Phase 3 Drawings 603-23-101.pdf
PDF 3 MB Posted
- Solicitation number
- 36C24923B0009
About this file
This solicitation is for a construction project to replace roofs on multiple buildings at the Robley Rex VA Medical Center in Louisville, KY. The project includes demolishing existing roofing systems and installing new insulation, cover boards, membrane roofing, and flashings on Buildings 1 and 6 according to specifications. Bids are due by January 15, 2023 with award by February 28, 2023. The estimated value is $2-5M. The VA will evaluate bids based on technical qualifications, past performance, and price. The small business set-aside encourages bids from SDVOSBs, HUBZone, 8(a), and WOSB firms. The project is funded by the VA and will be managed according to the FAR.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24923B0009 0001.docx | DOCX document | |
| 21-007 Additional Roof Core Sample Report_Mar 23.pdf | ||
| RFIs Answered_Replace Roofs Phase 3.pdf | ||
| Site Visit Sign In Sheet - 23B0009.pdf | ||
| 36C24923B0009_1.docx | DOCX document | |
| WD KY20230093 Jefferson Cty 01132023.pdf | ||
| Bid Documents Spec Set 603-23-101 13Mar23.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
VICINITY MAP
SCALE: N.T.S.
N
LOCATION MAP
SCALE: N.T.S.
REPLACE SELECTED FLAT
ROOFS ROBLEY REX VAMC
REPLACE ROOFS PHASE 3
BLDG 1 ROBLEY REX VAMC
800 ZORN AVENUE
LOUISVILLE, KENTUCKY 40206
Department of Veterans Affairs
PROJECT # 603-23-101
PROJECT LOCATION:
LOUISVILLE, KY
100% CONSTRUCTION DOCUMENTS
DEDUCT ALTERNATE 1:
OMIT BUILDING 1 ROOF AREAS 2D.1, 2D.2, O, 1G.2, 2B, 2C, 2E, S,
4A.2
DEDUCT ALTERNATE 2:
OMIT BUILDING 1 ROOF AREAS 4A. 4A.1, 4B, 4E, 5A, 5C, 8C, BA, BB,
BC
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
REPLACE ROOFS PHASE 3
BLDG 1
603-23-101
ROBLEY REX VA MEDICAL CENTER
LOUISVILLE KY 40206
18-392
100% CONSTRUCTION DOCUMENTS
Engineer of Record:
Raymond Engineering-Georgia 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592 Raymond Ramos, PE, RRC
.2022.10.17 .
T-695
BUILDING 1BUILDING 12 BUILDING 6
COVER SHEET
G-001
SHEET INDEX
SHEET
NUMBER SHEET NAME
GENERAL
G-001 COVER SHEET
ARCHITECTURAL
A-101 BUILDING 1 OVERALL ROOF PLAN
BUILDING 1 ENLARGED ROOF PLAN DEMO - A
BUILDING 1 ENLARGED ROOF PLAN DEMO - B
A-102 A-103
BUILDING 1 ENLARGED ROOF PLAN DEMO - CA-104
BUILDING 1 ENLARGED ROOF PLAN DEMO - DA-105
BUILDING 1 WIND ZONE ENLARGED ROOF PLAN - A
BUILDING 1 WIND ZONE ENLARGED ROOF PLAN - B
A-110 A-111
BUILDING 1 WIND ZONE ENLARGED ROOF PLAN - CA-112
BUILDING 1 WIND ZONE ENLARGED ROOF PLAN - DA-113
BUILDING 1 ENLARGED ROOF PLAN NEW - A
BUILDING 1 ENLARGED ROOF PLAN NEW - B
A-106 A-107
BUILDING 1 ENLARGED ROOF PLAN NEW - CA-108
BUILDING 1 ENLARGED ROOF PLAN NEW - DA-109
TYPICAL DETAILSA-501
TYPICAL DETAILSA-502
TYPICAL DETAILSA-503
TYPICAL DETAILSA-504
AutoCAD SHX Text 6/8/2021
AutoCAD SHX Text 1 100% Construction
(N.I.C)
ROOF 8A
ROOF 7A
ROOF BG
(N.I.C)
ROOF 2F(KITCHEN)
ROOF 8C
ROOF 7B
ROOF 8B
ROOF 1F ROOF 1E
ROOF 10A (N.I.C)
ROOF 11A (N.I.C)
ROOF 2C
ROOF 2B
ROOF 3C
ROOF 1B
ROOF 2D.1
ROOF 1C
ROOF 9A
ROOF 7C
ROOF 1G
ROOF 2D.2
ROOF 9C
ROOF 8D
ROOF 4B
ROOF 4A.1
ROOF 4A.2
ROOF 4A
ROOF 5A
ROOF BD.1
ROOF BD.2
ROOF 4C
ROOF BA
(EMS DOCK)
ROOF 3B ROOF 2A
ROOF 1A
ROOF BF
ROOF 5B
ROOF 5C
ROOF 6B
ROOF 3A
ROOF 3E
ROOF 2D
ROOF 3D
ROOF 2E
ROOF 4E
ROOF 5C.1
ROOF 4D
ROOF BC ROOF BB
(N.I.C)
R O
O F
X1
ROOF O
(N.I.C)
(N.I.C)
ROOF S
ROOF 1G.1
R O
O F
1G .2
ROOF 1G.3
PRD
PRD
PRD
PRD
GU
GU
DS
PRD
PP
PP
PP
PP PRD PRD
EF
EF
EF EF
PP
PP PP PP PP PP PP PP
PP
H H H
H H H
H
H
PRD PRD
SVP
EF
EF
EF
EF EF EF
PRD
PRD
PRD
PRD
SVP
SVP
FPD
PRD
PRD
PRD
DS
DS
6'-0"
PRD
PRD
PRD SVP
PRD
EF
EF
PP PPEF
EF
EF EF
EF
EF
EF EF
EF
EF
EF
EF
EF
EF
SVP
SVP
SVP
SVP SVP SVP
PRD
ORD
PRD
ORD
GUDS DS
SVP
SVP
ORD
PRD
ORD
PRD SVP
SVP
SVP
ORD
PRD
PP
PP
PP
PP
EF
PP
PRD PRD
PRD PRD
SVP
SVP
SVP
SVP SVP
SVP
SVP
SVP
SVP
HVS
EF
PRD PRD
SVP
GU
DS
DSGU GU
EF
EF EF
OSOS
SVP
SVP
SVP
HVS
EF PRD
PRD
EF
SVP
HVS
PP
PP
PP
PP
PP
PP
SVP
SVP
SVP
HVS
EF EF
EF
RTU
RTU PRD
PRD SVP
SVP
SVP
PRD
PRD SVP
EF
FPD
FPD
RTU
EF
EF EF
EF EF
FPD FPD
SVP SVP
SVP
SVP
PRD
FPD
FPD
SVP
SVP
PRD
EF
PP
SVP
SVP
SVP
SVP
HVS
PP FPD
FPD
EF
EF
EF
EF
EF
RTU
PP
PP
PP
PP
PRD
PRD PRD
EF SVP
SVP
SVP
FPD
FPD
HVS HVS
PP PP
PP
PP
PP
PP
PP PP
PP
EF EF EF EF
H
PRD PRD SVP
PRD
SVP
EF
SVP
SVP
SVP
EF
EF
EF
FPD
FPD
PRD
ORD
PRD
ORD
EF
ORD
PRD
ORD
PRD
PRDORD
SVP
EF
SVP
SVP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
SA SA SA
PRD
PRD PRD
FPD FPD
SA
SA
PRDPRD
EF EF EF
EF EF
EF EF
RTU
EF
HVS
GU GU
PRD PP
PP PP
PP
PRD
SVP
PP
PP
PP
PP EF EF
PRD PRD
PRD
SVP
SVP
RTU
PRD
PRD
EF EF
FPD
SVP
SVP
SVP
PRD
PRD
PRD
PRDPRD
PRD
PP
PP
PP
PP
PP
PP PP
FPD
FPD
PP
SVP
SVP
SVP
SVP
SVP
SVP
FPD SVP
PP
PP
EF
PRD
RTU
EF EF
SVP SVP
PRD
PRD
PRD
PRD
FPD
PP PP
FPD
SVP
SVP
RTU
RTU
FPD
SVP
SVP
SVP
PRD
PRD
PRD
PRD
PRD
SVP
PP PP PP PP
EF
EF
EF
EF EF EF
RTU
EF
EF
EF
EF
EF
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OSOS
OS
OS OS
OS
OS OS
OS
OS
OS
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EF
EF
EF
EF
EF
PP
OS
PRD
FPD
SVP
RTU
EF
EF
PP
RTU
PRD
PRD
EF
PP
EF
EF
PP
PP
EF
EF EF
EF
PP
PP
PP
PP
RTU
PRD
PRD PRD
PRD
FPD
FPD
FPD
EF
EF
SVP
SVP
PP
PP
PP PP PP PP
PP
SVP
OS
OS
PRD
PRD
PRD PRD
PRD PRD
EF
FPD
EF
OS
OS
OS
OS
SVP
FPD FPD
EF
EF
FPD FPD
FPDFPD
PP
PP
SA
EF
EF
SVP
SVP
SVP
SVP
SVP
SVP
FPD
SA
EF
PP
FPD
PRD
FPD
FPD
SVP
FPD
HVS
FPD
PRD
SVP
RTU
EF
EF
EF
PRD
EF
EJ
EJ
SVP
SVP
SVP
SVP
EF
PP
PP
PP
PP
PP
PP
PP
PP
PP PP
RTU RTU
PRD
PRD
OS
MATCH LINE A
MATCH LINE C
MATCH LINE B
MATCH LINE D
M
AT
C H
L
IN
E D
M
AT
C H
L
IN
E C
M
AT
C H
L
IN
E B
M
AT
C H
L
IN
E A
37'±1'-9"±
57'-8"±
19'-8"± 6'-5"± 14'-2"±
3'-8"±
59'-2"±
15'± 42'-9"± 26'±
41'-3"±
20'±
38'-8"±
19'-4"±
38'±
11'-6"±
33'-4"±
11'-7"±
37'-4"±
23'-8"±
16'-3"±
35'-6"±
37'-8"±
16'±14'-1"±
21'-8"±
46'-7"±
31'-3"±
39'-4"±
40'-5"±
34'-11"±
12'-7"±
9'-1"±
99'-2"±
9'-9"±
4'±
16'-1"±
37'-4"±
18'±
45'±
25'-1"± 30'-3"± 56'-3"±
23'-5"±40'-4"±4'-4"±
16'-1"± 50'-5"±
5'-8"±
20'-3"±
15'-4"±34'-10"±
20'-3"±
29'-7"±
13'±
7'-3"±
2'-7"± 10'-5"±
8'-3"±
5'-2"±
5'-7"±
11'-6"±
40'-1"±
11'-2"±
40'-4"±
46'-2"±
37'-9"±
36'-2"±
5'-5"±
4'-7"±
10'-9"±
BUILDING 1 KEY PLAN
A B
C D
ROOF 9B
25'-2"±
(N.I.C)
(N.I.C)(N.I.C)
(N.I.C)
(N.I.C)
(N.I.C)
(N.I.C)
(N.I.C)
(N.I.C) (N.I.C)
(N.I.C)
(N.I.C)
(N.I.C)
(N.I.C)
EF
EF
EF
RTU
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
REPLACE ROOFS PHASE 3
BLDG 1
603-23-101
ROBLEY REX VA MEDICAL CENTER
LOUISVILLE KY 40206
18-392
100% CONSTRUCTION DOCUMENTS
Engineer of Record:
Raymond Engineering-Georgia 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592 Raymond Ramos, PE, RRC
.2022.10.17 .
T-695
A-101
BUILDING 1
OVERALL ROOF PLAN
N
SCALE: 1/16" = 1'-0"1 BUILDING 1 OVERALL ROOF PLAN
ROOFTOP UNIT
ROOF
OUTLINE/PARAPET
GUTTER (GU)
VENT THRU ROOF
(VTR)
PRIMARY ROOF
DRAIN (PRD)
PITCH POCKET (PP)
ROOF OUTLINE/
GRAVE-STOP FASCIA
ROOF AREA NOT-IN-
CONTRACT (N.I.C.)
EXHAUST FAN (EF)
SKYLIGHT (S)S
ROOF ACCESS -
LADDER
STRUCTURAL
RIDGE/HIP
VALLEY
LEGEND
HOT VENT STACK
(HVS)OVERFLOW SCUPPEROS
SOIL VENT PIPE
(SVP)
FALL PROTECTION
DEVICE (FPD)
DOWNSPOUT (DS)
OVERFLOW ROOF
DRAIN (ORD)
SATELLITESA
EXPANSION JOINT
EJ
ABANDONED CURB
1). ROOF AREAS 1C, 2A, 2F, 3C, 4A, 4E, 5A, 6B, 7A, 7B, 8A,
8C, 8D, 9B, 9C, BD.1, BD.2, BF & O: MODIFY EXISTING
SCUPPER TO RECEIVE A MINIMUM 4" x 10" SCUPPER
LINER.
2). ROOF AREAS 3A & 9A : MODIFY EXISTING SCUPPER
TO RECEIVE A MINIMUM 4" x 18" SCUPPER LINER.
3). ALL ROOF DRAIN LEADERS EXCEPT ROOF AREA 2E
TO BE MINIMUM 3" Ø (DIAMETER).
4). ROOF AREA 2E ROOF DRAIN LEADER TO BE MINIMUM
4" Ø (DIAMETER).
5). ROOF AREAS 1C, 4A.2, 5B & BA MINIMUM GUTTER
SIZE TO BE 4" x 4" AND DOWNSPOUTS TO BE 2" x 3".
6). ROOF AREAS 2A & 4B MINIMUM GUTTER SIZE TO BE
6" x 6" AND DOWNSPOUTS TO BE 4" x 5".
ADDENDUM 200914 9/14/20201
GENERAL NOTES:
CONTRACTOR SHALL INSTALL NEW NEOPRENE OR
ANTI-VIBRATION PADS UNDER NON-PENETRATING
EQUIPMENT/CONDUIT SUPPORTS IN CONTRACT ROOF
AREA. ADHERE PADS TO ROOF MEMBRANE.
A.
REMOVE ALL ABANDONED CURBS. VERIFY WITH COR
DURING DEMOLITION PHASE.
B.
AutoCAD SHX Text 6/8/2021
ROOF 8C
ROOF 7B
ROOF 8B
ROOF 1F
ROOF 1E
ROOF 2C
ROOF 2B
ROOF 3C
ROOF 1B
ROOF 2D.1
ROOF 1C
ROOF 9A
ROOF 7C
ROOF 1G
ROOF 2D.2
ROOF 9C
(N.I.C)
ROOF 1G.1
ROOF 1G.3
GU
PRD PRD SVP
GU GU
PRD PP
PP PP
PP
PRD
SVP
PP
PP
PP
PP EF EF
PRD PRD
PRD
SVP
SVP
RTU
PRD
PRD
EF EF
PRD
PRD
SVP
SVP
FPD SVP
PP
PP
EF
PRD
RTU
EF EF
SVP SVP
PRD
PRD
PRD
PRD
FPD
PP PP
FPD
SVP
SVP
RTU
RTU
FPD
SVP
SVP
SVP
PRD
PRD
PRD
PRD
PRD
SVP
PP PP PP PP
EF
EF
EF
EF EF EF
RTU
EF
EF
EF
EF
EF
OS
OS
OS
OS
OS
OS
OS
EJ
EJ
EJ
EJ
EJ
EF
EF
EF
EF
EF
PP
OS
PRD
FPD
SVP
RTU
EF
EF
PP
RTU
PRD
PRD
EF
PP
EF
EF
PP
PP
EF
EF EF
EF
PP
PP
PP
PP
RTU
PRD
PRD PRD
PRD
FPD
FPD
FPD
EF
EF
SVP
SVP
PP
PP
PP PP PP PP
PP
SVP
OS
OS
PRD
PRD
PRD PRD
PRD PRD
EF
FPD
EF
OS
OS
OS
OS
SVP
FPD FPD
EF
EF
FPD FPD
FPDFPD
PP
PP
SA
EF
EF
SVP
SVP
SVP
SVP
SVP
SVP
FPD
SA
EF
PP
FPD
PRD
FPD
FPD
SVP
FPD
HVS
FPD
PRD
SVP
RTU
EF
EF
EF
RTU RTU
DS
BUILDING 1 KEY PLAN
A B
C D
MATCH LINE A
MATCH LINE C
M
AT
C H
L
IN
E B
M
AT
C H
L
IN
E A
37'±1'-9"±
57'-8"±
19'-8"± 6'-5"± 14'-2"±
3'-8"±
15'± 42'-9"±
20'±
38'-8"±
19'-4"±
38'±
11'-6"±
33'-4"±
11'-7"±
23'-8"±
16'-3"±
14'-1"±
21'-8"±
46'-7"±
31'-3"±
39'-4"±
40'-5"±
34'-11"±
25'-1"± 30'-3"± 56'-3"±
ROOF 9B
1 1
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
56 6
TYP.
(TO EDGE OF ROOF BEYOND)
17'-5"±
25'-1"± 42'-4"±
41'-7"± 30'-1"±6'±
36'-7"± 36'-5"±
45'-2"±
56'-9"±
26'-1"±
44'-11"±41'-4"±
27'-9"±
(TO EDGE
OF ROOF
BEYOND)
TYP.
ROOF 4A.2
6 TYP.
RTU
ROOF 10A (N.I.C)
ROOF 11A (N.I.C)
TYP.
TYP.
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
REPLACE ROOFS PHASE 3
BLDG 1
603-23-101
ROBLEY REX VA MEDICAL CENTER
LOUISVILLE KY 40206
18-392
100% CONSTRUCTION DOCUMENTS
Engineer of Record:
Raymond Engineering-Georgia 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592 Raymond Ramos, PE, RRC
.2022.10.17 .
T-695
A-102
BUILDING 1 ENLARGED ROOF
PLAN DEMO - A
N
SCALE: 1/8" = 1'-0"1 BUILDING 1 ENLARGED ROOF PLAN DEMO - A
REMOVE AND DISCARD EXISTING METAL FLASHINGS,
INSULATION, AND ROOFING MEMBRANE ACCORDING
TO SPECIFICATIONS. REPAIR EXISTING DECK AS
REQUIRED. REFER TO SPECIFICATION 011100
SUMMARY OF WORK AND 024100 DEMOLITION
REMOVE AND STORE EXISTING LIGHTNING
PROTECTION SYSTEM. REFER TO SPECIFICATION
011100 SUMMARY OF WORK AND 264100 FACILITY
LIGHTING PROTECTION. REINSTALL PER
COMPLETION OF NEW WORK FOR EACH ROOF AREA
3 REMOVE AND DISCARD EXISTING LADDER. REFER TO
SPECIFICATION 011100 SUMMARY OF WORK AND
024100 DEMOLITION
4 REMOVE AND DISCARD EXISTING STONE COPING
JOINT SEALANT. REFER TO SPECIFICATION 011100
SUMMARY OF WORK AND 024100 DEMOLITION
5 REMOVE AND DISCARD EXISTING EXPANSION JOINT.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK AND 024100 DEMOLITION
6 REMOVE AND DISCARD ABANDONED CURBS. REFER
TO SPECIFICATION 011100 SUMMARY OF WORK AND
024100 DEMOLITION
ROOFTOP UNIT
ROOF
OUTLINE/PARAPET
GUTTER (GU)
VENT THRU ROOF
(VTR)
PRIMARY ROOF
DRAIN (PRD)
PITCH POCKET (PP)
ROOF OUTLINE/
GRAVE-STOP FASCIA
ROOF AREA NOT-IN-
CONTRACT (N.I.C.)
EXHAUST FAN (EF)
SKYLIGHT (S)S
ROOF ACCESS -
LADDER
STRUCTURAL
RIDGE/HIP
VALLEY
LEGEND
HOT VENT STACK
(HVS)OVERFLOW SCUPPEROS
SOIL VENT PIPE
(SVP)
FALL PROTECTION
DEVICE (FPD)
DOWNSPOUT (DS)
OVERFLOW ROOF
DRAIN (ORD)
SATELLITESA
EXPANSION JOINT
EJ
ABANDONED CURB
7 REMOVE AND DISCARD EXISTING SCUPPER LINER.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK AND 024100 DEMOLITION
8 REMOVE AND DISCARD EXISTING WOODEN
CROSSOVER.
AutoCAD SHX Text 6/8/2021
ROOF 8D
ROOF 6B
ROOF 3A
ROOF 3E
ROOF 2D
ROOF 3D
ROOF 2E
ROOF 4E
ROOF X1
ROOF O
ROOF S
R O
O F
1G .2
PRD
SVP
EF
SVP
SVP
SVP
EF
EF
EF
FPD
FPD
PRD
ORD
PRD
ORD
EF
ORD
PRD
ORD
PRD
PRDORD
SVP
EF
SVP
SVP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
SA SA SA
PRD
PRD PRD
FPD FPD
SA
SA
PRDPRD
EF EF EF
EF EF
EF EF
RTU
EF
HVS
FPD
SVP
SVP
SVP
PRD
PRD
PRD
PRD
PP
PP
PP
PP
PP
PP PP
FPD
FPD
PP
SVP
SVP
SVP
SVP
OS
OS
PS
OS
OS
OS
OS
OS
OS
OS
EJ
EJ
PRD
PRD
PS
BUILDING 1 KEY PLAN
A B
C D
M
AT
C H
L
IN
E B
M
AT
C H
L
IN
E A
MATCH LINE B
MATCH LINE D
26'±
41'-3"±
16'±
12'-7"±
9'-1"±
99'-2"±
9'-9"±
4'±
16'-1"±
37'-4"±
30'-3"± 56'-3"±
8'-3"±
1 1
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
31'-10"±
35'-11"± 40'-1"±
45'-2"±
8'±
13'-6"±
TYP.
PS
102'-3"±
17'±
(TO EDGE
OF ROOF
BEYOND)
(TO EDGE OF ROOF BEYOND)
EF
EF
EF
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
REPLACE ROOFS PHASE 3
BLDG 1
603-23-101
ROBLEY REX VA MEDICAL CENTER
LOUISVILLE KY 40206
18-392
100% CONSTRUCTION DOCUMENTS
Engineer of Record:
Raymond Engineering-Georgia 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592 Raymond Ramos, PE, RRC
.2022.10.17 .
T-695
A-103
BUILDING 1 ENLARGED
ROOF PLAN DEMO - B
N
SCALE: 1/8" = 1'-0"1 BUILDING 1 ENLARGED ROOF PLAN DEMO - B
REMOVE AND DISCARD EXISTING METAL FLASHINGS,
INSULATION, BALLAST, AND ROOFING MEMBRANE
ACCORDING TO SPECIFICATIONS. REPAIR EXISTING
DECK AS REQUIRED. REFER TO SPECIFICATION
011100 SUMMARY OF WORK AND 024100 DEMOLITION
REMOVE AND STORE EXISTING LIGHTNING
PROTECTION SYSTEM. REFER TO SPECIFICATION
011100 SUMMARY OF WORK AND 264100 FACILITY
LIGHTING PROTECTION. REINSTALL PER
COMPLETION OF NEW WORK FOR EACH ROOF AREA
3 REMOVE AND DISCARD EXISTING LADDER. REFER TO
SPECIFICATION 011100 SUMMARY OF WORK AND
024100 DEMOLITION
4 REMOVE AND DISCARD EXISTING STONE COPING
JOINT SEALANT. REFER TO SPECIFICATION 011100
SUMMARY OF WORK AND 024100 DEMOLITION
5 REMOVE AND DISCARD EXISTING EXPANSION JOINT.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK AND 024100 DEMOLITION
6 REMOVE AND DISCARD ABANDONED CURBS. REFER
TO SPECIFICATION 011100 SUMMARY OF WORK AND
024100 DEMOLITION
ROOFTOP UNIT
ROOF
OUTLINE/PARAPET
GUTTER (GU)
VENT THRU ROOF
(VTR)
PRIMARY ROOF
DRAIN (PRD)
PITCH POCKET (PP)
ROOF OUTLINE/
GRAVE-STOP FASCIA
ROOF AREA NOT-IN-
CONTRACT (N.I.C.)
EXHAUST FAN (EF)
SKYLIGHT (S)S
ROOF ACCESS -
LADDER
STRUCTURAL
RIDGE/HIP
VALLEY
LEGEND
HOT VENT STACK
(HVS)OVERFLOW SCUPPEROS
SOIL VENT PIPE
(SVP)
FALL PROTECTION
DEVICE (FPD)
DOWNSPOUT (DS)
OVERFLOW ROOF
DRAIN (ORD)
SATELLITESA
EXPANSION JOINT
EJ
ABANDONED CURB
7 REMOVE AND DISCARD EXISTING SCUPPER LINER.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK AND 024100 DEMOLITION
AutoCAD SHX Text 6/8/2021
ROOF BG
ROOF 8A
ROOF 7A
ROOF 2F(KITCHEN)
ROOF 4B
ROOF 4A.1
ROOF 4A.2
ROOF 4A
ROOF 5A
ROOF BD.1
ROOF BD.2
ROOF 4C
ROOF BA
(EMS DOCK)
ROOF BF
ROOF BC
ROOF BB
(N.I.C)
(N.I.C)
PRD
PRD
PRD
PRD
GU
GU
DS
PRD
PP
PP
PP
PP PRD PRD
EF
EF
EF EF
PP
PP PP PP PP PP PP PP
PP
H H H
H H H
H
H
PRD PRD
SVP
EF
EF
EF
EF EF EF
PRD
PRD
PRD PRD
PRD PRD
SVP
SVP
SVP
SVP SVP
SVP
SVP
SVP
SVP
HVS
EF
PRD PRD
SVP
GU
DS
DSGU GU
EF
EF EF
OSOS
SVP
SVP
SVP
HVS
EF PRD
PRD
EF
SVP
HVS
PP
PP
PP
PP
PP
PP
SVP
SVP
SVP
HVS
EF EF
EF
RTU PRD
PRD SVP
SVP
SVP
PRD
PRD SVP
EF
FPD
FPD
RTU
EF
EF EF
EF EF
FPD FPD
SVP SVP
SVP
SVP
PRD
FPD
FPD
SVP
SVP
PRD
EF
PP
SVP
SVP
SVP
SVP
HVS
PP FPD
FPD
EF
EF
EF
EF
EF
RTU
PP
PP
PP
PP
PRD
PRD PRD
EF SVP
SVP
SVP
FPD
FPD
HVS HVS
PP PP
PP
PP
PP
PP
PP PP
PP
EF EF EF EF
H
OS
OSOS
OS
OS OS
OS
OS OS
OS
EJ
EJ
EJ
EJ
EJ
EJ
BUILDING 1 KEY PLAN
A B
C D
MATCH LINE A
MATCH LINE C
M
AT
C H
L
IN
E D
M
AT
C H
L
IN
E C
59'-2"±
11'-7"±
37'-4"±
23'-8"±
35'-6"±
37'-8"±
40'-1"±
11'-2"±
40'-4"±
46'-2"±
37'-9"±
36'-2"±
5'-5"±
4'-7"±
34'-10"±
20'-3"±
29'-7"±
13'±
7'-3"±
2'-7"± 10'-5"±
5'-2"±
5'-7"±
11'-6"±
10'-9"±
15'-4"±
25'-2"±
ROOF 9A
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
(TO EDGE OF ROOF BEYOND)
44'-9"±
96'-2"±
30'-8"±
19'-10"±
27'-7"±
7'-3"±
59'-3"±
53'-9"±
TYP.
TYP.
TYP.
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
REPLACE ROOFS PHASE 3
BLDG 1
603-23-101
ROBLEY REX VA MEDICAL CENTER
LOUISVILLE KY 40206
18-392
100% CONSTRUCTION DOCUMENTS
Engineer of Record:
Raymond Engineering-Georgia 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592 Raymond Ramos, PE, RRC
.2022.10.17 .
T-695
A-104
BUILDING 1 ENLARGED
ROOF PLAN DEMO - C
N
SCALE: 1/8" = 1'-0"1 BUILDING 1 ENLARGED ROOF PLAN DEMO - C
REMOVE AND DISCARD EXISTING METAL FLASHINGS,
INSULATION, AND ROOFING MEMBRANE ACCORDING
TO SPECIFICATIONS. REPAIR EXISTING DECK AS
REQUIRED. REFER TO SPECIFICATION 011100
SUMMARY OF WORK AND 024100 DEMOLITION
REMOVE AND STORE EXISTING LIGHTNING
PROTECTION SYSTEM. REFER TO SPECIFICATION
011100 SUMMARY OF WORK AND 264100 FACILITY
LIGHTING PROTECTION. REINSTALL PER
COMPLETION OF NEW WORK FOR EACH ROOF AREA
3 REMOVE AND DISCARD EXISTING LADDER. REFER TO
SPECIFICATION 011100 SUMMARY OF WORK AND
024100 DEMOLITION
4 REMOVE AND DISCARD EXISTING STONE COPING
JOINT SEALANT. REFER TO SPECIFICATION 011100
SUMMARY OF WORK AND 024100 DEMOLITION
5 REMOVE AND DISCARD EXISTING EXPANSION JOINT.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK AND 024100 DEMOLITION
6 REMOVE AND DISCARD ABANDONED CURBS. REFER
TO SPECIFICATION 011100 SUMMARY OF WORK AND
024100 DEMOLITION
ROOFTOP UNIT
ROOF
OUTLINE/PARAPET
GUTTER (GU)
VENT THRU ROOF
(VTR)
PRIMARY ROOF
DRAIN (PRD)
PITCH POCKET (PP)
ROOF OUTLINE/
GRAVE-STOP FASCIA
ROOF AREA NOT-IN-
CONTRACT (N.I.C.)
EXHAUST FAN (EF)
SKYLIGHT (S)S
ROOF ACCESS -
LADDER
STRUCTURAL
RIDGE/HIP
VALLEY
LEGEND
HOT VENT STACK
(HVS)OVERFLOW SCUPPEROS
SOIL VENT PIPE
(SVP)
FALL PROTECTION
DEVICE (FPD)
DOWNSPOUT (DS)
OVERFLOW ROOF
DRAIN (ORD)
SATELLITESA
EXPANSION JOINT
EJ
ABANDONED CURB
7 REMOVE AND DISCARD EXISTING SCUPPER LINER.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK AND 024100 DEMOLITION
AutoCAD SHX Text 6/8/2021
ROOF 3B ROOF 2A
ROOF 1A
ROOF 5B
ROOF 5C
ROOF 5C.1
ROOF 4D
(N.I.C)
H
H
PRD
PRD
SVP
SVP
FPD
PRD
PRD
PRD
DS
DS
6'-0"
PRD
PRD
PRD SVP
PRD
EF
EF
PP PPEF
EF
EF EF
EF
EF
EF EF
EF
EF
EF
EF
EF
EF
SVP
SVP
SVP
SVP SVP SVP
PRD
ORD
PRD
ORD
GUDS DS
SVP
SVP
ORD
PRD
ORD
PRD SVP
SVP
SVP
ORD
PRD
PP
PP
PP
PP
EF
PP
OS
RTU
OS
OS
OS
OS
OS
OS
EJ
EJ
EJ
EJ
PRD
EF
EJ
EJ
SVP
SVP
SVP
SVP
EF
PP
PP
PP
PP
PP
PP
PP
PP
PP PP
BUILDING 1 KEY PLAN
A B
C D
M
AT
C H
L
IN
E D
M
AT
C H
L
IN
E C
MATCH LINE B
MATCH LINE D
34'-3"±
18'±
45'±
23'-5"±40'-4"±4'-4"±
16'-1"± 50'-5"±
5'-8"±
20'-3"±
15'-4"±
1 1
TYP.
TYP.
TYP.
TYP.
20'±
42'-9"±
23'-3"±
24'-8"±
9'-11"± 12'-6"±
23'±
TYP.
(TO EDGE OF ROOF BEYOND)
(TO EDGE OF ROOF BEYOND)
70'-6"±
TYP.
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
REPLACE ROOFS PHASE 3
BLDG 1
603-23-101
ROBLEY REX VA MEDICAL CENTER
LOUISVILLE KY 40206
18-392
100% CONSTRUCTION DOCUMENTS
Engineer of Record:
Raymond Engineering-Georgia 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592 Raymond Ramos, PE, RRC
.2022.10.17 .
T-695
A-105
BUILDING 1 ENLARGED
ROOF PLAN DEMO - D
N
SCALE: 1/8" = 1'-0"1 BUILDING 1 ENLARGED ROOF PLAN DEMO - D
REMOVE AND DISCARD EXISTING METAL FLASHINGS,
INSULATION, BALLAST, AND ROOFING MEMBRANE
ACCORDING TO SPECIFICATIONS. REPAIR EXISTING
DECK AS REQUIRED. REFER TO SPECIFICATION
011100 SUMMARY OF WORK AND 024100 DEMOLITION
REMOVE AND STORE EXISTING LIGHTNING
PROTECTION SYSTEM. REFER TO SPECIFICATION
011100 SUMMARY OF WORK AND 264100 FACILITY
LIGHTING PROTECTION. REINSTALL PER
COMPLETION OF NEW WORK FOR EACH ROOF AREA
3 REMOVE AND DISCARD EXISTING LADDER. REFER TO
SPECIFICATION 011100 SUMMARY OF WORK AND
024100 DEMOLITION
4 REMOVE AND DISCARD EXISTING STONE COPING
JOINT SEALANT. REFER TO SPECIFICATION 011100
SUMMARY OF WORK AND 024100 DEMOLITION
5 REMOVE AND DISCARD EXISTING EXPANSION JOINT.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK AND 024100 DEMOLITION
6 REMOVE AND DISCARD ABANDONED CURBS. REFER
TO SPECIFICATION 011100 SUMMARY OF WORK AND
024100 DEMOLITION
ROOFTOP UNIT
ROOF
OUTLINE/PARAPET
GUTTER (GU)
VENT THRU ROOF
(VTR)
PRIMARY ROOF
DRAIN (PRD)
PITCH POCKET (PP)
ROOF OUTLINE/
GRAVE-STOP FASCIA
ROOF AREA NOT-IN-
CONTRACT (N.I.C.)
EXHAUST FAN (EF)
SKYLIGHT (S)S
ROOF ACCESS -
LADDER
STRUCTURAL
RIDGE/HIP
VALLEY
LEGEND
HOT VENT STACK
(HVS)OVERFLOW SCUPPEROS
SOIL VENT PIPE
(SVP)
FALL PROTECTION
DEVICE (FPD)
DOWNSPOUT (DS)
OVERFLOW ROOF
DRAIN (ORD)
SATELLITESA
EXPANSION JOINT
EJ
ABANDONED CURB
7 REMOVE AND DISCARD EXISTING SCUPPER LINER.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK AND 024100 DEMOLITION
AutoCAD SHX Text 6/8/2021
ROOF 8B
ROOF 1F
ROOF 1E
ROOF 10A (N.I.C)
ROOF 11A (N.I.C)
ROOF 2C
ROOF 2B
ROOF 3C
ROOF 1B
ROOF 2D.1
ROOF 1C
ROOF 9A
ROOF 7C
ROOF 1G
ROOF 2D.2
ROOF 9C
(N.I.C)
ROOF 1G.1
ROOF 1G.3
GU
PRD PRD SVP
GU GU
PRD PP
PP PP
PP
PRD
SVP
PP
PP
PP
PP EF EF
PRD PRD
PRD
SVP
SVP
RTU
PRD
PRD
EF EF
PRD
PRD
SVP
SVP
FPD SVP
PP
PP
EF
PRD
RTU
EF EF
SVP SVP
PRD
PRD
PRD
PRD
FPD
PP PP
FPD
SVP
SVP
RTU
RTU
FPD
SVP
SVP
SVP
PRD
PRD
PRD
PRD
PRD
SVP
PP PP PP PP
EF
EF
EF
EF EF EF
RTU
EF
EF
EF
EF
EF
OS
OS
OS
OS
OS
OS
OS
EJ
EJ
EJ
EJ
EJ
EF
EF
EF
EF
EF
PP
OS
PRD
FPD
SVP
RTU
EF
EF
PP
RTU
PRD
PRD
EF
PP
EF
EF
PP
PP
EF
EF EF
EF
PP
PP
PP
PP
RTU
PRD
PRD PRD
PRD
FPD
FPD
FPD
EF
EF
SVP
SVP
PP
PP
PP PP PP PP
PP
SVP
OS
OS
PRD
PRD
PRD PRD
PRD PRD
EF
FPD
EF
OS
OS
OS
OS
SVP
FPD FPD
EF
EF
FPD FPD
FPDFPD
PP
PP
SA
EF
EF
SVP
SVP
SVP
SVP
SVP
SVP
FPD
SA
EF
PP
FPD
PRD
FPD
FPD
SVP
FPD
HVS
FPD
PRD
SVP
RTU
EF
EF
EF
RTU RTU
DS
BUILDING 1 KEY PLAN
A B
C D
MATCH LINE A
MATCH LINE C
M
AT
C H
L
IN
E B
M
AT
C H
L
IN
E A37'±1'-9"±
57'-8"±
19'-8"± 6'-5"± 14'-2"±
3'-8"±
15'± 42'-9"±
20'±
38'-8"±
19'-4"±
38'±
11'-6"±
33'-4"±
11'-7"±
23'-8"±
16'-3"±
14'-1"±
21'-8"±
46'-7"±
31'-3"±
39'-4"±
40'-5"±
34'-11"±
25'-1"± 30'-3"± 56'-3"±
ROOF 9B
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
RTU RTU
TYP.
A-501
TYP.
A-501
TYP.
A-502
TYP.
A-503
TYP.
A-502
TYP.
A-502
TYP.
A-503
TYP.
A-502
TYP.
A-501
TYP.
LOW
A-501TYP.
A-501
TYP.
A-501TYP.
HIGH
A-501TYP.
(TO EDGE OF ROOF BEYOND)
17'-5"±
25'-1"± 42'-4"±
41'-7"± 30'-1"±6'±
36'-7"± 36'-5"±
45'-2"±
56'-9"±
26'-1"±
44'-11"±41'-4"±
27'-9"±
(TO EDGE
OF ROOF
BEYOND)
4 TYP.
TYP.
A-503
TYP.
TYP.
ROOF 4A.2
RTU
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
REPLACE ROOFS PHASE 3
BLDG 1
603-23-101
ROBLEY REX VA MEDICAL CENTER
LOUISVILLE KY 40206
18-392
100% CONSTRUCTION DOCUMENTS
Engineer of Record:
Raymond Engineering-Georgia 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592 Raymond Ramos, PE, RRC
.2022.10.17 .
T-695
A-106
BUILDING 1 ENLARGED
ROOF PLAN NEW - A
N
SCALE: 1/8" = 1'-0"1 BUILDING 1 ENLARGED ROOF PLAN NEW - A
1 FURNISH AND INSTALL NEW INSULATION, COVER
BOARD, ROOFING MEMBRANE, AND METAL
FLASHINGS ACCORDING TO SPECIFICATIONS.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK, 061000 ROUGH CARPENTRY, 072200 ROOF
BOARD INSULATION, 075216.11 COLD ADHESIVE
STYRENE-BUTADIENE-STYRENE MODIFIED
BITUMINOUS MEMBRANE ROOFING, 076000 FLASHING
AND SHEET METAL, 077100 ROOF SPECIALTIES,
077200 ROOF ACCESSORIES, AND 221400 FACILITY
STORM DRAINAGE
2 PROPERLY REINSTALL AND COMMISSION EXISTING
LIGHTNING PROTECTION. REFER TO SPECIFICATION
011100 SUMMARY OF WORK AND 264100 FACILITY
LIGHTING PROTECTION
3 FURNISH AND INSTALL NEW LADDER.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK AND 055000 METAL FABRICATIONS
4 FURNISH AND INSTALL NEW SEALANT AT STONE
COPING JOINT.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK AND 079200 JOINT SEALANTS
5 FURNISH AND INSTALL NEW EXPANSION JOINT
BELLOW SYSTEM.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK AND 077100 ROOF SPECIALITIES
ROOFTOP UNIT
ROOF
OUTLINE/PARAPET
GUTTER (GU)
VENT THRU ROOF
(VTR)
PRIMARY ROOF
DRAIN (PRD)
PITCH POCKET (PP)
ROOF OUTLINE/
GRAVE-STOP FASCIA
ROOF AREA NOT-IN-
CONTRACT (N.I.C.)
EXHAUST FAN (EF)
SKYLIGHT (S)S
ROOF ACCESS -
LADDER
STRUCTURAL
RIDGE/HIP
VALLEY
LEGEND
HOT VENT STACK
(HVS)OVERFLOW SCUPPEROS
SOIL VENT PIPE
(SVP)
FALL PROTECTION
DEVICE (FPD)
DOWNSPOUT (DS)
OVERFLOW ROOF
DRAIN (ORD)
SATELLITESA
EXPANSION JOINT
EJ
ABANDONED CURB
6 FURNISH AND INSTALL NEW SCUPPER LINER.
SEE NOTES ON A-101 FOR SIZING REQUIREMENTS
7 FURNISH AND INSTALL NEW ROOF AREA DIVIDER
TAPERED INSULATION
/ CRICKET WALKPADS
8 FURNISH AND INSTALL NEW CROSS-OVER STAIRS.
REFER TO SPECIFICATIONS 055000 METAL
FABRICATIONS.
9 FURNISH AND INSTALL NEW "SHIP" STAIRS. PROVIDE
NEW CURB FOR MOUNTING OF BASE. ATTACH UNIT TO
PARAPET WALL PER SPECIFICATIONS. REFER TO
SPECIFICATIONS 055000 METAL FABRICATIONS.
10 FURNISH AND INSTALL NEW STAIRS. PROVIDE NEW
CURB FOR MOUNTING OF BASE. ATTACH UNIT TO
PARAPET WALL PER SPECIFICATIONS. REFER TO
SPECIFICATIONS 055000 METAL FABRICATIONS.
AutoCAD SHX Text 6/8/2021
ROOF 3A
ROOF 3E
ROOF 2D
ROOF 3D
ROOF 2E
ROOF 4E
ROOF X1
ROOF O
ROOF S
R
O O
F 1G
.2
PRD
SVP
EF
SVP
SVP
SVP
EF
EF
EF
FPD
FPD
PRD
ORD
PRD
ORD
EF
ORD
PRD
ORD
PRD
PRDORD
SVP
EF
SVP
SVP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
SA SA SA
PRD
PRD PRD
FPD FPD
SA
SA
PRDPRD
EF EF EF
EF EF
EF EF
RTU
EF
HVS
FPD
SVP
SVP
SVP
PRD
PRD
PRD
PRD
PP
PP
PP
PP
PP
PP PP
FPD
FPD
PP
SVP
SVP
SVP
SVP
OS
OS
PS
OS
OS
OS
OS
OS
OS
OS
EJ
EJ
PRD
PRD
PS
BUILDING 1 KEY PLAN
A B
C D
M
AT
C H
L
IN
E B
M
AT
C H
L
IN
E A
MATCH LINE B
MATCH LINE D
26'±
41'-3"±
16'±
12'-7"±
9'-1"±
99'-2"±
9'-9"±
4'±
16'-1"±
37'-4"±
30'-3"± 56'-3"±
8'-3"±
31'-10"±
35'-11"± 40'-1"±
45'-2"±
8'±
13'-6"±
TYP.
