Plan - NP BAWA 1(9) 2(9).pdf

PDF 42 MB Posted

Attached to
Baltimore Washington Parkway Federal contract opportunity
Solicitation number
693C73-22-B-000003
Issued by
Department of Transportation Federal Highway Administration

About this file

This solicitation is for guardrail and signage replacement along the Baltimore Washington Parkway between the Big Patuxent River Bridge and Jessup Road in Prince George's County, Maryland. The project includes installing no truck signs at Parkway entrance ramps, new milepost markers from the District of Columbia boundary to Jessup Road, and other miscellaneous work. The price range for the project is estimated between $1,000,000 to $5,000,000. Sealed bids from certified small business concerns will be accepted with a bid due date to be specified in solicitation number 693C73-22-B-000003. Annual representations and certifications must be completed on SAM.gov and form Vets-4212 must be completed on dol.gov. Questions regarding construction projects should be directed to eflhd.contracts@dot.gov and must include the solicitation number, project name and number, requesting firm information and contact details. Bidders must be registered in SAM for payment processing in accordance with FAR.

View the file

Other files for this federal contract opportunity

Other files attached to Baltimore Washington Parkway, newest first.
File Type Posted
Results of Bid Opening - NP-BAWA 1(9) 2(9).pdf PDF
Amendment 0003 - NP-BAWA 1(9) 2(9).pdf PDF
Amendment 0002 - NP BAWA 1(9) 2(9).pdf PDF
Amendment 0001 - NP BAWA 1(9) 2(9).pdf PDF
VETS-4212 - Form - 2021.pdf PDF
Categorical Exclusion Form (NEPA).pdf PDF
IFB Solicitiation - NP BAWA 1(9) 2(9).pdf PDF
FP14_Eng.pdf PDF
ADV_Bidder s Qualifications Form.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX TO SHEETS

PLANS FOR PROPOSED

PLANS PREPARED BY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

ASHBURN, VIRGINIA

DESCRIPTION OF PROJECT

IMPROVEMENT:

PROJECT LENGTH: 37.81 Miles

ADT (2019)

ADT (2039)

DHV

%Truck

D

V (MPH)

2,800

50/50

1%

SPECIFICATIONS:

BRIDGE:

DESIGN DESIGNATION:

e(max) 6%

C/A Full to the Jessup Road (MD 175).

milepost markers from the District of Columbia Boundary (Route 50) installing No Trucks signs at the Parkway entrance ramps and new

Bridge and the Jessup Road (MD 175). The project also includes along the mainline and ramps between the Big Patuxent River

This project consists of guardrail and signage replacement

113,000

185,000

MARYLAND

ANNE ARUNDEL COUNTY AND PRINCE GEORGE'S COUNTY

ON BALTIMORE-WASHINGTON PARKWAY

GUARDRAIL AND SIGNAGE REPLACEMENT

Know what'sbelow.

before you dig.Call

R

Administration

Federal Highway

U.S. Department of Transportation

LANE MILES:

U.S. DEPARTMENT OF THE INTERIOR

NATIONAL PARK SERVICE

BALTIMORE WASHINGTON PARKWAY

NP BAWA 1(9), 2(9)

and Bridges on Federal Highway Projects", FP-14.

"Standard Specifications for Construction of Roads

ROAD: WIDTH

48' - 72'

SURFACE BASE

Aggregate ......N/A

SUBGRADE

Asphalt ... Aggregate ......N/A

Asphalt ...

ROAD: WIDTH

48' - 72'

SURFACE BASE SUBGRADE

I-495 Bridges

July, 2021

Project Manager

Katerina Roman

Lead Designer

Alazar Feleke

Highway Design Manager

Ahmed Lamarre

75.62 Miles

15' - 24'

15' - 24' .... Aggregate ......N/A

Asphalt ... Aggregate ......N/A

Asphalt ...

15' - 24'

15' - 24' .... Aggregate ......N/A

Asphalt ... Aggregate ......N/A

Asphalt ...

15' - 24'

15' - 24' .... Aggregate ......N/A

Asphalt ... Aggregate ......N/A

Asphalt ...

15' - 24'

15' - 24' .... Aggregate ......N/A

Asphalt ... Aggregate ......N/A

Asphalt ...

15' - 24'

15' - 24' .... Aggregate ......N/A

Asphalt ... Aggregate ......N/A

Asphalt ...

15' - 24'

15' - 24' .... Aggregate ......N/A

Asphalt ... Aggregate ......N/A

Asphalt ...

15' - 24'

15' - 24' .... Aggregate ......N/A

Asphalt ... Aggregate ......N/A

Asphalt ...

15' - 24' .... Asphalt ... Aggregate ......N/A

15' - 24' .... Asphalt ... Aggregate ......N/A

KEY MAP

STATE OF MARYLAND

SALISBURY

BALTIMORE

CUMBERLAND

FREDERICK

0 4040

SCALE IN MILES

PROJECT NP BAWA 1(9), 2(9)

END PROJECT

BEGIN PROJECT

N

SCALE IN MILES

0 1 2

Road Inventory Data

Symbols And Abbreviations

Location Map

Baseline Staking

Typical Sections

Tabulation of Quantities

Permanent Sign Schedule

Temporary Sign Schedule

DESCRIPTION

SHEET

NO

A01

A02

A03-A04

A05-A06

A07-A08

B01-B03

C01

C02-C03

C04-C09

C10

Summaries & Schedules

Title Sheet

Construction Plan - Mainline and Exit RampsD01-D24

Construction Plan - Entrance RampsE01-E09

Erosion And Sediment Control NarrativeM01-M03

Temporary Traffic Control PlanN01-N08

Standards And DetailsS01-S31

M04 Staging Area

811 or 1-800-257-7777 http://www.missutility.net/

N P B

A W

A

:2

P

M

N o v e m b e r

A

P R

O J E

C T

S \b a w a \1

(9

(9

P ro j_

D e v

\C A

D D

\N P

B A

W A

\d g n \A

N

P B

A W

A

(9

(9 tt l.

d g n

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) A01

NPS Drwg No. 842/173717 NPS PMIS No. 250082, 236095

C L

Existing asphalt concrete pavement, various depth

C L

Existing ground (typ.)

Existing asphalt concrete pavement, various depth

Remove existing SBT guardrail

C L

C L

Existing ground (typ.)

Existing asphalt concrete pavement, various depthExisting asphalt concrete pavement, various depth

B L

B L

B L

B L

From MD 198 WB to W-B Pkwy NB

Entrance Ramp - Rte. 0508BZ

From B-W Pkwy NB to MD 198 WB

Exit Ramp - Rte. 0508EZ

From MD 198 EB to B-W Pkwy NB

Entrance Ramp - Rte. 0508FZ

From B-W Pkwy NB to MD 198 EB

Exit Ramp - Rte. 0508AZ guardrail

Replace existing

NOTES:

1. Install MGS W-Beam guardrail, steel posts according to

Detail ET 617-32.

2. Install MGS W-Beam guardrail, flared terminal section according to

Traveled lane, 18'Traveled lane, 17'

Traveled lane, 17'Traveled lane, 17' existing guardrail

Do not disturb

Construction limits existing guardrail

Do not disturb

Detail ET 617-19.

Note 2.

guardrail Terminal, see

Install Flared W-Beam see Note 1.

guardrail, steel posts, Install MGS W-Beam guardrail Terminal. See Note 2.

Install Flared W-Beam steel posts. See Note 1.

Install MGS W-Beam guardrail,

3. Adjust work limits to fit conditions as approved by the CO.

NO. DATE BY REVISIONS

OFFICE OF FEDERAL LANDS HIGHWAY

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY

TYPICAL SECTIONS

SHEET 1 of 3

NO SCALE

Construction limits

:3

A

N o v e m b e r

B

P R

O J E

C T

S \b a w a \1

(9

(9

P ro j_

D e v

\C A

D D

\N P

B A

W A

\d g n \B

-B

B A

W A

(9

(9

T y p .d g n

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) B01

Existing asphalt concrete pavement, various depth

C L

Existing ground (typ.)

Existing asphalt concrete pavement, various depthguardrail Terminal, see Note 2.

Install Flared W-Beam steel posts. See Note 1.

MGS W-Beam guardrail, Replace existing guardrail with

C L

C L

Existing ground (typ.)

Existing asphalt concrete pavement, various depthExisting asphalt concrete pavement, various depth

Existing curb and gutter to remain (typ.)

B L

B L

B L

B L

From Route 32 WB to B-W Pkwy NB

Entrance Ramp - Rte. 0509EZ

From B-W Pkwy NB to Route 32 WB

Exit Ramp - Rte. 0509AZ from Route 32 EB to B-W Pkwy SB

Entrance Ramp - Rte. 0509GZ from B-W Pkwy SB to Route 175 EB

Exit Ramp - Rte. 0510DZ guardrail Terminal, see Note 2.

Install Flared W-Beam steel posts. See Note 1.

MGS W-Beam guardrail, Replace existing guardrail with

Remove existing SBT guardrail

Traveled lane, 18'Traveled lane, 17' existing guardrail

Do not disturb

Traveled lane, 17' Traveled lane, 17'

Construction limits

NOTES:

1. Install MGS W-Beam guardrail, steel posts according to

Detail ET 617-32.

2. Install MGS W-Beam guardrail, flared terminal section according to

Detail ET 617-19.

guardrail Terminal, see Note 2.

Install Flared W-Beam steel posts. See Note 1.

MGS W-Beam guardrail, Replace existing guardrail with

NOTES:

C L

C L

C L

C L

B L

B L

B L

B L guardrail Terminal. See Note 2.

Install Flared W-Beam steel posts. See Note 1.

Install MGS W-Beam guardrail,

3. Adjust work limits to fit conditions as approved by the CO.

U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY

TYPICAL SECTIONS

SHEET 2 of 3

NO SCALE

Construction limits

Construction limits

:3

N o v e m b e r

B

P R

O J E

C T

S \b a w a \1

(9

(9

P ro j_

D e v

\C A

D D

\N P

B A

W A

\d g n \B

-B

B A

W A

(9

(9

T y p .d g n

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) B02

Existing ground

Baltimore - Washington Parkway

Southbound- Rte. 0002

B L

Existing ground

Baltimore - Washington Parkway

Northbound- Rte. 0001

B to remain (typ.)

Existing curb and gutter

(typ.)

gutter to remain

Existing curb and pavement, various depth

Existing asphalt concrete guardwall masonry existing stone

Do not disturb existing guardrail

Do not disturb of the guardrail. See Note 1.

Replace damaged section guardwall masonry existing stone

Do not disturb pavement, various depth

Existing asphalt concrete

NOTES:

Detail ET 617-11.

2. Install W-Beam Double Faced guardrail, steel posts according to

Detail E 617-A.

1. Install G4 W-Beam guardrail, steel posts according to

L

Existing ground

Baltimore - Washington Parkway

Southbound- Rte. 0002

B L

Existing ground

Baltimore - Washington Parkway

Northbound- Rte. 0001

B to remain (typ.)

Existing curb and gutter

(typ.)

gutter to remain

Existing curb and pavement, various depth

Existing asphalt concrete guardrail Terminal. See Note 3.

Install Tangent W-Beam

See Note 2.

of the guardrail (double faced).

Replace damaged section pavement, various depth

Existing asphalt concrete

4. Adjust work limits to fit conditions as approved by the CO.

3. Install G4 W-Beam guardrail, tangent terminal section according to

Detail ET 617-20.

U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY

TYPICAL SECTIONS

SHEET 3 of 3

NO SCALE

12'+/-lane

Traveled

12'+/-lane

Traveled

12'+/-lane

Traveled

12'+/-lane

Traveled

Construction limits

8'+/-

Shldr.

8'+/-

Shldr.

12'+/-lane

Traveled

12'+/-lane

Traveled

12'+/-lane

Traveled

12'+/-lane

Traveled

Construction limits

8'+/-

Shldr.

8'+/-

Shldr.

:3

N o v e m b e r

B

P R

O J E

C T

S \b a w a \1

(9

(9

P ro j_

D e v

\C A

D D

\N P

B A

W A

\d g n \B

-B

B A

W A

(9

(9

T y p .d g n

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) B03

U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY

TABULATION OF QUANTITIES

:1

N o v e m b e r

C

P R

O J E

C T

S \b a w a \1

(9

(9

P ro j_

D e v

\C A

D D

\N P

B A

W A

\d g n \C

N

P B

A W

A

(9

(9

Q ty .d g n

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) C01

U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY

SUMMARIES AND SCHEDULES

MAINLINE & RAMPS - NB/SB

SHEET 2 of 2

Adjust work limits to fit conditions as approved by the CO.

NOTE:

:0

N o v e m b e r

C

P R

O J E

C T

S \b a w a \1

(9

(9

P ro j_

D e v

\C A

D D

\N P

B A

W A

\d g n \C

-C

N P

B A

W A

(9

(9

P e rm a n e n t S ig n

S u m

.d g n

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) C03

U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY

TEMPORARY SIGN SCHEDULE1

:2

J u ly

C fh fl fi le s e rv e .f lh d

.f h w a .d o t.

g o v \d a ta

\P R

O J E

C T

S \b a w a \1

(9

(9

P ro j_

D e v

\C A

D D

\N P

B A

W A

\d g n \C

N

P B

A W

A

(9

(9

C o n s tr u c ti o n

S ig n .d g n

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) C10

39770+64

W13-2 sign existing

Replace

39765+05

W4-1 sign existing

Replace

39774+19

W13-2 sign existing

Replace

M P H

EXIT

39776+36

E5-1 sign existing

Replace sign existing

Replace

39759+60

E5-1 sign existing

Replace

RTE.

9GZ

Z C9

0 .

ETR

median guardrail

Do not disturb Baseline Rte. 0002

S e e s h e e t D

M A

T C

H L I

N E

Z B

.E

TR

S e e s h e e t D

M A

T C

H L I

N E

Baseline Rte. 0001

Do not disturb median guardrail

Z D

E T

R

Z A

E T

R

R T

E . 0

H Z

NOTES:

20870+09 sign existing

Replace

U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY

CONSTRUCTION PLAN

20878+30 sign existing

Replace

20885+00

E5-1 sign existing

Replace

M P H

EXIT

20882+61

W13-2 sign existing

Replace

NO SCALE

NOTE:

Adjust work limits to fit field conditions as approved by the CO.

RTE.

9EZ

R T E . 0

F Z

RTE. 0002

Rte. 0001

M ARC

existing guardrails.

Do not disturb

See Detail ET 617-19.

Guardrail Terminal

Install Flared W-Beam

See Detail ET 617-31.

W-Beam Guardrail.

Install 1,750 LF MGS existing guardrail.

Remove and replace

MAINLINE AND EXIT RAMPS

See Detail ET 617-19.

Guardrail Terminal

Install Flared W-Beam

See Detail ET 617-31.

W-Beam Guardrail.

Install 1,750 LF MGS existing guardrail.

Remove and replace

P A

T U

X E

N T F

W Y

R t e . 3

:2 p r il

D fh fl fi le s e rv e .f lh d .f h w a .d o t.

g o v \d a ta

\P R

O J E

C T

S \b a w a \1

(9

(9

P ro j_

D e v \C

A D

D \N

P B

A W

A

\d g n \D

-S h e e ts

\D N

P B

A W

A

(1

(9

C

O N

.d g n

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) D17

U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY

CONSTRUCTION PLAN

ENTRANCE RAMPS

NORTHBOUND - SOUTHBOUND

R T E

R T E

2. Adjust work limits to fit conditions as approved by the CO.

Do not disturb existing signs.

1. Existing signs shown are for illustration only.

NOTE:

Balt. - Wash. Pkwy

North to

Baltimore

NO TRUCKS

WEST EAST

4 MILE

Avenue

New York

Annapolis

Richmond

Annapolis

TO

EAST - SOUTH

50 295

BALT - WASH

PARKWAY

Baltimore

NO TRUCKS

to remain (See Note).

Existing sign system to remain (See Note).

Existing sign system

SCALE IN FEET

0 25 50

N

Park boundary

Park boundary

9+

8+

7+

6+

5+

Install missing G4 guardrail, 467 Lnft

:3

N o v e m b e r

E

P R

O J E

C T

S \b a w a \1

(9

(9

P ro j_

D e v

\C A

D D

\N P

B A

W A

\d g n \E

,E

,E

B

A W

A

(9

(9

W it h

G E

.d g n

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) E01

M4-8

M6-3

M5-2R

LEGEND:

PCMS

P C

M S

DETOUR

FOLLOW

RTE. 0002

RTE. 0001

Work Area

"32 Fort Meade Exit 1/2 Mile" the existing sign

Install next to

RTE. 0002

RTE. 0001

"Exit"

Existing sign

Museum"

Cryptologic

"National the existing sign

Install next to

L A

U R

E L F

O R

T M

E A

D E R

O A

D (M

D

P a tu x e n t

F r e e w a y

S ta te R o u te

Exit 1/2 Mile"

"32 FT MEADE/

Existing sign for full ramp closure

See Detail E635-D

M D

CLOSED

EXIT

MD 198 E

DETOUR

M4-8a

END

DETOUR

Special sign

M D

P A

T U

X E

N T F

W Y

U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY

CONTROL PLAN

TEMPORARY TRAFFIC

RTE. 0508AZ

2-mi le

Patuxent Freew ay (State Route 32)

1 -mi le conditions as approved by the CO.

8. Final location and spacing of TTC devices may be changed to fit field

7. Replace damaged TTC devices as needed or as directed by the CO.

CO.

6. Limit lane closure to 1.5 miles at a time unless otherwise directed by the ramp) can be closed for construction at a time.

5. Unless otherwise indicated, only one ramp (either an entrance or an exit at the same time.

4. Do not perform work in both directions of the Baltimore-Washington Parkway

(work space), and the termination area.

zone includes the advance warning area, the transition area, the activity area

3. Only one temporary traffic control (TTC) zone is allowed at a time. A TTC

2. Unless otherwise indicated, maintain public traffic according to Section 156.

work restrictions.

1. Night work is permitted as approved by the CO. See Sections 108 and 156 for

NOTES:

NO SCALE

RTE. 0508AZ

RTE.0508FZ

R T E . 0

E Z

R T E

B Z

RTE

. 0

8DZ

RTE. 0508CAZ

RTE

. 0

9GZ

R T E . 0

C Z

R T E

B Z

RTE.

09AZ

R T E

D Z

RTE

EZ

R T E . 0

F Z

S ta te R o u te

R T

E . 0

H Z

ASTE

4 4

M3-2

:5 u ly

N fh fl fi le s e rv e .f lh d

.f h w a .d o t.

g o v \d a ta

\P R

O J E

C T

S \b a w a \1

(9

(9

P ro j_

D e v

\C A

D D

\N P

B A

W A

\d g n \N

-B A

W A

(9

T T

C .d g n

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) N01

PCM

SPCMS

(Before closure)

PCMS

(During closure) before ramp closure

Display sign 7 days

MON 5 AM

THRU

FRI 8 PM

CLOSED

BW PKWY

NB RAMP

TO CLOSE

BW PKWY

NB RAMP

for full ramp closure

See Detail E635-D

Work Area

M D

RTE. 0001

RTE. 0002

Washington

B-W Pkwy

DETOUR

FOLLOW

RTE

. 0

RTE

. 0

21071

21072

21073

21074

21096

21097

21098

21099

21100

21103

21104

21105

21106

21107

21108

21120

21122

21123

21124

21125

21126

21127

21128

21129

21130

21132

21133

21134

21135

21136

21138

21139

21140

21142

21143

21144

21145

21146

21147

21148

21150

21153

21154

21155

21156

21157

21158

21159

21160

21162

21163

21164

21165

21166

2116721168

21169

21170

21172

21173

21175

21109

U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY

CONTROL PLAN

TEMPORARY TRAFFIC

RTE. 0508BZ

LEGEND:

M6-2R

M4-8

DETOUR

M6-1L

M6-3

M5-2R

Special signSpecial sign

M4-8a

END

DETOUR

Laurel"

"197 North the existing sign

Install next to

Bowie"

"197 South the existing sign

Install next to

NOTES:

M D conditions as approved by the CO.

8. Final location and spacing of TTC devices may be changed to fit field

7. Replace damaged TTC devices as needed or as directed by the CO.

CO.

6. Limit lane closure to 1.5 miles at a time unless otherwise directed by the ramp) can be closed for construction at a time.

5. Unless otherwise indicated, only one ramp (either an entrance or an exit at the same time.

4. Do not perform work in both directions of the Baltimore-Washington Parkway

(work space), and the termination area.

1. Night work is permitted as approved by the CO. See Sections 108 and 156 for

NO SCALE

RTE

. 0

8DZ

RTE. 0508CAZ

RTE. 0508AZ

RTE.0508FZ

R

TE

B Z

R T

E

E Z

ORTHN

M3-1

-m ile

-m ile

:2

J u n e

N fh fl fi le s e rv e .f lh d .f h w a .d o t.

g o v \d a ta

\P R

O J E

C T

S \b a w a \1

(9

(9

P ro j_

D e v \C

A D

D \N

P B

A W

A

\d g n \N

-B

A W

A (9

T

T C

.d g n

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) N02

M S for full ramp closure

See Detail E635-D

Work Area

M D

RTE. 0001

RTE. 0002

RTE

. 0

RTE

. 0

21071

21072

21073

21074

21096

21097

21098

21099

21100

21103

21104

21105

21106

21107

21108

21120

21122

21123

21124

21125

21126

21127

21128

21129

21130

21132

21133

21134

21135

21136

21138

21139

21140

21142

21143

21144

21145

21146

21147

21148

21150

21153

21154

21155

21156

21157

21158

21159

21160

21162

21163

21164

21165

21166

2116721168

21169

21170

21172

21173

21175

21109

U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY

CONTROL PLAN

TEMPORARY TRAFFIC

RTE. 0508BZ

LEGEND:

M6-2R

M4-8

DETOUR

M6-1L

M6-3

M5-2R

M4-8a

END

DETOUR

Laurel"

"197 North the existing sign

Install next to

Bowie"

"197 South the existing sign

Install next to

NOTES:

M D conditions as approved by the CO.

8. Final location and spacing of TTC devices may be changed to fit field

7. Replace damaged TTC devices as needed or as directed by the CO.

CO.

6. Limit lane closure to 1.5 miles at a time unless otherwise directed by the ramp) can be closed for construction at a time.

5. Unless otherwise indicated, only one ramp (either an entrance or an exit at the same time.

4. Do not perform work in both directions of the Baltimore-Washington Parkway

(work space), and the termination area.

1. Night work is permitted as approved by the CO. See Sections 108 and 156 for

NO SCALE

RTE

. 0

8DZ

RTE. 0508CAZ

RTE. 0508AZ

RTE.0508FZ

R

TE

B Z

R T

E

E Z

1-mile

Special sign

ESTW

M3-4

PCMS

DETOUR

FOLLOW

CLOSED

EXIT

MD 198 W

-mile2

:0 u ly

N fh fl fi le s e rv e .f lh d .f h w a .d o t.

g o v \d a ta

\P R

O J E

C T

S \b a w a \1

(9

(9

P ro j_

D e v \C

A D

D \N

P B

A W

A

\d g n \N

-B

A W

A (9

T

T C

.d g n

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) N03

LEGEND:

PCMS

P C

M S

DETOUR

FOLLOW

RTE. 0002

RTE. 0001

RTE. 0002

RTE. 0001

Museum"

Cryptologic

"National the existing sign

Install next to

L A

U R

E L F

O R

T M

E A

D E R

O A

D (M

D

P a tu x e n t

F r e e w a y

S ta te R o u te

No Trucks"

South Washingont

Balt/Wash PKWY

"EXIT 10C

the existing sign

Install next to

Exit 1/2 Mile"

"198 Fort Meade Laurel

Existing sign

Exit 1/2 Mile"

"32 FT MEADE/

Existing sign

Work Area for full ramp closure

See Detail E635-D

CLOSED

EXIT

MD 198 W

M D

M6-2R

M4-8

END

DETOUR

DETOUR

M4-8a

M6-3

M5-2R

Special sign

P A

T U

X E

N T F

W

U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY

CONTROL PLAN

TEMPORARY TRAFFIC

RTE. 0508EZ

conditions as approved by the CO.

8. Final location and spacing of TTC devices may be changed to fit field

7. Replace damaged TTC devices as needed or as directed by the CO.

CO.

6. Limit lane closure to 1.5 miles at a time unless otherwise directed by the ramp) can be closed for construction at a time.

5. Unless otherwise indicated, only one ramp (either an entrance or an exit at the same time.

4. Do not perform work in both directions of the Baltimore-Washington Parkway

(work space), and the termination area.

1. Night work is permitted as approved by the CO. See Sections 108 and 156 for

NOTES:

NO SCALE

R T E

B Z

R T E . 0

E Z

RTE. 0508CAZ

RTE

. 0

8DZ

RTE.0508FZ

RTE. 0508AZ

RTE

EZ

RTE.

09AZ

R

TE

B Z

R T E . 0

F Z

R T E . 0

C Z

RTE

. 0

9GZ

R T E

D Z

R T

E . 0

H Z

ESTW

M3-4

4 6

"32 West Columbia" the existing sign

Install next to

"32 Fort Meade Exit 1/2 Mile" the existing sign

Install next to

1-mile

-mile2

:5 u ly

N fh fl fi le s e rv e .f lh d

.f h w a .d o t.

g o v \d a ta

\P R

O J E

C T

S \b a w a \1

(9

(9

P ro j_

D e v

\C A

D D

\N P

B A

W A

\d g n \N

-B A

W A

(9

T T

C .d g n

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) N04

T U

X E

N T F

W Y

R O

U T

E

R O

U T

E

No Trucks"

South

B/W PKWY

"EXIT

the existing sign

Install next to 1

"175 East Odenton" the existing sign

Install next to

P C

M S

3 West 32 Columbia" Mile2

"East 32 Fort Meade

Existing sign

Exit 1/2 Mile"

"175 Odenton Jessup

Existing sign

Work Area for full ramp closure See Detail E635-D

2-mile

U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY

CONTROL PLAN

TEMPORARY TRAFFIC

RTE. 0509AZ

PCMS

DETOUR

FOLLOW

CLOSED

EXIT

MD 198 W

LEGEND:

M6-2R

M4-8

END

DETOUR

DETOUR

M4-8a

M5-2R

Special sign

"175 East Odenton"

Existing sign

P a tu x e n t

F r e e w a y

S ta te R o u te

S ta te R o u te

West 32 Columbia" Mile2

"East 32 Fort Meade the existing sign

Install next to

Exits 1 Mile" Fort Meade "32 Columbia Existing sign

Exits 1 Mile"

Fort Meade

"32 Columbia the existing sign

Install next to

1-mile conditions as approved by the CO.

8. Final location and spacing of TTC devices may be changed to fit field

7. Replace damaged TTC devices as needed or as directed by the CO.

CO.

6. Limit lane closure to 1.5 miles at a time unless otherwise directed by the ramp) can be closed for construction at a time.

5. Unless otherwise indicated, only one ramp (either an entrance or an exit at the same time.

4. Do not perform work in both directions of the Baltimore-Washington Parkway

(work space), and the termination area.

1. Night work is permitted as approved by the CO. See Sections 108 and 156 for

NOTES:

M6-3

NO SCALE

R T E . 0

F Z

R T E . 0

C Z

RTE

EZ

RTE. 0509AZ

R T E

B Z

R T E

D Z

RTE

. 0

9GZ

R T

E . 0

H Z

R T E

B Z

RTE. 0510AZ

R T E

D Z

Z C

0 .

E T

R

ESTW

M3-4

"175 West Columbia" the existing sign

Install next to

Exit 1/2 Mile"

"175 Odenton Jessup the existing sign

Install next to

:3 u ly

N fh fl fi le s e rv e .f lh d

.f h w a .d o t.

g o v \d a ta

\P R

O J E

C T

S \b a w a \1

(9

(9

P ro j_

D e v

\C A

D D

\N P

B A

W A

\d g n \N

-B A

W A

(9

T T

C .d g n

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) N05

RTE. 0002

RTE. 0001

Work Area

L A

U R

E L F

O R

T M

E A

D E R

O A

D (M

D

S ta te R o u te

PCMS

RTE. 0001

PCMS

(Before closure)

PCMS

(During closure) before ramp closure

Display sign 7 days

MON 5 AM

THRU

FRI 8 PM

CLOSED

BW PKWY

NB RAMP

ROUTES

OTHER

USE

TO CLOSE

BW PKWY

NB RAMP

M D

P A

T U

X E

N T F

W

U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY

CONTROL PLAN

TEMPORARY TRAFFIC

RTE. 0509EZ

for full ramp closure See Detail E635-D m il e

LEGEND:

M6-2R

M4-8

DETOUR

M6-1L

M6-3

M5-2R

Special signSpecial sign

B-W Pkwy

Baltimore

No Trucks"

"EXIT 10C

the existing sign

Install next to

M4-8a

END

DETOUR

Laurel Racetrack"

"198 West Laurel the existing sign

Install next to

U.S Army Museum"

"198 East Fort Meade the existing sign

Install next to conditions as approved by the CO.

