Plan - NP BAWA 1(9) 2(9).pdf
PDF 42 MB Posted
- Attached to
- Baltimore Washington Parkway Federal contract opportunity
- Solicitation number
- 693C73-22-B-000003
About this file
This solicitation is for guardrail and signage replacement along the Baltimore Washington Parkway between the Big Patuxent River Bridge and Jessup Road in Prince George's County, Maryland. The project includes installing no truck signs at Parkway entrance ramps, new milepost markers from the District of Columbia boundary to Jessup Road, and other miscellaneous work. The price range for the project is estimated between $1,000,000 to $5,000,000. Sealed bids from certified small business concerns will be accepted with a bid due date to be specified in solicitation number 693C73-22-B-000003. Annual representations and certifications must be completed on SAM.gov and form Vets-4212 must be completed on dol.gov. Questions regarding construction projects should be directed to eflhd.contracts@dot.gov and must include the solicitation number, project name and number, requesting firm information and contact details. Bidders must be registered in SAM for payment processing in accordance with FAR.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - NP-BAWA 1(9) 2(9).pdf | ||
| Amendment 0003 - NP-BAWA 1(9) 2(9).pdf | ||
| Amendment 0002 - NP BAWA 1(9) 2(9).pdf | ||
| Amendment 0001 - NP BAWA 1(9) 2(9).pdf | ||
| VETS-4212 - Form - 2021.pdf | ||
| Categorical Exclusion Form (NEPA).pdf | ||
| IFB Solicitiation - NP BAWA 1(9) 2(9).pdf | ||
| FP14_Eng.pdf | ||
| ADV_Bidder s Qualifications Form.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX TO SHEETS
PLANS FOR PROPOSED
PLANS PREPARED BY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH: 37.81 Miles
ADT (2019)
ADT (2039)
DHV
%Truck
D
V (MPH)
2,800
50/50
1%
SPECIFICATIONS:
BRIDGE:
DESIGN DESIGNATION:
e(max) 6%
C/A Full to the Jessup Road (MD 175).
milepost markers from the District of Columbia Boundary (Route 50) installing No Trucks signs at the Parkway entrance ramps and new
Bridge and the Jessup Road (MD 175). The project also includes along the mainline and ramps between the Big Patuxent River
This project consists of guardrail and signage replacement
113,000
185,000
MARYLAND
ANNE ARUNDEL COUNTY AND PRINCE GEORGE'S COUNTY
ON BALTIMORE-WASHINGTON PARKWAY
GUARDRAIL AND SIGNAGE REPLACEMENT
Know what'sbelow.
before you dig.Call
R
Administration
Federal Highway
U.S. Department of Transportation
LANE MILES:
U.S. DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
BALTIMORE WASHINGTON PARKWAY
NP BAWA 1(9), 2(9)
and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
ROAD: WIDTH
48' - 72'
SURFACE BASE
Aggregate ......N/A
SUBGRADE
Asphalt ... Aggregate ......N/A
Asphalt ...
ROAD: WIDTH
48' - 72'
SURFACE BASE SUBGRADE
I-495 Bridges
July, 2021
Project Manager
Katerina Roman
Lead Designer
Alazar Feleke
Highway Design Manager
Ahmed Lamarre
75.62 Miles
15' - 24'
15' - 24' .... Aggregate ......N/A
Asphalt ... Aggregate ......N/A
Asphalt ...
15' - 24'
15' - 24' .... Aggregate ......N/A
Asphalt ... Aggregate ......N/A
Asphalt ...
15' - 24'
15' - 24' .... Aggregate ......N/A
Asphalt ... Aggregate ......N/A
Asphalt ...
15' - 24'
15' - 24' .... Aggregate ......N/A
Asphalt ... Aggregate ......N/A
Asphalt ...
15' - 24'
15' - 24' .... Aggregate ......N/A
Asphalt ... Aggregate ......N/A
Asphalt ...
15' - 24'
15' - 24' .... Aggregate ......N/A
Asphalt ... Aggregate ......N/A
Asphalt ...
15' - 24'
15' - 24' .... Aggregate ......N/A
Asphalt ... Aggregate ......N/A
Asphalt ...
15' - 24' .... Asphalt ... Aggregate ......N/A
15' - 24' .... Asphalt ... Aggregate ......N/A
KEY MAP
STATE OF MARYLAND
SALISBURY
BALTIMORE
CUMBERLAND
FREDERICK
0 4040
SCALE IN MILES
PROJECT NP BAWA 1(9), 2(9)
END PROJECT
BEGIN PROJECT
N
SCALE IN MILES
0 1 2
Road Inventory Data
Symbols And Abbreviations
Location Map
Baseline Staking
Typical Sections
Tabulation of Quantities
Permanent Sign Schedule
Temporary Sign Schedule
DESCRIPTION
SHEET
NO
A01
A02
A03-A04
A05-A06
A07-A08
B01-B03
C01
C02-C03
C04-C09
C10
Summaries & Schedules
Title Sheet
Construction Plan - Mainline and Exit RampsD01-D24
Construction Plan - Entrance RampsE01-E09
Erosion And Sediment Control NarrativeM01-M03
Temporary Traffic Control PlanN01-N08
Standards And DetailsS01-S31
M04 Staging Area
811 or 1-800-257-7777 http://www.missutility.net/
N P B
A W
A
:2
P
M
N o v e m b e r
A
P R
O J E
C T
S \b a w a \1
(9
(9
P ro j_
D e v
\C A
D D
\N P
B A
W A
\d g n \A
N
P B
A W
A
(9
(9 tt l.
d g n
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) A01
NPS Drwg No. 842/173717 NPS PMIS No. 250082, 236095
C L
Existing asphalt concrete pavement, various depth
C L
Existing ground (typ.)
