Pipe Layout Picture.jpg
JPG image 104 KB Posted
- Attached to
- IPD STL - Holding Tank Replacement
- Solicitation number
- 70Z02925QNEWO0026
About this file
The image depicts an industrial piping layout with three key components: a 4-in to 3-in reducer coupling with 8 bolt holes, an eccentric plug valve from the Milliken Millcentric Series 601, and an inline check valve from the Tideflex Tech Series 39. Multiple metal chains are visible, suggesting the components are suspended or secured in place.
This image is associated with a United States Coast Guard Base solicitation (70Z02925QNEWO0026) for a Holding Tank Replacement project in St. Louis, Missouri. The small business set-aside contract seeks a contractor to remove and replace existing discharge piping for two wastewater pumps, including associated valves, hardware, and gaskets. The project is valued between $25,000 and $100,000, with a firm-fixed price contract to be awarded to the lowest price technically acceptable bidder. Mandatory site visits and SAM.gov registration are required for potential contractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment A_IPD.docx | DOCX document | |
| 70Z02925QNEWO0026_0_US.pdf | ||
| 2025 Floating Pier Sewage SSMR SoW.doc | DOC document | |
| Attachment B.pdf | ||
| Pier Sewage Lift Station BP.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .