
J E
S T E N D . B R E NNERJ UL Y 1 1 , 2 0 17
AutoCAD SHX Text
OREGON LAW REQUIRES YOU TO FOLLOW RULES
AutoCAD SHX Text
ADOPTED BY THE OREGON UTILITY NOTIFICATION
AutoCAD SHX Text
CENTER. THOSE RULES ARE SET FORTH IN
AutoCAD SHX Text
OAR 952-001-0010 THROUGH 952-001-0090.
AutoCAD SHX Text
YOU MAY OBTAIN COPIES OF THE RULES BY
AutoCAD SHX Text
CALLING THE CENTER AT (503) 232-1987.
AutoCAD SHX Text
REV#
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
%%UDWG NO. SHEET NO. DESCRIPTION
AutoCAD SHX Text
COVER ABBREVIATIONS, SYMBOLS, LEGEND, & PROJECT AREA GENERAL NOTES WATER NOTES
AutoCAD SHX Text
COV G1 G2 G3
AutoCAD SHX Text 1 2 3 4
AutoCAD SHX Text
SCH B - PLAN AND PROFILE STA 0+00 TO 2+30
AutoCAD SHX Text
AutoCAD SHX Text C100
AutoCAD SHX Text THRUST BLOCKING TRENCH BACKFILL, BEDDING, PIPE ZONE STREET CUT STANDARD STORM SEWER MANHOLE STANDARD MANHOLE DETAILS PIPE TO STRUCTURE CONNECTIONS STANDARD MANHOLE BASE SECTIONS PIPE TO MANHOLE CONNECTIONS MANHOLE COVERS AND FRAMES MANHOLE FRAME ADJUSTMENT CATCH BASIN INLETS FRAMES AND GRATES CONCRETE INLET BASE CG-3 CONCRETE INLET TOP OPTION 1 CG-3 CONCRETE CURBS
AutoCAD SHX Text RD250 RD300 RD302 RD335 RD336 RD339 RD344 RD345 RD356 RD360 RD364 RD365 RD371 RD372 RD700
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text D1
AutoCAD SHX Text
SCH B - PLAN AND PROFILE STA 2+30 TO 4+50
AutoCAD SHX Text
AutoCAD SHX Text C101
AutoCAD SHX Text
SCH B - PLAN AND PROFILE STA 4+50 TO 6+11
AutoCAD SHX Text
AutoCAD SHX Text C200
AutoCAD SHX Text
SCH A - PLAN AND PROFILE STA 0+00 TO 2+08
AutoCAD SHX Text
AutoCAD SHX Text C201
AutoCAD SHX Text
SCH A - PLAN AND DETAIL
AutoCAD SHX Text
AutoCAD SHX Text C202
AutoCAD SHX Text
LINE IS 1 INCH
AT FULL SCALE
DESIGNED: DRAWN: REVISIONS
IF NOT 1-INCH - SCALE ACCORDINGLY
DRAWING NO.
SHEET NO.
OF
DATE
PROJECT NO.
CITY OF ROSEBURG
Public Works Department
900 SE Douglas Ave.
Roseburg OR 97470
2026 STORM WATER
10NOTES, ABBREVIATIONS, SYMBOLS, & LEGEND,
IMPROVEMENTS
G1
NOV 2026
26PW16JDB & ABJDB
GENERAL
STS
SS
TV TV
W G
A C5
D3
/E
XE
IP R S 21
72/31
83982PE
OREGON
E
E
GN
I N
E
R
REG
ISTERED PROFESS IONAL
J E
S T E N D . B R E NNERJ UL Y 1 1 , 2 0 1 7
AutoCAD SHX Text
REV#
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
PRESSURE TREATED DOUG. FIR
AutoCAD SHX Text
AIR RELEASE VALVE
AutoCAD SHX Text
ARV
AutoCAD SHX Text
HB
AutoCAD SHX Text
HOSE BIB
AutoCAD SHX Text
SVC
AutoCAD SHX Text
SERVICE
AutoCAD SHX Text
SLAB-ON-GRADE
AutoCAD SHX Text
SOG
AutoCAD SHX Text
REDUCER
AutoCAD SHX Text
RDCR
AutoCAD SHX Text
PIPE SUPPORT
AutoCAD SHX Text
PS
AutoCAD SHX Text
PLUG VALVE
AutoCAD SHX Text
PV
AutoCAD SHX Text
FLOW ELEMENT
AutoCAD SHX Text
FE
AutoCAD SHX Text
FLANGE COUPLING ADAPTER
AutoCAD SHX Text
FCA
AutoCAD SHX Text
HIGH DENSITY POLYETHYLENE
AutoCAD SHX Text
HDPE
AutoCAD SHX Text
TOE
AutoCAD SHX Text
TOE OF BANK
AutoCAD SHX Text
TOP BACK CURB
AutoCAD SHX Text
TBC
AutoCAD SHX Text
NIC
AutoCAD SHX Text
NOT IN CONTRACT
AutoCAD SHX Text
STATION
AutoCAD SHX Text
STA
AutoCAD SHX Text
LEFT
AutoCAD SHX Text
LT
AutoCAD SHX Text
CUL
AutoCAD SHX Text
CULVERT
AutoCAD SHX Text
RT
AutoCAD SHX Text
RIGHT
AutoCAD SHX Text
LAT
AutoCAD SHX Text
LATERAL
AutoCAD SHX Text
VALVE
AutoCAD SHX Text
VLV
AutoCAD SHX Text
PTDF
AutoCAD SHX Text
ADAPTER
AutoCAD SHX Text
ADPTR
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
GV
AutoCAD SHX Text
FIRE HYDRANT
AutoCAD SHX Text
FH
AutoCAD SHX Text
STORM DRAIN
AutoCAD SHX Text
SD
AutoCAD SHX Text
SANITARY SEWER
AutoCAD SHX Text
SS
AutoCAD SHX Text
STANDARD
AutoCAD SHX Text
STAINLESS STEEL
AutoCAD SHX Text
SPECIFICATIONS
AutoCAD SHX Text
RIGHT OF WAY
AutoCAD SHX Text
REQUIRED
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
POUNDS PER SQUARE FOOT
AutoCAD SHX Text
PRESSURE
AutoCAD SHX Text
PLATE
AutoCAD SHX Text
PERFORATED
AutoCAD SHX Text
OVERFLOW
AutoCAD SHX Text
MINIMUM
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
MAXIMUM
AutoCAD SHX Text
MATERIAL
AutoCAD SHX Text
STD
AutoCAD SHX Text
SST
AutoCAD SHX Text
SPEC
AutoCAD SHX Text
ROW
AutoCAD SHX Text
REQ'D
AutoCAD SHX Text
PVMT
AutoCAD SHX Text
PSF
AutoCAD SHX Text
PRESS.
AutoCAD SHX Text
PL
AutoCAD SHX Text
PERF
AutoCAD SHX Text
OF
AutoCAD SHX Text
MIN
AutoCAD SHX Text
MECH
AutoCAD SHX Text
MAX
AutoCAD SHX Text
MATL
AutoCAD SHX Text
LOWPOINT
AutoCAD SHX Text
HIGH POINT
AutoCAD SHX Text
HORIZONTAL
AutoCAD SHX Text
FOOTING
AutoCAD SHX Text
EXTERIOR
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
EACH WAY
AutoCAD SHX Text
ELBOW
AutoCAD SHX Text
EACH
AutoCAD SHX Text
DIMENSION
AutoCAD SHX Text
DIAMETER
AutoCAD SHX Text
CENTER
AutoCAD SHX Text
COUPLING
AutoCAD SHX Text
CORPORATION
AutoCAD SHX Text
CLEAN OUT
AutoCAD SHX Text
CATCH BASIN
AutoCAD SHX Text
COMBINATION AIR RELEASE VALVE
AutoCAD SHX Text
BENCH MARK
AutoCAD SHX Text
APPROXIMATE
AutoCAD SHX Text
ALUMINUM
AutoCAD SHX Text
ANCHOR BOLT
AutoCAD SHX Text
LPT
AutoCAD SHX Text
HPT
AutoCAD SHX Text
HORIZ
AutoCAD SHX Text
FTG
AutoCAD SHX Text
EXT
AutoCAD SHX Text
EXIST'G
AutoCAD SHX Text
EW
AutoCAD SHX Text
ELB
AutoCAD SHX Text
EA
AutoCAD SHX Text
DIM
AutoCAD SHX Text
DIA
AutoCAD SHX Text
CTR
AutoCAD SHX Text
CPLG
AutoCAD SHX Text
CORP
AutoCAD SHX Text
CO
AutoCAD SHX Text
CB
AutoCAD SHX Text
CARV
AutoCAD SHX Text
BM
AutoCAD SHX Text
APPROX
AutoCAD SHX Text
AL
AutoCAD SHX Text
AB
AutoCAD SHX Text
AUX
AutoCAD SHX Text
AGG
AutoCAD SHX Text
AUXILIARY
AutoCAD SHX Text
AGGREGATE
AutoCAD SHX Text
POWER POLE/UTILITY POLE
AutoCAD SHX Text P/P
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
MANUFACTURER
AutoCAD SHX Text
LINEAR FEET
AutoCAD SHX Text
LENGTH
AutoCAD SHX Text
HORSE POWER
AutoCAD SHX Text
POWER INPUT
AutoCAD SHX Text
PLAIN END
AutoCAD SHX Text
ON CENTER
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
MASTER
AutoCAD SHX Text
REINFORCING
AutoCAD SHX Text
RADIUS
AutoCAD SHX Text
POLYVINYL CHLORIDE
AutoCAD SHX Text
POUNDS PER SQUARE INCH
AutoCAD SHX Text
PUMPING STATION
AutoCAD SHX Text
PRESSURE MAIN
AutoCAD SHX Text
PHASE (ELEC)/PUMP
AutoCAD SHX Text
OUTSIDE DIAMETER
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
THREADED
AutoCAD SHX Text
SUBMERSION
AutoCAD SHX Text
SQUARE
AutoCAD SHX Text
STEEL
AutoCAD SHX Text
SECTION
AutoCAD SHX Text
SCHEDULE
AutoCAD SHX Text
MECHANICAL JOINT
AutoCAD SHX Text L
AutoCAD SHX Text
HP
AutoCAD SHX Text
MH
AutoCAD SHX Text
MFR
AutoCAD SHX Text
LF
AutoCAD SHX Text
OC
AutoCAD SHX Text
NTS
AutoCAD SHX Text
MSTR
AutoCAD SHX Text
PI
AutoCAD SHX Text
PE
AutoCAD SHX Text P
AutoCAD SHX Text
OD
AutoCAD SHX Text P/S
AutoCAD SHX Text
PM
AutoCAD SHX Text
REINF
AutoCAD SHX Text R
AutoCAD SHX Text
PVC
AutoCAD SHX Text
PSI
AutoCAD SHX Text
STL
AutoCAD SHX Text
SEC
AutoCAD SHX Text
SCH
AutoCAD SHX Text
TYP
AutoCAD SHX Text
THD
AutoCAD SHX Text
SUBM
AutoCAD SHX Text
SQ
AutoCAD SHX Text
MJ
AutoCAD SHX Text
AIR
AutoCAD SHX Text
CI
AutoCAD SHX Text C
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
BKFL
AutoCAD SHX Text
AC
AutoCAD SHX Text A
AutoCAD SHX Text
CAST IRON
AutoCAD SHX Text
CONDUIT
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
BACKFILL
AutoCAD SHX Text
ASPHALTIC CONCRETE
AutoCAD SHX Text
DRAIN
AutoCAD SHX Text
FD
AutoCAD SHX Text
E/ELEC
AutoCAD SHX Text
EL/ELEV
AutoCAD SHX Text
EFF
AutoCAD SHX Text
DWG
AutoCAD SHX Text
DIP
AutoCAD SHX Text
DET
AutoCAD SHX Text D
AutoCAD SHX Text
CONT
AutoCAD SHX Text
CONST
AutoCAD SHX Text
CONN
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CNTRL
AutoCAD SHX Text
CMP
AutoCAD SHX Text
FEET
AutoCAD SHX Text
FM
AutoCAD SHX Text
GPD,H,M
AutoCAD SHX Text
GND
AutoCAD SHX Text
GIP
AutoCAD SHX Text
GALV
AutoCAD SHX Text
FT
AutoCAD SHX Text
FLG
AutoCAD SHX Text
FF/FIN FLR
AutoCAD SHX Text
FORCE MAIN
AutoCAD SHX Text
GROUND (ELEC)
AutoCAD SHX Text
GALVANIZED IRON PIPE
AutoCAD SHX Text
GALVANIZED
AutoCAD SHX Text
FLANGED
AutoCAD SHX Text
FINISH FLOOR
AutoCAD SHX Text
FLOOR DRAIN
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
EFFLUENT
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
DUCTILE IRON PIPE
AutoCAD SHX Text
DETAIL
AutoCAD SHX Text
CONTINUOUS
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
CONNECTION
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONTROL
AutoCAD SHX Text
CORRUGATED METAL PIPE
AutoCAD SHX Text
GALLONS PER DAY, HOUR, MINUTE
AutoCAD SHX Text
TRANS
AutoCAD SHX Text
TRANSITION
AutoCAD SHX Text
FIBER OPTIC
AutoCAD SHX Text
FO
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
EOP
AutoCAD SHX Text
FOC
AutoCAD SHX Text
FACE OF CURB
AutoCAD SHX Text
FINISH GRADE
AutoCAD SHX Text
FG
AutoCAD SHX Text
TOB
AutoCAD SHX Text
TOP OF BANK
AutoCAD SHX Text
TRANSITION COUPLING
AutoCAD SHX Text
TCPLG
AutoCAD SHX Text
CONTROL POINT
AutoCAD SHX Text
CP
AutoCAD SHX Text
TELEPHONE
AutoCAD SHX Text T
AutoCAD SHX Text
POINT OF CURVATURE
AutoCAD SHX Text
PC
AutoCAD SHX Text
POINT OF COMPOUND CURVE
AutoCAD SHX Text
PCC
AutoCAD SHX Text
POINT ON CURVE
AutoCAD SHX Text
POC
AutoCAD SHX Text
FL
AutoCAD SHX Text
FLOWLINE
AutoCAD SHX Text
POINT OF TANGENCY
AutoCAD SHX Text
PT
AutoCAD SHX Text
TOW
AutoCAD SHX Text
TOP OF WALL
AutoCAD SHX Text
TOF
AutoCAD SHX Text
TOP OF FOOTING
AutoCAD SHX Text
ABBREVIATIONS
AutoCAD SHX Text
GRAVITY SEWER LINE
AutoCAD SHX Text
NATURAL GAS LINE
AutoCAD SHX Text
FIRE HYDRANT
AutoCAD SHX Text
WATER VALVE
AutoCAD SHX Text
POWER POLE
AutoCAD SHX Text
SIDEWALK, CURB & GUTTER
AutoCAD SHX Text
POWER POLE W/GUY WIRE
AutoCAD SHX Text
UNDERGROUND TELEPHONE LINE
AutoCAD SHX Text
STREET SIGN
AutoCAD SHX Text
SANITARY SEWER MANHOLE = SS
AutoCAD SHX Text
STORM DRAIN MANHOLE = D
AutoCAD SHX Text
CATCH BASIN
AutoCAD SHX Text
PROPERTY LINE/ROW
AutoCAD SHX Text
PROPERTY CORNER
AutoCAD SHX Text
REFLECTOR / MILE MARKER
AutoCAD SHX Text
EDGE OF GRAVEL
AutoCAD SHX Text
EDGE A.C. PAVEMENT
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
ELECTRICAL PEDESTAL
AutoCAD SHX Text
UNDERGROUND ELECTRIC
AutoCAD SHX Text
MAILBOX
AutoCAD SHX Text
WATER METER
AutoCAD SHX Text
STORM DRAIN/ CULVERT
AutoCAD SHX Text
SANITARY SEWER CLEANOUT
AutoCAD SHX Text
TELEPHONE PEDESTAL
AutoCAD SHX Text
UNDERGROUND TELEVISION
AutoCAD SHX Text
STOP BAR
AutoCAD SHX Text
STREAM/DITCH
AutoCAD SHX Text
BRUSH
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
CO
AutoCAD SHX Text w
AutoCAD SHX Text E
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text T
AutoCAD SHX Text
PUG
AutoCAD SHX Text
MB
AutoCAD SHX Text
SS
AutoCAD SHX Text D
AutoCAD SHX Text
SURVEY CONTROL POINT
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
CP#4
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING GROUND CONTOURS
AutoCAD SHX Text
WATER LINE
AutoCAD SHX Text
DRAWN ON DWG NO. D3
AutoCAD SHX Text
SECTION DESIGNATION
AutoCAD SHX Text
DRAWN ON DWG NO. C5
AutoCAD SHX Text
DETAIL DESIGNATION
AutoCAD SHX Text
REFERENCE SYMBOLS
AutoCAD SHX Text
OREGON STANDARD DRAWINGS
AutoCAD SHX Text
OSD
AutoCAD SHX Text
1. ALL WORK AND MATERIALS SHALL CONFORM TO THE CURRENT ALL WORK AND MATERIALS SHALL CONFORM TO THE CURRENT EDITION OF THE OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION AS AMENDED BY THE CITY OF ROSEBURG PUBLIC WORKS STANDARDS AND CONSTRUCTION REQUIREMENTS PER THE PUBLIC WORKS DIRECTOR. ALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY OR PUBLIC EASEMENTS REQUIRES A PUBLIC WORKS PERMIT. 2. THE CONTRACTOR IS RESPONSIBLE FOR THE PROCUREMENT OF THE CONTRACTOR IS RESPONSIBLE FOR THE PROCUREMENT OF ALL APPLICABLE PERMITS, LICENSES AND CERTIFICATES RELATIVE TO THE TRADES TO COMPLETE THE PROJECT AND FOR THE USE OF SUCH WORK WHEN COMPLETED. COMPLIANCE SHALL BE AT ALL LEVELS, FEDERAL, STATE, COUNTY, AND LOCAL, RELATING TO THE PERFORMANCE OF WORK. 3. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL UTILITY LOCATIONS PRIOR TO CONSTRUCTION AND ARRANGE FOR THE RELOCATION OF ANY IN CONFLICT WITH THE PROPOSED CONSTRUCTION. THE LOCATIONS, DEPTH, AND DESCRIPTION OF EXISTING UTILITIES SHOWN WERE COMPILED FROM AVAILABLE RECORDS AND-OR FIELD SURVEYS. THE ENGINEER OR UTILITY COMPANIES DO NOT GUARANTEE THE ACCURACY OF THE COMPLETENESS OF SUCH RECORDS. ADDITIONAL UTILITIES MAY EXIST WITHIN THE WORK AREA. 4. OREGON LAW REQUIRES THE CONTRACTOR TO FOLLOW RULES OREGON LAW REQUIRES THE CONTRACTOR TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 052-001-0010 THROUGH OAR 952-001-0000. THE CONTRACTOR MAY OBTAIN COPIES OF THE RULES FROM THE CENTER BY CALLING TOLL FREE TO (877)668-4001 OR BY ACCESSING THE INTERNET AT WWW.CALLBEFOREYOUDIG.ORG. THE CONTRACTOR MUST NOTIFY THE CENTER AT LEAST TWO (2) BUSINESS DAYS, BUT NOT MORE THAN TEN (10) BUSINESS DAYS, BEFORE COMMENCING AN EXCAVATION. CALL TOLL FREE TO (800)332-2344. 5. THE CONTRACTOR SHALL MAKE PROVISIONS TO KEEP ALL THE CONTRACTOR SHALL MAKE PROVISIONS TO KEEP ALL EXISTING UTILITIES (INCLUDING NON-LOCATABLE) IN SERVICE AND PROTECT THEM DURING CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE FOR THE IMMEDIATE NOTIFICATION OF DAMAGE TO UTILITIES AND THE REPAIR OR REPLACEMENT OF DAMAGED UTILITIES USING MATERIALS AND METHODS APPROVED BY THE UTILITY OWNER. NO SERVICE INTERRUPTIONS SHALL BE PERMITTED WITHOUT PRIOR WRITTEN AGREEMENT WITH THE UTILITY OWNER. 