The document is a set of engineering and construction plans for the Pineland Trail project, prepared by Infrastructure Consulting & Engineering, PLLC for Calhoun County, South Carolina. The project involves paving a dirt road (Pineland Trail) from station 11+00.00 to 31+98.55, spanning approximately 2.1 miles. The plans include detailed design specifications, typical road cross-sections, right-of-way data, erosion control measures, and construction details. The project involves roadway construction with a 20-foot travelway, 10-foot lanes, 4-foot grassed shoulders, and a 6-inch uniform graded aggregate base course topped with hot mix asphalt surface course.
The project scope includes multiple construction elements such as clearing and grubbing, excavation, fine grading, drainage infrastructure (including infiltration ditches and culverts), pavement installation, and erosion control measures. The estimated quantities include 5,873 square yards of fine grading, 5,513 square yards of graded aggregate base course, 50 tons of maintenance stone, 50 tons of hot mix asphalt surface course Type C, and various other materials and quantities. The project will require right-of-way acquisitions from 21 different property owners, with most parcels requiring drainage easements. The design follows South Carolina Department of Transportation standard specifications and includes specific provisions for utility protection, sediment control, and environmental compliance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 23-153.01_PineLandTrail DirtRd Paving_10302025 (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NPDES PERMIT INFORMATION
APPROXIMATE LOCATION OF ROADWAY IS
BEGIN
END
LATITUDE
LONGITUDE
LATITUDE
LONGITUDE
NET LENGTH OF ROADWAY
NET LENGTH OF PROJECT
LENGTH OF EXCEPTIONS
GROSS LENGTH OF PROJECT
LAYOUT
EQUALITIES IN STATIONING
YES / NO
RAILROAD INVOLVEMENT?
MILES
MILES
MILES
MILES
MILES
INDEX OF SHEETS
Z
P r o j e c t s
C a lh o u n o
O
C a ll
.0
P in e la d
T r a il
R o a d w a y
P L
A N
S
S H
T 1_
T
IT
L E S
H E
E T
.d g n
NO.
SHEET
SHEETS
TOTAL
NOT TO SCALE
SOUTH CAROLINA
3 DAYS BEFORE DIGGING IN
ALL UTILITIES MAY NOT BE A MEMBER OF SC811
WWW.SC811.COM
SOUTH CAROLINA 811 (SC811)
CALL 811
provided by:
Hydraulic and NPDES Design
CONSULTING & ENGINEERING
INFRASTRUCTURE
NONE
SHEET NO
DESCRIPTION
TITLE SHEET
TYPICAL SECTIONS
PLAN AND PROFILE SHEETS
SHEET SUB-TOTALS
ACRESPERMITTED AREA =
DISTURBED AREA = ACRES
0.398
6-10 5
3 1
SUMMARY OF ESTIMATED QUANTITIES
-N-
CONSULTING ENGINEERING FIRM
FOR CONSTRUCTION :
DATE
ENGINEER OF RECORD
X1-X5 CROSS SECTIONS 5
NET LENGTH OF SIDEWALK
B E G
IN
END
0.398
0.398
80 33' 05.62'' W
33 34' 17.05'' N
80 33' 23.75'' W
33 34' 19.12'' N
CALHOUN COUNTY
PROPOSED PLANS
PINELAND TRAIL
CTC DIRT ROAD PAVING 2023
FOR CALHOUN COUNTY
SEE SHEETS 6-10
END STA. 31+98.55
PINELAND TRAIL
15A REFERENCE DATA SHEET
GENERAL CONSTRUCTION NOTES
DETAIL SHEETS
APPROVED FOR CONSTRUCTION:
ADMINISTRATOR
CALHOUN COUNTY Date
Calhoun County
Designs may be obtained from
14A
411-14
R
I I
F
ETA
C
T R
E C
UAFO
O
HT
Z I
N O
I T
A
NO
S
HT
U
RAC
IL
O
A
S O
U
TH CAROL
IN
A
L I
E N
S E
D
P
R O
FESSION
N
G
IN
E E
R
INFRASTRUCTURE
CONSULTING &
ENGINEERING,
PLLC
No. 4470
C
No. 34113
B
RANDON W. P
AYN
E
1.423
3.423
EROSION CONTROL NOTESEC1-EC3
RIGHT-OF-WAY DATA SHEET
PROPERTY STRIP MAP
SEE SHEETS 6-10
BEGIN PROJECT STA. 11+00.00
PINELAND TRAIL
25TOTAL
1XP1 PIPE CROSS SECTIONS
EXCEPT AS MAY OTHERWISE BE SPECIFIED ON THE PLANS OR IN THE SPECIAL
PROVISIONS, ALL MATERIALS AND WORKMANSHIP ON THIS PROJECT SHALL CONFORM
TO THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD
SPECIFICATIONS FOR HIGHWAY CONSTRUCTION (2025 EDITION) AND THE STANDARD
DRAWINGS FOR ROAD CONSTRUCTION IN EFFECT AT THE TIME OF LETTING.
NOTE:
SUMMARY OF ESTIMATED QUANTITIES
STATE COUNTY
REV. NO. DATE DESCRIPTION OF REVISIONBY
SUMMARY OF ESTIMATED QUANTITIES
DIV. NO.
FED. RD.
ROUTE NO.
ROAD
NO.
PROJECT ID
NO.
SHEET
u s e r ll
.0
P in e la a il
R o a d w a y
P L
A N
S
S H
T
S u m m a y f
Q a n t it ie s .d g n
S.C.3
CALHOUN COUNTY
PINELAND TRAIL
R
I I
F
ETA
C
T R
E C
UAFO
O
HT
Z I
N O
I T
A
NO
S
HT
U
RAC
IL
O
A
S O
U
TH CAROL
E N
S
O
FESSION
G
IN
E E
R
INFRASTRUCTURE
CONSULTING &
ENGINEERING,
PLLC
No. 4470
C
No. 34113
B
RANDON W. P
AYN
E
CALHOUN TRAIL
PINELAND
Z
P r o j e c t s lh o
C a ll
.0
P in e la a il
R o a d w a y
P L
A N
S
S H
T .d g n
FED. RD. SHEET
STATE COUNTY
DIV. NO. NO. NO.
ROAD / ROUTE
MPH FROM STA. TO STA
EXCEPTIONS TO DESIGN SPEED
REV. NO. DATE DESCRIPTION OF REVISIONBY
SCALE: 1" = NTS
PROJECT ID
3 SC
TYPICAL SECTIONS
LEGEND
GRADED AGGREGATE BASE COURSE (6" UNIFORM)
31+98.5525
CALHOUN
L
0.5'
12:1
0.5'
GROUND
EXISTING
12:1
LANES
10'
20' TRAVELWAY
LANES
10'
VARIES2:1
SHOULDER
GRASSED
4'
SHOULDER
GRASSED
4'
C
PINELAND TRAIL
11+00.00
CALHOUN COUNTY CTC
(175 PSY)
HOT MIX ASPHALT SURFACE COURSE TYPE C
TRAIL
PINELAND
GROUND
EXISTING
4:
DITCH
4'
4:1 MAX.
USE THIS SECTION ON
50:1 50:1
R
I I
F
ETA
C
T R
E C
UAFO
O
HT
Z I
N O
I T
A
NO
S
HT
U
RAC
IL
O
A
S O
U
TH CAROL
E N
S
O
FESSION
G
IN
E E
R
INFRASTRUCTURE
CONSULTING &
ENGINEERING,
PLLC
No. 4470
C
No. 34113
B
RANDON W. P
AYN
E
STATION 11+00.00 TO STATION 31+98.55PINELAND TRAIL
PGL
FOR MORE INFORMATION
SEE CROSS SECTIONS
DRAINAGE PURPOSES.
SLOPE MAY VARY FOR*
SCDOT ROW FROM STATION 31+76.68 TO STATION 31+98.55
AND GRADED AGGREGATE BASE COURSE (6" UNIFORM) WITHIN
USE A PAVEMENT DESIGN OF 4" HMA SURFACE COURSE TYPE C
NOT TO SCALE
RIGHT-OF-WAY DATA SHEET
RIGHT-OF-WAY DATA SHEET
REV. NO. DATE DESCRIPTION OF REVISIONBY
Z
P r o j e c t s lh o
C a ll
.0
P in e la a il
R o a d w a y
P L
A N
S
S H
T .d g n
FED. RD. SHEET
STATE COUNTY
DIV. NO. NO.
3 SC
NO.
ROAD / ROUTEPROJECT ID
CALHOUN COUNTY
CALHOUN
PINELAND TRAIL
TRAIL
FOR INFORMATION ONLY
-N-
PINELAND TRAIL
P
IN
E
LA
N D
TR
A
IL
D
IN
KY
C T
P
IN
E
LA
N D
TR
A
IL
P A
U L
IN
G S
C H E S S
R O
A D
D A
T E
F
IL
E
.3
P R
E S
E N
T
R
W
T E
E
.3
P R
E S
E N
T
R e s
R
W
(S
C D il e
.3
P r e s
R
W
(S
C D
EASEMENT
PRESCRIPTIVE
PRESENT
EASEMENT
PRESCRIPTIVE
PRESENTEASEMENT
PRESCRIPTIVE
PRESENT
FOR ROAD
5' RESEREVED
4A
PROPERTY STRIP MAP
N E
W
' R
W
N E
W
' R
W
N E
W
0' R
W
N E
W
0' R
W
N E
W
' R
W
P L
=N E
W
R
W
NE
W
' R
/W NEW 20' R/W
NEW 20' R/W
F E R R E T D
R
T
V
A D
(S
REV. NO. DATE DESCRIPTION OF REVISIONBY
Z
P r o j e c t s lh o
C a ll
.0
P in e la a il
R o a d w a y
P L
A N
S
S H
T
A .d g n
FED. RD. SHEET
STATE COUNTY
DIV. NO. NO.
