Phase III Worksheet.docx
DOCX document 34 KB Posted
- Attached to
- 6. 5 Creedmoor Gas Operated Rifle
- Solicitation number
- 70US0925R70092836
About this file
The document is a Phase III Worksheet for testing a 6.5 Creedmoor Gas Operated Rifle for the United States Secret Service. The worksheet outlines comprehensive testing protocols including Trigger Pull Test, Velocity Test, and Accuracy Test across multiple rounds and different firing speeds (2000, 3500, and 5000 FPS). The testing methodology involves multiple evaluators conducting repeated measurements, with spaces to record individual and average test results for each round and performance metric. The worksheet is designed to systematically assess the rifle's performance characteristics, including trigger pull consistency, velocity performance, and accuracy across different ammunition rounds and firing conditions, with specific emphasis on measuring potential performance degradation from previous testing phases.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6.5 Solicitation Amendment.pdf | ||
| Appendix B Armorer Eval.docx | DOCX document | |
| SOW 6.5 Creedmoor Gas Operated Rifle.docx | DOCX document | |
| 6.5 Creedmore Phase I Worksheet.docx | DOCX document | |
| Phase I Worksheet.docx | DOCX document | |
| 6.5 Creedmoor Rifle Solicitation - 70US0925R70092836_0_US.pdf | ||
| Testing Procedures 6.5 Creedmoor.docx | DOCX document | |
| SOW 6.5 Creedmoor Gas Operated Rifle.docx | DOCX document | |
| Appendix B Armorer Eval.docx | DOCX document | |
| USSS Clauses for 6.5 Creedmoor Rifle.docx | DOCX document | |
| Instruction to Offerors for 6.5 Creedmoor Rifle.docx | DOCX document | |
| Appendix C End User Eval.docx | DOCX document | |
| Appendix A Drop Test.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Phase III Worksheet
2. Trigger Pull Test (at Govt’s discretion)
| Evaluator: | Date: | |
| Round | ||
| #1 | ||
| #2 | ||
| #3 |
Average
Trigger Pull Test (at Govt’s discretion)
| Evaluator: | Date: | |
| Round | ||
| #1 | ||
| #2 | ||
| #3 |
Average
Trigger Pull Test (at Govt’s discretion)
| Evaluator: | Date: | |
| Round | ||
| #1 | ||
| #2 | ||
| #3 |
Average
3. Velocity Test (Sample Set A)
| Evaluator: | Date: | ||
| Round | 2000 | ||
| #1 – FPS | |||
| #2 – FPS | |||
| #3- FPS |
AVERAGE
Degradation From Phase I
| Evaluator: | Date: | ||
| Round | 3500 | ||
| #1 – FPS | |||
| #2 – FPS | |||
| #3-FPS |
AVERAGE
Degradation From Phase I
| Evaluator: | Date: | ||
| Round | 5000 | ||
| #1 – FPS | |||
| #2 – FPS | |||
| #3- FPS |
AVERAGE
Degradation From Phase I
4. Accuracy Test (Sample Set A)
| Evaluator: | Date: | |
| Round 2000 | ||
| #1 – MOA | ||
| #2 – MOA | ||
| #3-MOA |
1 – Set of 5 Shot Groups
2 – Set of 5 Shot Groups
3 – Set of 5 Shot Groups
AVERAGE
Degradation From Phase I
| Evaluator: | Date: | |
| Round 3500 | ||
| #1 – MOA | ||
| #2 – MOA | ||
| #3-MOA |
1 – Set of 5 Shot Groups
2 – Set of 5 Shot Groups
3 – Set of 5 Shot Groups
AVERAGE
Degradation From Phase I
| Evaluator: | Date: | |
| Round 5000 | ||
| #1 – MOA | ||
| #2 – MOA | ||
| #3- MOA |
1 – Set of 5 Shot Groups
2 – Set of 5 Shot Groups
3 – Set of 5 Shot Groups
AVERAGE
Degradation From Phase I
File details come from the government source that posted it. Updated .