Phase I Archeological Survey
Solicitation number
71205
Issued by
Fauquier County, Sugarland Run CDP, Virginia

About this file

The document is a set of specifications for a Phase I Archeological Survey requested by Frederick County Parks and Recreation in Virginia. The survey is to be conducted in preparation for the development plan of Old Charlestown Road Park located in Stephenson, VA, covering approximately 20 acres of the 24.92-acre park parcel. The survey must be performed by an archaeologist meeting the Secretary of the Interior's Professional Qualifications Standards and in accordance with the Virginia Department of Historic Resources' guidelines. The fieldwork and survey report are to be completed within 10 weeks of the Notice to Proceed.

The document does not provide details on pricing terms, set asides, incumbents, funding requirements or sources, or contract duration and renewal options. It references attached Frederick County General Terms and Conditions, but these are not included in the file provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Phase I Archeological Survey Frederick County Parks and Recreation is seeking a qualified consultant to conduct a Phase I Archeological Survey in preparation for the development plan of Old Charlestown Road Park located in Stephenson, VA. Specification follow:

· The survey should be conducted in accordance with DHR’s Guidelines for Conducting Historic Resources Survey in Virginia (October 2011, Revised 2017) found at https://www.dhr.virginia.gov/wp-content/uploads/2018/06/SurveyManual_2017.pdf.

· The archaeological survey must be conducted by an archaeologist that meets the Secretary of the Interior's Professional Qualifications Standards (48 FR 44738-39).

· The survey area should include all areas where ground disturbing activity is planned, this being approximately 20 acres of the 24.92-acre park parcel.

· See attached letter from DHR Office of Review and Compliance

· See attached DHR results map

· See attached VCRIS records

· See attached Topographic map of Existing Conditions

· Field work and Survey report to be completed within 10 weeks of Notice to Proceed

· See Attached Frederick County General Terms and Conditions