Plan.pdf
PDF 6 MB Posted
- Attached to
- 24-216870. OS. EVSE. CHICO. 13443
- Solicitation number
- 0000033080
About this file
This document contains plans and specifications for an electric vehicle supply equipment (EVSE) Level II charging station project at the California Department of Transportation (Caltrans) Chico Maintenance Station in District 3. The project entails installing dual-port and single-port EVSE pedestals, conduits, wiring, and related electrical infrastructure. The approved plans and details cover the project scope, equipment, site layout, grounding, and structural requirements. No procurement details, response deadlines, or contract term information is provided in the document. Pricing, funding sources, incumbent contractors, or set-asides are also not mentioned.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFBI__1.pdf | ||
| Project_Manual.pdf | ||
| Bid_Package_Documents.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2535 NOTRE DAME BLVD
CHICO, CA 95928
State of California
Department of General Services
Real Estate Services Division
PROJECT MANAGEMENT AND DEVELOPMENT BRANCH
Architecture & Engineering Section
707 Third Street, Suite 4-105
West Sacramento, California 95605
Sina Roudbari
(279) 799-4343 Phone Sina.Roudbari@dgs.ca.gov
EVSE LEVEL II - CDOT
CHICO MAINTENANCE
STATION, DISTRICT 3
WP JA LG KK
000000000013443
V2
TITLE SHEET
E1.0
CODES AND PREFERENCES SHEET INDEX
SYMBOLS AND ABBREVIATIONS
EVSE DESCRIPTION SCOPE OF WORK
EXISTING EVSE SPACES NEW EVSE SPACES
FLEET WORKPLACE WORKPLACEFLEET
PROJECT LOCATION
PROJECT WORK
AREA - FLEET
PARKING
SFM PROJECT NUMBER: 24-1784
SHEET COUNT: 9 SHEETS TOTAL
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
07/05/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
24-1784
ISSUE DATE:07/05/2024
07/05/2024
VOLTAGE DROP CALCS
CONDUIT/CABLE SCHEDULE
(E) PANEL 400A, 120/208V 3 PHASE, 4 WIRES
400A
(E)
TO (E) UTILITY
(E)
PB-EV
PB-EV PANEL SCHEDULE
100A
(E)
100A
(E)
100A
(E)
100A
(E)
70A
(E)
50A
(E)
100A
(E)
100A
(E)
50A
(E)
20A
(E)
2535 NOTRE DAME BLVD
CHICO, CA 95928
State of California
Department of General Services
Real Estate Services Division
PROJECT MANAGEMENT AND DEVELOPMENT BRANCH
Architecture & Engineering Section
707 Third Street, Suite 4-105
West Sacramento, California 95605
Sina Roudbari
(279) 799-4343 Phone Sina.Roudbari@dgs.ca.gov
EVSE LEVEL II - CDOT
CHICO MAINTENANCE
STATION, DISTRICT 3
WP JA LG KK
000000000013443
V2
SINGLE LINE DIAGRAM
AND PANEL SCHEDULES
E1.1
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
07/05/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
24-1784
D R
A W
IN
G
L
IM
IT
S
D R
A W
IN
G
L
IM
IT
S
N E1.2
AS NOTED
ELECTRICAL PLAN
2535 NOTRE DAME BLVD
CHICO, CA 95928
State of California
Department of General Services
Real Estate Services Division
PROJECT MANAGEMENT AND DEVELOPMENT BRANCH
Architecture & Engineering Section
707 Third Street, Suite 4-105
West Sacramento, California 95605
Sina Roudbari
(279) 799-4343 Phone Sina.Roudbari@dgs.ca.gov
EVSE LEVEL II - CDOT
CHICO MAINTENANCE
STATION, DISTRICT 3
WP JA LG KK
000000000013443
DRAWING LIMITS
DRAWING LIMITS
V1V1 V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
07/05/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
SPECIAL INSPECTIONS REQUIRED
CONCRETE CONSTRUCTION:
STEEL CONSTRUCTION:
GENERAL NOTES:
2535 NOTRE DAME BLVD
CHICO, CA 95928
State of California
Department of General Services
Real Estate Services Division
PROJECT MANAGEMENT AND DEVELOPMENT BRANCH
Architecture & Engineering Section
707 Third Street, Suite 4-105
West Sacramento, California 95605
Sina Roudbari
(279) 799-4343 Phone Sina.Roudbari@dgs.ca.gov
EVSE LEVEL II - CDOT
CHICO MAINTENANCE
STATION, DISTRICT 3
WP JA LG KK
E2.0
NONE
GENERAL NOTES
V1
000000000013443
V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
07/05/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
CONDUIT TRENCH HANDHOLES
PERMANENT BOLLARD
E2.1
NONE
ELECTRICAL DETAILS
2535 NOTRE DAME BLVD
CHICO, CA 95928
State of California
Department of General Services
Real Estate Services Division
PROJECT MANAGEMENT AND DEVELOPMENT BRANCH
Architecture & Engineering Section
707 Third Street, Suite 4-105
West Sacramento, California 95605
Sina Roudbari
(279) 799-4343 Phone Sina.Roudbari@dgs.ca.gov
EVSE LEVEL II - CDOT
CHICO MAINTENANCE
STATION, DISTRICT 3
WP JA LG KK
CONDUIT STUB-UP
1" MIN., 2" MAX. FROM
SOIL. CONDUCTOR SHALL BE
CONTINUOUS.
#4/0 AWG BARE COPPER.
SLAB CONSTRUCTION
BARE COPPER CONDUCTOR
REFERENCE GROUND BUS
MAIN BUILDING
20 FEET MIN. #4/0
RIGID NON-METALLIC CONDUIT
BARRIER PROHIBITED
BED OR VAPOR
W/EARTH; DRY GRAVEL
IN DIRECT CONTACT
CONC. FOUNDATION
2" MIN
BOND TO GROUND RING 36" BELOW GRADE
UNLESS OTHERWISE NOTED.
G G G G G G G
G
UFER GROUNDING ELECTRODE
BOND TO GROUND RING.
V1
000000000013443
V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
07/05/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
4' LONG WHEEL STOP
FLEET EVSE SIGNAGE
E2.2
NONE
ELECTRICAL DETAILS
2535 NOTRE DAME BLVD
CHICO, CA 95928
State of California
Department of General Services
Real Estate Services Division
PROJECT MANAGEMENT AND DEVELOPMENT BRANCH
Architecture & Engineering Section
707 Third Street, Suite 4-105
West Sacramento, California 95605
Sina Roudbari
(279) 799-4343 Phone Sina.Roudbari@dgs.ca.gov
EVSE LEVEL II - CDOT
CHICO MAINTENANCE
STATION, DISTRICT 3
WP JA LG KK
PANEL BOARD SUPPORT DETAIL
16302
ELECTRICAL
EQUIPMENT FOUNDATION
CORE DRILLED CONDUIT PENETRATION
GROUND WELL
EVSE PARKING SPACE
GROUND ROD CONNECTION
V1
000000000013443
V1V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
07/05/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
E2.3
NONE
ELECTRICAL DETAILS
2535 NOTRE DAME BLVD
CHICO, CA 95928
State of California
Department of General Services
Real Estate Services Division
PROJECT MANAGEMENT AND DEVELOPMENT BRANCH
Architecture & Engineering Section
707 Third Street, Suite 4-105
West Sacramento, California 95605
Sina Roudbari
(279) 799-4343 Phone Sina.Roudbari@dgs.ca.gov
EVSE LEVEL II - CDOT
CHICO MAINTENANCE
STATION, DISTRICT 3
WP JA LG KK
000000000013443
1. UNISTRUT P1000 CHANNEL, 12GA., 1.625''SQ. x
LENGTH AS REQUIRED.
2. SECURE TO METAL STUD WITH #14 SMS, MINIMUM OF
ONE PER 6''. MINIMUM OF 3.
3. UNISTRUT P2543, 18'' LONG. SECURE TO SUPPORT
CHANNELWITH (2) 1/4'' BOLTS.
4. UNISTRUT P1000 CHANNEL, LENGTH AS REQUIRED.
SECURE TO METAL STUD WITH (4) #14 SMS.
5. TYPICAL - CONDUIT WITH CONDUIT STRAP TO
SUPPORT CHANNEL. STRAPS TO BE UNISTRUT
P1425-P1431, AND P1118-P1121.
6. METAL STUD WALL 18 GA MIN., WITH OR W/O
SHEETROCK, (1) 5/8'' GYP. LAYER MAX.
NOTES: LEGEND:
1. SUPPORTS TO BE MAXIMUM 10FT. ON CENTER.
2. THE WEIGHT ON EACH SUPPORT SHALL NOT
EXCEED 100LBS. OR 10LBS PER FOOT.
3. WHERE WEIGHTS MAY BE EXCEEDED SHORTEN
THE SPACING BETWEEN SUPPORTS.