3 SC
NO.
ROAD / ROUTEPROJECT ID
SCALE: 1" = 100'
CALHOUN COUNTY
CALHOUN
0 100 400300200
SCALE IN FEET
PINELAND TRAIL
TRAIL
-N-
5A
Ending chain PINELAND description Point P104 N 632,661.8061 E 2,136,580.4619 Sta 32+08.86
Course from P103 to P104 S 84° 17' 34.69" E Dist 159.9093
Point P103 N 632,677.7078 E 2,136,421.3453 Sta 30+48.95
Course from PT PINELAND-4 to P103 S 83° 54' 44.55" E Dist 106.5268
LG-PT=0.78%
LG-PC=0.78%
e=3.8% eMAX=6%
DS=25 MPH
Chord Bear = N 71° 30' 48.76" E Ahead = S 83° 54' 44.55" E Back = N 46° 56' 22.07" E C.C. N 632,490.1327 E 2,136,294.2093 P.T. Station 29+42.42 N 632,689.0049 E 2,136,315.4191 P.C. Station 27+70.86 N 632,636.2593 E 2,136,157.6551 Mid. Ord. = 18.1151 Long Chord = 166.3478 External = 19.9193 Radius = 200.0000 Length = 171.5594 Tangent = 91.4577 Degree = 28° 38' 52.40" Delta = 49° 08' 53.38" (RT) P.I. Station 28+62.32 N 632,698.7039 E 2,136,224.4772 Curve PINELAND-4 Curve Data
Course from P102 to PC PINELAND-4 N 46° 56' 22.07" E Dist 142.0467
Point P102 N 632,539.2739 E 2,136,053.8712 Sta 26+28.82
Course from P101 to P102 N 44° 53' 31.54" E Dist 491.7507
Point P101 N 632,190.8994 E 2,135,706.8064 Sta 21+37.07
Course from PT PINELAND-3 to P101 S 48° 15' 56.13" E Dist 464.0064
LG-PT=0.78%
LG-PC=0.78%
e=N/A eMAX=N/A
DS=25 MPH
Chord Bear = S 41° 38' 23.20" E Ahead = S 48° 15' 56.13" E Back = S 35° 00' 50.27" E C.C. N 633,149.0061 E 2,135,939.6873 P.T. Station 16+73.06 N 632,499.7786 E 2,135,360.5469 P.C. Station 14+71.84 N 632,649.8209 E 2,135,227.1467 Mid. Ord. = 5.8108 Long Chord = 200.7693 External = 5.8499 Radius = 870.0000 Length = 201.2175 Tangent = 101.0597 Degree = 6° 35' 08.60" Delta = 13° 15' 05.86" (LT) P.I. Station 15+72.90 N 632,567.0518 E 2,135,285.1323 Curve PINELAND-3 Curve Data
LG-PT=0.78%
LG-PC=0.78%
e=N/A eMAX=N/A
DS=25 MPH
Chord Bear = S 39° 05' 47.37" E Ahead = S 35° 00' 50.27" E Back = S 43° 10' 44.46" E C.C. N 632,150.6358 E 2,134,514.6061 P.T. Station 14+71.84 N 632,649.8209 E 2,135,227.1467 P.C. Station 13+47.86 N 632,745.9594 E 2,135,149.0268 Mid. Ord. = 2.2076 Long Chord = 123.8762 External = 2.2132 Radius = 870.0000 Length = 123.9811 Tangent = 62.0957 Degree = 6° 35' 08.60" Delta = 8° 09' 54.19" (RT) P.I. Station 14+09.96 N 632,700.6781 E 2,135,191.5177 Curve PINELAND-2 Curve Data
LG-PT=0.78%
LG-PC=0.78%
e=N/A eMAX=N/A
DS=25 MPH
Chord Bear = S 40° 05' 00.03" E Ahead = S 43° 10' 44.46" E Back = S 36° 59' 15.61" E C.C. N 634,312.9608 E 2,136,818.9390 P.T. Station 13+47.86 N 632,745.9594 E 2,135,149.0268 P.C. Station 11+00.40 N 632,935.1981 E 2,134,989.7671 Mid. Ord. = 3.3417 Long Chord = 247.3357 External = 3.3466 Radius = 2,290.0000 Length = 247.4560 Tangent = 123.8486 Degree = 2° 30' 07.20" Delta = 6° 11' 28.85" (LT) P.I. Station 12+24.25 N 632,836.2722 E 2,135,064.2797 Curve PINELAND-1 Curve Data Course from P100 to PC PINELAND-1 S 36° 59' 15.61" E Dist 100.4039
Point P100 N 633,015.3972 E 2,134,929.3598 Sta 10+00.00
Beginning chain PINELAND description
CP 11
CP 5
CP 6
CP 7
CP 13
CP 8
CP 9
CP 12
CP 10
CP 1
CP 2
CP 3
CP 4
DATUM DESCRIPTION
NOTES:
PO
T
ST
A.
.0
PC
S
TA.
.4
PR
C
S
TA
.8
PR
C
ST
A.
.8
P T
S T A
.0
P I S
T A
1+
.0
PI S
TA
26+ 28.82
P C
S T A
.8
P T
S
T A
.4
P I S
T A
.9
P O
T
S
T A
.8
C
U R V E -1
C U
R V E -2
C U
R V E -3
CURVE-4
REV. NO. DATE DESCRIPTION OF REVISIONBY
Z
P r o j e c t s lh o
C a ll
.0
P in e la a il
R o a d w a y
P L
A N
S
S H
T
A .d g n
FED. RD. SHEET
STATE COUNTY
DIV. NO. NO.
3 SC
NO.
ROAD / ROUTEPROJECT ID
SCALE: 1" = 100'
CALHOUN COUNTY
CALHOUN
REFERENCE DATA SHEET
0 100 400300200
SCALE IN FEET
PINELAND TRAIL
TRAIL
PINELAND
R
I I
F
ETA
C
T R
E C
UAFO
O
HT
Z I
N O
I T
A
NO
S
HT
U
RAC
IL
O
A
S O
U
TH CAROL
E N
S
O
FESSION
G
IN
E E
R
INFRASTRUCTURE
CONSULTING &
No. 4470C
No. 34113
B
RANDON W. P
AYN
ENGINEERING, LLC
GENERAL CONSTRUCTION NOTES
NTS
GENERAL CONSTRUCTION NOTES
FINE GRADING SY
ROADWAY INCIDENTAL ITEMS
4011004 TON
SYGRADED AGGREGATE BASE COURSE (6" UNIFORM)
DIRECTED BY ENGINEER)
(ADDITIONAL DRIVEWAYS AS
DIRECTED BY ENGINEER)
(ADDITIONAL DRIVEWAYS ASTONHOT MIX ASPHALT SURFACE COURSE TYPE D 10
1031000
2081001
3050106
4030350
(INCIDENTAL TO ITEM 4030350)
1032010
CONSTRUCTION STAKES, LINES & GRADES1050800
MOBILIZATION
BONDS AND INSURANCE
LS
LS
NEC
NEC
2012000
2023000
CLEARING AND GRUBBING WITHIN ROADWAY (AND OUTFALLS) NEC LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT SY
ANY DAMAGES TO THE ROADS AND/OR UTILITIES DUE TO NONCOMPLIANCE OF WEIGHT LIMIT REGULATIONS.
HAULING EQUIPMENT AND/OR MATERIALS TO AND FROM THIS SITE. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR
16. THE CONTRACTOR SHALL ADHERE TO THE WEIGHT LIMITS PRESCRIBED ON SCDOT/COUNTY MAINTAINED ROADS FOR
CONTRACTOR SHALL COORDINATE ANY TEMPORARY MAILBOX RELOCATIONS WITH UNITED STATES POSTAL SERVICE.
CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ACCESS FOR MAIL SERVICE DURING CONSTRUCTION. IF NECESSARY,15.
CONFLICTS WITH THE CONSTRUCTION TRAFFIC CONTROL SIGNAGE SHALL BE COVERED OR TEMPORARILY REMOVED.
BE RELOCATED SHALL BE ERECTED IN A TEMPORARY MANNER THAT DOES NOT IMPEDE TRAFFIC FLOW. ANY SIGN MESSAGE THAT
NECESSARY TO PERFORM THE WORK. IF ROADWAY REMAINS OPEN TO TRAFFIC DURING CONSTRUCTION, ALL SIGNS THAT ARE TO
ALL EXISTING ROADWAY SIGNAGE SHALL BE RELOCATED, REUSED OR REPLACED AS INDICATED ON THE PLANS OR AS DEEMED14.
TO PROVIDE ACCESS TO ALL PUBLIC ROADS AND RESIDENTIAL ENTRANCES AT ALL TIMES.
CONSTRUCTION BY PROVIDING A REASONABLY SMOOTH AND EVEN SURFACE SATISFACTORY FOR THE USE OF PUBLIC TRAFFIC AND
THE CONTRACTOR WILL BE RESPONSIBLE FOR THE MAINTENANCE OF TRAFFIC THROUGHOUT THE ENTIRE PERIOD OF13.
TO COMPLETE THE WORK, UNLESS OTHERWISE STATED.
THE ASPHALT OVERLAY AREA. THIS WORK SHALL BE CONSIDERED INCIDENTAL TO THE FINAL ASPHALT PAVEMENT ITEM NECESSARY
THE CONTRACTOR SHALL ADJUST TO GRADE ALL EXISTING MANHOLES, VALVE BOXES, OR OTHER UTILITIES LOCATED WITHINE.
CONSTRUCTION. CONTRACTOR SHALL ENSURE COMPACTION IN ALL UTILITY LOCATIONS.
ALL UNDERGROUND UTILITIES AND/OR CONDUITS AT PAVED AREAS MUST BE IN PLACE PRIOR TO THE PAVEMENT BASED.
RELOCATED. NEW LOCATIONS SHALL BE AS SHOWN IN THESE CONTRACT PLANS.
THIS WORK SHALL BE INCIDENTAL TO THE PERTINENT PAY ITEMS. PORTIONS OF THE UTILITIES SHOWN ON THE PLANS MAY BE
AUTHORIZED BY THE ENGINEER. THE CONTRACTOR SHALL SUPPORT EXISTING UNDERGROUND UTILITIES DURING CONSTRUCTION.
THE CONTRACTOR SHALL PROTECT AND NOT INTERRUPT EXISTING UTILITY SERVICES DURING CONSTRUCTION, UNLESSC.
SHALL BE MADE AT NO ADDITIONAL COST TO THE COUNTY OR PROPERTY OWNER.
REPAIRS TO UTILITIES OR PROPERTY DAMAGE AS A RESULT OF CONTRACTOR NEGLIGENCE OR METHOD OF OPERATIONB.
COMPLETED AS PART OF THE PROJECT.
ACTIVE UNDERGROUND UTILITIES UNLESS OTHERWISE NOTED ON THE PLANS. NO S.U.E. OR VERTICAL LOCATIONS HAVE BEEN
COORDINATION WILL BE THE CONTRACTORS RESPONSIBILTIY AS WELL.THE CONTRACTOR MUST PROTECT, IN PLACE, ALL
STAKEOUT OF UTILITIES AT LEAST 3 DAYS PRIOR TO STARTING CONSTRUCTION. AFTER CONSTRUCTION BEGINS UTILITY
ONLY AND SHOULD NOT BE CONSIDERED AS COMPLETE OR ACCURATE. THE CONTRACTOR SHALL NOTIFY PUPS TO ARRANGE
THE LOCATIONS OF UNDERGROUND AND AERIAL UTILITIES SHOWN ON THE PLANS ARE FOR INFORMATIONAL PURPOSESA.
UTILITIES:12.
AND YARDS IN CONFORMANCE WITH THE PROPOSED DRAINAGE PATTERNS ON THE PLANS.
THE CONTRACTOR SHALL GRADE FOR POSITIVE DRAINAGE AT ALL ROADWAY INTERSECTIONS, ENTRANCES, PARKING LOTS,11.
COMPLETION OF THE WORK.
THE CONTRACTOR SHALL REMOVE ALL SEDIMENT AND DEBRIS FROM ALL PIPES WITHIN THE PROJECT LIMITS UPON10.
THE LOCATION AND LENGTH OF PIPE SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO ORDERING.9.
OTHERWISE DIRECTED BY THE ENGINEER.
AND PIPES SHALL BE CONSTRUCTED ON UNIFORM GRADE BETWEEN INVERT ELEVATIONS AS NOTED ON PLANS, UNLESS
THE ENGINEER TO MEET THE CONDITIONS ENCOUNTERED DURING INSTALLATION OF DRAINAGE STRUCTURES. ALL DITCHES
ALL INVERT ELEVATIONS ARE APPROXIMATE. INVERT ELEVATIONS OF INLETS AND PIPES MAY BE MODIFIED AS DIRECTED BY8.
PERIOD.
THE TOTAL COST OF THE PROJECT AND SHALL BE CONTRACTORS RESPONSIBILITY UNTIL THE START OF THE WARRANTY
STABILIZATION ALONG THE PROJECT LIMITS IN ACCORDANCE TO THE SCDOT SPECIFICATIONS. THIS WORK IS INCIDENTAL TO
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CUTTING AND MAINTAINING THE PERMANENT AND/OR TEMPORARY7.
ALL PROJECT INSPECTION LOGS / CERTIFIED TEST RESULTS SHALL BE SUBMITTED TO THE OWNER WITH EACH PAY REQUEST.6.
SHOWN ARE IN FEET BASED ON NAVD 88 DATUM.
VERTICAL CONTROL: THE LOCATION AND ELEVATION OF BENCHMARKS ARE SHOWN ON THE PLANS. ALL ELEVATIONS5.
CAROLINA STATE PLANE NAD 83 (2011).
HORIZONTAL CONTROL: THE COORDINATES FOR THIS PROJECT HAVE BEEN ESTABLISHED BY GPS BASED ON SOUTH4.
BOUNDARY AND TOPOGRAPHIC INFORMATION FURNISHED BY CALHOUN COUNTY ENGINEERS, COLLECTED ON 11/01/2017. 3.
AND ANY REFERENCED SCDOT STANDARDS AT THE TIME OF NOTICE TO PROCEED.
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE LATEST SET OF THESE PLANS AND SPECIAL PROVISIONS2.
THE PLANS SHALL REFER TO THE SPECIAL PROVISIONS, UNLESS OTHERWISE NOTED.
SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD DRAWINGS. ALL REFERENCES TO THE SPECIFICATIONS ON
DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION (2007 EDITION), AND THE
ALL WORK ON THIS PROJECT SHALL BE DONE IN ACCORDANCE WITH THE SPECIAL PROVISIONS, THE SOUTH CAROLINA1.
GENERAL NOTES
EVENT AFTER THE INTIATION OF CONSTRUCTION ACTIVITIES, AFTER THE INSTALLATION OF BMPS.
CONTRACTOR WITHIN 24 HOURS OF THE END OF A STORM EVENT OF 1.0 INCH OR GREATER, AS WELL AS DURING THE FIRST RAIN
STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION SITE. IT IS RECOMMENDED THAT BMPS BE ASSESSED BY THE
CALENDAR WEEK, WITH NO TIME PERIOD BETWEEN INSPECTIONS EXCEEDING 9 DAS, AND MUST BE CONDUCTED UNTIL FINAL
AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM OF AT LEAST ONCE EVERY
DRAINAGE PIPE INSTALLATION.
COORDINATING WITH THE COUNTY TO ENSURE THAT THE WATERLINE ADJUSTMENT IS ADEQUATE TO ALLOW FOR
LANE TO AVOID CONFLICT WITH THE PROPOSED DRAINAGE SYSTEM. THE CONTRACTOR WILL BE RESPONSIBLE FOR
COUNTY IS RESPONSIBLE FOR ADJUSTMENT TO WATERLINE NEAR INTERSECTION OF PAULINGS ROAD AND GOLDENROD24.
UNDERGROUND DETENTION SYSTEM QUANTITY INCLUDES ALL EARTHWORK REQUIRED TO CONSTRUCT THE SYSTEM.23.
ALTERATIONS NOT IN CONFLICT WITH THE STANDARD PRACTICES OF THE COUNTY AND/OR SCDOT.
COUNTY'S REPRESENTATIVE IS PERMITTED UNDER THE DIRECTION OF THE COUNTY ENGINEER TO AUTHORIZE MINOR
THE COUNTY ENGINEER MUST SPECIFICALLY AUTHORIZE CHANGES INVOLVING INCREASED COST OF PROJECT. THE22.
THE CONTRACTOR MUST NOT OCCUPY ANY NON-PERMITTED WETLAND AREAS.21.
ALL DRIVEWAY CULVERTS SHALL BE RCP PIPE.20.
CHANGES TO INDIVIDUAL DRIVEWAYS SHALL BE COORDINATED WITH THE ENGINEER.
ALL RESIDENTIAL DRIVEWAYS SHALL BE RECONSTRUCTED IN ACCORDANCE WITH THE STANDARD DRIVEWAY DETAIL. ANY19.
ALL TIE INS WITH EXISTING ASPHALT SHALL BE SAW CUT.18.
PAVEMENT.
THE PROPER CONSTRUCTION OF ALL WORK. ALL ROAD WIDTH LAYOUT DIMENSIONS SHOWN ARE TO THE EDGE OF
THE CONTRACTOR SHALL MAKE, CHECK, AND BE RESPONSIBLE FOR ALL MEASUREMENTS AND DIMENSIONS NECESSARY FOR17.