6. THE CONTRACTOR SHALL NOTIFY PROJECT ENGINEER AND CITY THE CONTRACTOR SHALL NOTIFY PROJECT ENGINEER AND CITY OF ROSEBURG PUBLIC WORKS INSPECTOR FORTY-EIGHT (48) HOURS IN ADVANCE OF STARTING CONSTRUCTION AND TWENTY-FOUR (24) HOURS BEFORE RESUMING WORK AFTER SHUT DOWNS, EXCEPT FOR NORMAL RESUMPTION OF WORK FOLLOWING SATURDAYS, SUNDAYS OR HOLIDAYS. 7. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL TREES, THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL TREES, STUMPS, ROOTS, TOPSOIL, AND OTHER MATERIAL AND WHERE INDICATED ON THE PLANS. MATERIALS SHALL BE DISPOSED OF IN SUCH A MANNER AS TO MEET ALL APPLICABLE REGULATIONS. NO BURNING IS ALLOWED WITHIN CITY LIMITS. 8. ALL CONSTRUCTION VEHICLES SHALL PARK ON THE ALL CONSTRUCTION VEHICLES SHALL PARK ON THE CONSTRUCTION SITE OR AT A LOCATION(S) INDICATED ON THE APPROVED PLAN. HOURS OF CONSTRUCTION FOR PUBLIC IMPROVEMENTS SHALL BE 7:30 AM TO 5:00 PM, MONDAY THROUGH FRIDAY. CONSTRUCTION OF PUBLIC IMPROVEMENTS IS PROHIBITED SATURDAY, SUNDAY, AND GOVERNMENT HOLIDAYS. CONSTRUCTION ACTIVITIES INCLUDE ALL FIELD MAINTENANCE OF EQUIPMENT, REFUELING, AND PICK-UP OR DELIVERY OF EQUIPMENT AS WELL AS THE ACTUAL CONSTRUCTION ACTIVITY. 9. THE CONTRACTOR SHALL KEEP AN APPROVED SET OF PLANS THE CONTRACTOR SHALL KEEP AN APPROVED SET OF PLANS ON THE PROJECT SITE AT ALL TIMES. 10. THE CONTRACTOR SHALL PERFORM ALL WORK NECESSARY TO THE CONTRACTOR SHALL PERFORM ALL WORK NECESSARY TO COMPLETE THIS PROJECT IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS INCLUDING SUCH INCIDENTALS AS MAY BE NECESSARY TO MEET THE INTENT OF THE PROJECT CONTRACT DOCUMENTS AND APPLICABLE AGENCY REQUIREMENTS. 11. IF GROUND WATER SPRINGS OR TILED DRAINAGE SYSTEMS ARE IF GROUND WATER SPRINGS OR TILED DRAINAGE SYSTEMS ARE ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY CONTACT THE PROJECT ENGINEER. THE PROJECT ENGINEER SHALL DIRECT THE CONTRACTOR TO TAKE MEASURES TO ENSURE THAT THE WATER IS NOT CONVEYED THROUGH UTILITY TRENCHES AND THE NATURAL FLOW PATH OF THE SPRING IS ALTERED AS LITTLE AS PRACTICABLE. IMPACTS AND MITIGATION SHALL BE ADDRESSED FOR CITY APPROVAL. 12. THE CONTRACTOR SHALL POTHOLE AND VERIFY LOCATION AND THE CONTRACTOR SHALL POTHOLE AND VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND OTHERWISE VERIFY ALL DIMENSIONS AND EXISTING CONSTRUCTION CONDITIONS INDICATED AND OR SHOWN ON THE PLANS. EXISTING CONDITIONS SHALL BE VERIFIED PRIOR TO THE ORDERING OF ANY PRE-CONSTRUCTED OR PRE-FORMED EQUIPMENT. SHOULD ANY ERROR OR INCONSISTENCY EXIST, THE CONTRACTOR SHALL NOT PROCEED WITH THE WORK AFFECTED UNTIL REPORTED TO THE PROJECT ENGINEER FOR CLARIFICATION OR CORRECTION. 13. ANY INSPECTION BY THE CITY, COUNTY, STATE, FEDERAL ANY INSPECTION BY THE CITY, COUNTY, STATE, FEDERAL AGENCY, OR PROJECT ENGINEER SHALL NOT, IN ANY WAY RELIEVE THE CONTRACTOR FROM ANY OBLIGATION TO PERFORM THE WORK IN COMPLIANCE WITH THE APPLICABLE CODES AND REGULATIONS, CITY STANDARDS, AND PROJECT DOCUMENTS. 14. THE CONTRACTOR SHALL VERIFY CENTERLINE AND TOP OF THE CONTRACTOR SHALL VERIFY CENTERLINE AND TOP OF CURB ELEVATIONS PRIOR TO CONSTRUCTION TO ENSURE COMPLIANCE WITH THE CONSTRUCTION DRAWINGS AND REPORT ANY DISCREPANCIES IMMEDIATELY TO THE PROJECT ENGINEER. 15. THE CONTRACTOR SHALL PROVIDE THE CITY AND PROJECT THE CONTRACTOR SHALL PROVIDE THE CITY AND PROJECT ENGINEER A TWENTY-FOUR (24) HOUR CONTACT PERSON AND NUMBER. 16. THE CONTRACTOR SHALL VERIFY TEMPORARY CONSTRUCTION THE CONTRACTOR SHALL VERIFY TEMPORARY CONSTRUCTION EASEMENTS PRIOR TO CONSTRUCTION. 17. THE CONTRACTOR SHALL RECORD ALL CHANGES TO THE THE CONTRACTOR SHALL RECORD ALL CHANGES TO THE CONSTRUCTION PLANS. CHANGES SHALL INCLUDE REFERENCE MEASUREMENTS, MATERIALS TYPE, AND UTILITIES NOT PREVIOUSLY SHOWN ON THE PLANS. INFORMATION SHALL BE SUBMITTED TO THE PROJECT ENGINEER FOR THE COMPLETION OF RECORD DRAWINGS. 18. ALL SURVEY MONUMENTS ON THE PROJECT'S SITE OR THAT ALL SURVEY MONUMENTS ON THE PROJECT'S SITE OR THAT MAY BE SUBJECT TO DISTURBANCE WITHIN THE CONSTRUCTION AREA, OR THE CONSTRUCTION OF ANY OFF-SITE IMPROVEMENTS SHALL BE ADEQUATELY REFERENCED AND PROTECTED PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY. IF THE SURVEY MONUMENTS ARE DISTURBED, MOVED, RELOCATED, OR DESTROYED AS A RESULT OF ANY CONSTRUCTION, THE CONTRACTOR SHALL, AT THEIR COST, RETAIN THE SERVICES OF A REGISTERED PROFESSIONAL LAND SURVEYOR IN THE STATE OF OREGON TO RESTORE THE MONUMENT TO ITS ORIGINAL CONDITION AND FILE THE NECESSARY SURVEYS AS REQUIRED BY OREGON STATE LAW. A COPY OF ANY RECORDED SURVEY SHALL BE SUBMITTED TO THE PROJECT ENGINEER OR AUTHORIZED REPRESENTATIVE. 19. THE CONTRACTOR IS REQUIRED TO METER CONSTRUCTION THE CONTRACTOR IS REQUIRED TO METER CONSTRUCTION WATER THROUGH A CITY BULK WATER METER. CONTACT ROSEBURG UTILITY BILLING AT 541-492-6730 TO SET UP AN ACCOUNT. 20. ANY ROOTS ENCOUNTERED OVER 2 INCHES SHALL BE CUT WITH ANY ROOTS ENCOUNTERED OVER 2 INCHES SHALL BE CUT WITH SAW PERPENDICULAR TO TRENCH. 21. CONTRACTOR SHALL COORDINATE WITH AVISTA UTILITIES, OR CONTRACTOR SHALL COORDINATE WITH AVISTA UTILITIES, OR OTHERS, FOR THE RE-LOCATION OF UTILITY LINES. THE CITY OF ROSEBURG WILL NOTIFY THE UTILITY ABOUT THE CONFLICT, BUT THE CONTRACTOR WILL NEED TO FOLLOW UP AND COORDINATE FOR THE RE-LOCATION.
AutoCAD SHX Text
GENERAL NOTES
PUG
LINE IS 1 INCH
AT FULL SCALE
DESIGNED: DRAWN: REVISIONS
IF NOT 1-INCH - SCALE ACCORDINGLY
DRAWING NO.
SHEET NO.
OF
DATE
PROJECT NO.
CITY OF ROSEBURG
Public Works Department
900 SE Douglas Ave.
Roseburg OR 97470
2026 STORM WATER
10NOTES
IMPROVEMENTS
G2
NOV 2026
26PW16JDB & ABJDB
GENERAL
/E
XE
IP R S 21
72/31
83982PE
OREGON
E
E
GN
I N
E
R
REG
ISTERED PROFESS IONAL
J E
S T E N D . B R E NNERJ U L Y 1 1 , 2 0 17
AutoCAD SHX Text
REV#
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
PAVING NOTES
AutoCAD SHX Text
1. TRIM VEGETATION AS NEEDED PRIOR TO PAVING TO ENSURE ALL VEGETATION IS CLEAR OF PAVING OPERATIONS. TRIM VEGETATION AS NEEDED PRIOR TO PAVING TO ENSURE ALL VEGETATION IS CLEAR OF PAVING OPERATIONS. 2. ALL EDGES REMAINING AFTER COLD PLANE ASPHALT REMOVAL AND SAW CUTTING SHALL REMAIN VERTICAL TO ALL EDGES REMAINING AFTER COLD PLANE ASPHALT REMOVAL AND SAW CUTTING SHALL REMAIN VERTICAL TO ALLOW FULL DEPTH ASPHALT PAVING. 3. ALL JOINTS BETWEEN NEW ASPHALTIC CONCRETE AND EXISTING OR NEW ASPHALT CONCRETE SHALL BE TACKED ALL JOINTS BETWEEN NEW ASPHALTIC CONCRETE AND EXISTING OR NEW ASPHALT CONCRETE SHALL BE TACKED AND SAND SEALED.