PS
A-501
TYP.
A-501TYP.
A-501
TYP.
A-503
TYP.
A-502
TYP.
A-502
TYP.
A-503
TYP.
A-503
TYP.
A-501
LOW
A-501
A-501
LOW
HIGH
102'-3"±
17'±
(TO EDGE
OF ROOF
BEYOND)
(TO EDGE OF ROOF BEYOND)
EF
EF
EF
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
REPLACE ROOFS PHASE 3
BLDG 1
603-23-101
ROBLEY REX VA MEDICAL CENTER
LOUISVILLE KY 40206
18-392
100% CONSTRUCTION DOCUMENTS
Engineer of Record:
Raymond Engineering-Georgia 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592 Raymond Ramos, PE, RRC
.2022.10.17 .
T-695
A-107
BUILDING 1 ENLARGED
ROOF PLAN NEW - B
N
SCALE: 1/8" = 1'-0"1 BUILDING 1 ENLARGED ROOF PLAN NEW - B
1 FURNISH AND INSTALL NEW INSULATION, COVER
BOARD, ROOFING MEMBRANE, AND METAL
FLASHINGS ACCORDING TO SPECIFICATIONS.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK, 061000 ROUGH CARPENTRY, 072200 ROOF
BOARD INSULATION, 075216.11 COLD ADHESIVE
STYRENE-BUTADIENE-STYRENE MODIFIED
BITUMINOUS MEMBRANE ROOFING, 076000 FLASHING
AND SHEET METAL, 077100 ROOF SPECIALTIES,
077200 ROOF ACCESSORIES, AND 221400 FACILITY
STORM DRAINAGE
2 PROPERLY REINSTALL AND COMMISSION EXISTING
LIGHTNING PROTECTION. REFER TO SPECIFICATION
011100 SUMMARY OF WORK AND 264100 FACILITY
LIGHTING PROTECTION
3 FURNISH AND INSTALL NEW LADDER.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK AND 055000 METAL FABRICATIONS
4 FURNISH AND INSTALL NEW SEALANT AT STONE
COPING JOINT.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK AND 079200 JOINT SEALANTS
5 FURNISH AND INSTALL NEW EXPANSION JOINT
BELLOW SYSTEM.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK AND 077100 ROOF SPECIALITIES
ROOFTOP UNIT
ROOF
OUTLINE/PARAPET
GUTTER (GU)
VENT THRU ROOF
(VTR)
PRIMARY ROOF
DRAIN (PRD)
PITCH POCKET (PP)
ROOF OUTLINE/
GRAVE-STOP FASCIA
ROOF AREA NOT-IN-
CONTRACT (N.I.C.)
EXHAUST FAN (EF)
SKYLIGHT (S)S
ROOF ACCESS -
LADDER
STRUCTURAL
RIDGE/HIP
VALLEY
LEGEND
HOT VENT STACK
(HVS)OVERFLOW SCUPPEROS
SOIL VENT PIPE
(SVP)
FALL PROTECTION
DEVICE (FPD)
DOWNSPOUT (DS)
OVERFLOW ROOF
DRAIN (ORD)
SATELLITESA
EXPANSION JOINT
EJ
ABANDONED CURB
6 FURNISH AND INSTALL NEW SCUPPER LINER.
SEE NOTES ON A-101 FOR SIZING REQUIREMENTS
TAPERED INSULATION
/ CRICKET WALKPADS
7 FURNISH AND INSTALL NEW CROSS-OVER STAIRS.
REFER TO SPECIFICATIONS 055000 METAL
FABRICATIONS.
8 FURNISH AND INSTALL NEW ROOF STAIRS ON ROOF
8D WITH LANDING AND STAIR TO ROOF 9C. PROVIDE
AND INSTALL CURB ON 8D ROOF TO ATTACH BASE TO.
ANCHOR BOTH SIDES OF STAIRS TO PARAPET WALL
PER SPECIFICATIONS. REFER TO SPECIFICATIONS
055000 METAL FABRICATIONS.
AutoCAD SHX Text 6/8/2021
ROOF 8A
ROOF 7A
ROOF BG
(N.I.C)
ROOF 2F(KITCHEN)
ROOF 4B
ROOF 4A.1
ROOF 4A.2
ROOF 4A
ROOF 5A
ROOF BD.1
ROOF BD.2
ROOF 4C
ROOF BA
(EMS DOCK)
ROOF BF
ROOF BC ROOF BB
(N.I.C)
(N.I.C)
PRD
PRD
PRD
PRD
GU
GU
DS
PRD
PP
PP
PP
PP PRD PRD
EF
EF
EF EF
PP
PP PP PP PP PP PP PP
PP
H H H
H H H
H
H
PRD PRD
SVP
EF
EF
EF
EF EF EF
PRD
PRD
PRD PRD
PRD PRD
SVP
SVP
SVP
SVP SVP
SVP
SVP
SVP
SVP
HVS
EF
PRD PRD
SVP
GU
DS
DSGU GU
EF
EF EF
OSOS
SVP
SVP
SVP
HVS
EF PRD
PRD
EF
SVP
HVS
PP
PP
PP
PP
PP
PP
SVP
SVP
SVP
HVS
EF EF
EF
RTU PRD
PRD SVP
SVP
SVP
PRD
PRD SVP
EF
FPD
FPD
RTU
EF
EF EF
EF EF
FPD FPD
SVP SVP
SVP
SVP
PRD
FPD
FPD
SVP
SVP
PRD
EF
PP
SVP
SVP
SVP
SVP
HVS
PP FPD
FPD
EF
EF
EF
EF
EF
RTU
PP
PP
PP
PP
PRD
PRD PRD
EF SVP
SVP
SVP
FPD
FPD
HVS HVS
PP PP
PP
PP
PP
PP
PP PP
PP
EF EF EF EF
H
OS
OSOS
OS
OS OS
OS
OS OS
OS
EJ
EJ
EJ
EJ
EJ
EJ
BUILDING 1 KEY PLAN
A B
C D
MATCH LINE A
MATCH LINE C
M
AT
C H
L
IN
E D
M
AT
C H
L
IN
E C
59'-2"±
11'-7"±
37'-4"±
23'-8"±
35'-6"±
37'-8"±
40'-1"±
11'-2"±
40'-4"±
46'-2"±
37'-9"±
36'-2"±
5'-5"±
4'-7"±
34'-10"±
20'-3"±
29'-7"±
13'±
7'-3"±
2'-7"± 10'-5"±
5'-2"±
5'-7"±
11'-6"±
10'-9"±
15'-4"±
25'-2"±
ROOF 9A
1 1
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
A-501
TYP.
A-501TYP.
A-503TYP.
A-502
TYP.
LOWA-501
TYP.
A-502
TYP.
A-502
TYP.
A-503
TYP.
A-502
TYP.
A-502
TYP.
A-502
TYP.
A-502
TYP.
44'-9"±
96'-2"±
30'-8"±
19'-10"±
27'-7"±
7'-3"±
59'-3"±
53'-9"±
TYP.
A-503
TYP.
TYP.
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
REPLACE ROOFS PHASE 3
BLDG 1
603-23-101
ROBLEY REX VA MEDICAL CENTER
LOUISVILLE KY 40206
18-392
100% CONSTRUCTION DOCUMENTS
Engineer of Record:
Raymond Engineering-Georgia 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592 Raymond Ramos, PE, RRC
.2022.10.17 .
T-695
A-108
BUILDING 1 ENLARGED
ROOF PLAN NEW - C
N
SCALE: 1/8" = 1'-0"1 BUILDING 1 ENLARGED ROOF PLAN NEW - C
1 FURNISH AND INSTALL NEW INSULATION, COVER
BOARD, ROOFING MEMBRANE, AND METAL
FLASHINGS ACCORDING TO SPECIFICATIONS.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK, 061000 ROUGH CARPENTRY, 072200 ROOF
BOARD INSULATION, 075216.11 COLD ADHESIVE
STYRENE-BUTADIENE-STYRENE MODIFIED
BITUMINOUS MEMBRANE ROOFING, 076000 FLASHING
AND SHEET METAL, 077100 ROOF SPECIALTIES,
077200 ROOF ACCESSORIES, AND 221400 FACILITY
STORM DRAINAGE
2 PROPERLY REINSTALL AND COMMISSION EXISTING
LIGHTNING PROTECTION. REFER TO SPECIFICATION
011100 SUMMARY OF WORK AND 264100 FACILITY
LIGHTING PROTECTION
3 FURNISH AND INSTALL NEW LADDER.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK AND 055000 METAL FABRICATIONS
4 FURNISH AND INSTALL NEW SEALANT AT STONE
COPING JOINT.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK AND 079200 JOINT SEALANTS
5 FURNISH AND INSTALL NEW EXPANSION JOINT
BELLOW SYSTEM.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK AND 077100 ROOF SPECIALITIES
ROOFTOP UNIT
ROOF
OUTLINE/PARAPET
GUTTER (GU)
VENT THRU ROOF
(VTR)
PRIMARY ROOF
DRAIN (PRD)
PITCH POCKET (PP)
ROOF OUTLINE/
GRAVE-STOP FASCIA
ROOF AREA NOT-IN-
CONTRACT (N.I.C.)
EXHAUST FAN (EF)
SKYLIGHT (S)S
ROOF ACCESS -
LADDER
STRUCTURAL
RIDGE/HIP
VALLEY
LEGEND
HOT VENT STACK
(HVS)OVERFLOW SCUPPEROS
SOIL VENT PIPE
(SVP)
FALL PROTECTION
DEVICE (FPD)
DOWNSPOUT (DS)
OVERFLOW ROOF
DRAIN (ORD)
SATELLITESA
EXPANSION JOINT
EJ
ABANDONED CURB
6 FURNISH AND INSTALL NEW SCUPPER LINER.
SEE NOTES ON A-101 FOR SIZING REQUIREMENTS
TAPERED INSULATION
/ CRICKET WALKPADS
7 FURNISH AND INSTALL NEW ROOF AREA DIVIDER
8 FURNISH AND INSTALL NEW CROSS-OVER STAIRS.
REFER TO SPECIFICATIONS 055000 METAL
FABRICATIONS.
9 FURNISH AND INSTALL NEW "SHIP" STAIRS. PROVIDE
NEW CURB FOR MOUNTING OF BASE. ATTACH UNIT TO
PARAPET WALL PER SPECIFICATIONS. REFER TO
SPECIFICATIONS 055000 METAL FABRICATIONS.
10 PROVIDE AND INSTALL NEW HANDRAIL/FALL
PROTECTION FOR 4A.1. MATCH EXISTING
HANDRAIL/FALL PROTECTION.
11 FURNISH AND INSTALL NEW STAIRS FROM MECH RM
DOOR DOWN TO ROOF 4B. PROVIDE NEW CURB FOR
MOUNTING OF BASE. ATTACH UNIT TO PARAPET WALL
PER SPECIFICATIONS. REFER TO SPECIFICATIONS
055000 METAL FABRICATIONS.
12 FURNISH AND INSTALL NEW STAIRS FROM ROOF 4B
UP TO ROOF 4A.1. PROVIDE NEW CURB FOR
MOUNTING OF BASE. ATTACH UNIT TO PARAPET WALL
PER SPECIFICATIONS. REFER TO SPECIFICATIONS
055000 METAL FABRICATIONS.
AutoCAD SHX Text 6/8/2021
ROOF 5B
ROOF 5C
ROOF 5C.1
ROOF 4D
(N.I.C)
H
H
PRD
PRD
SVP
SVP
FPD
PRD
PRD
PRD
DS
DS
6'-0"
PRD
PRD
PRD SVP
PRD
EF
EF
PP PPEF
EF
EF EF
EF
EF
EF EF
EF
EF
EF
EF
EF
EF
SVP
SVP
SVP
SVP SVP SVP
PRD
ORD
PRD
ORD
GUDS DS
SVP
SVP
ORD
PRD
ORD
PRD SVP
SVP
SVP
ORD
PRD
PP
PP
PP
PP
EF
PP
OS
RTU
OS
OS
OS
OS
OS
OS
EJ
EJ
EJ
EJ
PRD
EF
EJ
EJ
SVP
SVP
SVP
SVP
EF
PP
PP
PP
PP
PP
PP
PP
PP
PP PP
BUILDING 1 KEY PLAN
A B
C D
M
AT
C H
L
IN
E D
M
AT
C H
L
IN
E C
MATCH LINE B
MATCH LINE D
34'-3"±
18'±
45'±
23'-5"±40'-4"±4'-4"±
16'-1"± 50'-5"±
5'-8"±
20'-3"±
15'-4"±
TYP.
TYP.
TYP.
TYP.
TYP.
18'±
42'-9"±
23'-3"±
24'-8"±
9'-11"± 12'-6"±
23'±
TYP.
A-502
TYP.
A-503
TYP.
A-501
TYP.
A-502
TYP.
A-503
TYP.
A-503
TYP.
A-501
TYP.
HIGH
A-501
TYP.
LOW
A-501TYP.
LOW
(TO EDGE OF ROOF BEYOND)
(TO EDGE OF ROOF BEYOND)
70'-6"±
TYP.
LADDER N.I.C.
TYP. A-503
TYP.
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
REPLACE ROOFS PHASE 3
BLDG 1
603-23-101
ROBLEY REX VA MEDICAL CENTER
LOUISVILLE KY 40206
18-392
100% CONSTRUCTION DOCUMENTS
Engineer of Record:
Raymond Engineering-Georgia 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592 Raymond Ramos, PE, RRC
.2022.10.17 .
T-695
A-109
BUILDING 1 ENLARGED
ROOF PLAN NEW - D
N
SCALE: 1/8" = 1'-0"1 BUILDING 1 ENLARGED ROOF PLAN NEW - D
1 FURNISH AND INSTALL NEW INSULATION, COVER
BOARD, ROOFING MEMBRANE, AND METAL
FLASHINGS ACCORDING TO SPECIFICATIONS.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK, 061000 ROUGH CARPENTRY, 072200 ROOF
BOARD INSULATION, 075216.11 COLD ADHESIVE
STYRENE-BUTADIENE-STYRENE MODIFIED
BITUMINOUS MEMBRANE ROOFING, 076000 FLASHING
AND SHEET METAL, 077100 ROOF SPECIALTIES,
077200 ROOF ACCESSORIES, AND 221400 FACILITY
STORM DRAINAGE
2 PROPERLY REINSTALL AND COMMISSION EXISTING
LIGHTNING PROTECTION. REFER TO SPECIFICATION
011100 SUMMARY OF WORK AND 264100 FACILITY
LIGHTING PROTECTION
3 FURNISH AND INSTALL NEW LADDER.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK AND 055000 METAL FABRICATIONS
4 FURNISH AND INSTALL NEW SEALANT AT STONE
COPING JOINT.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK AND 079200 JOINT SEALANTS
5 FURNISH AND INSTALL NEW EXPANSION JOINT
BELLOW SYSTEM.
REFER TO SPECIFICATION 011100 SUMMARY OF
WORK AND 077100 ROOF SPECIALITIES
ROOFTOP UNIT
ROOF
OUTLINE/PARAPET
GUTTER (GU)
VENT THRU ROOF
(VTR)
PRIMARY ROOF
DRAIN (PRD)
PITCH POCKET (PP)
ROOF OUTLINE/
GRAVE-STOP FASCIA
ROOF AREA NOT-IN-
CONTRACT (N.I.C.)
EXHAUST FAN (EF)
SKYLIGHT (S)S
ROOF ACCESS -
LADDER
STRUCTURAL
RIDGE/HIP
VALLEY
LEGEND
HOT VENT STACK
(HVS)OVERFLOW SCUPPEROS
SOIL VENT PIPE
(SVP)
FALL PROTECTION
DEVICE (FPD)
DOWNSPOUT (DS)
OVERFLOW ROOF
DRAIN (ORD)
SATELLITESA
EXPANSION JOINT
EJ
ABANDONED CURB
6 FURNISH AND INSTALL NEW SCUPPER LINER.
SEE NOTES ON A-101 FOR SIZING REQUIREMENTS
TAPERED INSULATION
/ CRICKET WALKPADS
7 FURNISH AND INSTALL NEW ROOF STAIRS ON ROOF
4D WITH LANDING AND "SHIP" STAIR TO ROOF 4A.
ROOF 4A SHALL BE NON ATTACHED BASE PER DETAIL.
PROVIDE AND INSTALL CURB ON 4D ROOF TO ATTACH
BASE TO. ANCHOR BOTH SIDES OF STAIRS TO
PARAPET WALL PER SPECIFICATIONS. REFER TO
SPECIFICATIONS 055000 METAL FABRICATIONS.
AutoCAD SHX Text 6/8/2021
ROOF 8B
ROOF 1F
ROOF 1E
ROOF 10A (N.I.C)
ROOF 11A (N.I.C)
ROOF 2C
ROOF 2B
ROOF 3C
ROOF 1B
ROOF 2D.1
ROOF 1C
ROOF 9A
ROOF 7C
ROOF 1G
ROOF 2D.2
ROOF 9C
(N.I.C)
ROOF 1G.1
ROOF 1G.3
BUILDING 1 KEY PLAN
A B
C D
MATCH LINE A
MATCH LINE C
M
AT
C H
L
IN
E B
M
AT
C H
L
IN
E A37'±1'-9"±
57'-8"±
19'-8"± 6'-5"± 14'-2"±
3'-8"±
15'± 42'-9"±
20'±
38'-8"±
19'-4"±
38'±
11'-6"±
33'-4"±
11'-7"±
23'-8"±
16'-3"±
14'-1"±
21'-8"±
46'-7"±
31'-3"±
39'-4"±
40'-5"±
34'-11"±
25'-1"± 30'-3"± 56'-3"±
ROOF 9B
(TO EDGE OF ROOF BEYOND)
17'-5"±
25'-1"± 42'-4"±
41'-7"± 30'-1"±6'±
36'-7"± 36'-5"±
45'-2"±
56'-9"±
26'-1"±
44'-11"±41'-4"±
27'-9"±
(TO EDGE
OF ROOF
BEYOND)
ROOF 4A.2
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
REPLACE ROOFS PHASE 3
BLDG 1
603-23-101
ROBLEY REX VA MEDICAL CENTER
LOUISVILLE KY 40206
18-392
100% CONSTRUCTION DOCUMENTS
Engineer of Record:
Raymond Engineering-Georgia 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592 Raymond Ramos, PE, RRC
.2022.10.17 .
T-695
A-110
BUILDING 1 WIND ZONE
ENLARGED ROOF PLAN - A
N
SCALE: 1/8" = 1'-0"1 BUILDING 1 WIND ZONE ENLARGED ROOF PLAN NEW - A
LEGEND
ROOF AREA 1B, 1C, 1G, 1G.1, 1G.3
WIND ZONE NO. 1: 18.83 PSF
WIND ZONE NO. 2: 31.60 PSF
WIND ZONE NO. 3: 47.56 PSF
WIND ZONE NO. 1 WIND ZONE NO. 3
WIND ZONE NO. 2
ROOF AREA NOT-IN-
CONTRACT (N.I.C.)
ROOF AREA 1E, 1F
WIND ZONE NO. 1: 19.25 PSF
WIND ZONE NO. 2: 32.31 PSF
WIND ZONE NO. 3: 48.63 PSF
ROOF AREA 2B, 2C, 2D.1, 2D.2
WIND ZONE NO. 1: 20.93 PSF
WIND ZONE NO. 2: 35.13 PSF
WIND ZONE NO. 3: 52.87 PSF
ROOF AREA 3C
WIND ZONE NO. 1: 22.55 PSF
WIND ZONE NO. 2: 37.84 PSF
WIND ZONE NO. 3: 56.95 PSF
ROOF AREA 7B
WIND ZONE NO. 1: 36.33 PSF
WIND ZONE NO. 2: 57.02 PSF
WIND ZONE NO. 3: 77.72 PSF
ROOF AREA 7C
WIND ZONE NO. 1: 36.24 PSF
WIND ZONE NO. 2: 56.89 PSF
WIND ZONE NO. 3: 77.53 PSF
ROOF AREA 8B
WIND ZONE NO. 1: 37.19 PSF
WIND ZONE NO. 2: 58.37 PSF
WIND ZONE NO. 3: 79.56 PSF
ROOF AREA 8C
WIND ZONE NO. 1: 37.38 PSF
WIND ZONE NO. 2: 58.67 PSF
WIND ZONE NO. 3: 79.96 PSF
ROOF AREA 9A
WIND ZONE NO. 1: 38.50 PSF
WIND ZONE NO. 2: 60.44 PSF
WIND ZONE NO. 3: 82.37 PSF
ROOF AREA 9B
WIND ZONE NO. 1: 39.47 PSF
WIND ZONE NO. 2: 61.95 PSF
WIND ZONE NO. 3: 84.44 PSF
ROOF AREA 9B
WIND ZONE NO. 1: 39.47 PSF
WIND ZONE NO. 2: 61.95 PSF
WIND ZONE NO. 3: 84.44 PSF
AutoCAD SHX Text 6/8/2021
ROOF 3A
ROOF 3E
ROOF 2D
ROOF 3D
ROOF 2E
ROOF 4E
ROOF X1
ROOF O
ROOF S
R
O O
F 1G
.2
BUILDING 1 KEY PLAN
A B
C D
M
AT
C H
L
IN
E B
M
AT
C H
L
IN
E A
MATCH LINE B
MATCH LINE D
26'±
41'-3"±
16'±
12'-7"±
9'-1"±
99'-2"±
9'-9"±
4'±
16'-1"±
37'-4"±
30'-3"± 56'-3"±
8'-3"± 31'-10"±
35'-11"± 40'-1"±
45'-2"±
8'±
13'-6"±
102'-3"±
17'±
(TO EDGE
OF ROOF
BEYOND)
(TO EDGE OF ROOF BEYOND)
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
REPLACE ROOFS PHASE 3
BLDG 1
603-23-101
ROBLEY REX VA MEDICAL CENTER
LOUISVILLE KY 40206
18-392
100% CONSTRUCTION DOCUMENTS
Engineer of Record:
Raymond Engineering-Georgia 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592 Raymond Ramos, PE, RRC
.2022.10.17 .
T-695
A-111
BUILDING 1 WIND ZONE
ENLARGED ROOF PLAN - B
N
SCALE: 1/8" = 1'-0"1 BUILDING 1 WIND ZONE ENLARGED ROOF PLAN NEW - B
LEGEND
WIND ZONE NO. 1 WIND ZONE NO. 3
WIND ZONE NO. 2
ROOF AREA NOT-IN-
CONTRACT (N.I.C.)
ROOF AREA 1G.2, 2E
WIND ZONE NO. 1: 21.14 PSF
WIND ZONE NO. 2: 35.48 PSF
WIND ZONE NO. 3: 53.40 PSF
ROOF AREA 2D
WIND ZONE NO. 1: 20.93 PSF
WIND ZONE NO. 2: 35.13 PSF
WIND ZONE NO. 3: 52.87 PSF
ROOF AREA 3A, 3E
WIND ZONE NO. 1: 22.60 PSF
WIND ZONE NO. 2: 37.93 PSF
WIND ZONE NO. 3: 57.08 PSF
ROOF AREA 3D
WIND ZONE NO. 1: 24.40 PSF
WIND ZONE NO. 2: 40.94 PSF
WIND ZONE NO. 3: 61.61 PSF
ROOF AREA 4E
WIND ZONE NO. 1: 25.21 PSF
WIND ZONE NO. 2: 42.31 PSF
WIND ZONE NO. 3: 63.68 PSF
ROOF AREA 6B
WIND ZONE NO. 1: 36.46 PSF
WIND ZONE NO. 2: 57.23 PSF
WIND ZONE NO. 3: 78.01 PSF
ROOF AREA 8D
WIND ZONE NO. 1: 38.47 PSF
WIND ZONE NO. 2: 60.38 PSF
WIND ZONE NO. 3: 82.30 PSF
ROOF AREA O, X1
WIND ZONE NO. 1: 18.83 PSF
WIND ZONE NO. 2: 31.60 PSF
WIND ZONE NO. 3: 47.56 PSF
ROOF AREA S
WIND ZONE NO. 1: 19.09 PSF
WIND ZONE NO. 2: 32.03 PSF
WIND ZONE NO. 3: 48.21 PSF
ROOF AREA S
WIND ZONE NO. 1: 19.09 PSF
WIND ZONE NO. 2: 32.03 PSF
WIND ZONE NO. 3: 48.21 PSF
AutoCAD SHX Text 6/8/2021
ROOF BG
ROOF 8A
ROOF 7A
ROOF 2F(KITCHEN)
ROOF 4B
ROOF 4A.1
ROOF 4A.2
ROOF 4A
ROOF 5A
ROOF BD.1
ROOF BD.2
ROOF 4C
ROOF BA
(EMS DOCK)
ROOF BF
ROOF BC
ROOF BB
(N.I.C)
(N.I.C)
H H H
H H H
H
H
H
BUILDING 1 KEY PLAN
A B
C D
MATCH LINE A
MATCH LINE C
M
AT
C H
L
IN
E D
M
AT
C H
L
IN
E C
59'-2"±
11'-7"±
37'-4"±
23'-8"±
35'-6"±
37'-8"±
40'-1"±
11'-2"±
40'-4"±
46'-2"±
37'-9"±
36'-2"±
5'-5"±
4'-7"±
34'-10"±
20'-3"±
29'-7"±
13'±
7'-3"±
2'-7"± 10'-5"±
5'-2"±
5'-7"±
11'-6"±
10'-9"±
15'-4"±
25'-2"±
ROOF 9A
(TO EDGE OF ROOF BEYOND)
44'-9"±
96'-2"±
30'-8"±
19'-10"±
27'-7"±
7'-3"±
59'-3"±
53'-9"±
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
REPLACE ROOFS PHASE 3
BLDG 1
603-23-101
ROBLEY REX VA MEDICAL CENTER
LOUISVILLE KY 40206
18-392
100% CONSTRUCTION DOCUMENTS
Engineer of Record:
Raymond Engineering-Georgia 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592 Raymond Ramos, PE, RRC
.2022.10.17 .
T-695
A-112
BUILDING 1 WIND ZONE
ENLARGED ROOF PLAN - C
N
SCALE: 1/8" = 1'-0"1 BUILDING 1 WIND ZONE ENLARGED ROOF PLAN NEW - C
LEGEND
WIND ZONE NO. 1 WIND ZONE NO. 3
WIND ZONE NO. 2
ROOF AREA NOT-IN-
CONTRACT (N.I.C.)
ROOF AREA 2F
WIND ZONE NO. 1: 22.90 PSF
WIND ZONE NO. 2: 38.43 PSF
WIND ZONE NO. 3: 57.84 PSF
ROOF AREA 4A
WIND ZONE NO. 1: 34.34 PSF
WIND ZONE NO. 2: 53.89 PSF
WIND ZONE NO. 3: 73.45 PSF
ROOF AREA 4A.1, 5A
WIND ZONE NO. 1: 35.48 PSF
WIND ZONE NO. 2: 55.70 PSF
WIND ZONE NO. 3: 75.91 PSF
ROOF AREA 4A.2
WIND ZONE NO. 1: 34.98 PSF
WIND ZONE NO. 2: 54.91 PSF
WIND ZONE NO. 3: 74.83 PSF
ROOF AREA 4B
WIND ZONE NO. 1: 33.88 PSF
WIND ZONE NO. 2: 53.18 PSF
WIND ZONE NO. 3: 72.47 PSF
ROOF AREA 4C
WIND ZONE NO. 1: 25.04 PSF
WIND ZONE NO. 2: 42.01 PSF
WIND ZONE NO. 3: 63.22 PSF
ROOF AREA 7A
WIND ZONE NO. 1: 37.48 PSF
WIND ZONE NO. 2: 58.82 PSF
WIND ZONE NO. 3: 80.17 PSF
ROOF AREA 8A
WIND ZONE NO. 1: 37.19 PSF
WIND ZONE NO. 2: 58.37 PSF
WIND ZONE NO. 3: 79.56 PSF
ROOF AREA BD.1, BD.2
WIND ZONE NO. 1: 19.66 PSF
WIND ZONE NO. 2: 32.99 PSF
WIND ZONE NO. 3: 49.65 PSF
ROOF AREA 9A
WIND ZONE NO. 1: 38.50 PSF
WIND ZONE NO. 2: 60.44 PSF
WIND ZONE NO. 3: 82.37 PSF
ROOF AREA BA, BB, BC
WIND ZONE NO. 1: 18.83 PSF
WIND ZONE NO. 2: 31.60 PSF
WIND ZONE NO. 3: 47.56 PSF
AutoCAD SHX Text 6/8/2021
ROOF 5B
ROOF 5C
ROOF 5C.1
ROOF 4D
(N.I.C)
H
H
6'-0"
BUILDING 1 KEY PLAN
A B
C D
M
AT
C H
L
IN
E D
M
AT
C H
L
IN
E C
MATCH LINE B
MATCH LINE D
34'-3"±
18'±
45'±
23'-5"±40'-4"±4'-4"±
16'-1"± 50'-5"±
5'-8"±
20'-3"±
15'-4"±
20'±
42'-9"±
23'-3"±
24'-8"±
9'-11"± 12'-6"±
23'±
(TO EDGE OF ROOF BEYOND)
(TO EDGE OF ROOF BEYOND)
70'-6"±
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
REPLACE ROOFS PHASE 3
BLDG 1
603-23-101
ROBLEY REX VA MEDICAL CENTER
LOUISVILLE KY 40206
18-392
100% CONSTRUCTION DOCUMENTS
Engineer of Record:
Raymond Engineering-Georgia 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592 Raymond Ramos, PE, RRC
.2022.10.17 .
T-695
A-113
BUILDING 1 WIND ZONE
ENLARGED ROOF PLAN - D
N
SCALE: 1/8" = 1'-0"1 BUILDING 1WIND ZONE ENLARGED ROOF PLAN NEW - D
LEGEND
WIND ZONE NO. 1 WIND ZONE NO. 3
WIND ZONE NO. 2
ROOF AREA NOT-IN-
CONTRACT (N.I.C.)
ROOF AREA 1A
WIND ZONE NO. 1: 21.64 PSF
WIND ZONE NO. 2: 36.31 PSF
WIND ZONE NO. 3: 54.64 PSF
ROOF AREA 2A
WIND ZONE NO. 1: 22.51 PSF
WIND ZONE NO. 2: 37.77 PSF
WIND ZONE NO. 3: 56.84 PSF
ROOF AREA 3B
WIND ZONE NO. 1: 24.88 PSF
WIND ZONE NO. 2: 41.75 PSF
WIND ZONE NO. 3: 62.83 PSF
ROOF AREA 4D
WIND ZONE NO. 1: 34.34 PSF
WIND ZONE NO. 2: 53.89 PSF
WIND ZONE NO. 3: 73.45 PSF
ROOF AREA 5B, 5C
WIND ZONE NO. 1: 35.48 PSF
WIND ZONE NO. 2: 55.70 PSF
WIND ZONE NO. 3: 75.91 PSF
ROOF AREA 5C.1
WIND ZONE NO. 1: 35.08 PSF
WIND ZONE NO. 2: 55.07 PSF
WIND ZONE NO. 3: 75.05 PSF
AutoCAD SHX Text 6/8/2021
B E
LO
W
B
LO
C K
IN
G
1' ' M
IN
IM
U M
SHEET-METAL PARAPET CAP
SLOPED TO DRAIN TO ROOF
CONTINUOUS WEATHERPROOF
MEMBRANE ON TOP OF WALL
TURNED DOWN BOTH SIDES
CONTINUOUS SHIM
WOOD NAILER ATTACHED
TO SUBSTRATE
FASTENERS APPROX. 8" O.C.