5,873
2034000 CYMUCK EXCAVATION 50
LIQUID ASPHALT BINDER PG64-22
8100200
8100100
8109050
8109901
PERMANENT COVER
TEMPORARY COVER
SELECTIVE WATERING
MOWING
1.500 ACRE
4.500 ACRE
(FOR GROUND COVER)
(FOR GROUND COVER)
(FOR GROUND COVER)
(FOR GROUND COVER)
6250110
6250025
4" YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FDP (AS DIRECTED BY ENGINEER)
(AS DIRECTED BY ENGINEER)24" WHITE SOLID LINES(STOP/DIAGONAL LINES)-FDP
LF
LF
2033000 CY70 (AS DIRECTED BY ENGINEER)BORROW EXCAVATION
FOR REPLACEMENT OF MUCK)
(AS DIRECTED BY ENGINEER
NEC LS
(AS DIRECTED BY ENGINEER)
GAL54,300
ACRE0.750
6510105 (AS DIRECTED BY ENGINEER)SFFLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 10
6531210 (AS DIRECTED BY ENGINEER)LF32U-SECTION POST FOR SIGN SUPPORTS - 3P
REV. NO. DATE DESCRIPTION OF REVISIONBY
Z
P r o j e c t s lh o
C a ll
.0
P in e la a il
R o a d w a y
P L
A N
S
S H
T .d g n
FED. RD. SHEET
STATE COUNTY
DIV. NO. NO.
3 SC
NO.
ROAD / ROUTEPROJECT ID
SCALE: 1" = 100'
CALHOUN COUNTY
CALHOUN
PINELAND TRAIL
TRAIL
PINELAND
R
I I
F
ETA
C
T R
E C
UAFO
O
HT
Z I
N O
I T
A
NO
S
HT
U
RAC
IL
O
A
S O
U
TH CAROL
E N
S
O
FESSION
G
IN
E E
R
INFRASTRUCTURE
CONSULTING &
No. 4470C
No. 34113
B
RANDON W. P
AYN
ENGINEERING, LLC
R B C A P
REV. NO. DATE DESCRIPTION OF REVISIONBY
Z
P r o j e c t s lh o
C a ll
.0
P in e la a il
R o a d w a y
P L
A N
S
S H
T .d g n
FED. RD. SHEET
STATE COUNTY
DIV. NO. NO.
3 SC
NO.
ROAD / ROUTEPROJECT ID
0 20 806040
SCALE IN FEET
SCALE: 1" = 20'
CALHOUN COUNTY
CALHOUN
PLAN AND PROFILE SHEET
PINELAND TRAIL
TRAIL
PINELAND
R
I I
F
ETA
C
T R
E C
UAFO
O
HT
Z I
N O
I T
A
NO
S
HT
U
RAC
IL
O
A
S O
U
TH CAROL
E N
S
O
FESSION
G
IN
E E
R
INFRASTRUCTURE
CONSULTING &
ENGINEERING,
PLLC
No. 4470
C
No. 34113
B
RANDON W. P
AYN
E
M A T C
H L
IN
E
S T
A
S E E
S
H E E
Phone
UTILITY OWNERS
Water
(803) 739-1711
CMW35
Calhoun County Municipal Water
WINZ08
(800) 778-9140
TCE12
(803) 707-2078
Electric/Fiber
Tri County Electric - Richland District
Windstream Communication - WINZ08
P O
T
.0
P C
.4
P R
C
.8
P R
C
.8
CURVE-1
CURVE-2
-N
PINELAND TRAIL
PAU
LIN
G S R
D
10'
10'
10'
10'
NEW 20' R/W
NEW 20' R/W
NEW 20' R/W
NEW 20' R/W
23'C
23'C
20'F
26'C
19'F
18'F
22'C
14'F
26'C
14'F
22'C
16'F
25'C
14'F
23'C
17'F
21'C
21'F
16'F
10.00
+65.79
10.00
+97.07 10.00
+80.64
10.00
+15.33
E=2134989.5241
N=632935.5207
STA. 11+00.00
PINELAND TRAIL
BEGIN PROJECT
21'F
21'C
PRIVACY FENCE
RESET 100' OF WOOD
CHAIN LINK FENCE
RESET 10' OF
PICKET FENCE
RESET 90' OF
BOTTOM ELEV = 176.50'
SIDE SLOPES = 3:1
INFILTRATION DITCH
CONSTRUCT 100' TRIANGULAR
INFILTRATION DITCH-1
15" RCP
PLACE 28 LF
NP-7
BOTTOM ELEV = 175.24'
SIDE SLOPES = 4:1 & 2:1
INFILTRATION DITCH
CONSTRUCT 25' TRIANGULAR
INFILTRATION DITCH-5
BOTTOM ELEV = 175.24'
SIDE SLOPES = 4:1 & 2:1
INFILTRATION DITCH
CONSTRUCT 70' TRIANGULAR
INFILTRATION DITCH-2
11+00 12+00 13+00 14+00 15+00
.6
.0
.5
.7
.1
.8
.5
.9
.2
.7
.3
.9
.5
.1
.7
.3
.9
.2
.4
VPI = 15+00
Elev. = 181.53
(+) 1.19%
100' V.C.
K = 41
SSD = 489'
.9
V
P C
EXISTING GROUND LINE
FINISHED GRADE
50'
REV. NO. DATE DESCRIPTION OF REVISIONBY
Z
P r o j e c t s lh o
C a ll
.0
P in e la a il
R o a d w a y
P L
A N
S
S H
T .d g n
FED. RD. SHEET
STATE COUNTY
DIV. NO. NO.
3 SC
NO.
ROAD / ROUTEPROJECT ID
0 20 806040
SCALE IN FEET
SCALE: 1" = 20'
CALHOUN COUNTY
CALHOUN
PLAN AND PROFILE SHEET
PINELAND TRAIL
TRAIL
PINELAND
R
I I
F
ETA
C
T R
E C
UAFO
O
HT
Z I
N O
I T
A
NO
S
HT
U
RAC
IL
O
A
S O
U
TH CAROL
E N
S
O
FESSION
G
IN
E E
R
INFRASTRUCTURE
CONSULTING &
ENGINEERING,
PLLC
No. 4470
C
No. 34113
B
RANDON W. P
AYN
E
M A T C
H L
IN
E
S T
A
S E E
S
H E E T
M A T C
H L
IN
E
S T
A
S E E
S
H E E T
P T
.0
CURVE-3
-N
PINELAND TRAIL
D
IN
K Y
C
T
10'
10'
NEW 20' R/
W
NEW 20' R/
W
NEW 20' R/W
10'
10'
NEW 20' R/W
21'C
21'F
24'C
21'F
26'C
17'F
28'F
16'F
30'F
16'F
30'C
13'F
32'C
29'C
19'C
30'C
15'F
R 15'
R
25'F
10.00
+10.53
10.00
+42.53
10.00
+44.36
10.00
+76.36
20.00
+96.03 20.00
+15.75
10.00
+81.89 10.00
+29.89
10.00
+17.60
10.00
+66.48
10.00
+39.27
10.00
+09.25
21'F
21'C
16'F
5' RESEREVED FOR ROAD
13141516
8 6
TYPE D GEOTEXTILE
16 SY CLASS 2
CLASS B RIPRAP
PLACE 12 TONS
TYPE D GEOTEXTILE
11 SY CLASS 2
CLASS B RIPRAP
PLACE 9 TONS
BOTTOM ELEV = 175.00'
SIDE SLOPES = 3:1
INFILTRATION DITCH
CONSTRUCT 200' TRIANGULAR
INFILTRATION DITCH-3
TYPE 9
CONSTRUCT CB
CB-1
IE OUT:175.50'
IE IN: 177.50'
18" RCP
PLACE 48 LF
NP-1
IE OUT:175.00'
IE IN: 175.50'
18" RCP
PLACE 58 LF
NP-2
IE OUT:175.00'
IE IN: 175.50'
18" RCP
PLACE 38LF
NP-3
IE
O
U T :1
.4
IE
I
N .5
R C
P P
L A
C E
L
F N
P -4
15" RCP
PLACE 28 LF
NP-8
15" RCP
PLACE 28 LF
NP-9
VPI = 17+70
Elev. = 178.10
(-) 1.27% (+) 0.42%
100' V.C.
K = 59
.7
V
P C
.3
V
P T
EXISTING GROUND LINE
FINISHED GRADE
17+00 18+00 19+00 20+00
.1
.7
.7
.6
.9
.3
.6
.8
.9
.4
.2
.4
.6
.8
.0
.2
(-) 1.27%
.8
V
P T
100' V.C.
K = 41
SSD = 489'
VPI = 15+00
Elev. = 181.53
15+00 16+00
.2
.9
.0
.4
.2
.8
.2
.6
TT
REV. NO. DATE DESCRIPTION OF REVISIONBY
Z
P r o j e c t s lh o
C a ll
.0
P in e la a il
R o a d w a y
P L
A N
S
S H
T .d g n
FED. RD. SHEET
STATE COUNTY
DIV. NO. NO.
3 SC
NO.
ROAD / ROUTEPROJECT ID
0 20 806040
SCALE IN FEET
SCALE: 1" = 20'
CALHOUN COUNTY
CALHOUN
PLAN AND PROFILE SHEET
PINELAND TRAIL
TRAIL
PINELAND
R
I I
F
ETA
C
T R
E C
UAFO
O
HT
Z I
N O
I T
A
NO
S
HT
U
RAC
IL
O
A
S O
U
TH CAROL
E N
S
O
FESSION
G
IN
E E
R
INFRASTRUCTURE
CONSULTING &
ENGINEERING,
PLLC
No. 4470
C
No. 34113
B
RANDON W. P
AYN
E
MATCHLINE STA. 20+50 SEE SHEET 7
M A T C
H L
IN
E
S T
A
S E E
S
H E E T
PI = 21+37.07
PINELAND TRAIL
C H
E
A D
-N -10
10'
10'
N E
W
' R
W
N E
W
' R
W
NEW 20' R/W NEW 20' R/W
P/L =NEW R/W
P/L =NEW R/W
'C
'C
24'C
24'C
12'F
21'C
20'F
20'C 20'C
R
R1-1
PLACE
STA.21+59.23
PAVEMENT MARKING
APPLY 24" STOP BAR
25.88
+37.07
20.00
+45.39 10.00
+75.50
11.15
+26.70
10.00
+12.72 10.00
+52.71
R
10.00
+67.11
10.00
+70.88
10.00
+32.89
20'F
20'C
TYPE D GEOTEXTILE
22 SY CLASS 2
CLASS B RIPRAP
PLACE 18 TONS
TYPE 9
CONSTRUCT CB
CB-2
TYPE 9
CONSTRUCT CB
CB-3
IE OUT:176.40'
IE IN: 176.55'
18" RCP
PLACE 46 LF
NP-4
IE OUT:176.40'
IE IN: 176.55'
18" RCP
PLACE 82 LF
NP-5
IE OUT:175.69'
IE IN: 176.40'
18" RCP
PLACE 120 LF
NP-10
VPI = 24+60
Elev. = 181.00
(+) 0.42% (-) 1.60%
100' V.C.
K = 50
SSD = 584'
.7
V
P C
EXISTING GROUND LINE
FINISHED GRADE
21+00 22+00 23+00 24+00 25+00
.8
.3
.4
.9
.9
.1
.1
.5
.0
.3
.2
.4
.7
.9
.1
.3
.5
.7
.8
REV. NO. DATE DESCRIPTION OF REVISIONBY
Z
P r o j e c t s lh o
C a ll
.0
P in e la a il
R o a d w a y
P L
A N
S
S H
T .d g n
FED. RD. SHEET
STATE COUNTY
DIV. NO. NO.
3 SC
NO.
ROAD / ROUTEPROJECT ID
0 20 806040
SCALE IN FEET
SCALE: 1" = 20'
CALHOUN COUNTY
CALHOUN
PLAN AND PROFILE SHEET
PINELAND TRAIL
TRAIL
PINELAND
R
I I
F
ETA
C
T R
E C
UAFO
O
HT
Z I
N O
I T
A
NO
S
HT
U
RAC
IL
O
A
S O
U
TH CAROL
E N
S
O
FESSION
G
IN
E E
R
INFRASTRUCTURE
CONSULTING &
ENGINEERING,
PLLC
No. 4470
C
No. 34113
B
RANDON W. P
AYN
E
M A T C
H L
IN
E
S T A . 2
S E E
S
H E E T
M A T C
H L
IN
E
S T A
S E E
S H E E T
P I
.8
P C
.8
CURVE-4PINELAND TRAIL
C H
E
A D
-N-
10'
10'
10'
10'
NEW 20'
R/W
NEW 20' R/W
NEW 20' R/W
NEW 20' R/W
P/L =N
EW R/W
P/L =NEW R/W
20'F
20'C
19'F
31'C
21'C
39'C
18'F
46'C
18'F
47'C
20'F
R 15'
10.00
+42.44
10.00
+79.61
10.00
+00.55
10.00
+68.54
10.00
+15.11
37'C
21'C20'F
TYPE D GEOTEXTILE
16 SY CLASS 2
CLASS B RIPRAP
PLACE 12 TONS
TYPE D GEOTEXTILE
11 SY CLASS 2
CLASS B RIPRAP
PLACE 9 TONS
BOTTOM ELEV = 173.00'
BOTTOM WIDTH 1'
SIDE SLOPES = 4:1
INFILTRATION DITCH
CONSTRUCT 200' TRAPEZOIDAL
INFILTRATION DITCH-4
TYPE 9
CONSTRUCT CB
CB-3
TYPE 9
CONSTRUCT CB
CB-4
IE OUT:175.55'
IE IN: 175.69'
18" RCP
PLACE 40 LF
NP-11
IE OUT:173.90'
IE IN: 174.40'
18" RCP
PLACE 45 LF
NP-12
25+00 26+00 27+00 28+00 29+00
.0
.3
.6
.2
.5
.1
.1
.3
.3
.9
.8
.3
.5
.7
.9
.2
.0
.3
.6
.5
VPI = 27+30
Elev. = 176.68
(-) 1.60% (+) 0.98%
100' V.C.
K = 39
VPI = 28+40
Elev. = 177.76
(+) 0.98% (-) 0.41%
100' V.C.
K = 72
SSD = 831'
.2
V
P T
.4
V
P C
.1
V
P T
.2
V
P C
.5
V
P T
REV. NO. DATE DESCRIPTION OF REVISIONBY
Z
P r o j e c t s lh o
C a ll
.0
P in e la a il
R o a d w a y
P L
A N
S
S H
T .d g n
FED. RD. SHEET
STATE COUNTY
DIV. NO. NO.
3 SC
NO.
ROAD / ROUTEPROJECT ID
0 20 806040
SCALE IN FEET
SCALE: 1" = 20'
CALHOUN COUNTY
CALHOUN
PLAN AND PROFILE SHEET
PINELAND TRAIL
TRAIL
PINELAND
R
I I
F
ETA
C
T R
E C
UAFO
O
HT
Z I
N O
I T
A
NO
S
HT
U
RAC
IL
O
A
S O
U
TH CAROL
E N
S
O
FESSION
G
IN
E E
R
INFRASTRUCTURE
CONSULTING &
ENGINEERING,
PLLC
No. 4470
C
No. 34113
B
RANDON W. P
AYN
E
M A T C
H L
IN
E
S T A . 2
S E E
S
H E E T
P T
.4
P I
.9
P O
T
.8
S
T
V
A D
PINELAND TRAIL
-N-
10'
10' 10'
10'
R1-1
PLACE
STA.31+88.66
PAVEMENT MARKING
APPLY 24" STOP BAR
E=2136570.2045
N=632662.8312
STA. 31+98.55
PINELAND TRAIL
END CONSTRUCTION
NEW 20' R/
W
NEW 20' R/
W NEW 20' R/W
21'C
37'C
30'C
27'C
23'C
21'C
34'
R 30'
R30'
PAVEMENT MARKING
APPLY 4" DOUBLE YELLOW
0.00
+83.55
10.00
+19.32
20' R/W
NEW
10.41
+73.27
P r e s
R
W
(S
C D
P r e s
R
W
(S
C D
D A
T E
E
.3
P R
E S
E N
T
R
T E
E
.3
P R
E S
E N
T
R
TYPE D GEOTEXTILE
16 SY CLASS 2
CLASS B RIPRAP
PLACE 12 TONS
IE OUT:174.13'
IE IN: 174.27'
18" RCP
PLACE 48 LF
NP-6
15" RCP
PLACE 44 LF
NP-13
29+00 30+00 31+00 32+00
.9
.4
.1
.0
.5
.2
.8
.5
.3
.1
.9
.2
.0
.8
VPI = 31+10
Elev. = 176.66
(-) 0.41%
5.90
100' V.C.
K = 16
VPI = 31+97
Elev. = 181.79
5.90
(+) 2.09%
.0
.8
V
P C
.6
V
P T
DETAIL SHEET
NTS
FOR INFORMATION ONLY
REV. NO. DATE DESCRIPTION OF REVISIONBY
Z
P r o j e c t s lh o
C a ll
.0
P in e la a il
R o a d w a y
P L
A N
S
S H
T .d g n
FED. RD. SHEET
STATE COUNTY
DIV. NO. NO.
3 SC
NO.
ROAD / ROUTEPROJECT ID
PINELAND TRAIL
CALHOUN COUNTY
TYPICAL DRIVEWAY DETAIL
NTS
V A
R
IE
S
NEW EP
FOR INFORMATION ONLY
(6" UNIFORM)
GRADED AGGREGATE BASE COURSE
TYPE D - 220 LBS/SY
HOT MIX ASPHALT SURFACE COURSE
OTHERWISE
NOTED
UNLESS
10' R
OTHERWISE
NOTED
UNLESS
10' R
VARIES
WIDTH
(SEE PLAN)
EXISTING
OR MATCH
10' MINUMUM
NEW R/W
REV. NO. DATE DESCRIPTION OF REVISIONBY
Z
P r o j e c t s lh o
C a ll
.0
P in e la a il
R o a d w a y
P L
A N
S
S H
T .d g n
FED. RD. SHEET
STATE COUNTY
DIV. NO. NO.
3 SC
NO.
ROAD / ROUTEPROJECT ID
SCALE: 1" = 20'
PINELAND TRAIL
CALHOUN COUNTY
FOR INFORMATION ONLY
REV. NO. DATE DESCRIPTION OF REVISIONBY
Z
P r o j e c t s lh o
C a ll
.0
P in e la a il
R o a d w a y
P L
A N
S
S H
T .d g n
FED. RD. SHEET
STATE COUNTY
DIV. NO. NO.
3 SC
NO.
ROAD / ROUTEPROJECT ID
SCALE: 1" = 20'
PINELAND TRAIL
CALHOUN COUNTY
FOR INFORMATION ONLY
REV. NO. DATE DESCRIPTION OF REVISIONBY
Z
P r o j e c t s lh o
C a ll
.0
P in e la a il
R o a d w a y
P L
A N
S
S H
T .d g n
FED. RD. SHEET
STATE COUNTY
DIV. NO. NO.
3 SC
NO.
ROAD / ROUTEPROJECT ID
SCALE: 1" = 20'
PINELAND TRAIL
CALHOUN COUNTY
EC1
EROSION CONTROL NOTES
I
F
ETA
C
T R
E C
UAFO
O
HT
Z I
N O
I T
A
NO
S
HT
U
RAC
IL
O
A
S O
U
TH CAROL
E N
S
O
FESSION
G
IN
E E
R
INFRASTRUCTURE
CONSULTING &
No. 4470C
ENGINEERING, LLC
No. 42773
I K
S
WELEIMHC .M
NA
Y R
REV. NO. DATE DESCRIPTION OF REVISIONBY
Z
P r o j e c t s lh o
C a ll
.0
P in e la a il
R o a d w a y
P L
A N
S
S H
T
E C 1.
d g n
FED. RD. SHEET
STATE COUNTY
DIV. NO. NO.
3 SC
NO.
ROAD / ROUTEPROJECT ID
SCALE: 1" = 100'
CALHOUN COUNTY
CALHOUN
PINELAND TRAIL
TRAIL
EC2
SEQUENCE OF CONSTRUCTION
SCDHEC STANDARD NOTES
1. IF NECESSARY, SLOPES, WHICH EXCEED EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED WITH SYNTHETIC
OR VEGETATIVE MATS, IN ADDITION TO HYDROSEEDING. IT MAY BE NECESSARY TO INSTALL TEMPORARY
SLOPE DRAINS DURING CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED UNTIL THE SLOPE IS
BROUGHT TO GRADE.
2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE
WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE
THAN FOURTEEN (14) DAYS AFTER WORK HAS CEASED, EXCEPT AS STATED BELOW.
WHERE STABILIZATION BY THE 14TH DAY IS PRECLUDED BY SNOW COVER OR FROZEN GROUND
CONDITIONS STABILIZATION MEASURES MUST BE INITIATED AS SOON AS PRACTICABLE.
WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED, AND
EARTH-DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 14 DAYS, TEMPORARY STABILIZATION
MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE.
3. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY CALENDAR WEEK. IF
PERIODIC INSPECTION OR OTHER INFORMATION INDICATES THAT A BMP HAS BEEN INAPPROPRIATELY OR
INCORRECTLY INSTALLED, THE PERMITTEE MUST ADDRESS THE NECESSARY REPLACEMENT OR MODIFICATION
4. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL
EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED, AND
STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY INSTALLATION. FILL, COVER, AND TEMPORARY
SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE SEDIMENT BEFORE BEING PUMPED BACK INTO ANY WATERS
OF THE STATE.
UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN
STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO
CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE
REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED.
REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED.
ET SEQ. AND SCR100000.
APPROPRIATE TRAPS OR STABLE OUTLETS.
50-FOOT BUFFER CAN’
STORM WATER DISCHARGES.
11.
STABILIZATION IS REACHED.
12.
13.
14.
15.
16. THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED:
WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL;
WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING
COMPOUNDS AND OTHER CONSTRUCTION MATERIALS;
FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND
MAINTENANCE; AND
SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING.
17. AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM OF AT LEAST
ONCE EVERY CALENDAR WEEK AND MUST BE CONDUCTED UNTIL FINAL STABILIZATION IS REACHED ON ALL
AREAS OF THE CONSTRUCTION SITE.
18. IF EXISTING BMPS NEED TO BE MODIFIED OR IF ADDITIONAL BMPS ARE NECESSARY TO COMPLY WITH THE
REQUIREMENTS OF THIS PERMIT AND/OR SC’S WATER QUALITY STANDARDS, IMPLEMENTATION MUST BE
COMPLETED BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. IF IMPLEMENTATION BEFORE THE
NEXT STORM EVENT IS IMPRACTICABLE, THE SITUATION MUST BE DOCUMENTED IN THE SWPPP AND
ALTERNATIVE BMPS MUST BE IMPLEMENTED AS SOON AS REASONABLY POSSIBLE.
19. A PRE-CONSTRUCTION CONFERENCE MUST BE HELD FOR EACH CONSTRUCTION SITE WITH AN APPROVED
ON-SITE SWPPP PRIOR TO THE IMPLEMENTATION OF CONSTRUCTION ACTIVITIES. FOR NON-LINEAR
PROJECTS THAT DISTURB 10 ACRES OR MORE THIS CONFERENCE MUST BE HELD ON-SITE UNLESS THE
DEPARTMENT HAS APPROVED OTHERWISE.
5. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION
6. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED
ROADWAY(S) FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY
7. RESIDENTIAL SUBDIVISIONS REQUIRE EROSION CONTROL FEATURES FOR INFRASTRUCTURE AS WELL AS FOR
INDIVIDUAL LOT CONSTRUCTION. INDIVIDUAL PROPERTY OWNERS SHALL FOLLOW THESE PLANS DURING
CONSTRUCTION OR OBTAIN APPROVAL OF AN INDIVIDUAL PLAN IN ACCORDANCE WITH S.C REG. 72-300
8. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO
PROTECT WORK AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT SEDIMENT-LADEN WATER TO
9. ALL WATERS OF THE STATE (WOS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR OTHERWISE CLEARLY
MARKED IN THE FIELD. A DOUBLE ROW OF SILT FENCE IS TO BE INSTALLED IN ALL AREAS WHERE A
T BE MAINTAINED BETWEEN THE DISTURBED AREA AND ALL WOS. A 10-FOOT
BUFFER SHOULD BE MAINTAINED BETWEEN THE LAST ROW OF SILT FENCE AND ALL WOS.
10. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR
IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT
COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN
A COPY OF THE SWPPP, INSPECTIONS RECORDS, AND RAINFALL DATA MUST BE RETAINED AT THE
CONSTRUCTION SITE OR A NEARBY LOCATION EASILY ACCESSIBLE DURING NORMAL BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OF CONSTRUCTION ACTIVITIES TO THE DATE THAT FINAL
INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER) WHERE
LAND-DISTURBING ACTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED, AND WILL NOT RESUME FOR
A PERIOD OF 7 CALENDAR DAYS.
MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL.
MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATERS. WASH WATERS MUST BE TREATED IN A SEDIMENT BASIN OR ALTERNATIVE
CONTROL THAT PROVIDES EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE;
8156200 CLEANING INLET STRUCTURE FILTERS
STABILIZED CONSTRUCTION ENTRANCE
8153090 REPLACE/REPAIR SILT FENCE
8154050
100 LF
420 LF
8152006
REMOVAL OF SILT RETAINED BY SILT FENCE
INLET STRUCTURE FILTER - TYPE F (NON-WEIGHTED)
300 SY8156490
8 EA
17. SUBMIT TO DHEC THE NOTICE OF TERMINATION
16. CONTACT CALHOUN COUNTY FOR FINAL INSPECTION
15. REMOVAL OF SEDIMENT CONTROLS AFTER SITE HAS BEEN STABILIZED
THE PROJECT
14. MAINTAIN ALL SEDIMENT AND EROSION CONTROL DEVICES FOR THE EXTENT OF
13. FINISH GRADING AND FINAL GRASSING AND LANDSCAPING
12. ASPHALT PAVING
11. FINE GRADING
10. INSTALL STORM DRAINAGE
9. ROUGH GRADING
DISTURBANCE."
SWALES, CHECK DAMS, ETC] MUST BE INCLUDED WITHIN THE LIMITS OF
CLEARING, GRUBBING, STOCK PILING, AND INSTALLATION OF ANY BMPS (SILT FENCE,
AREA OF LAND THAT WILL BE DISTURBED DURING CONSTRUCTION, THAT INCLUDES
PER SECTION 209 OF THE STANDARD SPECIFICATIONS. "ALL DISTURBED AREA [ANY
8. STRIP TOP SOIL AND STOCKPILE FOR LATER USE ON SHOULDERS AND SLOPES
FOR THESE AREAS MUST ALREADY BE INSTALLED.
7. CLEARING AND GRUBBING OF SITE (SEDIMENT & EROSION CONTROL MEASURES
6. PROVIDE SITE DRAINAGE WITH DIVERSION DITCHES, SWALES AND DRAINS.
5. INSTALL PERIMETER CONTROLS (E.G. SILT FENCE).
CONTROLS (E.G. SILT FENCE).
4. CLEARING & GRUBBING ONLY AS NECESSARY FOR INSTALLATION OF PERIMETER
3. INSTALL TREE PROTECTION AND DELINEATE CLEARING LIMITS
ACTIVITIES.
2. NOTIFY DHEC REGIONAL OFFICE 48 HOURS PRIOR TO ANY LAND DISTURBING
1. OBTAIN NPDES COVERAGE FROM DHEC
INITIATION OF CONSTRUCTION ACTIVITIES, AFTER THE INSTALLATION OF BMPS.