6''
1 5/8'' 18''
6''
6''
6''
6''
A
3'' WIDE X 14GA. BENT PL W/
(3) #14 SMS TO STUD AND
(2) #14 SMS TO STRUT.
45 DEG. +/- 15
DEG. MAX.
VERTICAL ON
WALL
SIDE VIEW ON
WALL
SECTION A
11030
PENETRATIONS (TYPICAL)
NONE
11030
WALL CONDUIT SUPPORT
NONE
V1V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
07/05/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
S1.0
V1
2535 NOTRE DAME BLVD,
CHICO, CA 94964
State of California
Department of General Services
Real Estate Services Division
PROJECT MANAGEMENT AND DEVELOPMENT BRANCH
Architecture & Engineering Section
707 Third Street, Suite 4-105
West Sacramento, California 95605
Sina Roudbari 279 799-4343 Phone Sina.Roudbari@dgs.ca.gov
-KPM AM JA
EVSE LEVEL II
DGS - CDOT
MAINTENANCE STATION
DEPARTMENT OF
GENERAL SERVICES
1 LEVEL 2 EVSE DUAL PORT PEDESTAL
NONE
FINISHED GRADE
24"W x 24"L x 24"D
4000 PSI
INSTALL FLUSH WITH
FINISHED PAVED OR
CONCRETE SURFACES.
INSTALL 4" ABOVE
FINISHED GRADE IN
UNPAVED AND
LANDSCAPING AREAS.
CHARGEPOINT LEVEL 2
CP6000 SERIES
PEDESTAL CHARGER
CONDUIT
NATIVE SOIL
CONCRETE PAD
SECTION
3" COVER
(TYP.)
CONCRETE PAD
PLAN VIEW
0.63"Ø ANCHOR BOLTS
(TYP. 3)
CONDUIT
ENTRY
CONCRETE MOUNTING TEMPLATE
ENLARGED PLAN VIEW
CHARGEPOINT LEVEL 2 PEDESTAL CHARGER
ELEVATION VIEW
GENERAL NOTES:
STRUCTURAL DETAILS
6 - #4 @ 3.6" O.C. EA. WAY
TOP & BOTTOM
09-30-2224
2-28-24
000000000013443
V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
07/05/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
S2.0
V1
2535 NOTRE DAME BLVD,
CHICO, CA 94964
State of California
Department of General Services
Real Estate Services Division
PROJECT MANAGEMENT AND DEVELOPMENT BRANCH
Architecture & Engineering Section
707 Third Street, Suite 4-105
West Sacramento, California 95605
Sina Roudbari 279 799-4343 Phone Sina.Roudbari@dgs.ca.gov
-KPM AM JA
EVSE LEVEL II
DGS - CDOT
MAINTENANCE STATION
DEPARTMENT OF
GENERAL SERVICES
1 LEVEL 2 EVSE SINGLE PORT PEDESTAL
NONE
FINISHED GRADE
24"W x 24"L x 24"D
4000 PSI
INSTALL FLUSH WITH
FINISHED PAVED OR
CONCRETE SURFACES.
INSTALL 4" ABOVE
FINISHED GRADE IN
UNPAVED AND
LANDSCAPING AREAS.
CHARGEPOINT LEVEL 2
CP6000 SERIES
PEDESTAL CHARGER
CONDUIT
NATIVE SOIL
CONCRETE PAD
SECTION
3" COVER
(TYP.)
CONCRETE PAD
PLAN VIEW
0.63"Ø ANCHOR BOLTS
(TYP. 3)
CONDUIT
ENTRY
CONCRETE MOUNTING TEMPLATE
ENLARGED PLAN VIEW
CHARGEPOINT LEVEL 2 PEDESTAL CHARGER
ELEVATION VIEW
GENERAL NOTES:
STRUCTURAL DETAILS
6 - #4 @ 3.6" O.C. EA. WAY
TOP & BOTTOM
09-30-2224
2-28-24
000000000013443
V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
07/05/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
| E1.0 TITLE SHEET |
| E1.1 SINGLE LINE DIAGRAM AND PANEL SCHEDULES |
| E1.2 ELECTRICAL PLAN |
| E2.0 GENERAL NOTES |
| E2.1 ELECTRICAL DETAILS |
| E2.2 ELECTRICAL DETAILS |
| E2.3 ELECTRICAL DETAILS |
| S1.0 STRUCTURAL DETAILS |
| S2.0 STRUCTURAL DETAILS |
File details come from the government source that posted it. Updated .