MEMBRANE FLASHING SHEET
ADHERED TO BACKER, MOP- OR
COLD-APPLIED (FOR ROOF SYSTEMS
WITH FACTORY-APPLIED GRANULE
SURFACING, THE MULTIPLE-PLY
MEMBRANE FLASHING CAN BE
INSTALLED BETWEEN THE BASE PLY
AND GRANULE-SURFACED SHEET)
OPTIONAL: EXTENDED FIELD
PLIES ABOVE TOP OF CANT
MULTIPLE-PLY MODIFIED
BITUMEN ROOF MEMBRANE
CANT
COVER-BOARD INSULATION
THERMAL INSULATION
ROOF DECK
8' ' M
IN
IM
U M
FL
A
S H
IN
G
H E
IG
H
T
CONTINUOUS CLEAT
BACKER
GASKETED FASTENERS
B E
LO
W
B
LO
C K
IN
G
1' ' M
IN
IM
U M
SHEET-METAL GRAVEL STOP
SET IN COMPATIBLE ROOF
CEMENT, PRIME FLANGE
BEFORE STRIPPING OPTIONAL: COMPATIBLE
SEALANT AT JUNCTION OF
MEMBRANE AND EDGE
METAL
FASTENERS AT APPROX. 3''
to 6'' O.C., STAGGERED
MODIFIED BITUMEN
MEMBRANE STRIPPING SHEET
(FOR ROOF SYSTEMS WITH
FACTORY-APPLIED GRANULE
SURFACING, THE GRAVEL-
STOP FLANGE AND
MEMBRANE STRIPPING CAN
BE INSTALLED BETWEEN THE
BASE PLY AND GRANULE-
SURFACED SHEET)
MULTIPLE-PLY MODIFIED
BITUMEN ROOF MEMBRANE
COVER-BOARD INSULATION
THERMAL INSULATION
ROOF DECK
ONE PLY OR SEPARATE
MEMBRANE SHEET EXTENDED
BELOW BLOCKING
CONTINUOUS CLEAT
2 X 6 MIN. WOOD NAILER
ATTACHED TO SUBSTRATE --
OVERALL THICKNESS TO
MATCH INSULATION
SMOOTH CONCRETE
INSTALL APPROPRIATE SEALANT
AND TOOL TO FACILITATE WATER
RUNOFF
OPTIONAL: COMPRESSIBLE
ELASTOMERIC SEALANT OR TAPE
TO SPAN IRREGULARITIES
CONCRETE FASTENERS
SEAL TOP OF FLASHING WITH A
COMPATIBLE VERTICAL-GRADE ROOF
CEMENT AND REINFORCEMENT
SHEET-METAL COUNTERFLASHING
FASTENERS APPROX. 8'' O.C.
OPTIONAL: EXTENDED FIELD PLIES
ABOVE TOP OF CANT (NOT SHOWN FOR
CLARITY)
MEMBRANE FLASHING SHEET
ADHERED TO BACKER (FOR ROOF
SYSTEMS WITH FACTORY-APPLIED
GRANULE SURFACING, THE
MULTIPLE-PLY MEMBRANE FLASHING
CAN BE INSTALLED BETWEEN THE
BASE PLY AND GRANULE-SURFACED
SHEET)
MULTIPLE-PLY MODIFIED BITUMEN
ROOF MEMBRANE
COVER-BOARD INSULATION
CANT
THERMAL INSULATION
ROOF DECK
8' ' M
IN
IM
U M
FL
A
S H
IN
G
H E
IG
H
T
BACKER
EXISTING SHEET-METAL REGLET
FASTENERS
OPTIONAL: MEMBRANE SHEET CLOSURE
SECURED AND ADHERED TO WALL
REMOVABLE SHEET-METAL
COUNTERFLASHING
OPTIONAL: EXTENDED FLASHING
FASTENERS APPROX. 8'' O.C.
OPTIONAL: EXTENDED FIELD PLIES
ABOVE TOP OF CANT STRIP (NOT
SHOWN FOR CLARITY)
FLEXIBLE VAPOR RETARDER WITH
COMPRESSIBLE INSULATION
MEMBRANE FLASHING SHEET ADHERED TO
BACKER, MOP- OR COLD-APPLIED. COVER
TOP OF BASE FLASHING WITH VAPOR
RETARDER. (FOR ROOF SYSTEMS WITH
FACTORY-APPLIED GRANULE SURFACING,
THE MULTIPLE-PLY MEMBRANE FLASHING
CAN BE INSTALLED BETWEEN THE BASE PLY
AND GRANULE-SURFACED SHEET)
MULTIPLE-PLY MODIFIED BITUMEN
ROOF MEMBRANE
COVER-BOARD INSULATION
THERMAL INSULATION
ROOF DECK
CANT
FL
A
S H
IN
G
H E
IG
H
T
8' ' M
IN
IM
U M
MASONRY WALL AND FLASHING
BACKER
2 X 6 MIN. WOOD NAILER ATTACHED TO
SUBSTRATE -- OVERALL THICKNESS TO
MATCH INSULATION
EXISTING SHEET-METAL REGLET
FASTENERS
REMOVABLE SHEET-METAL
COUNTERFLASHING
SEAL TOP OF FLASHING WITH A
COMPATIBLE VERTICAL-GRADE
ROOF CEMENT AND
REINFORCEMENT
FASTENERS APPROX. 8'' O.C.
NONCOMBUSTIBLE SURFACE.
PRIME SURFACE AS REQUIRED
OPTIONAL: EXTENDED FIELD
PLIES ABOVE TOP OF CANT
CANT
MEMBRANE FLASHING SHEET
ADHERED TO BACKER (FOR
ROOF SYSTEMS WITH
FACTORY-APPLIED GRANULE
SURFACING, THE MULTIPLE-PLY
MEMBRANE FLASHING CAN BE
INSTALLED BETWEEN THE BASE
PLY AND GRANULE-SURFACED
SHEET)
MULTIPLE-PLY MODIFIED
BITUMEN ROOF MEMBRANE
COVER-BOARD INSULATION
THERMAL INSULATION
ROOF DECK
FL
A
S H
IN
G
H E
IG
H
T
8' ' M
IN
IM
U M
MASONRY WALL AND FLASHING
BACKER
8'
' M
IN
IM
U
M
FL
A S
H
IN
G H
E
IG
H T
FLEXIBLE
WEATHERPROOF
MEMBRANE CLOSURE
TOP OF CURB TO
DRAIN TO SIDE
FASTENERS APPROX. 8'' O.C.
GASKETED FASTENERS
OPTIONAL:
EXTENDED FIELD
PLIES ABOVE TOP
OF CANT
MEMBRANE FLASHING SHEET
ADHERED TO BACKER, MOP-
OR COLD-APPLIED. (FOR
ROOF SYSTEMS WITH
FACTORY-APPLIED GRANULE
SURFACING, THE MULTI-PLY
MEMBRANE FLASHING CAN
BE INSTALLED BETWEEN THE
BASE PLY AND
GRANULE-SURFACED SHEET)
MULTIPLE-PLY MODIFIED
BITUMEN ROOF MEMBRANE
COVER-BOARD
INSULATION
THERMAL INSULATION
ROOF DECK
2 X 6 MIN. WOOD NAILER
ATTACHED TO SUBSTRATE --
OVERALL THICKNESS TO MATCH
INSULATION
CANT
COMPRESSIBLE
INSULATION
OPTIONAL: EXTENDED
BASE FLASHING
RETARDER TO SERVE
AS INSULATION
RETAINER (ATTACHED
TO TOP OF CURB)
FLEXIBLE VAPOR
PREMANUFACTURED
EXPANSION JOINT COVER
BACKER
8' ' M
IN
IM
U M
FL
AS
H
IN
G H
EI
G
H T
O N
L O
W S
ID
E
SHEET-METAL EXPANSION
JOINT COVER
TOP OF CURB TO
DRAIN TO ONE SIDE
OPTIONAL: EXTENDED
FLASHING
FLEXIBLE VAPOR RETARDER TO
SERVE AS INSULATION RETAINER
(ATTACHED TO TOP OF CURB)
COMPRESSIBLE
INSULATION
CANT
2 X 6 MIN. WOOD
NAILER ATTACHED TO SUBSTRATE
-- OVERALL THICKNESS TO MATCH
INSULATION
ROOF DECK
THERMAL INSULATION
COVER-BOARD INSULATION
MULTIPLE-PLY MODIFIED
BITUMEN ROOF MEMBRANE
MEMBRANE FLASHING SHEET
ADHERED TO BACKER, MOP- OR
COLD-APPLIED (FOR ROOF
SYSTEMS WITH FACTORY-APPLIED
GRANULE SURFACING, THE
MULTIPLE-PLY MEMBRANE
FLASHING CAN BE INSTALLED
BETWEEN THE BASE PLY AND
GRANULE-SURFACED SHEET)
OPTIONAL: EXTENDED FIELD PLIES
ABOVE TOP OF CANT
GASKETED FASTENERS
FASTENERS APPROX.
8'' O.C.
FLEXIBLE WEATHERPROOF
MEMBRANE CLOSURE
EXPECTED
MOVEMENT + 1/2"
SHEET-METAL "T" FLASHING/
CLEAT -- SECURED ON TOP AND
FACE
BACKER
8' ' M
IN
IM
U M
FL
A
S H
IN
G
H E
IG
H
T
SHEET-METAL AREA
DIVIDER COVER
FASTENERS APPROX. 8'' O.C.
GASKETED FASTENERS
OPTIONAL: EXTENDED FIELD
PLIES ABOVE TOP OF CANT
MEMBRANE FLASHING SHEET
ADHERED TO BACKER, MOP-
OR COLD-APPLIED (FOR
ROOF SYSTEMS WITH
FACTORY-APPLIED GRANULE
SURFACING, THE MULTIPLE-
PLY MEMBRANE FLASHING
CAN BE INSTALLED BETWEEN
THE BASE PLY AND
GRANULE-SURFACED SHEET)
MULTIPLE-PLY MODIFIED
BITUMEN ROOF MEMBRANE
COVER-BOARD INSULATION
THERMAL INSULATION
ROOF DECK
BACKER
2 X 6 MIN. WOOD NAILER
ATTACHED TO SUBSTRATE --
OVERALL THICKNESS TO
MATCH INSULATION
STONE COPING STONE COPING
MULTI-PLY SYSTEM MEMBRANE
1/2" PERLITE COVERBOARD
1" POLYISOCYANURATE INSULATION
BASE SHEET
LWIC DECK
SINGLE PLY MEMBRANE
1/2" WOOD FIBER COVERBOARD
1" POLYISOCYANURATE INSULATION
1/2" PERLITE INSULATION
METAL DECK
MODIFIED BITUMEN CAP SHEET
BASE PLY
1/2" GYPSUM COVERBOARD
1" POLYISOCYANURATE INSULATION
BASE SHEET
LWIC DECK
NEW ULTRA WHITE FINISH MODIFIED
BITUMEN CAP SHEET
NEW BASE PLY
NEW 1/2" GYPSUM COVERBOARD
NEW (2)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .