About this file

This document is a Multi-Year Capital Improvement Program (CIP) Amended Budget financial overview for Pinellas County, specifically for Project Number 002625A, Surface Water Pipe Lining/Removal & Replacement. The project involves the replacement or lining of inadequate stormwater systems at various locations throughout the county, identified through the county's asset management process and planned via a prioritization process. The project is part of OpenGov Request 25-0356-ITB for Cured-In-Place Pipe (CIPP) Stormwater Pipe Rehabilitation (Re-Bid), which is a shared contract between Public Works and Utilities with a total estimated value of $15.4M, of which $10.6M is allocated to Public Works and $4.7M to Utilities.

The financial overview shows a multi-year budget with funding from two sources: Surface Water Utility Fee and Penny for Pinellas. The total amended budget for the project is $7,508,000 for the first document and $6,775,000 for the second, with construction costs spread across fiscal years 2025-2030. Both budget documents indicate sufficient funds are available, with year-to-date expenditures and encumbrances already recorded. The project resources are primarily allocated to construction, with no allocated funds for acquisitions, professional services/design, testing, or other categories. The funding is programmed to support the Public Works estimate between fiscal years 2025 and 2027 in the CIP plan.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amended Planned Planned Multi-Year CIP Plan FY25 FY26 FY27-FY30 Total Acquisitions -$ -$ -$ -$ Professional Services/Design -$ -$ -$ -$ Construction 4,737,000$ 2,771,000$ -$ 7,508,000$ Testing -$ -$ -$ -$ Other -$ -$ -$ -$ CIP Plan Totals 4,737,000$ 2,771,000$ -$ 7,508,000$ +/- Adjustment -$ -$ -$ -$ Adjusted Total 4,737,000$ 2,771,000$ -$ 7,508,000$

Project Resources +/- Adjustment 4,737,000$ 2,771,000$ -$ 7,508,000$ Total Project Resources 4,737,000$ 2,771,000$ -$ 7,508,000$ +/- Restatement -$ -$ -$ -$ Adjusted Total Project Resources 4,737,000$ 2,771,000$ -$ 7,508,000$

Year to Date Activity FY25 FY26 FY27-FY30 Multi-Year

Total (1)

YTD Expenditures 402,000.91 0.00 0.00 402,000.91 Encumbrances 270,630.15 0.00 0.00 270,630.15 Total 672,631.06 0.00 0.00 672,631.06

Budget Less YTD Activity $4,064,368.94 $2,771,000.00 $0.00 $6,835,368.94

Estimated Activity FY25 FY26 FY27-FY30 Multi-Year

Total (1)

Parent 0.00 0.00 0.00 0.00 Child 2,641,997.70 0.00 0.00 2,641,997.70 Total 2,641,997.70 0.00 0.00 2,641,997.70

Estimated Remaining Appropriation $2,095,002.30 $2,771,000.00 $0.00 $4,866,002.30 (2)

Result Sufficient Funds Sufficient Funds Sufficient Funds Sufficient Funds (3)

Notes:

Prepared By the Office of Management & Budget, March 3rd, 2025.

Amended Budget

(1) Estimated Activity section includes Year to Date Activity.

(2) Estimated Remaining Appropriation at the end of each fiscal year will vary based on actual expenditures.

(3) OpenGov Request 25-0356-ITB for Cured-In-Place Pipe (CIPP) Stormwater Pipe Rehabilitation (Re-Bid) is for a shared contract between Public Works and Utilities estimated at $15.4M, $10.6M estimated for Public Works and $4.7M for Utilities. Program projects 002064A (funded by Penny for Pinellas) and 002625A (funded by Surface Water Utility Fee) have sufficient funding programmed between FY25 and FY27 in the FY25-FY30 CIP plan to support the Public Works estimate.

Project Financial Overview

Parent/Budgeted Number: 002625A Surf Wtr Pipe Lining/Rmv & Repl Description: Replacement or lining inadequate stormwater systems at locations throughout the County, identified through the County's asset management process. Specific Projects are planned through a prioritization process.

Reason: OpenGov Review

Multi-Year Capital Improvement Program

Amended Planned Planned Multi-Year CIP Plan FY25 FY26 FY27-FY30 Total Acquisitions -$ -$ -$ -$ Professional Services/Design -$ -$ -$ -$ Construction 2,775,000$ 975,000$ 3,025,000$ 6,775,000$ Testing -$ -$ -$ -$ Other -$ -$ -$ -$ CIP Plan Totals 2,775,000$ 975,000$ 3,025,000$ 6,775,000$ +/- Adjustment -$ -$ -$ -$ Adjusted Total 2,775,000$ 975,000$ 3,025,000$ 6,775,000$

Project Resources Penny for Pinellas 2,775,000$ 975,000$ 3,025,000$ 6,775,000$ Total Project Resources 2,775,000$ 975,000$ 3,025,000$ 6,775,000$ +/- Adjustment -$ -$ -$ -$ Adjusted Total Project Resources 2,775,000$ 975,000$ 3,025,000$ 6,775,000$

Year to Date Activity FY25 FY26 FY27-FY30 Multi-Year

Total (1)

YTD Expenditures 42,245.58 0.00 0.00 42,245.58 Encumbrances 887,142.55 0.00 0.00 887,142.55 Total 929,388.13 0.00 0.00 929,388.13

Budget Less YTD Activity $1,845,611.87 $975,000.00 $3,025,000.00 $5,845,611.87

Estimated Activity FY25 FY26 FY27-FY30 Multi-Year

Total (1)

Parent 0.00 0.00 0.00 0.00 Child 2,649,598.52 835,710.25 0.00 3,485,308.77 Total 2,649,598.52 835,710.25 0.00 3,485,308.77

Estimated Remaining Appropriation $125,401.48 $139,289.75 $3,025,000.00 $3,289,691.23 (2)

Result Sufficient Funds Sufficient Funds Sufficient Funds Sufficient Funds (3)

Notes:

Prepared By the Office of Management & Budget, March 3rd, 2025.

(1) Estimated Activity section includes Year to Date Activity.

(2) Estimated Remaining Appropriation at the end of each fiscal year will vary based on actual expenditures.

(3) OpenGov Request 25-0356-ITB for Cured-In-Place Pipe (CIPP) Stormwater Pipe Rehabilitation (Re-Bid) is for a shared contract between Public Works and Utilities estimated at $15.4M, $10.6M estimated for Public Works and $4.7M for Utilities. Program projects 002064A (funded by Penny for Pinellas) and 002625A (funded by Surface Water Utility Fee) have sufficient funding programmed between FY25 and FY27 in the FY25-FY30 CIP plan to support the Public Works estimate.

Project Financial Overview

Parent/Budgeted Number: 002625A Surf Wtr Pipe Lining/Rmv & Repl Description: Replacement or lining inadequate stormwater systems at locations throughout the County, identified through the County's asset management process. Specific Projects are planned through a prioritization process.

Reason: OpenGov Review

Multi-Year Capital Improvement Program Amended Budget