This file is a PowerPoint presentation containing images documenting current HVAC components at the Ouray National Fish Hatchery's Grand Valley Unit. The presentation shows two existing indoor HVAC units that will be replaced with new units to be installed outside the building. The images depict two current condenser units located on the left side of a picture, which will be replaced. The existing concrete pads will be joined into one continuous pad to accommodate the new outside units. Holes will be cut in the building's side to connect new ducting to the existing interior ducting. The generator and an office A/C condenser will remain unchanged. The related federal contract opportunity is a solicitation by the Department of the Interior Fish and Wildlife Service (Solicitation Number: 140FC326Q0007) for professional services to procure, remove, replace, and install two HVAC systems with integrated dehumidification capability at the hatchery building.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hatch 1 HVAC Unit

This is one of two inside HVAC Units that will be replaced. The New Unit will sit outside the building and not inside like the current Unit.

Hatch 2 HVAC Unit

This is the second of two inside HVAC Units that will be replaced. The New Unit will sit outside the building and not inside like the current Unit.

Outside HVAC Condenser Unit’s

The two condenser units (on the left side of the picture) are the current units that will be replaced. All concrete pads in picture will be joined together as one whole concrete pad to make room for the new outside units. The generator (right side of picture) will stay as is along with the office A/C condenser that is to the left of the generator.

Outside HVAC Condenser Unit’s

These are the two outside HVAC condenser units that will be replace and is where the new outside units will be installed. All current concrete pads will be tied together with new concrete making one continuous pad. Holes will be cut in the side of the building to attach new ducting to current ducting inside building.