AutoCAD SHX Text
EROSION CONTROL NOTES
AutoCAD SHX Text
1. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO ANY DISTURBANCE CAUSED BY ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO ANY DISTURBANCE CAUSED BY GRADING AND SHALL CONFORM TO THE REQUIREMENTS OF STATE AND FEDERAL REGULATIONS AND TO THE SPECIFIC REQUIREMENTS CONTAINED IN THE SPECIFICATIONS. 2. ANY INLETS AND CATCH BASINS THAT MAY RECEIVE RUNOFF FROM THE PROJECT AREA ARE TO BE PROTECTED ANY INLETS AND CATCH BASINS THAT MAY RECEIVE RUNOFF FROM THE PROJECT AREA ARE TO BE PROTECTED PRIOR TO CONSTRUCTION. ALL INLETS AND CATCH BASINS ARE TO BE PROTECTED IN ACCORDANCE WITH ODOT/APWA STANDARDS FOR EROSION AND SEDIMENT CONTROL. 3. ALL PESTICIDES, PETROLEUM PRODUCTS, CHEMICALS OR OTHER POTENTIAL POLLUTANTS SHALL BE ADMINISTERED ALL PESTICIDES, PETROLEUM PRODUCTS, CHEMICALS OR OTHER POTENTIAL POLLUTANTS SHALL BE ADMINISTERED RESPONSIBLY WITH DISPOSAL AND SPILLS HANDLED IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL REQUIREMENTS.
AutoCAD SHX Text
STRIPING NOTES
AutoCAD SHX Text
1. CONTRACTOR TO REPLACE, IN-KIND, ANY STRIPING REMOVE AND/OR DAMAGED AS PART OF THE CONSTRUCTION CONTRACTOR TO REPLACE, IN-KIND, ANY STRIPING REMOVE AND/OR DAMAGED AS PART OF THE CONSTRUCTION ACTIVITIES. 2. ALL SIGNING AND PAVING MARKING MATERIAL AND WORKMANSHIP SHALL CONFORM TO THE REQUIREMENTS AND ALL SIGNING AND PAVING MARKING MATERIAL AND WORKMANSHIP SHALL CONFORM TO THE REQUIREMENTS AND SPECIFICATIONS OF THE MANUAL AND UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), AND 2021 APWA STANDARD SPECIFICATIONS. 3. ALL LONGITUDINAL STRIPING SHALL BE PAINT. TRANSVERSE PAVEMENT MARKINGS, INCLUDING CROSSWALKS, STOP ALL LONGITUDINAL STRIPING SHALL BE PAINT. TRANSVERSE PAVEMENT MARKINGS, INCLUDING CROSSWALKS, STOP BARS, BIKE SYMBOLS, AND STORM INLET MARKINGS, SHALL BE PREFORMED THERMOPLASTIC AS SHOWN AND SPECIFIED. CONTRACTOR IS RESPONSIBLE FOR LAYOUT AND STAKING OF ALL TRANSVERSE PAVEMENT MARKINGS.
AutoCAD SHX Text
TRAFFIC CONTROL NOTES
AutoCAD SHX Text
1. THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN FOR APPROVAL PRIOR TO THE START OF THE THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN FOR APPROVAL PRIOR TO THE START OF THE CONSTRUCTION IN ACCORDANCE WITH THE SPECIFICATIONS, CITY STANDARDS, AND THE CURRENT EDITION OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES. ALL FLAGGERS SHALL BE CERTIFIED BY THE STATE OF OREGON. 2. APPROPRIATE METHODS OF PEDESTRIAN AND VEHICULAR TRAFFIC CONTROL, INCLUDING FLAGGERS, SHALL BE APPROPRIATE METHODS OF PEDESTRIAN AND VEHICULAR TRAFFIC CONTROL, INCLUDING FLAGGERS, SHALL BE EMPLOYED BY THE CONTRACTOR TO THE EXTENT DEEMED NECESSARY BY THE TRAFFIC CONTROL SUPERVISOR AND AS APPROVED BY THE CITY TO PROTECT WORKERS OR THIRD PARTIES AND SAFELY ACCOMMODATE TRAFFIC THROUGH THE WORK ZONE. 3. THE CONTRACTOR SHALL COORDINATE ACCESS TO DRIVEWAYS WITH PROPERTY OWNERS. ACCESS TO ROADWAY THE CONTRACTOR SHALL COORDINATE ACCESS TO DRIVEWAYS WITH PROPERTY OWNERS. ACCESS TO ROADWAY APPROACHES WITHIN THE PROJECT LIMITS SHALL BE MAINTAINED AT ALL TIMES. TRAFFIC PLATES SHALL BE USED, AND SECURED, IN A MANNER ACCEPTABLE TO THE CITY, ACROSS ALL TRENCHES BLOCKING DRIVEWAYS TO PROVIDE ACCESS AT ALL TIMES. AT NO TIMES SHALL CONTRACTORS DETAIN OR DELAY EMERGENCY VEHICLES.
AutoCAD SHX Text
1. ALL WATER SYSTEM WORK SHALL BE IN CONFORMANCE WITH ALL WATER SYSTEM WORK SHALL BE IN CONFORMANCE WITH WATER SYSTEM WORK SHALL BE IN CONFORMANCE WITH WATER SYSTEM WORK SHALL BE IN CONFORMANCE WITH SYSTEM WORK SHALL BE IN CONFORMANCE WITH SYSTEM WORK SHALL BE IN CONFORMANCE WITH WORK SHALL BE IN CONFORMANCE WITH WORK SHALL BE IN CONFORMANCE WITH SHALL BE IN CONFORMANCE WITH SHALL BE IN CONFORMANCE WITH BE IN CONFORMANCE WITH BE IN CONFORMANCE WITH IN CONFORMANCE WITH IN CONFORMANCE WITH CONFORMANCE WITH CONFORMANCE WITH WITH WITH CURRENT ODOT STANDARD SPECIFICATIONS FOR CONSTRUCTION ODOT STANDARD SPECIFICATIONS FOR CONSTRUCTION ODOT STANDARD SPECIFICATIONS FOR CONSTRUCTION STANDARD SPECIFICATIONS FOR CONSTRUCTION STANDARD SPECIFICATIONS FOR CONSTRUCTION SPECIFICATIONS FOR CONSTRUCTION SPECIFICATIONS FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION CONSTRUCTION CONSTRUCTION WITH SPECIAL PROVISIONS PROVIDED BY THE CITY. IN CASES OF SPECIAL PROVISIONS PROVIDED BY THE CITY. IN CASES OF SPECIAL PROVISIONS PROVIDED BY THE CITY. IN CASES OF PROVISIONS PROVIDED BY THE CITY. IN CASES OF PROVISIONS PROVIDED BY THE CITY. IN CASES OF PROVIDED BY THE CITY. IN CASES OF PROVIDED BY THE CITY. IN CASES OF BY THE CITY. IN CASES OF BY THE CITY. IN CASES OF THE CITY. IN CASES OF THE CITY. IN CASES OF CITY. IN CASES OF CITY. IN CASES OF IN CASES OF IN CASES OF CASES OF CASES OF OF OF CONFLICT, THE CITY OF ROSEBURG SPECIAL PROVISIONS SHALL THE CITY OF ROSEBURG SPECIAL PROVISIONS SHALL THE CITY OF ROSEBURG SPECIAL PROVISIONS SHALL CITY OF ROSEBURG SPECIAL PROVISIONS SHALL CITY OF ROSEBURG SPECIAL PROVISIONS SHALL OF ROSEBURG SPECIAL PROVISIONS SHALL OF ROSEBURG SPECIAL PROVISIONS SHALL ROSEBURG SPECIAL PROVISIONS SHALL ROSEBURG SPECIAL PROVISIONS SHALL SPECIAL PROVISIONS SHALL SPECIAL PROVISIONS SHALL PROVISIONS SHALL PROVISIONS SHALL SHALL SHALL TAKE PRECEDENCE OVER THE STANDARD SPECIFICATIONS. 2. A PRE-CONSTRUCTION MEETING SHALL BE HELD WITH THE A PRE-CONSTRUCTION MEETING SHALL BE HELD WITH THE PRE-CONSTRUCTION MEETING SHALL BE HELD WITH THE PRE-CONSTRUCTION MEETING SHALL BE HELD WITH THE MEETING SHALL BE HELD WITH THE MEETING SHALL BE HELD WITH THE SHALL BE HELD WITH THE SHALL BE HELD WITH THE BE HELD WITH THE BE HELD WITH THE HELD WITH THE HELD WITH THE WITH THE WITH THE THE THE ENGINEER AND CONTRACTOR PRIOR TO START OF CONSTRUCTION. 