8. Final location and spacing of TTC devices may be changed to fit field

7. Replace damaged TTC devices as needed or as directed by the CO.

CO.

6. Limit lane closure to 1.5 miles at a time unless otherwise directed by the ramp) can be closed for construction at a time.

5. Unless otherwise indicated, only one ramp (either an entrance or an exit at the same time.

4. Do not perform work in both directions of the Baltimore-Washington Parkway

(work space), and the termination area.

1. Night work is permitted as approved by the CO. See Sections 108 and 156 for

NOTES:

NO SCALE

R T E . 0

F Z

RTE

. 0

9GZ

R T E . 0

C Z

R T E

B Z

RTE

EZ

RTE.

09AZ

R T E

D Z

R T

E . 0

H Z

R T E . 0

E Z

RTE. 0508CAZ

RTE

. 0

8DZ

RTE.0508FZ

RTE. 0508AZ

ORTHN

M3-1

7 7

Z B

0 .

E T

R

:3 u ly

N fh fl fi le s e rv e .f lh d .f h w a .d o t.

g o v \d a ta

\P R

O J E

C T

S \b a w a \1

(9

(9

P ro j_

D e v \C

A D

D \N

P B

A W

A

\d g n \N

-B

A W

A (9

T

T C

.d g n

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) N06

M4-8

Special sign

M6-3

M5-2R

LEGEND:

RTE. 0002

RTE. 0001

RTE. 0001

L A

U R

E L F

O R

T M

E A

D E R

O A

D (M

D

P a tu x e n t

F r e e w a y

S ta te R o u te

M D

DETOUR

M6-2R

M4-8a

END

DETOUR

Special sign

B-W Pkwy

Washington

P A

T U

X E

N T F

W

M D

Patuxent Freew ay (State Route 32)

PCMS

for full ramp closure

See Detail E635-D

U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY

CONTROL PLAN

TEMPORARY TRAFFIC

RTE. 0509GZ

-m il e

PCMS

(Before closure)

PCMS

(During closure) before ramp closure

Display sign 7 days

MON 5 AM

THRU

FRI 8 PM

CLOSED

BW PKWY

SB RAMP

TO CLOSE

BW PKWY

SB RAMP

DETOUR

FOLLOW

conditions as approved by the CO.

8. Final location and spacing of TTC devices may be changed to fit field

7. Replace damaged TTC devices as needed or as directed by the CO.

CO.

6. Limit lane closure to 1.5 miles at a time unless otherwise directed by the ramp) can be closed for construction at a time.

5. Unless otherwise indicated, only one ramp (either an entrance or an exit at the same time.

4. Do not perform work in both directions of the Baltimore-Washington Parkway

(work space), and the termination area.

1. Night work is permitted as approved by the CO. See Sections 108 and 156 for

NOTES:

-m il e

Work Area

R T E . 0

F Z

R T E . 0

C Z

R T E

B Z

RTE

EZ

RTE.

09AZ

R T E

D Z

R T

E . 0

H Z

R T E

B Z

R T E . 0

E Z

RTE. 0508CAZ

RTE

. 0

8DZ

RTE.0508FZ

RTE. 0508AZ

RTE.

09AZ

RTE

. 0

9GZ

OUTHS

M3-3

5 4

M6-1L

:2 u ly

N fh fl fi le s e rv e .f lh d

.f h w a .d o t.

g o v \d a ta

\P R

O J E

C T

S \b a w a \1

(9

(9

P ro j_

D e v

\C A

D D

\N P

B A

W A

\d g n \N

R

E V

-B A

W A

(9

T T

C .d g n

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) N07

T U

X E

N T F

W Y

G U

A R

D W

A

T U

X E

N T F

W Y

G U

A R

D W

A L L

CLOSED

EXIT

MD 175 E

PCMS

DETOUR

FOLLOW

M6-2R

M4-8

END

DETOUR

DETOUR

M4-8a

M6-3

M5-2R

Special sign

LEGEND:

1-m ile

1/2 -m ile

P C

M S

Work Area

West 32 Columbia"

"32 Fort Meade Exit 1/2 Mile the existing sign

Install next toWest 32 Columbia"

Exit 1/2 Mile

"32 Fort Meade

Existing sign

T U

X E

N T F

W Y R

O U

T E

Columbia"

"32 West the existing sign

Install next to

Columbia"

"32 West

Existing sign

R O

U T

E

P A

T U

X E

N T F

W Y R

O U

T E

U.S. DEPARTMENT OF TRANSPORTATION BALTIMORE - WASHINGTON PARKWAY

CONTROL PLAN

TEMPORARY TRAFFIC

RTE. 0510DZ

conditions as approved by the CO.

8. Final location and spacing of TTC devices may be changed to fit field

7. Replace damaged TTC devices as needed or as directed by the CO.

CO.

6. Limit lane closure to 1.5 miles at a time unless otherwise directed by the ramp) can be closed for construction at a time.

5. Unless otherwise indicated, only one ramp (either an entrance or an exit at the same time.

4. Do not perform work in both directions of the Baltimore-Washington Parkway

(work space), and the termination area.

1. Night work is permitted as approved by the CO. See Sections 108 and 156 for

NOTES:

NO SCALE

R T E . 0

C Z

RTE. 0509AZ

R T E

B Z

RTE

. 0

9E

Z

RTE.

09GZ

RTE.

9DZ

R T

E . 0

H Z

R T E . 0

F Z

R T E

D Z

R T E B Z

Z C

0 .

E T

RRTE. 0510AZ

R T E

D Z

Z

C0150 .ETR

R T E B Z

RTE. 0510AZ1

for full ramp closure

See Detail E635-D

ASTE

M3-2

:2 u ly

N fh fl fi le s e rv e .f lh d

.f h w a .d o t.

g o v \d a ta

\P R

O J E

C T

S \b a w a \1

(9

(9

P ro j_

D e v

\C A

D D

\N P

B A

W A

\d g n \N

-B A

W A

(9

T T

C .d g n

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) N08

E 617-A

:1

N o v e m b e r

D

M e tr ic D e s ig n

P R

O J E

C T

S \b a w a \1

(9

(9

P ro j_

D e v \C

A D

D \N

P B

A W

A

\d g n \S td \S

X

-M D

D o u b le

F a c e d G u a rd ra il

.d g n

DETAIL

OFFICE OF FEDERAL LANDS HIGHWAY

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

EFLHD DETAIL

GUARDRAIL SYSTEM G4

W BEAM MEDIAN BARRIER

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) S01A

NPS PMIS No. 250082, 236095 NPS Drwg No. 842/173717

E635-A

:0

J u n e

S

P R

O J E

C T

S \b a w a \1

(9

(9

P ro j_

D e v

\C A

D D

\N P

B A

W A

\d g n \S td \S

-A

R ig h t

L a n e C lo s u re d e ta il .d g n

DETAIL

OFFICE OF FEDERAL LANDS HIGHWAY

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

EFLHD DETAIL

RIGHT LANE CLOSURE

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) S25

E635-B

:1

J u n e

S

P R

O J E

C T

S \b a w a \1

(9

(9

P ro j_

D e v

\C A

D D

\N P

B A

W A

\d g n \S td \S

-A

R ig h t

L a n e C lo s u re d e ta il .d g n

DETAIL

OFFICE OF FEDERAL LANDS HIGHWAY

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

EFLHD DETAIL

ENTRANCE RAMP TREATMENT

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) S26

E635-C

:1

J u n e

S

P R

O J E

C T

S \b a w a \1

(9

(9

P ro j_

D e v

\C A

D D

\N P

B A

W A

\d g n \S td \S

-A

R ig h t

L a n e C lo s u re d e ta il .d g n

DETAIL

OFFICE OF FEDERAL LANDS HIGHWAY

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

EFLHD DETAIL

ENTRANCE RAMP TREATMENT

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) S27

E635-D

:1

J u n e

S

P R

O J E

C T

S \b a w a \1

(9

(9

P ro j_

D e v

\C A

D D

\N P

B A

W A

\d g n \S td \S

-A

R ig h t

L a n e C lo s u re d e ta il .d g n

DETAIL

OFFICE OF FEDERAL LANDS HIGHWAY

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

EFLHD DETAIL

FULL RAMP CLOSURE

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) S28

E635-E

:2

J u n e

S

P R

O J E

C T

S \b a w a \1

(9

(9

P ro j_

D e v

\C A

D D

\N P

B A

W A

\d g n \S td \S

-A

R ig h t

L a n e C lo s u re d e ta il .d g n

DETAIL

OFFICE OF FEDERAL LANDS HIGHWAY

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

EFLHD DETAIL

EXIT RAMP TREATMENT

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) S29

.7

.8

.7

.8

.7

BORDER

R=2.25"

TH=0.75"

.6

.2

.6

.8

.9

.9

.9

.8

.6

.2

.4

.8

.1

1.

.5

11" 39" 11"

1" 59" 1"

10" 40" 10"

5'-0"

Panel Style: BW-Pkwy Washington.ssi

M.U.T.C.D.: 2009 Edition

.7

.8

.7

.8

.7

BORDER

R=2.25"

TH=0.75"

.6

.2

.6

.8

.9

.9

.1

.8

.3

.9

.2

.6

.4

60" 1"

11" 2" 34" 2" 11"

5'-0"

Panel Style: BW-Pkwy Baltimore.ssi

M.U.T.C.D.: 2009 Edition

.7

.2

.5

.5

BORDER

R=2.25"

TH=0.75"

.6

.2

.2

.1

.5

.5

.1

.4

.3

.5

1" 47" 1"

7" 3" 29" 3" 7"

4'-0"

Panel Style: Maryland 198.ssi

M.U.T.C.D.: 2009 Edition

.2

.7

.5

.5

BORDER

R=2.25"

TH=0.75"

4 7 .8

.8

.8

.8

1.

.6

.2

4 19 .8

1" 35" 1"

4" 28" 4"

3'-0"

Panel Style: Maryland 32.ssi

M.U.T.C.D.: 2009 Edition

.7

.2

.5

.5

BORDER

R=2.25"

TH=0.75"

.6

.2

.2

.1

.5

.5

.1

.4

.7

.5

1" 47" 1"

7" 3" 29" 3" 7"

4'-0"

Panel Style: Maryland 175.ssi

M.U.T.C.D.: 2009 Edition

SPECIAL SIGN LAYOUT

CONTROL

TEMPORARY TRAFFIC

E635-F

NO SCALE

EFLHD DETAIL

:3

J u n e

S

P R

O J E

C T

S \b a w a \1

\P r o j_ D e v

\C A

D D

\N P

B A

W A

\d g n \S td \S

F

S p e c ia l S ig n s C o n s tr u c ti o n

.d g n

DETAIL

OFFICE OF FEDERAL LANDS HIGHWAY

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

STATE PROJECT

NUMBER

SHEET

MD NP BAWA 1(9), 2(9) S30

A01_NP BAWA 1(9) 2(9)_Title-A01-000
A02_NP BAWA 1(9) 2(9)_RIP-A02-000
A03_BAWA 1(9) 2(9)_sym-A03-000
A04_BAWA 1(9) 2(9)_sym-A04-000
A05_BAWA 1(9) 2(9)_Loc-A05-000
A06_BAWA 1(9) 2(9)_Loc-A06-000
A07_BAWA 1(9) 2(9)_Surv-A07-000
A08_BAWA 1(9) 2(9)_Surv-A08-000
B01_BAWA 1(9) 2(9)_Typ-B01-000
B02_BAWA 1(9) 2(9)_Typ-B02-000
B03_BAWA 1(9) 2(9)_Typ-B03-000
C01_NP BAWA 1(9) 2(9)_Qty-C01-000
C02_NP BAWA 1(9) 2(9)_Permanent Sign-C02-000
C03_NP BAWA 1(9) 2(9)_Permanent Sign & Sum-C03-000
C04_NP BAWA 1(9) 2(9)_Permanent Sign & Sum-C04-000
C05_NP BAWA 1(9) 2(9)_Permanent Sign & Sum-C05-000
C06_NP BAWA 1(9) 2(9)_Permanent Sign & Sum-C06-000
C07_NP BAWA 1(9) 2(9)_Permanent Sign & Sum-C07-000
C08_NP BAWA 1(9) 2(9)_Permanent Sign & Sum-C08-000
C09_NP BAWA 1(9) 2(9)_Permanent Sign & Sum-C09-000
C10_NP BAWA 1(9) 2(9)_Construction Sign-C10-000
D01_NP BAWA 1(9) 2(9)_CON_Rev-D01-000
D02_NP BAWA 1(9) 2(9)_CON-D02-000
D03_NP BAWA 1(9) 2(9)_CON-D03-000
D04_NP BAWA 1(9) 2(9)_CON-D04-000
D05_NP BAWA 1(9) 2(9)_CON-D05-000
D06_NP BAWA 1(9) 2(9)_CON-D06-000
D07_NP BAWA 1(9) 2(9)_CON-D07-000
D08_NP BAWA 1(9) 2(9)_CON-D08-000
D09_NP BAWA 1(9) 2(9)_CON-D09-000
D10_NP BAWA 1(9) 2(9)_CON-D10-000
D11_NP BAWA 1(9) 2(9)_CON-D11-000
D12_NP BAWA 1(9) 2(9)_CON_Rev-D12-000
D13_NP BAWA 1(9) 2(9)_CON-D13-000
D14_NP BAWA 1(10) 2(9)_CON-D14-000
D15_NP BAWA 1(11) 2(9)_CON-D15-000
D16_NP BAWA 1(11) 2(9)_CON-D16-000
D17_NP BAWA 1(12) 2(9)_CON-D17-000
D18_NP BAWA 1(14) 2(9)_CON-D18-000
D19_NP BAWA 1(15) 2(9)_CON-D19-000
D20_NP BAWA 1(16) 2(9)_CON-D20-000
D21_NP BAWA 1(17) 2(9)_CON-D21-000
D22_NP BAWA 1(18) 2(9)_CON-D22-000
D23_NP BAWA 1(19) 2(9)_CON-D23-000
D24_NP BAWA 1(20) 2(9)_CON-D24-000
E01_NP BAWA 1(12) 2(9)_Sign-E01 [Sheet]-000
E02_NP BAWA 1(12) 2(9)_Sign-E02 [Sheet]-000
E03_NP BAWA 1(12) 2(9)_Sign-E03 [Sheet]-000
E04_NP BAWA 1(12) 2(9)_Sign-E03 [Sheet]-000
E05_NP BAWA 1(12) 2(9)_Sign-E03 [Sheet]-000
E06_NP BAWA 1(12) 2(9)_Sign-E06 [Sheet]-000
E07_NP BAWA 1(12) 2(9)_Sign-E07 [Sheet]-000
E08_NP BAWA 1(12) 2(9)_Sign-E08 [Sheet]-000
E09_NP BAWA 1(12) 2(9)_Sign-E09 [Sheet]-000
M01_BAWA_1(9)_Narrative-M01-000
M02_BAWA_1(9)_Narrative-M02-000
M03_BAWA_1(9)_Narrative-M03-000
M04_BAWA_1(9)_Staging Area-M04-000
N01-BAWA_1(9)_TTC
N02-BAWA_1(9)_TTC-Untitled [Sheet]-000
N03-BAWA_1(9)_TTC-N03-000
N04-BAWA_1(9)_TTC-N04-000
N05-BAWA_1(9)_TTC-N05-000
N06_REV-BAWA_1(9)_TTC-Untitled [Sheet]-000
N07-BAWA_1(9)_TTC-N07-000
N08-BAWA_1(9)_TTC-N08-000
S01_st15702_detail-S01-000
S02_st61711_EFL_TEMP
S03_st61719_G4_EFL_TEMP
S04_st61720_EFL_TEMP-S04-000
S05_st61732_MGS_EFL_TEMP-S05-000
S06_st61737_MGS_EFL_TEMP-Sheet-000
S07_st63301_detail-S07-000
S08_st63302_detail-S08-000
S09_st63303_detail-S09-000
S10_st63304_detail-S10-000
S11_Special Signs_For-S-sheets-S11-000
S12_Special Signs_For-S-sheets-S12-000
S13_Special Signs_For-S-sheets-S13-000
S14_Special Signs_For-S-sheets-S14-000
S15_Special Signs_For-S-sheets-S15-000
S16_Special Signs_For-S-sheets-S16-000
S17_Special Signs_For-S-sheets-S17-000
S18_633-B_MD821_03-S18-000
S19_633-B_MD821_03-01-S19-000
S20_633-B_MD821_03-03-S20-000
S21_633-B_MD821_03-04-S21-000
S22_633-B_MD821_03-05-S22-000
S23_633-B_MD821_03-06-S23-000
S24_635-01_detail-S24-000
S25_635-A_Right Lane Closure_detail-S25-000
S26_635-B_Entrance Ramp Closure_detail
S27_635-C_Entrance Ramp Closure_detail
S28_635-D_ Exit Ramp Closure_detail
S29_635-E_Full Ramp Closure_detail
S30_635-F_Special Signs Construction-S30-000

File details come from the government source that posted it. Updated .