OF A STORM EVENT OF 1.0 INCH OR GREATER, AS WELL AS DURING THE FIRST RAIN EVENT AFTER THE
SITE. IT IS RECOMMENDED THAT BMPS BE ASSESSED BY THE CONTRACTOR WITHIN 24 HOURS OF THE END
MUST BE CONDUCTED UNTIL FINAL STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION
ONCE EVERY CALENDAR WEEK, WITH NO TIME PERIOD BETWEEN INSPECTIONS EXCEEDING 9 DAYS, AND
AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM OF A LEAST
REQUIRED TO CORRECT THE BMP WITHIN 48 HOURS OF IDENTIFICATION.
AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH APPROPRIATE BMPS
MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED
(SEDIMENT BASIN, FILTER BAG, ETC.).
CONSTRUCTION ACTIVITIES, AFTER THE INSTALLATION OF BMPS.
EVENT OF 1.0 INCH OR GREATER, AS WELL AS DURING THE FIRST RAIN EVENT AFTER THE INITIATION OF
RECOMMENDED THAT BMPS BE ASSESSED BY THE CONTRACTOR WITHIN 24 HOURS OF THE END OF A STORM
CONDUCTED UNTIL FINAL STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION SITE. IT IS
EVERY CALENDAR WEEK, WITH NO TIME PERIOD BETWEEN INSPECTIONS EXCEEDING 9 DAYS, AND MUST BE
AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM OF A LEAST ONCE
(INCIDENTAL TO PAY ITEM 8153000)
(INCIDENTAL TO PAY ITEM 8153000)
R
I I
F
ETA
C
T R
E C
UAFO
O
HT
Z I
N O
I T
A
NO
S
HT
U
RAC
IL
O
A
S O
U
TH CAROL
E N
S
O
FESSION
G
IN
E E
R
INFRASTRUCTURE
CONSULTING &
No. 4470C
ENGINEERING, LLC
No. 42773
I K
S
WELEIMHC .M
NA
Y R
1050 LF
EROSION CONTROL INCLUSION ITEMS
REV. NO. DATE DESCRIPTION OF REVISIONBY
Z
P r o j e c t s lh o
C a ll
.0
P in e la a il
R o a d w a y
P L
A N
S
S H
T
E C .d g n
FED. RD. SHEET
STATE COUNTY
DIV. NO. NO.
3 SC
NO.
ROAD / ROUTEPROJECT ID
CALHOUN COUNTY
CALHOUN
0 100 400300200
SCALE IN FEET
PINELAND TRAIL
TRAIL
EC3
EROSION CONTROL NOTES1
REV. NO. DATE DESCRIPTION OF REVISIONBY
Z
P r o j e c t s lh o
C a ll
.0
P in e la a il
R o a d w a y
P L
A N
S
S H
T
E C .d g n
FED. RD. SHEET
STATE COUNTY
DIV. NO. NO.
3 SC
NO.
ROAD / ROUTEPROJECT ID
CALHOUN COUNTY
CALHOUN
PINELAND TRAIL
TRAIL
00 1010 2020 3030 4040 5050 6060 7070
175 175
180 180
185 185
175 175
180 180
185 185
11+50.00
175 175
180 180
185 185
12+00.00
00 1010 2020 3030 4040 5050 6060 7070
175 175
180 180
185 185
12+50.00
180 180
185 185
13+00.00
180 180
185 185
13+50.00
180 180
185 185
14+00.00
X1
STA.11+00.00
PINELAND TRAIL
BEGIN PROJECT
Z
P r o j e c t s lh o
C a ll
.0
P in e la a il
R o a d w a y
D G
N
C R
O
C T
IO
N S
S H
E E
T S
.0
1_ X
S S
H E
E T
S .d g n
FED. RD. SHEET
STATE COUNTY
DIV. NO. NO. NO.
ROAD / ROUTE
5'
10'
REV. NO. DATE DESCRIPTION OF REVISIONBY
INFRASTRUCTURE
CONSULTING & ENGINEERING
CROSS SECTIONS
CALHOUN
PINELAND TRAIL
R
I I
F
ETA
C
T R
E C
UAFO
O
HT
Z I
N O
I T
A
NO
S
HT
U
RAC
IL
O
A
S O
U
TH CAROL
E N
S
O
FESSION
G
IN
E E
R
INFRASTRUCTURE
CONSULTING &
ENGINEERING,
PLLC
No. 4470
C
No. 34113
B
RANDON W. P
AYN
E
PINELAND TRAIL
TRAIL
PINELAND
3 SC
.7
0.0200 FT./FT.
12:117
.2
L 4:1
2:1
0.0200 FT./FT.
12:1 17 .2
R
4:1 2:
E x
/W
.0
.3
0.0200 FT./FT.
12:1
0.0200 FT./FT.
12:1
.2
R
.0
4:1 2:
N E
W x
.5
.9
0.0200 FT./FT.
20:1
0.0200 FT./FT.
20:1
N E
W
W
.7
.5
0.0200 FT./FT.
12:117
.5
L 3:1
0.0200 FT./FT.
12:1N
E W
W
3:
.1
.1
0.0200 FT./FT.
12:117
.5
L
0.0200 FT./FT.
12:1N
E W
W
3:1 3:
.8
.7
0.0200 FT./FT.
12:117
.0
L 4:1
2:1
0.0200 FT./FT.
12:1
N E
W
W
.3
0.0200 FT./FT.
12:1
.2
L 4:1
2:1
0.0200 FT./FT.
12:1
.9
N
E W
W
180 180
185 185
190 190
14+50.00
180 180
185 185
190 190
15+00.00
180 180
185 185
190 190
15+50.00
00 1010 2020 3030 4040 5050 6060 7070
180 180
185 185
190 190
16+00.00
180 180
185 185
16+50.00
180 180
185 185
17+00.00
175 175
180 180
18+00.00
X2
STA.16+73.06
BEGIN CONSTRUCTION
Z
P r o j e c t s lh o
C a ll
.0
P in e la a il
R o a d w a y
D G
N
C R
O
C T
IO
N S
S H
E E
T S
.0
1_ X
S S
H E
E T
S .d g n
FED. RD. SHEET
STATE COUNTY
DIV. NO. NO. NO.
ROAD / ROUTE
REV. NO. DATE DESCRIPTION OF REVISIONBY
INFRASTRUCTURE
CALHOUN
PINELAND TRAIL
R
I I
F
ETA
C
T R
E C
UAFO
O
HT
Z I
N O
I T
A
NO
S
HT
U
RAC
IL
O
A
S O
U
TH CAROL
E N
S
O
FESSION
G
IN
E E
R
INFRASTRUCTURE
CONSULTING &
ENGINEERING,
PLLC
No. 4470
C
No. 34113
B
RANDON W. P
AYN
E
PINELAND TRAIL
TRAIL
PINELAND
3 SC
.0
.9
0.0200 FT./FT.
12:1
.4
L 4:1
2:1
0.0200 FT./FT.
12:1 N E
W
W
1.
0.0200 FT./FT.
12:1
.6
L 4:1
2:1
0.0200 FT./FT.
12:1 N
E W
W
.9
.8
0.0200 FT./FT.
12:1
.0
L 4:1
2:1
0.0200 FT./FT.
12:1 N
E W
W
.2
0.0200 FT./FT.
12:1
.0
L 4:1
2:1
0.0200 FT./FT.
12:1 N
E W
W
.8
.6
0.0200 FT./FT.
12:1
0.0200 FT./FT.
12:1 N
E W
W
.9
0.0200 FT./FT.
25.1
0.0200 FT./FT.
12:1 N
E W
W
.2
0.0200 FT./FT.
12:1
.0
L
3:
0.0200 FT./FT.
12:1
N E
W
W
3:1
180 180
185 185
19+00.00
180 180
185 185
190 190
20+00.00
180 180
185 185
190 190
21+00.00
00 1010 2020 3030 4040 5050 6060 7070
180 180
185 185
190 190
22+00.00
180 180
185 185
23+00.00
180 180
185 185
190 190
24+00.00
X3
Z
P r o j e c t s lh o
C a ll
.0
P in e la a il
R o a d w a y
D G
N
C R
O
C T
IO
N S
S H
E E
T S
.0
1_ X
S S
H E
E T
S .d g n
FED. RD. SHEET
STATE COUNTY
DIV. NO. NO. NO.
ROAD / ROUTE
REV. NO. DATE DESCRIPTION OF REVISIONBY
INFRASTRUCTURE
CALHOUN
PINELAND TRAIL
R
I I
F
ETA
C
T R
E C
UAFO
O
HT
Z I
N O
I T
A
NO
S
HT
U
RAC
IL
O
A
S O
U
TH CAROL
E N
S
O
FESSION
G
IN
E E
R
INFRASTRUCTURE
CONSULTING &
ENGINEERING,
PLLC
No. 4470
C
No. 34113
B
RANDON W. P
AYN
E
PINELAND TRAIL
TRAIL
PINELAND
3 SC
.6
0.0200 FT./FT.
12:1
L
.0
0.0200 FT./FT.
12:1
R
.8
4:1 2:
N E
W
W
3:1 3:
.0
0.0200 FT./FT.
12:1
.0
L 4:1
2:1
0.0200 FT./FT.
12:1
R
.1
4:1 2:
N E
W
W
.2
.4
0.0200 FT./FT.
12:1
L
4:12:1
0.0200 FT./FT.
12:1
R
.4
4:1 2:
N E
W
W
.5
.9
0.0200 FT./FT.
12:1
.0
L
4:1 2:1
0.0200 FT./FT.
12:1
.0
R
4:1 2:
N E
W
.3
0.0200 FT./FT. 0.0200 FT./FT.
12:1
.7
R
4:1 2:
N E
W
.7
0.0200 FT./FT.
50:1
0.0200 FT./FT.
12:1
.2
R
4:1 2:
N E
W
180 180
185 185
190 190
25+00.00
180 180
185 185
26+00.00
175 175
180 180
185 185
27+00.00
00 1010 2020 3030 4040 5050 6060 7070
175 175
180 180
185 185
28+00.00
175 175
180 180
185 185
28+50.00
175 175
180 180
185 185
29+00.00
X4
STA. 27+80.60
BEGIN MAX S.E.
STA. 27+57.53
BEGIN S.E.
STA. 27+80.60
BEGIN MAX S.E.
STA. 29+32.68
END MAX S.E.
STA. 29+55.75
END S.E.
STA. 29+32.68
END MAX S.E.
STA. 27+06.24
BEGIN S.E.
Z
P r o j e c t s lh o
C a ll
.0
P in e la a il
R o a d w a y
D G
N
C R
O
C T
IO
N S
S H
E E
T S
.0
1_ X
S S
H E
E T
S .d g n
FED. RD. SHEET
STATE COUNTY
DIV. NO. NO. NO.
ROAD / ROUTE
REV. NO. DATE DESCRIPTION OF REVISIONBY
INFRASTRUCTURE
CALHOUN
PINELAND TRAIL
R
I I
F
ETA
C
T R
E C
UAFO
O
HT
Z I
N O
I T
A
NO
S
HT
U
RAC
IL
O
A
S O
U
TH CAROL
E N
S
O
FESSION
G
IN
E E
R
INFRASTRUCTURE
CONSULTING &
ENGINEERING,
PLLC
No. 4470
C
No. 34113
B
RANDON W. P
AYN
E
PINELAND TRAIL
TRAIL
PINELAND
3 SC
.4
.3
0.0200 FT./FT.
12:1
0.0200 FT./FT.
12:1 17
.8
R
4:1 2:
N E
W
.3
.7
0.0200 FT./FT.
12:1
0.0200 FT./FT.
12:1
R
.4
4:1
2:
N E
W
.2
0.0200 FT./FT. 0.0200 FT./FT.
12:1
.0
R
4:1
N E
W
4:1
.3
0.0380 FT./FT.12:1 0.0380 FT./FT.
12:1
N E
W
W
4:1
.0
.6
0.0380 FT./FT.12:1 0.0380 FT./FT.
12:1
R
.0
4:1
N E
W
W
.5
0.0380 FT./FT.12:117
.5
L4:1 2:1
0.0380 FT./FT.
12:1 17
.8
R
4:1
N E
W
W
180 180
185 185
30+00.00
175 175
180 180
185 185
31+00.00
180 180
185 185
190 190
31+98.55
00 1010 2020 3030 4040 5050 6060 7070
X5
STA. 30+07.04
END S.E.
PINELAND TRAIL
END PROJECT
Z
P r o j e c t s lh o
C a ll
.0
P in e la a il
R o a d w a y
D G
N
C R
O
C T
IO
N S
S H
E E
T S
.0
1_ X
S S
H E
E T
S .d g n
FED. RD. SHEET
STATE COUNTY
DIV. NO. NO. NO.
ROAD / ROUTE
REV. NO. DATE DESCRIPTION OF REVISIONBY
INFRASTRUCTURE
CALHOUN
PINELAND TRAIL
R
I I
F
ETA
C
T R
E C
UAFO
O
HT
Z I
N O
I T
A
NO
S
HT
U
RAC
IL
O
A
S O
U
TH CAROL
E N
S
O
FESSION
G
IN
E E
R
INFRASTRUCTURE
CONSULTING &
ENGINEERING,
PLLC
No. 4470
C
No. 34113
B
RANDON W. P
AYN
E
PINELAND TRAIL
TRAIL
PINELAND
3 SC
.1
0.0145 FT./FT.
12:1
L
.2
4:1 2:1
0.0200 FT./FT.
12:1
.1
R
4:1 2:
N E
W
W
.2
0.0200 FT./FT.
12:117
.6
L 4:1
2:1
0.0200 FT./FT.
12:1
.6
R
4:1 2:
N E
W
W
MATCH EXISTINGMATCH EXISTING
180 180
185 185
18+60.75
180 180
185 185
20+95.64
180 180
185 185
25+49.40
175 175
180 180
185 185
27+69.19
00 1010 2020 3030 4040 5050 6060 7070
175 175
180 180
185 185
30+01.66
XP1
Z
P r o j e c t s lh o
C a ll
.0
P in e la a il
R o a d w a y
D G
N
C R
O
C T
IO
N S
S H
E E
T S
.0
1_ P
IP
E
X S S
H E
E T
S .d g n
FED. RD. SHEET
STATE COUNTY
DIV. NO. NO. NO.
ROAD / ROUTE
REV. NO. DATE DESCRIPTION OF REVISIONBY
INFRASTRUCTURE
CALHOUN
PINELAND TRAIL
PINELAND TRAIL
TRAIL
PINELAND
3 SC
PIPE CROSS SECTIONS
R
I I
F
ETA
C
T R
E C
UAFO
O
HT
Z I
N O
I T
A
NO
S
HT
U
RAC
IL
O
A
S O
U
TH CAROL
E N
S
O
FESSION
G
IN
E E
R
INFRASTRUCTURE
CONSULTING &
No. 4470C
ENGINEERING, LLC
No. 42773
I K
S
WELEIMHC .M
NA
Y R
.4
0.0199 FT./FT.
12.3:117 .0
4.1 15:
2.058:1
0.0179 FT./FT.
12.3:1 17
.5
4.115:1 2.
8:
NP-3 18" RCP 1.3% SLOPE
.4
0.0184 FT./FT.
12.2:1
.5
4.0 :12.041:1
0.0200 FT./FT.
12.2:1
.4
4.082:1
2.
1:
NP-4 18" RCP 0.3% SLOPE
.5
0.0183 FT./FT.
12.1:1
0.0214 FT./FT.
12.1:1 17
.5
4.019:1
2.
9:
NP-11 18" RCP 0.3% SLOPE
.0
0.0279 FT./FT.12:1 0.0290 FT./FT.
12:1
4.010:1 4.0 10:
.0
NP-12 18" RCP 1.1% SLOPE
TYPE 9
CB-4
.1
.1
0.0158 FT./FT.
12:1
4:12:1
0.0200 FT./FT.
12:1
.1
4:1
2:
.2
NP-6 18" RCP 0.3% SLOPE
| SHT_01_TITLE_SHEET |
| SHT02 Summary of Quantities |
| SHT_03 |
| SHT_04 |
| SHT_04A |
| SHT_05A |
| SHT_05 |
| SHT_06 |
| SHT_07 |
| SHT_08 |
| SHT_09 |
| SHT_10 |
| SHT_11 |
| SHT_12 |
| SHT_13 |
| SHT_14 |
| SHT_EC1 |
| SHT_EC2 |
| SHT_EC3 |
| 23-153.01_XS_SHEETS |
| 23-153.01_XS_SHEETS |
| 23-153.01_XS_SHEETS |
| 23-153.01_XS_SHEETS |
| 23-153.01_XS_SHEETS |
| 23-153.01_PIPE_XS_SHEETS |
| 2025-10-29T16:03:33-0400 | |
| Brandon Payne |
| 2025-10-29T16:05:29-0400 | |
| Brandon Payne |
| 2025-10-29T16:05:30-0400 | |
| Brandon Payne |
| 2025-10-29T16:05:31-0400 | |
| Brandon Payne |
| 2025-10-29T16:05:32-0400 | |
| Brandon Payne |
| 2025-10-29T16:05:33-0400 | |
| Brandon Payne |
| 2025-10-29T16:05:34-0400 | |
| Brandon Payne |
| 2025-10-29T16:05:35-0400 | |
| Brandon Payne |
| 2025-10-29T16:05:35-0400 | |
| Brandon Payne |
| 2025-10-29T16:05:36-0400 | |
| Brandon Payne |
| 2025-10-29T16:30:52-0400 | |
| Ryan Chmielewski |
| 2025-10-29T16:31:06-0400 | |
| Ryan Chmielewski |
| 2025-10-29T16:05:39-0400 | |
| Brandon Payne |
| 2025-10-29T16:05:40-0400 | |
| Brandon Payne |
| 2025-10-29T16:05:41-0400 | |
| Brandon Payne |
| 2025-10-29T16:05:42-0400 | |
| Brandon Payne |
| 2025-10-29T16:05:43-0400 | |
| Brandon Payne |
| 2025-10-29T16:31:26-0400 | |
| Ryan Chmielewski |
File details come from the government source that posted it. Updated .