3. ALL PIPE FOR WATER MAINLINES SHALL BE THICKNESS CLASS ALL PIPE FOR WATER MAINLINES SHALL BE THICKNESS CLASS PIPE FOR WATER MAINLINES SHALL BE THICKNESS CLASS PIPE FOR WATER MAINLINES SHALL BE THICKNESS CLASS FOR WATER MAINLINES SHALL BE THICKNESS CLASS FOR WATER MAINLINES SHALL BE THICKNESS CLASS WATER MAINLINES SHALL BE THICKNESS CLASS WATER MAINLINES SHALL BE THICKNESS CLASS MAINLINES SHALL BE THICKNESS CLASS MAINLINES SHALL BE THICKNESS CLASS SHALL BE THICKNESS CLASS SHALL BE THICKNESS CLASS BE THICKNESS CLASS BE THICKNESS CLASS THICKNESS CLASS THICKNESS CLASS CLASS CLASS DUCTILE IRON AS SPECIFIED IN ANSI/AWWA C151/A21.51-09, IRON AS SPECIFIED IN ANSI/AWWA C151/A21.51-09, IRON AS SPECIFIED IN ANSI/AWWA C151/A21.51-09, AS SPECIFIED IN ANSI/AWWA C151/A21.51-09, AS SPECIFIED IN ANSI/AWWA C151/A21.51-09, SPECIFIED IN ANSI/AWWA C151/A21.51-09, SPECIFIED IN ANSI/AWWA C151/A21.51-09, IN ANSI/AWWA C151/A21.51-09, IN ANSI/AWWA C151/A21.51-09, ANSI/AWWA C151/A21.51-09, ANSI/AWWA C151/A21.51-09, C151/A21.51-09, C151/A21.51-09, TABLE 3, UNLESS OTHERWISE SPECIFIED. 4-INCH DI PIPE SHALL 3, UNLESS OTHERWISE SPECIFIED. 4-INCH DI PIPE SHALL 3, UNLESS OTHERWISE SPECIFIED. 4-INCH DI PIPE SHALL UNLESS OTHERWISE SPECIFIED. 4-INCH DI PIPE SHALL UNLESS OTHERWISE SPECIFIED. 4-INCH DI PIPE SHALL OTHERWISE SPECIFIED. 4-INCH DI PIPE SHALL OTHERWISE SPECIFIED. 4-INCH DI PIPE SHALL SPECIFIED. 4-INCH DI PIPE SHALL SPECIFIED. 4-INCH DI PIPE SHALL 4-INCH DI PIPE SHALL 4-INCH DI PIPE SHALL DI PIPE SHALL DI PIPE SHALL PIPE SHALL PIPE SHALL SHALL SHALL BE CLASS 52, 6-INCH DI SHALL BE CLASS 51, AND 8-INCH CLASS 52, 6-INCH DI SHALL BE CLASS 51, AND 8-INCH CLASS 52, 6-INCH DI SHALL BE CLASS 51, AND 8-INCH 52, 6-INCH DI SHALL BE CLASS 51, AND 8-INCH 52, 6-INCH DI SHALL BE CLASS 51, AND 8-INCH 6-INCH DI SHALL BE CLASS 51, AND 8-INCH 6-INCH DI SHALL BE CLASS 51, AND 8-INCH DI SHALL BE CLASS 51, AND 8-INCH DI SHALL BE CLASS 51, AND 8-INCH SHALL BE CLASS 51, AND 8-INCH SHALL BE CLASS 51, AND 8-INCH BE CLASS 51, AND 8-INCH BE CLASS 51, AND 8-INCH CLASS 51, AND 8-INCH CLASS 51, AND 8-INCH 51, AND 8-INCH 51, AND 8-INCH AND 8-INCH AND 8-INCH 8-INCH 8-INCH THROUGH 16-INCH DI SHALL BE CLASS 50. 18-INCH & LARGER 16-INCH DI SHALL BE CLASS 50. 18-INCH & LARGER 16-INCH DI SHALL BE CLASS 50. 18-INCH & LARGER DI SHALL BE CLASS 50. 18-INCH & LARGER DI SHALL BE CLASS 50. 18-INCH & LARGER SHALL BE CLASS 50. 18-INCH & LARGER SHALL BE CLASS 50. 18-INCH & LARGER BE CLASS 50. 18-INCH & LARGER BE CLASS 50. 18-INCH & LARGER CLASS 50. 18-INCH & LARGER CLASS 50. 18-INCH & LARGER 50. 18-INCH & LARGER 50. 18-INCH & LARGER 18-INCH & LARGER 18-INCH & LARGER 18-INCH & LARGER & LARGER & LARGER LARGER LARGER DI PIPE SHALL BE CLASS 52. 4. DUCTILE IRON PIPE SHALL BE MANUFACTURED IN THE UNITED DUCTILE IRON PIPE SHALL BE MANUFACTURED IN THE UNITED IRON PIPE SHALL BE MANUFACTURED IN THE UNITED IRON PIPE SHALL BE MANUFACTURED IN THE UNITED PIPE SHALL BE MANUFACTURED IN THE UNITED PIPE SHALL BE MANUFACTURED IN THE UNITED SHALL BE MANUFACTURED IN THE UNITED SHALL BE MANUFACTURED IN THE UNITED BE MANUFACTURED IN THE UNITED BE MANUFACTURED IN THE UNITED MANUFACTURED IN THE UNITED MANUFACTURED IN THE UNITED IN THE UNITED IN THE UNITED THE UNITED THE UNITED UNITED UNITED STATES OF AMERICA IN ACCORDANCE WITH ANSI/AWWA OF AMERICA IN ACCORDANCE WITH ANSI/AWWA OF AMERICA IN ACCORDANCE WITH ANSI/AWWA AMERICA IN ACCORDANCE WITH ANSI/AWWA AMERICA IN ACCORDANCE WITH ANSI/AWWA IN ACCORDANCE WITH ANSI/AWWA IN ACCORDANCE WITH ANSI/AWWA ACCORDANCE WITH ANSI/AWWA ACCORDANCE WITH ANSI/AWWA WITH ANSI/AWWA WITH ANSI/AWWA ANSI/AWWA ANSI/AWWA C151/A21.51. APPROVED MANUFACTURES INCLUDE: AMERICAN APPROVED MANUFACTURES INCLUDE: AMERICAN APPROVED MANUFACTURES INCLUDE: AMERICAN MANUFACTURES INCLUDE: AMERICAN MANUFACTURES INCLUDE: AMERICAN INCLUDE: AMERICAN INCLUDE: AMERICAN AMERICAN AMERICAN DUCTILE IRON PIPE, MCWANE DUCTILE, AND U.S. PIPE, UNLESS IRON PIPE, MCWANE DUCTILE, AND U.S. PIPE, UNLESS IRON PIPE, MCWANE DUCTILE, AND U.S. PIPE, UNLESS PIPE, MCWANE DUCTILE, AND U.S. PIPE, UNLESS PIPE, MCWANE DUCTILE, AND U.S. PIPE, UNLESS MCWANE DUCTILE, AND U.S. PIPE, UNLESS MCWANE DUCTILE, AND U.S. PIPE, UNLESS DUCTILE, AND U.S. PIPE, UNLESS DUCTILE, AND U.S. PIPE, UNLESS AND U.S. PIPE, UNLESS AND U.S. PIPE, UNLESS U.S. PIPE, UNLESS U.S. PIPE, UNLESS PIPE, UNLESS PIPE, UNLESS UNLESS UNLESS OTHERWISE APPROVED BY THE CITY. 5. ALL METALIC WATER MAIN PIPE SHALL BE ENCASED WITH V-BIO ALL METALIC WATER MAIN PIPE SHALL BE ENCASED WITH V-BIO METALIC WATER MAIN PIPE SHALL BE ENCASED WITH V-BIO METALIC WATER MAIN PIPE SHALL BE ENCASED WITH V-BIO WATER MAIN PIPE SHALL BE ENCASED WITH V-BIO WATER MAIN PIPE SHALL BE ENCASED WITH V-BIO MAIN PIPE SHALL BE ENCASED WITH V-BIO MAIN PIPE SHALL BE ENCASED WITH V-BIO PIPE SHALL BE ENCASED WITH V-BIO PIPE SHALL BE ENCASED WITH V-BIO SHALL BE ENCASED WITH V-BIO SHALL BE ENCASED WITH V-BIO BE ENCASED WITH V-BIO BE ENCASED WITH V-BIO ENCASED WITH V-BIO ENCASED WITH V-BIO WITH V-BIO WITH V-BIO V-BIO V-BIO POLYETHYLENE ENCASEMENT OR APPROVED EQUAL. 6. ALL PIPE FITTINGS SHALL BE MANUFACTURED IN THE UNITED ALL PIPE FITTINGS SHALL BE MANUFACTURED IN THE UNITED PIPE FITTINGS SHALL BE MANUFACTURED IN THE UNITED PIPE FITTINGS SHALL BE MANUFACTURED IN THE UNITED FITTINGS SHALL BE MANUFACTURED IN THE UNITED FITTINGS SHALL BE MANUFACTURED IN THE UNITED SHALL BE MANUFACTURED IN THE UNITED SHALL BE MANUFACTURED IN THE UNITED BE MANUFACTURED IN THE UNITED BE MANUFACTURED IN THE UNITED MANUFACTURED IN THE UNITED MANUFACTURED IN THE UNITED IN THE UNITED IN THE UNITED THE UNITED THE UNITED UNITED UNITED STATES OF AMERICA UNLESS OTHERWISE APPROVED BY THE CITY. OF AMERICA UNLESS OTHERWISE APPROVED BY THE CITY. OF AMERICA UNLESS OTHERWISE APPROVED BY THE CITY. AMERICA UNLESS OTHERWISE APPROVED BY THE CITY. AMERICA UNLESS OTHERWISE APPROVED BY THE CITY. UNLESS OTHERWISE APPROVED BY THE CITY. UNLESS OTHERWISE APPROVED BY THE CITY. OTHERWISE APPROVED BY THE CITY. OTHERWISE APPROVED BY THE CITY. APPROVED BY THE CITY. APPROVED BY THE CITY. BY THE CITY. BY THE CITY. THE CITY. THE CITY. CITY. CITY. THE ONLY EXCEPTION SHALL BE NON-DOMESTIC DUCTILE IRON ONLY EXCEPTION SHALL BE NON-DOMESTIC DUCTILE IRON ONLY EXCEPTION SHALL BE NON-DOMESTIC DUCTILE IRON EXCEPTION SHALL BE NON-DOMESTIC DUCTILE IRON EXCEPTION SHALL BE NON-DOMESTIC DUCTILE IRON SHALL BE NON-DOMESTIC DUCTILE IRON SHALL BE NON-DOMESTIC DUCTILE IRON BE NON-DOMESTIC DUCTILE IRON BE NON-DOMESTIC