Existing asphalt concrete pavement, various depth
Remove existing SBT guardrail
C L
C L
Existing ground (typ.)
Existing asphalt concrete pavement, various depthExisting asphalt concrete pavement, various depth
B L
B L
B L
B L
From MD 198 WB to W-B Pkwy NB
Entrance Ramp - Rte. 0508BZ
From B-W Pkwy NB to MD 198 WB
Exit Ramp - Rte. 0508EZ
From MD 198 EB to B-W Pkwy NB
Entrance Ramp - Rte. 0508FZ
From B-W Pkwy NB to MD 198 EB
Exit Ramp - Rte. 0508AZ guardrail
Replace existing
NOTES:
1. Install MGS W-Beam guardrail, steel posts according to
Detail ET 617-32.
2. Install MGS W-Beam guardrail, flared terminal section according to
Traveled lane, 18'Traveled lane, 17'
Traveled lane, 17'Traveled lane, 17' existing guardrail
Do not disturb
Construction limits existing guardrail
Do not disturb
Detail ET 617-19.
Note 2.
guardrail Terminal, see
Install Flared W-Beam see Note 1.
guardrail, steel posts, Install MGS W-Beam guardrail Terminal. See Note 2.
Install Flared W-Beam steel posts. See Note 1.
Install MGS W-Beam guardrail,
3. Adjust work limits to fit conditions as approved by the CO.
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY
TYPICAL SECTIONS
SHEET 1 of 3
NO SCALE
Construction limits
:3
A
N o v e m b e r
B
P R
O J E
C T
S \b a w a \1
(9
(9
P ro j_
D e v
\C A
D D
\N P
B A
W A
\d g n \B
-B
B A
W A
(9
(9
T y p .d g n
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) B01
Existing asphalt concrete pavement, various depth
C L
Existing ground (typ.)
Existing asphalt concrete pavement, various depthguardrail Terminal, see Note 2.
Install Flared W-Beam steel posts. See Note 1.
MGS W-Beam guardrail, Replace existing guardrail with
C L
C L
Existing ground (typ.)
Existing asphalt concrete pavement, various depthExisting asphalt concrete pavement, various depth
Existing curb and gutter to remain (typ.)
B L
B L
B L
B L
From Route 32 WB to B-W Pkwy NB
Entrance Ramp - Rte. 0509EZ
From B-W Pkwy NB to Route 32 WB
Exit Ramp - Rte. 0509AZ from Route 32 EB to B-W Pkwy SB
Entrance Ramp - Rte. 0509GZ from B-W Pkwy SB to Route 175 EB
Exit Ramp - Rte. 0510DZ guardrail Terminal, see Note 2.
Install Flared W-Beam steel posts. See Note 1.
MGS W-Beam guardrail, Replace existing guardrail with
Remove existing SBT guardrail
Traveled lane, 18'Traveled lane, 17' existing guardrail
Do not disturb
Traveled lane, 17' Traveled lane, 17'
Construction limits
NOTES:
1. Install MGS W-Beam guardrail, steel posts according to
Detail ET 617-32.
2. Install MGS W-Beam guardrail, flared terminal section according to
Detail ET 617-19.
guardrail Terminal, see Note 2.
Install Flared W-Beam steel posts. See Note 1.
MGS W-Beam guardrail, Replace existing guardrail with
NOTES:
C L
C L
C L
C L
B L
B L
B L
B L guardrail Terminal. See Note 2.
Install Flared W-Beam steel posts. See Note 1.
Install MGS W-Beam guardrail,
3. Adjust work limits to fit conditions as approved by the CO.
U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY
TYPICAL SECTIONS
SHEET 2 of 3
NO SCALE
Construction limits
Construction limits
:3
N o v e m b e r
B
P R
O J E
C T
S \b a w a \1
(9
(9
P ro j_
D e v
\C A
D D
\N P
B A
W A
\d g n \B
-B
B A
W A
(9
(9
T y p .d g n
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) B02
Existing ground
Baltimore - Washington Parkway
Southbound- Rte. 0002
B L
Existing ground
Baltimore - Washington Parkway
Northbound- Rte. 0001
B to remain (typ.)
Existing curb and gutter
(typ.)
gutter to remain
Existing curb and pavement, various depth
Existing asphalt concrete guardwall masonry existing stone
Do not disturb existing guardrail
Do not disturb of the guardrail. See Note 1.
Replace damaged section guardwall masonry existing stone
Do not disturb pavement, various depth
Existing asphalt concrete
NOTES:
Detail ET 617-11.
2. Install W-Beam Double Faced guardrail, steel posts according to
Detail E 617-A.
1. Install G4 W-Beam guardrail, steel posts according to
L
Existing ground
Baltimore - Washington Parkway
Southbound- Rte. 0002
B L
Existing ground
Baltimore - Washington Parkway
Northbound- Rte. 0001
B to remain (typ.)
Existing curb and gutter
(typ.)
gutter to remain
Existing curb and pavement, various depth
Existing asphalt concrete guardrail Terminal. See Note 3.
Install Tangent W-Beam
See Note 2.
of the guardrail (double faced).
Replace damaged section pavement, various depth
Existing asphalt concrete
4. Adjust work limits to fit conditions as approved by the CO.
3. Install G4 W-Beam guardrail, tangent terminal section according to
Detail ET 617-20.
U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY
TYPICAL SECTIONS
SHEET 3 of 3
NO SCALE
12'+/-lane
Traveled
12'+/-lane
Traveled
12'+/-lane
Traveled
12'+/-lane
Traveled
Construction limits
8'+/-
Shldr.
8'+/-
Shldr.
12'+/-lane
Traveled
12'+/-lane
Traveled
12'+/-lane
Traveled
12'+/-lane
Traveled
Construction limits
8'+/-
Shldr.
8'+/-
Shldr.
:3
N o v e m b e r
B
P R
O J E
C T
S \b a w a \1
(9
(9
P ro j_
D e v
\C A
D D
\N P
B A
W A
\d g n \B
-B
B A
W A
(9
(9
T y p .d g n
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) B03
U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY
TABULATION OF QUANTITIES
:1
N o v e m b e r
C
P R
O J E
C T
S \b a w a \1
(9
(9
P ro j_
D e v
\C A
D D
\N P
B A
W A
\d g n \C
N
P B
A W
A
(9
(9
Q ty .d g n
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) C01
U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY
SUMMARIES AND SCHEDULES
MAINLINE & RAMPS - NB/SB
SHEET 2 of 2
Adjust work limits to fit conditions as approved by the CO.
NOTE:
:0
N o v e m b e r
C
P R
O J E
C T
S \b a w a \1
(9
(9
P ro j_
D e v
\C A
D D
\N P
B A
W A
\d g n \C
-C
N P
B A
W A
(9
(9
P e rm a n e n t S ig n
S u m
.d g n
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) C03
U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY
TEMPORARY SIGN SCHEDULE1
:2
J u ly
C fh fl fi le s e rv e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \b a w a \1
(9
(9
P ro j_
D e v
\C A
D D
\N P
B A
W A
\d g n \C
N
P B
A W
A
(9
(9
C o n s tr u c ti o n
S ig n .d g n
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) C10
39770+64
W13-2 sign existing
Replace
39765+05
W4-1 sign existing
Replace
39774+19
W13-2 sign existing
Replace
M P H
EXIT
39776+36
E5-1 sign existing
Replace sign existing
Replace
39759+60
E5-1 sign existing
Replace
RTE.
9GZ
Z C9
0 .
ETR
median guardrail
Do not disturb Baseline Rte. 0002
S e e s h e e t D
M A
T C
H L I
N E
Z B
.E
TR
S e e s h e e t D
M A
T C
H L I
N E
Baseline Rte. 0001
Do not disturb median guardrail
Z D
E T
R
Z A
E T
R
R T
E . 0
H Z
NOTES:
20870+09 sign existing
Replace
U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY
CONSTRUCTION PLAN
20878+30 sign existing
Replace
20885+00
E5-1 sign existing
Replace
M P H
EXIT
20882+61
W13-2 sign existing
Replace
NO SCALE
NOTE:
Adjust work limits to fit field conditions as approved by the CO.
RTE.
9EZ
R T E . 0
F Z
RTE. 0002
Rte. 0001
M ARC
existing guardrails.
Do not disturb
See Detail ET 617-19.
Guardrail Terminal
Install Flared W-Beam
See Detail ET 617-31.
W-Beam Guardrail.
Install 1,750 LF MGS existing guardrail.
Remove and replace
MAINLINE AND EXIT RAMPS
See Detail ET 617-19.
Guardrail Terminal
Install Flared W-Beam
See Detail ET 617-31.
W-Beam Guardrail.
Install 1,750 LF MGS existing guardrail.
Remove and replace
P A
T U
X E
N T F
W Y
R t e . 3
:2 p r il
D fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \b a w a \1
(9
(9
P ro j_
D e v \C
A D
D \N
P B
A W
A
\d g n \D
-S h e e ts
\D N
P B
A W
A
(1
(9
C
O N
.d g n
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) D17
U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY
CONSTRUCTION PLAN
ENTRANCE RAMPS
NORTHBOUND - SOUTHBOUND
R T E
R T E
2. Adjust work limits to fit conditions as approved by the CO.
Do not disturb existing signs.
1. Existing signs shown are for illustration only.
NOTE:
Balt. - Wash. Pkwy
North to
Baltimore
NO TRUCKS
WEST EAST
4 MILE
Avenue
New York
Annapolis
Richmond
Annapolis
TO
EAST - SOUTH
50 295
BALT - WASH
PARKWAY
Baltimore
NO TRUCKS
to remain (See Note).
Existing sign system to remain (See Note).
Existing sign system
SCALE IN FEET
0 25 50
N
Park boundary
Park boundary
9+
8+
7+
6+
5+
Install missing G4 guardrail, 467 Lnft
:3
N o v e m b e r
E
P R
O J E
C T
S \b a w a \1
(9
(9
P ro j_
D e v
\C A
D D
\N P
B A
W A
\d g n \E
,E
,E
B
A W
A
(9
(9
W it h
G E
.d g n
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) E01
M4-8
M6-3
M5-2R
LEGEND:
PCMS
P C
M S
DETOUR
FOLLOW
RTE. 0002
RTE. 0001
Work Area
"32 Fort Meade Exit 1/2 Mile" the existing sign
Install next to
RTE. 0002
RTE. 0001
"Exit"
Existing sign
Museum"
Cryptologic
"National the existing sign
Install next to
L A
U R
E L F
O R
T M
E A
D E R
O A
D (M
D
P a tu x e n t
F r e e w a y
S ta te R o u te
Exit 1/2 Mile"
"32 FT MEADE/
Existing sign for full ramp closure
See Detail E635-D
M D
CLOSED
EXIT
MD 198 E
DETOUR
M4-8a
END
DETOUR
Special sign
M D
P A
T U
X E
N T F
W Y
U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY
CONTROL PLAN
TEMPORARY TRAFFIC
RTE. 0508AZ
2-mi le
Patuxent Freew ay (State Route 32)
1 -mi le conditions as approved by the CO.
8. Final location and spacing of TTC devices may be changed to fit field
7. Replace damaged TTC devices as needed or as directed by the CO.
CO.
6. Limit lane closure to 1.5 miles at a time unless otherwise directed by the ramp) can be closed for construction at a time.
5. Unless otherwise indicated, only one ramp (either an entrance or an exit at the same time.
4. Do not perform work in both directions of the Baltimore-Washington Parkway
(work space), and the termination area.
zone includes the advance warning area, the transition area, the activity area
3. Only one temporary traffic control (TTC) zone is allowed at a time. A TTC
2. Unless otherwise indicated, maintain public traffic according to Section 156.
work restrictions.
1. Night work is permitted as approved by the CO. See Sections 108 and 156 for
NOTES:
NO SCALE
RTE. 0508AZ
RTE.0508FZ
R T E . 0
E Z
R T E
B Z
RTE
. 0
8DZ
RTE. 0508CAZ
RTE
. 0
9GZ
R T E . 0
C Z
R T E
B Z
RTE.
09AZ
R T E
D Z
RTE
EZ
R T E . 0
F Z
S ta te R o u te
R T
E . 0
H Z
ASTE
4 4
M3-2
:5 u ly
N fh fl fi le s e rv e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \b a w a \1
(9
(9
P ro j_
D e v
\C A
D D
\N P
B A
W A
\d g n \N
-B A
W A
(9
T T
C .d g n
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) N01
PCM
SPCMS
(Before closure)
PCMS
(During closure) before ramp closure
Display sign 7 days
MON 5 AM
THRU
FRI 8 PM
CLOSED
BW PKWY
NB RAMP
TO CLOSE
BW PKWY
NB RAMP
for full ramp closure
See Detail E635-D
Work Area
M D
RTE. 0001
RTE. 0002
Washington
B-W Pkwy
DETOUR
FOLLOW
RTE
. 0
RTE
. 0
21071
21072
21073
21074
21096
21097
21098
21099
21100
21103
21104
21105
21106
21107
21108
21120
21122
21123
21124
21125
21126
21127
21128
21129
21130
21132
21133
21134
21135
21136
21138
21139
21140
21142
21143
21144
21145
21146
21147
21148
21150
21153
21154
21155
21156
21157
21158
21159
21160
21162
21163
21164
21165
21166
2116721168
21169
21170
21172
21173
21175
21109
U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY
CONTROL PLAN
TEMPORARY TRAFFIC
RTE. 0508BZ
LEGEND:
M6-2R
M4-8
DETOUR
M6-1L
M6-3
M5-2R
Special signSpecial sign
M4-8a
END
DETOUR
Laurel"
"197 North the existing sign
Install next to
Bowie"
"197 South the existing sign
Install next to
NOTES:
M D conditions as approved by the CO.
8. Final location and spacing of TTC devices may be changed to fit field
7. Replace damaged TTC devices as needed or as directed by the CO.
CO.
6. Limit lane closure to 1.5 miles at a time unless otherwise directed by the ramp) can be closed for construction at a time.
5. Unless otherwise indicated, only one ramp (either an entrance or an exit at the same time.
4. Do not perform work in both directions of the Baltimore-Washington Parkway
(work space), and the termination area.
1. Night work is permitted as approved by the CO. See Sections 108 and 156 for
NO SCALE
RTE
. 0
8DZ
RTE. 0508CAZ
RTE. 0508AZ
RTE.0508FZ
R
TE
B Z
R T
E
E Z
ORTHN
M3-1
-m ile
-m ile
:2
J u n e
N fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \b a w a \1
(9
(9
P ro j_
D e v \C
A D
D \N
P B
A W
A
\d g n \N
-B
A W
A (9
T
T C
.d g n
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) N02
M S for full ramp closure
See Detail E635-D
Work Area
M D
RTE. 0001
RTE. 0002
RTE
. 0
RTE
. 0
21071
21072
21073
21074
21096
21097
21098
21099
21100
21103
21104
21105
21106
21107
21108
21120
21122
21123
21124
21125
21126
21127
21128
21129
21130
21132
21133
21134
21135
21136
21138
21139
21140
21142
21143
21144
21145
21146
21147
21148
21150
21153
21154
21155
21156
21157
21158
21159
21160
21162
21163
21164
21165
21166
2116721168
21169
21170
21172
21173
21175
21109
U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY
CONTROL PLAN
TEMPORARY TRAFFIC
RTE. 0508BZ
LEGEND:
M6-2R
M4-8
DETOUR
M6-1L
M6-3
M5-2R
M4-8a
END
DETOUR
Laurel"
"197 North the existing sign
Install next to
Bowie"
"197 South the existing sign
Install next to
NOTES:
M D conditions as approved by the CO.
8. Final location and spacing of TTC devices may be changed to fit field
7. Replace damaged TTC devices as needed or as directed by the CO.
CO.
6. Limit lane closure to 1.5 miles at a time unless otherwise directed by the ramp) can be closed for construction at a time.
5. Unless otherwise indicated, only one ramp (either an entrance or an exit at the same time.
4. Do not perform work in both directions of the Baltimore-Washington Parkway
(work space), and the termination area.
1. Night work is permitted as approved by the CO. See Sections 108 and 156 for
NO SCALE
RTE
. 0
8DZ
RTE. 0508CAZ
RTE. 0508AZ
RTE.0508FZ
R
TE
B Z
R T
E
E Z
1-mile
Special sign
ESTW
M3-4
PCMS
DETOUR
FOLLOW
CLOSED
EXIT
MD 198 W
-mile2
:0 u ly
N fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \b a w a \1
(9
(9
P ro j_
D e v \C
A D
D \N
P B
A W
A
\d g n \N
-B
A W
A (9
T
T C
.d g n
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) N03
LEGEND:
PCMS
P C
M S
DETOUR
FOLLOW
RTE. 0002
RTE. 0001
RTE. 0002
RTE. 0001
Museum"
Cryptologic
"National the existing sign
Install next to
L A
U R
E L F
O R
T M
E A
D E R
O A
D (M
D
P a tu x e n t
F r e e w a y
S ta te R o u te
No Trucks"
South Washingont
Balt/Wash PKWY
"EXIT 10C
the existing sign
Install next to
Exit 1/2 Mile"
"198 Fort Meade Laurel
Existing sign
Exit 1/2 Mile"
"32 FT MEADE/
Existing sign
Work Area for full ramp closure
See Detail E635-D
CLOSED
EXIT
MD 198 W
M D
M6-2R
M4-8
END
DETOUR
DETOUR
M4-8a
M6-3
M5-2R
Special sign
P A
T U
X E
N T F
W
U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY
CONTROL PLAN
TEMPORARY TRAFFIC
RTE. 0508EZ
conditions as approved by the CO.
8. Final location and spacing of TTC devices may be changed to fit field
7. Replace damaged TTC devices as needed or as directed by the CO.
CO.
6. Limit lane closure to 1.5 miles at a time unless otherwise directed by the ramp) can be closed for construction at a time.
5. Unless otherwise indicated, only one ramp (either an entrance or an exit at the same time.
4. Do not perform work in both directions of the Baltimore-Washington Parkway
(work space), and the termination area.
1. Night work is permitted as approved by the CO. See Sections 108 and 156 for
NOTES:
NO SCALE
R T E
B Z
R T E . 0
E Z
RTE. 0508CAZ
RTE
. 0
8DZ
RTE.0508FZ
RTE. 0508AZ
RTE
EZ
RTE.
09AZ
R
TE
B Z
R T E . 0
F Z
R T E . 0
C Z
RTE
. 0
9GZ
R T E
D Z
R T
E . 0
H Z
ESTW
M3-4
4 6
"32 West Columbia" the existing sign
Install next to
"32 Fort Meade Exit 1/2 Mile" the existing sign
Install next to
1-mile
-mile2
:5 u ly
N fh fl fi le s e rv e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \b a w a \1
(9
(9
P ro j_
D e v
\C A
D D
\N P
B A
W A
\d g n \N
-B A
W A
(9
T T
C .d g n
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) N04
T U
X E
N T F
W Y
R O
U T
E
R O
U T
E
No Trucks"
South
B/W PKWY
"EXIT
the existing sign
Install next to 1
"175 East Odenton" the existing sign
Install next to
P C
M S
3 West 32 Columbia" Mile2
"East 32 Fort Meade
Existing sign
Exit 1/2 Mile"
"175 Odenton Jessup
Existing sign
Work Area for full ramp closure See Detail E635-D
2-mile
U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY
CONTROL PLAN
TEMPORARY TRAFFIC
RTE. 0509AZ
PCMS
DETOUR
FOLLOW
CLOSED
EXIT
MD 198 W
LEGEND:
M6-2R
M4-8
END
DETOUR
DETOUR
M4-8a
M5-2R
Special sign
"175 East Odenton"
Existing sign
P a tu x e n t
F r e e w a y
S ta te R o u te
S ta te R o u te
West 32 Columbia" Mile2
"East 32 Fort Meade the existing sign
Install next to
Exits 1 Mile" Fort Meade "32 Columbia Existing sign
Exits 1 Mile"
Fort Meade
"32 Columbia the existing sign
Install next to
1-mile conditions as approved by the CO.
8. Final location and spacing of TTC devices may be changed to fit field
7. Replace damaged TTC devices as needed or as directed by the CO.
CO.
6. Limit lane closure to 1.5 miles at a time unless otherwise directed by the ramp) can be closed for construction at a time.
5. Unless otherwise indicated, only one ramp (either an entrance or an exit at the same time.
4. Do not perform work in both directions of the Baltimore-Washington Parkway
(work space), and the termination area.
1. Night work is permitted as approved by the CO. See Sections 108 and 156 for
NOTES:
M6-3
NO SCALE
R T E . 0
F Z
R T E . 0
C Z
RTE
EZ
RTE. 0509AZ
R T E
B Z
R T E
D Z
RTE
. 0
9GZ
R T
E . 0
H Z
R T E
B Z
RTE. 0510AZ
R T E
D Z
Z C
0 .
E T
R
ESTW
M3-4
"175 West Columbia" the existing sign
Install next to
Exit 1/2 Mile"
"175 Odenton Jessup the existing sign
Install next to
:3 u ly
N fh fl fi le s e rv e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \b a w a \1
(9
(9
P ro j_
D e v
\C A
D D
\N P
B A
W A
\d g n \N
-B A
W A
(9
T T
C .d g n
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) N05
RTE. 0002
RTE. 0001
Work Area
L A
U R
E L F
O R
T M
E A
D E R
O A
D (M
D
S ta te R o u te
PCMS
RTE. 0001
PCMS
(Before closure)
PCMS
(During closure) before ramp closure
Display sign 7 days
MON 5 AM
THRU
FRI 8 PM
CLOSED
BW PKWY
NB RAMP
ROUTES
OTHER
USE
TO CLOSE
BW PKWY
NB RAMP
M D
P A
T U
X E
N T F
W
U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY
CONTROL PLAN
TEMPORARY TRAFFIC
RTE. 0509EZ
for full ramp closure See Detail E635-D m il e
LEGEND:
M6-2R
M4-8
DETOUR
M6-1L
M6-3
M5-2R
Special signSpecial sign
B-W Pkwy
Baltimore
No Trucks"
"EXIT 10C
the existing sign
Install next to
M4-8a
END
DETOUR
Laurel Racetrack"
"198 West Laurel the existing sign
Install next to
U.S Army Museum"
"198 East Fort Meade the existing sign
Install next to conditions as approved by the CO.
8. Final location and spacing of TTC devices may be changed to fit field
7. Replace damaged TTC devices as needed or as directed by the CO.
CO.
6. Limit lane closure to 1.5 miles at a time unless otherwise directed by the ramp) can be closed for construction at a time.
5. Unless otherwise indicated, only one ramp (either an entrance or an exit at the same time.
4. Do not perform work in both directions of the Baltimore-Washington Parkway
(work space), and the termination area.
1. Night work is permitted as approved by the CO. See Sections 108 and 156 for
NOTES:
NO SCALE
R T E . 0
F Z
RTE
. 0
9GZ
R T E . 0
C Z
R T E
B Z
RTE
EZ
RTE.
09AZ
R T E
D Z
R T
E . 0
H Z
R T E . 0
E Z
RTE. 0508CAZ
RTE
. 0
8DZ
RTE.0508FZ
RTE. 0508AZ
ORTHN
M3-1
7 7
Z B
0 .
E T
R
:3 u ly
N fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \b a w a \1
(9
(9
P ro j_
D e v \C
A D
D \N
P B
A W
A
\d g n \N
-B
A W
A (9
T
T C
.d g n
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) N06
M4-8
Special sign
M6-3
M5-2R
LEGEND:
RTE. 0002
RTE. 0001
RTE. 0001
L A
U R
E L F
O R
T M
E A
D E R
O A
D (M
D
P a tu x e n t
F r e e w a y
S ta te R o u te
M D
DETOUR
M6-2R
M4-8a
END
DETOUR
Special sign
B-W Pkwy
Washington
P A
T U
X E
N T F
W
M D
Patuxent Freew ay (State Route 32)
PCMS
for full ramp closure
See Detail E635-D
U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY
CONTROL PLAN
TEMPORARY TRAFFIC
RTE. 0509GZ
-m il e
PCMS
(Before closure)
PCMS
(During closure) before ramp closure
Display sign 7 days
MON 5 AM
THRU
FRI 8 PM
CLOSED
BW PKWY
SB RAMP
TO CLOSE
BW PKWY
SB RAMP
DETOUR
FOLLOW
conditions as approved by the CO.
8. Final location and spacing of TTC devices may be changed to fit field
7. Replace damaged TTC devices as needed or as directed by the CO.
CO.
6. Limit lane closure to 1.5 miles at a time unless otherwise directed by the ramp) can be closed for construction at a time.
5. Unless otherwise indicated, only one ramp (either an entrance or an exit at the same time.
4. Do not perform work in both directions of the Baltimore-Washington Parkway
(work space), and the termination area.
1. Night work is permitted as approved by the CO. See Sections 108 and 156 for
NOTES:
-m il e
Work Area
R T E . 0
F Z
R T E . 0
C Z
R T E
B Z
RTE
EZ
RTE.
09AZ
R T E
D Z
R T
E . 0
H Z
R T E
B Z
R T E . 0
E Z
RTE. 0508CAZ
RTE
. 0
8DZ
RTE.0508FZ
RTE. 0508AZ
RTE.
09AZ
RTE
. 0
9GZ
OUTHS
M3-3
5 4
M6-1L
:2 u ly
N fh fl fi le s e rv e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \b a w a \1
(9
(9
P ro j_
D e v
\C A
D D
\N P
B A
W A
\d g n \N
R
E V
-B A
W A
(9
T T
C .d g n
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) N07
T U
X E
N T F
W Y
G U
A R
D W
A
T U
X E
N T F
W Y
G U
A R
D W
A L L
CLOSED
EXIT
MD 175 E
PCMS
DETOUR
FOLLOW
M6-2R
M4-8
END
DETOUR
DETOUR
M4-8a
M6-3
M5-2R
Special sign
LEGEND:
1-m ile
1/2 -m ile
P C
M S
Work Area
West 32 Columbia"
"32 Fort Meade Exit 1/2 Mile the existing sign
Install next toWest 32 Columbia"
Exit 1/2 Mile
"32 Fort Meade
Existing sign
T U
X E
N T F
W Y R
O U
T E
Columbia"
"32 West the existing sign
Install next to
Columbia"
"32 West
Existing sign
R O
U T
E
P A
T U
X E
N T F
W Y R
O U
T E
U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY
CONTROL PLAN
TEMPORARY TRAFFIC
RTE. 0510DZ
conditions as approved by the CO.
8. Final location and spacing of TTC devices may be changed to fit field
7. Replace damaged TTC devices as needed or as directed by the CO.
CO.
6. Limit lane closure to 1.5 miles at a time unless otherwise directed by the ramp) can be closed for construction at a time.
5. Unless otherwise indicated, only one ramp (either an entrance or an exit at the same time.
4. Do not perform work in both directions of the Baltimore-Washington Parkway
(work space), and the termination area.
1. Night work is permitted as approved by the CO. See Sections 108 and 156 for
NOTES:
NO SCALE
R T E . 0
C Z
RTE. 0509AZ
R T E
B Z
RTE
. 0
9E
Z
RTE.
09GZ
RTE.
9DZ
R T
E . 0
H Z
R T E . 0
F Z
R T E
D Z
R T E B Z
Z C
0 .
E T
RRTE. 0510AZ
R T E
D Z
Z
C0150 .ETR
R T E B Z
RTE. 0510AZ1
for full ramp closure
See Detail E635-D
ASTE
M3-2
:2 u ly
N fh fl fi le s e rv e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \b a w a \1
(9
(9
P ro j_
D e v
\C A
D D
\N P
B A
W A
\d g n \N
-B A
W A
(9
T T
C .d g n
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) N08
E 617-A
:1
N o v e m b e r
D
M e tr ic D e s ig n
P R
O J E
C T
S \b a w a \1
(9
(9
P ro j_
D e v \C
A D
D \N
P B
A W
A
\d g n \S td \S
X
-M D
D o u b le
F a c e d G u a rd ra il
.d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EFLHD DETAIL
GUARDRAIL SYSTEM G4
W BEAM MEDIAN BARRIER
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) S01A
NPS PMIS No. 250082, 236095 NPS Drwg No. 842/173717
E635-A
:0
J u n e
S
P R
O J E
C T
S \b a w a \1
(9
(9
P ro j_
D e v
\C A
D D
\N P
B A
W A
\d g n \S td \S
-A
R ig h t
L a n e C lo s u re d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EFLHD DETAIL
RIGHT LANE CLOSURE
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) S25
E635-B
:1
J u n e
S
P R
O J E
C T
S \b a w a \1
(9
(9
P ro j_
D e v
\C A
D D
\N P
B A
W A
\d g n \S td \S
-A
R ig h t
L a n e C lo s u re d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EFLHD DETAIL
ENTRANCE RAMP TREATMENT
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) S26
E635-C
:1
J u n e
S
P R
O J E
C T
S \b a w a \1
(9
(9
P ro j_
D e v
\C A
D D
\N P
B A
W A
\d g n \S td \S
-A
R ig h t
L a n e C lo s u re d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EFLHD DETAIL
ENTRANCE RAMP TREATMENT
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) S27
E635-D
:1
J u n e
S
P R
O J E
C T
S \b a w a \1
(9
(9
P ro j_
D e v
\C A
D D
\N P
B A
W A
\d g n \S td \S
-A
R ig h t
L a n e C lo s u re d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EFLHD DETAIL
FULL RAMP CLOSURE
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) S28
E635-E
:2
J u n e
S
P R
O J E
C T
S \b a w a \1
(9
(9
P ro j_
D e v
\C A
D D
\N P
B A
W A
\d g n \S td \S
-A
R ig h t
L a n e C lo s u re d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EFLHD DETAIL
EXIT RAMP TREATMENT
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) S29
.7
.8
.7
.8
.7
BORDER
R=2.25"
TH=0.75"
.6
.2
.6
.8
.9
.9
.9
.8
.6
.2
.4
.8
.1
1.
.5
11" 39" 11"
1" 59" 1"
10" 40" 10"
5'-0"
Panel Style: BW-Pkwy Washington.ssi
M.U.T.C.D.: 2009 Edition
.7
.8
.7
.8
.7
BORDER
R=2.25"
TH=0.75"
.6
.2
.6
.8
.9
.9
.1
.8
.3
.9
.2
.6
.4
60" 1"
11" 2" 34" 2" 11"
5'-0"
Panel Style: BW-Pkwy Baltimore.ssi
M.U.T.C.D.: 2009 Edition
.7
.2
.5
.5
BORDER
R=2.25"
TH=0.75"
.6
.2
.2
.1
.5
.5
.1
.4
.3
.5
1" 47" 1"
7" 3" 29" 3" 7"
4'-0"
Panel Style: Maryland 198.ssi
M.U.T.C.D.: 2009 Edition
.2
.7
.5
.5
BORDER
R=2.25"
TH=0.75"
4 7 .8
.8
.8
.8
1.
.6
.2
4 19 .8
1" 35" 1"
4" 28" 4"
3'-0"
Panel Style: Maryland 32.ssi
M.U.T.C.D.: 2009 Edition
.7
.2
.5
.5
BORDER
R=2.25"
TH=0.75"
.6
.2
.2
.1
.5
.5
.1
.4
.7
.5
1" 47" 1"
7" 3" 29" 3" 7"
4'-0"
Panel Style: Maryland 175.ssi
M.U.T.C.D.: 2009 Edition
SPECIAL SIGN LAYOUT
CONTROL
TEMPORARY TRAFFIC
E635-F
NO SCALE
EFLHD DETAIL
:3
J u n e
S
P R
O J E
C T
S \b a w a \1
\P r o j_ D e v
\C A
D D
\N P
B A
W A
\d g n \S td \S
F
S p e c ia l S ig n s C o n s tr u c ti o n
.d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
MD NP BAWA 1(9), 2(9) S30
| A01_NP BAWA 1(9) 2(9)_Title-A01-000 |
| A02_NP BAWA 1(9) 2(9)_RIP-A02-000 |
| A03_BAWA 1(9) 2(9)_sym-A03-000 |
| A04_BAWA 1(9) 2(9)_sym-A04-000 |
| A05_BAWA 1(9) 2(9)_Loc-A05-000 |
| A06_BAWA 1(9) 2(9)_Loc-A06-000 |
| A07_BAWA 1(9) 2(9)_Surv-A07-000 |
| A08_BAWA 1(9) 2(9)_Surv-A08-000 |
| B01_BAWA 1(9) 2(9)_Typ-B01-000 |
| B02_BAWA 1(9) 2(9)_Typ-B02-000 |
| B03_BAWA 1(9) 2(9)_Typ-B03-000 |
| C01_NP BAWA 1(9) 2(9)_Qty-C01-000 |
| C02_NP BAWA 1(9) 2(9)_Permanent Sign-C02-000 |
| C03_NP BAWA 1(9) 2(9)_Permanent Sign & Sum-C03-000 |
| C04_NP BAWA 1(9) 2(9)_Permanent Sign & Sum-C04-000 |
| C05_NP BAWA 1(9) 2(9)_Permanent Sign & Sum-C05-000 |
| C06_NP BAWA 1(9) 2(9)_Permanent Sign & Sum-C06-000 |
| C07_NP BAWA 1(9) 2(9)_Permanent Sign & Sum-C07-000 |
| C08_NP BAWA 1(9) 2(9)_Permanent Sign & Sum-C08-000 |
| C09_NP BAWA 1(9) 2(9)_Permanent Sign & Sum-C09-000 |
| C10_NP BAWA 1(9) 2(9)_Construction Sign-C10-000 |
| D01_NP BAWA 1(9) 2(9)_CON_Rev-D01-000 |
| D02_NP BAWA 1(9) 2(9)_CON-D02-000 |
| D03_NP BAWA 1(9) 2(9)_CON-D03-000 |
| D04_NP BAWA 1(9) 2(9)_CON-D04-000 |
| D05_NP BAWA 1(9) 2(9)_CON-D05-000 |
| D06_NP BAWA 1(9) 2(9)_CON-D06-000 |
| D07_NP BAWA 1(9) 2(9)_CON-D07-000 |
| D08_NP BAWA 1(9) 2(9)_CON-D08-000 |
| D09_NP BAWA 1(9) 2(9)_CON-D09-000 |
| D10_NP BAWA 1(9) 2(9)_CON-D10-000 |
| D11_NP BAWA 1(9) 2(9)_CON-D11-000 |
| D12_NP BAWA 1(9) 2(9)_CON_Rev-D12-000 |
| D13_NP BAWA 1(9) 2(9)_CON-D13-000 |
| D14_NP BAWA 1(10) 2(9)_CON-D14-000 |
| D15_NP BAWA 1(11) 2(9)_CON-D15-000 |
| D16_NP BAWA 1(11) 2(9)_CON-D16-000 |
| D17_NP BAWA 1(12) 2(9)_CON-D17-000 |
| D18_NP BAWA 1(14) 2(9)_CON-D18-000 |
| D19_NP BAWA 1(15) 2(9)_CON-D19-000 |
| D20_NP BAWA 1(16) 2(9)_CON-D20-000 |
| D21_NP BAWA 1(17) 2(9)_CON-D21-000 |
| D22_NP BAWA 1(18) 2(9)_CON-D22-000 |
| D23_NP BAWA 1(19) 2(9)_CON-D23-000 |
| D24_NP BAWA 1(20) 2(9)_CON-D24-000 |
| E01_NP BAWA 1(12) 2(9)_Sign-E01 [Sheet]-000 |
| E02_NP BAWA 1(12) 2(9)_Sign-E02 [Sheet]-000 |
| E03_NP BAWA 1(12) 2(9)_Sign-E03 [Sheet]-000 |
| E04_NP BAWA 1(12) 2(9)_Sign-E03 [Sheet]-000 |
| E05_NP BAWA 1(12) 2(9)_Sign-E03 [Sheet]-000 |
| E06_NP BAWA 1(12) 2(9)_Sign-E06 [Sheet]-000 |
| E07_NP BAWA 1(12) 2(9)_Sign-E07 [Sheet]-000 |
| E08_NP BAWA 1(12) 2(9)_Sign-E08 [Sheet]-000 |
| E09_NP BAWA 1(12) 2(9)_Sign-E09 [Sheet]-000 |
| M01_BAWA_1(9)_Narrative-M01-000 |
| M02_BAWA_1(9)_Narrative-M02-000 |
| M03_BAWA_1(9)_Narrative-M03-000 |
| M04_BAWA_1(9)_Staging Area-M04-000 |
| N01-BAWA_1(9)_TTC |
| N02-BAWA_1(9)_TTC-Untitled [Sheet]-000 |
| N03-BAWA_1(9)_TTC-N03-000 |
| N04-BAWA_1(9)_TTC-N04-000 |
| N05-BAWA_1(9)_TTC-N05-000 |
| N06_REV-BAWA_1(9)_TTC-Untitled [Sheet]-000 |
| N07-BAWA_1(9)_TTC-N07-000 |
| N08-BAWA_1(9)_TTC-N08-000 |
| S01_st15702_detail-S01-000 |
| S02_st61711_EFL_TEMP |
| S03_st61719_G4_EFL_TEMP |
| S04_st61720_EFL_TEMP-S04-000 |
| S05_st61732_MGS_EFL_TEMP-S05-000 |
| S06_st61737_MGS_EFL_TEMP-Sheet-000 |
| S07_st63301_detail-S07-000 |
| S08_st63302_detail-S08-000 |
| S09_st63303_detail-S09-000 |
| S10_st63304_detail-S10-000 |
| S11_Special Signs_For-S-sheets-S11-000 |
| S12_Special Signs_For-S-sheets-S12-000 |
| S13_Special Signs_For-S-sheets-S13-000 |
| S14_Special Signs_For-S-sheets-S14-000 |
| S15_Special Signs_For-S-sheets-S15-000 |
| S16_Special Signs_For-S-sheets-S16-000 |
| S17_Special Signs_For-S-sheets-S17-000 |
| S18_633-B_MD821_03-S18-000 |
| S19_633-B_MD821_03-01-S19-000 |
| S20_633-B_MD821_03-03-S20-000 |
| S21_633-B_MD821_03-04-S21-000 |
| S22_633-B_MD821_03-05-S22-000 |
| S23_633-B_MD821_03-06-S23-000 |
| S24_635-01_detail-S24-000 |
| S25_635-A_Right Lane Closure_detail-S25-000 |
| S26_635-B_Entrance Ramp Closure_detail |
| S27_635-C_Entrance Ramp Closure_detail |
| S28_635-D_ Exit Ramp Closure_detail |
| S29_635-E_Full Ramp Closure_detail |
| S30_635-F_Special Signs Construction-S30-000 |
File details come from the government source that posted it. Updated .