DUCTILE IRON NON-DOMESTIC DUCTILE IRON NON-DOMESTIC DUCTILE IRON DUCTILE IRON DUCTILE IRON IRON IRON FITTINGS MANUFACTURED BY MCWANE DUCTILE (TYLER/UNION) MANUFACTURED BY MCWANE DUCTILE (TYLER/UNION) MANUFACTURED BY MCWANE DUCTILE (TYLER/UNION) BY MCWANE DUCTILE (TYLER/UNION) BY MCWANE DUCTILE (TYLER/UNION) MCWANE DUCTILE (TYLER/UNION) MCWANE DUCTILE (TYLER/UNION) DUCTILE (TYLER/UNION) DUCTILE (TYLER/UNION) (TYLER/UNION) (TYLER/UNION) WHICH MEET THE REQUIREMENTS OF AWWA C153 AND C110 AND MEET THE REQUIREMENTS OF AWWA C153 AND C110 AND MEET THE REQUIREMENTS OF AWWA C153 AND C110 AND THE REQUIREMENTS OF AWWA C153 AND C110 AND THE REQUIREMENTS OF AWWA C153 AND C110 AND REQUIREMENTS OF AWWA C153 AND C110 AND REQUIREMENTS OF AWWA C153 AND C110 AND OF AWWA C153 AND C110 AND OF AWWA C153 AND C110 AND AWWA C153 AND C110 AND AWWA C153 AND C110 AND C153 AND C110 AND C153 AND C110 AND AND C110 AND AND C110 AND C110 AND C110 AND AND AND AS SPECIFIED BY CITY OF ROSEBURG SPECIAL PROVISIONS SPECIFIED BY CITY OF ROSEBURG SPECIAL PROVISIONS SPECIFIED BY CITY OF ROSEBURG SPECIAL PROVISIONS BY CITY OF ROSEBURG SPECIAL PROVISIONS BY CITY OF ROSEBURG SPECIAL PROVISIONS CITY OF ROSEBURG SPECIAL PROVISIONS CITY OF ROSEBURG SPECIAL PROVISIONS OF ROSEBURG SPECIAL PROVISIONS OF ROSEBURG SPECIAL PROVISIONS ROSEBURG SPECIAL PROVISIONS ROSEBURG SPECIAL PROVISIONS SPECIAL PROVISIONS SPECIAL PROVISIONS PROVISIONS PROVISIONS SECTION 2475 . 7. GATE VALVES SHALL BE REDUCED-WALL DUCTILE IRON-BODY, GATE VALVES SHALL BE REDUCED-WALL DUCTILE IRON-BODY, VALVES SHALL BE REDUCED-WALL DUCTILE IRON-BODY, VALVES SHALL BE REDUCED-WALL DUCTILE IRON-BODY, SHALL BE REDUCED-WALL DUCTILE IRON-BODY, SHALL BE REDUCED-WALL DUCTILE IRON-BODY, BE REDUCED-WALL DUCTILE IRON-BODY, BE REDUCED-WALL DUCTILE IRON-BODY, REDUCED-WALL DUCTILE IRON-BODY, REDUCED-WALL DUCTILE IRON-BODY, DUCTILE IRON-BODY, DUCTILE IRON-BODY, IRON-BODY, IRON-BODY, RESILIENT-SEATED GATE VALVES MEETING THE REQUIREMENTS OF GATE VALVES MEETING THE REQUIREMENTS OF GATE VALVES MEETING THE REQUIREMENTS OF VALVES MEETING THE REQUIREMENTS OF VALVES MEETING THE REQUIREMENTS OF MEETING THE REQUIREMENTS OF MEETING THE REQUIREMENTS OF THE REQUIREMENTS OF THE REQUIREMENTS OF REQUIREMENTS OF REQUIREMENTS OF OF OF AWWA C515. ALL GATE VALVES SHALL BE MANUFACTURED IN THE C515. ALL GATE VALVES SHALL BE MANUFACTURED IN THE C515. ALL GATE VALVES SHALL BE MANUFACTURED IN THE ALL GATE VALVES SHALL BE MANUFACTURED IN THE ALL GATE VALVES SHALL BE MANUFACTURED IN THE ALL GATE VALVES SHALL BE MANUFACTURED IN THE GATE VALVES SHALL BE MANUFACTURED IN THE GATE VALVES SHALL BE MANUFACTURED IN THE VALVES SHALL BE MANUFACTURED IN THE VALVES SHALL BE MANUFACTURED IN THE SHALL BE MANUFACTURED IN THE SHALL BE MANUFACTURED IN THE BE MANUFACTURED IN THE BE MANUFACTURED IN THE MANUFACTURED IN THE MANUFACTURED IN THE IN THE IN THE THE THE UNITED STATES OF AMERICA UNLESS OTHERWISE APPROVED BY STATES OF AMERICA UNLESS OTHERWISE APPROVED BY STATES OF AMERICA UNLESS OTHERWISE APPROVED BY OF AMERICA UNLESS OTHERWISE APPROVED BY OF AMERICA UNLESS OTHERWISE APPROVED BY AMERICA UNLESS OTHERWISE APPROVED BY AMERICA UNLESS OTHERWISE APPROVED BY UNLESS OTHERWISE APPROVED BY UNLESS OTHERWISE APPROVED BY OTHERWISE APPROVED BY OTHERWISE APPROVED BY APPROVED BY APPROVED BY BY BY THE CITY OF ROSEBURG. APPROVED MANUFACTURES MAKES AND CITY OF ROSEBURG. APPROVED MANUFACTURES MAKES AND CITY OF ROSEBURG. APPROVED MANUFACTURES MAKES AND OF ROSEBURG. APPROVED MANUFACTURES MAKES AND OF ROSEBURG. APPROVED MANUFACTURES MAKES AND ROSEBURG. APPROVED MANUFACTURES MAKES AND ROSEBURG. APPROVED MANUFACTURES MAKES AND APPROVED MANUFACTURES MAKES AND APPROVED MANUFACTURES MAKES AND MANUFACTURES MAKES AND MANUFACTURES MAKES AND MAKES AND MAKES AND AND AND MODELS INCLUDE: AMERICAN FLOW CONTROL SERIES 2500, INCLUDE: AMERICAN FLOW CONTROL SERIES 2500, INCLUDE: AMERICAN FLOW CONTROL SERIES 2500, AMERICAN FLOW CONTROL SERIES 2500, AMERICAN FLOW CONTROL SERIES 2500, FLOW CONTROL SERIES 2500, FLOW CONTROL SERIES 2500, CONTROL SERIES 2500, CONTROL SERIES 2500, SERIES 2500, SERIES 2500, 2500, 2500, AMERICAN AVK SERIES 65, CLOW MODEL 2638, KENNEDY KS-RW, AVK SERIES 65, CLOW MODEL 2638, KENNEDY KS-RW, AVK SERIES 65, CLOW MODEL 2638, KENNEDY KS-RW, SERIES 65, CLOW MODEL 2638, KENNEDY KS-RW, SERIES 65, CLOW MODEL 2638, KENNEDY KS-RW, 65, CLOW MODEL 2638, KENNEDY KS-RW, 65, CLOW MODEL 2638, KENNEDY KS-RW, CLOW MODEL 2638, KENNEDY KS-RW, CLOW MODEL 2638, KENNEDY KS-RW, MODEL 2638, KENNEDY KS-RW, MODEL 2638, KENNEDY KS-RW, 2638, KENNEDY KS-RW, 2638, KENNEDY KS-RW, KENNEDY KS-RW, KENNEDY KS-RW, KS-RW, KS-RW, OR AN APPROVED EQUAL. 8. FIRE HYDRANT SHALL BE THREE PORT 5-1/4” DRY-BARREL WITH FIRE HYDRANT SHALL BE THREE PORT 5-1/4” DRY-BARREL WITH HYDRANT SHALL BE THREE PORT 5-1/4” DRY-BARREL WITH HYDRANT SHALL BE THREE PORT 5-1/4” DRY-BARREL WITH SHALL BE THREE PORT 5-1/4” DRY-BARREL WITH SHALL BE THREE PORT 5-1/4” DRY-BARREL WITH BE THREE PORT 5-1/4” DRY-BARREL WITH BE THREE PORT 5-1/4” DRY-BARREL WITH THREE PORT 5-1/4” DRY-BARREL WITH THREE PORT 5-1/4” DRY-BARREL WITH PORT 5-1/4” DRY-BARREL WITH PORT 5-1/4” DRY-BARREL WITH 5-1/4” DRY-BARREL WITH 5-1/4” DRY-BARREL WITH DRY-BARREL WITH DRY-BARREL WITH WITH WITH TWO 2-1/2” HOSE NOZZLES AND ONE 4-1/2” PUMPER NOZZLE. 2-1/2” HOSE NOZZLES AND ONE 4-1/2” PUMPER NOZZLE. 2-1/2” HOSE NOZZLES AND ONE 4-1/2” PUMPER NOZZLE. HOSE NOZZLES AND ONE 4-1/2” PUMPER NOZZLE. HOSE NOZZLES AND ONE 4-1/2” PUMPER NOZZLE. NOZZLES AND ONE 4-1/2” PUMPER NOZZLE. NOZZLES AND ONE 4-1/2” PUMPER NOZZLE. AND ONE 4-1/2” PUMPER NOZZLE. AND ONE 4-1/2” PUMPER NOZZLE. ONE 4-1/2” PUMPER NOZZLE. ONE 4-1/2” PUMPER NOZZLE. 4-1/2” PUMPER NOZZLE. 4-1/2” PUMPER NOZZLE. PUMPER NOZZLE. PUMPER NOZZLE. NOZZLE. NOZZLE. ALL COMPONENTS OF THE UPPER BARREL SECTION, AND LOWER COMPONENTS OF THE UPPER BARREL SECTION, AND LOWER COMPONENTS OF THE UPPER BARREL SECTION, AND LOWER OF THE UPPER BARREL SECTION, AND LOWER OF THE UPPER BARREL SECTION, AND LOWER THE UPPER BARREL SECTION, AND LOWER THE UPPER BARREL SECTION, AND LOWER UPPER BARREL SECTION, AND LOWER UPPER BARREL SECTION, AND LOWER BARREL SECTION, AND LOWER BARREL SECTION, AND LOWER SECTION, AND LOWER SECTION, AND LOWER AND LOWER AND LOWER LOWER LOWER BASE SECTION SHALL BE CONSTRUCTED OF DUCTILE IRION THAT SECTION SHALL BE CONSTRUCTED OF DUCTILE IRION THAT SECTION SHALL BE CONSTRUCTED OF DUCTILE IRION THAT SHALL BE CONSTRUCTED OF DUCTILE IRION THAT SHALL BE CONSTRUCTED OF DUCTILE IRION THAT BE CONSTRUCTED OF DUCTILE IRION THAT BE CONSTRUCTED OF DUCTILE IRION THAT CONSTRUCTED OF DUCTILE IRION THAT CONSTRUCTED OF DUCTILE IRION THAT OF DUCTILE IRION THAT OF DUCTILE IRION THAT DUCTILE IRION THAT DUCTILE IRION THAT IRION THAT IRION THAT THAT THAT MEETS OR EXCEEDS ALL THE REQUIREMENTS OF ANSI/AWWA C502 OR EXCEEDS ALL THE REQUIREMENTS OF ANSI/AWWA C502 OR EXCEEDS ALL THE REQUIREMENTS OF ANSI/AWWA C502 EXCEEDS ALL THE REQUIREMENTS OF ANSI/AWWA C502 EXCEEDS ALL THE REQUIREMENTS OF ANSI/AWWA C502 ALL THE REQUIREMENTS OF ANSI/AWWA C502 ALL THE REQUIREMENTS OF ANSI/AWWA C502 THE REQUIREMENTS OF ANSI/AWWA C502 THE REQUIREMENTS OF ANSI/AWWA C502 REQUIREMENTS OF ANSI/AWWA C502 REQUIREMENTS OF ANSI/AWWA C502 OF ANSI/AWWA C502 OF ANSI/AWWA C502 ANSI/AWWA C502 ANSI/AWWA C502 C502 C502 WITH A MINIMUM PRESSURE RATING OF 250 PSIG AND BE A MINIMUM PRESSURE RATING OF 250 PSIG AND BE A MINIMUM PRESSURE RATING OF 250 PSIG AND BE MINIMUM PRESSURE RATING OF 250 PSIG AND BE MINIMUM PRESSURE RATING OF 250 PSIG AND BE PRESSURE RATING OF 250 PSIG AND BE PRESSURE RATING OF 250 PSIG AND BE RATING OF 250 PSIG AND BE RATING OF 250 PSIG AND BE OF 250 PSIG AND BE OF 250 PSIG AND BE 250 PSIG AND BE 250 PSIG AND BE PSIG AND BE PSIG AND BE AND BE AND BE BE BE MANUFACTURED IN THE UNITED STATES OF AMERICA UNLESS IN THE UNITED STATES OF AMERICA UNLESS IN THE UNITED STATES OF AMERICA UNLESS THE UNITED STATES OF AMERICA UNLESS THE UNITED STATES OF AMERICA UNLESS UNITED STATES OF AMERICA UNLESS UNITED STATES OF AMERICA UNLESS STATES OF AMERICA UNLESS STATES OF AMERICA UNLESS OF AMERICA UNLESS OF AMERICA UNLESS AMERICA UNLESS AMERICA UNLESS UNLESS UNLESS OTHERWISE APPROVED BY THE CITY. APPROVED MANUFACTURES APPROVED BY THE CITY. APPROVED MANUFACTURES APPROVED BY THE CITY. APPROVED MANUFACTURES BY THE CITY. APPROVED MANUFACTURES BY THE CITY. APPROVED MANUFACTURES THE CITY. APPROVED MANUFACTURES THE CITY. APPROVED MANUFACTURES CITY. APPROVED MANUFACTURES CITY. APPROVED MANUFACTURES APPROVED MANUFACTURES APPROVED MANUFACTURES APPROVED MANUFACTURES MANUFACTURES MANUFACTURES MAKES AND MODELS INCLUDE: AMERICAN FLOW AND MODELS INCLUDE: AMERICAN FLOW AND MODELS INCLUDE: AMERICAN FLOW MODELS INCLUDE: AMERICAN FLOW MODELS INCLUDE: AMERICAN FLOW INCLUDE: AMERICAN FLOW INCLUDE: AMERICAN FLOW AMERICAN FLOW AMERICAN FLOW FLOW FLOW CONTROL/WATEROUS PACER WB-67-250, AMERICAN AVK SERIES PACER WB-67-250, AMERICAN AVK SERIES PACER WB-67-250, AMERICAN AVK SERIES WB-67-250, AMERICAN AVK SERIES WB-67-250, AMERICAN AVK SERIES AMERICAN AVK SERIES AMERICAN AVK SERIES AVK SERIES AVK SERIES SERIES SERIES 2780 NOSTALGIC, KENNEDY GUARDIAN K81DI, OR APPROVED NOSTALGIC, KENNEDY GUARDIAN K81DI, OR APPROVED NOSTALGIC, KENNEDY GUARDIAN K81DI, OR APPROVED KENNEDY GUARDIAN K81DI, OR APPROVED KENNEDY GUARDIAN K81DI, OR APPROVED GUARDIAN K81DI, OR APPROVED GUARDIAN K81DI, OR APPROVED K81DI, OR APPROVED K81DI, OR APPROVED OR APPROVED OR APPROVED APPROVED APPROVED EQUAL. 9. THE CONTRACTOR SHALL HYDROSTATICALLY TEST, AND THE CONTRACTOR SHALL HYDROSTATICALLY TEST, AND CONTRACTOR SHALL HYDROSTATICALLY TEST, AND CONTRACTOR SHALL HYDROSTATICALLY TEST, AND SHALL HYDROSTATICALLY TEST, AND SHALL HYDROSTATICALLY TEST, AND HYDROSTATICALLY TEST, AND HYDROSTATICALLY TEST, AND TEST, AND TEST, AND AND AND CHLORINATE ALL NEW WATER MAINLINES INSTALLED. THE ALL NEW WATER MAINLINES INSTALLED. THE ALL NEW WATER MAINLINES INSTALLED. THE NEW WATER MAINLINES INSTALLED. THE NEW WATER MAINLINES INSTALLED. THE WATER MAINLINES INSTALLED. THE WATER MAINLINES INSTALLED. THE MAINLINES INSTALLED. THE MAINLINES INSTALLED. THE INSTALLED. THE INSTALLED. THE THE THE THE ENGINEER SHALL WITNESS ALL TESTS MADE BY THE CONTRACTOR SHALL WITNESS ALL TESTS MADE BY THE CONTRACTOR SHALL WITNESS ALL TESTS MADE BY THE CONTRACTOR WITNESS ALL TESTS MADE BY THE CONTRACTOR WITNESS ALL TESTS MADE BY THE CONTRACTOR ALL TESTS MADE BY THE CONTRACTOR ALL TESTS MADE BY THE CONTRACTOR TESTS MADE BY THE CONTRACTOR TESTS MADE BY THE CONTRACTOR MADE BY THE CONTRACTOR MADE BY THE CONTRACTOR BY THE CONTRACTOR BY THE CONTRACTOR THE CONTRACTOR THE CONTRACTOR CONTRACTOR CONTRACTOR TO INSURE THEY ARE PERFORMED PROPERLY. TEST PRESSURES INSURE THEY ARE PERFORMED PROPERLY. TEST PRESSURES INSURE THEY ARE PERFORMED PROPERLY. TEST PRESSURES THEY ARE PERFORMED PROPERLY. TEST PRESSURES THEY ARE PERFORMED PROPERLY. TEST PRESSURES ARE PERFORMED PROPERLY. TEST PRESSURES ARE PERFORMED PROPERLY. TEST PRESSURES PERFORMED PROPERLY. TEST PRESSURES PERFORMED PROPERLY. TEST PRESSURES PROPERLY. TEST PRESSURES PROPERLY. TEST PRESSURES TEST PRESSURES TEST PRESSURES TEST PRESSURES PRESSURES PRESSURES SHALL BE DETERMINED BY THE ENGINEER PRIOR TO THE TEST. 10. THE OWNER / DEVELOPER MUST COORDINATE WITH THE CITY OF THE OWNER / DEVELOPER MUST COORDINATE WITH THE CITY OF OWNER / DEVELOPER MUST COORDINATE WITH THE CITY OF OWNER / DEVELOPER MUST COORDINATE WITH THE CITY OF / DEVELOPER MUST COORDINATE WITH THE CITY OF / DEVELOPER MUST COORDINATE WITH THE CITY OF DEVELOPER MUST COORDINATE WITH THE CITY OF DEVELOPER MUST COORDINATE WITH THE CITY OF MUST COORDINATE WITH THE CITY OF MUST COORDINATE WITH THE CITY OF COORDINATE WITH THE CITY OF COORDINATE WITH THE CITY OF WITH THE CITY OF WITH THE CITY OF THE CITY OF THE CITY OF CITY OF CITY OF OF OF ROSEBURG FIRE DEPARTMENT FOR PAYMENT OF FEES PRIOR TO FIRE DEPARTMENT FOR PAYMENT OF FEES PRIOR TO FIRE DEPARTMENT FOR PAYMENT OF FEES PRIOR TO DEPARTMENT FOR PAYMENT OF FEES PRIOR TO DEPARTMENT FOR PAYMENT OF FEES PRIOR TO FOR PAYMENT OF FEES PRIOR TO FOR PAYMENT OF FEES PRIOR TO PAYMENT OF FEES PRIOR TO PAYMENT OF FEES PRIOR TO OF FEES PRIOR TO OF FEES PRIOR TO FEES PRIOR TO FEES PRIOR TO PRIOR TO PRIOR TO TO TO PUBLIC WORKS SCHEDULING OF FIRE HYDRANT FLOW TESTING. 11. ALL CONSTRUCTION & TESTING IS SUBJECT TO INSPECTION BY ALL CONSTRUCTION & TESTING IS SUBJECT TO INSPECTION BY CONSTRUCTION & TESTING IS SUBJECT TO INSPECTION BY CONSTRUCTION & TESTING IS SUBJECT TO INSPECTION BY & TESTING IS SUBJECT TO INSPECTION BY & TESTING IS SUBJECT TO INSPECTION BY TESTING IS SUBJECT TO INSPECTION BY TESTING IS SUBJECT TO INSPECTION BY IS SUBJECT TO INSPECTION BY IS SUBJECT TO INSPECTION BY SUBJECT TO INSPECTION BY SUBJECT TO INSPECTION BY TO INSPECTION BY TO INSPECTION BY INSPECTION BY INSPECTION BY BY BY THE CITY OF ROSEBURG PUBLIC WORKS DEPARTMENT AND THE CITY OF ROSEBURG PUBLIC WORKS DEPARTMENT AND THE CITY OF ROSEBURG PUBLIC WORKS DEPARTMENT AND THE OF ROSEBURG PUBLIC WORKS DEPARTMENT AND THE OF ROSEBURG PUBLIC WORKS DEPARTMENT AND THE ROSEBURG PUBLIC WORKS DEPARTMENT AND THE ROSEBURG PUBLIC WORKS DEPARTMENT AND THE PUBLIC WORKS DEPARTMENT AND THE PUBLIC WORKS DEPARTMENT AND THE WORKS DEPARTMENT AND THE WORKS DEPARTMENT AND THE DEPARTMENT AND THE DEPARTMENT AND THE AND THE AND THE THE THE ENGINEER. THE CONTRACTOR SHALL GIVE THE CITY AND THE THE CONTRACTOR SHALL GIVE THE CITY AND THE THE CONTRACTOR SHALL GIVE THE CITY AND THE THE CONTRACTOR SHALL GIVE THE CITY AND THE CONTRACTOR SHALL GIVE THE CITY AND THE CONTRACTOR SHALL GIVE THE CITY AND THE SHALL GIVE THE CITY AND THE SHALL GIVE THE CITY AND THE GIVE THE CITY AND THE GIVE THE CITY AND THE THE CITY AND THE THE CITY AND THE CITY AND THE CITY AND THE AND THE AND THE THE THE ENGINEER 48 HOURS NOTICE PRIOR TO BEGINNING CONSTRUCTION 48 HOURS NOTICE PRIOR TO BEGINNING CONSTRUCTION 48 HOURS NOTICE PRIOR TO BEGINNING CONSTRUCTION HOURS NOTICE PRIOR TO BEGINNING CONSTRUCTION HOURS NOTICE PRIOR TO BEGINNING CONSTRUCTION NOTICE PRIOR TO BEGINNING CONSTRUCTION NOTICE PRIOR TO BEGINNING CONSTRUCTION PRIOR TO BEGINNING CONSTRUCTION PRIOR TO BEGINNING CONSTRUCTION TO BEGINNING CONSTRUCTION TO BEGINNING CONSTRUCTION BEGINNING CONSTRUCTION BEGINNING CONSTRUCTION CONSTRUCTION CONSTRUCTION AND 24 HOURS NOTICE PRIOR TO TESTING. THE CITY SHALL BE 24 HOURS NOTICE PRIOR TO TESTING. THE CITY SHALL BE 24 HOURS NOTICE PRIOR TO TESTING. THE CITY SHALL BE HOURS NOTICE PRIOR TO TESTING. THE CITY SHALL BE HOURS NOTICE PRIOR TO TESTING. THE CITY SHALL BE NOTICE PRIOR TO TESTING. THE CITY SHALL BE NOTICE PRIOR TO TESTING. THE CITY SHALL BE PRIOR TO TESTING. THE CITY SHALL BE PRIOR TO TESTING. THE CITY SHALL BE TO TESTING. THE CITY SHALL BE TO TESTING. THE CITY SHALL BE TESTING. THE CITY SHALL BE TESTING. THE CITY SHALL BE THE CITY SHALL BE THE CITY SHALL BE CITY SHALL BE CITY SHALL BE SHALL BE SHALL BE BE BE ON SITE TO WITNESS THE INSTALLATION OF JOINT RESTRAINT SITE TO WITNESS THE INSTALLATION OF JOINT RESTRAINT SITE TO WITNESS THE INSTALLATION OF JOINT RESTRAINT TO WITNESS THE INSTALLATION OF JOINT RESTRAINT TO WITNESS THE INSTALLATION OF JOINT RESTRAINT WITNESS THE INSTALLATION OF JOINT RESTRAINT WITNESS THE INSTALLATION OF JOINT RESTRAINT THE INSTALLATION OF JOINT RESTRAINT THE INSTALLATION OF JOINT RESTRAINT INSTALLATION OF JOINT RESTRAINT INSTALLATION OF JOINT RESTRAINT OF JOINT RESTRAINT OF JOINT RESTRAINT JOINT RESTRAINT JOINT RESTRAINT RESTRAINT RESTRAINT SYSTEMS. 12. NO OTHER MAJOR UTILITIES SHALL RUN PARALLEL WITHIN THREE NO OTHER MAJOR UTILITIES SHALL RUN PARALLEL WITHIN THREE OTHER MAJOR UTILITIES SHALL RUN PARALLEL WITHIN THREE OTHER MAJOR UTILITIES SHALL RUN PARALLEL WITHIN THREE MAJOR UTILITIES SHALL RUN PARALLEL WITHIN THREE MAJOR UTILITIES SHALL RUN PARALLEL WITHIN THREE UTILITIES SHALL RUN PARALLEL WITHIN THREE UTILITIES SHALL RUN PARALLEL WITHIN THREE SHALL RUN PARALLEL WITHIN THREE SHALL RUN PARALLEL WITHIN THREE RUN PARALLEL WITHIN THREE RUN PARALLEL WITHIN THREE PARALLEL WITHIN THREE PARALLEL WITHIN THREE WITHIN THREE WITHIN THREE THREE THREE (3) FEET OF THE NEW WATER MAIN. 13. RESTRAINED JOINT DUCTILE IRON PIPE AND FITTINGS SHALL BE RESTRAINED JOINT DUCTILE IRON PIPE AND FITTINGS SHALL BE JOINT DUCTILE IRON PIPE AND FITTINGS SHALL BE JOINT DUCTILE IRON PIPE AND FITTINGS SHALL BE DUCTILE IRON PIPE AND FITTINGS SHALL BE DUCTILE IRON PIPE AND FITTINGS SHALL BE IRON PIPE AND FITTINGS SHALL BE IRON PIPE AND FITTINGS SHALL BE PIPE AND FITTINGS SHALL BE PIPE AND FITTINGS SHALL BE AND FITTINGS SHALL BE AND FITTINGS SHALL BE FITTINGS SHALL BE FITTINGS SHALL BE SHALL BE SHALL BE BE BE PROVIDED AS IDENTIFIED ON THE ENGINEERED CONSTRUCTION AS IDENTIFIED ON THE ENGINEERED CONSTRUCTION AS IDENTIFIED ON THE ENGINEERED CONSTRUCTION IDENTIFIED ON THE ENGINEERED CONSTRUCTION IDENTIFIED ON THE ENGINEERED CONSTRUCTION ON THE ENGINEERED CONSTRUCTION ON THE ENGINEERED CONSTRUCTION THE ENGINEERED CONSTRUCTION THE ENGINEERED CONSTRUCTION ENGINEERED CONSTRUCTION ENGINEERED CONSTRUCTION CONSTRUCTION CONSTRUCTION DRAWINGS. ALL FITTINGS SHALL BE RESTRAINED TO THE SPECIFIED ALL FITTINGS SHALL BE RESTRAINED TO THE SPECIFIED ALL FITTINGS SHALL BE RESTRAINED TO THE SPECIFIED FITTINGS SHALL BE RESTRAINED TO THE SPECIFIED FITTINGS SHALL BE RESTRAINED TO THE SPECIFIED SHALL BE RESTRAINED TO THE SPECIFIED SHALL BE RESTRAINED TO THE SPECIFIED BE RESTRAINED TO THE SPECIFIED BE RESTRAINED TO THE SPECIFIED RESTRAINED TO THE SPECIFIED RESTRAINED TO THE SPECIFIED TO THE SPECIFIED TO THE SPECIFIED THE SPECIFIED THE SPECIFIED SPECIFIED SPECIFIED RESTRAINT DISTANCES AS REQUIRED FOR APPLICATION AND AS DISTANCES AS REQUIRED FOR APPLICATION AND AS DISTANCES AS REQUIRED FOR APPLICATION AND AS AS REQUIRED FOR APPLICATION AND AS AS REQUIRED FOR APPLICATION AND AS REQUIRED FOR APPLICATION AND AS REQUIRED FOR APPLICATION AND AS FOR APPLICATION AND AS FOR APPLICATION AND AS APPLICATION AND AS APPLICATION AND AS AND AS AND AS AS AS SHOWN ON THE ENGINEERED CONSTRUCTION DRAWINGS. ON THE ENGINEERED CONSTRUCTION DRAWINGS. ON THE ENGINEERED CONSTRUCTION DRAWINGS. THE ENGINEERED CONSTRUCTION DRAWINGS. THE ENGINEERED CONSTRUCTION DRAWINGS. ENGINEERED CONSTRUCTION DRAWINGS. ENGINEERED CONSTRUCTION DRAWINGS. CONSTRUCTION DRAWINGS.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .