This document is a comprehensive set of engineering and design plans for the Perry Park Green Infrastructure Improvements project, prepared by Geosyntec Consultants and MKSK Studios for the Joseph Jones Drain Drainage District in Pontiac, Michigan. The project involves creating a stormwater management system with green infrastructure improvements, including a stormwater wetland, drainage infrastructure, pedestrian paths, landscaping, and site restoration. The plans are dated May 9, 2025, with a subsequent re-bid date of July 29, 2025, and cover 19 detailed sheets including site layouts, grading, utility plans, erosion control, landscape design, and construction details.
The project is funded by the Clean Water State Revolving Fund (CWSRF), with federal award number SLRFRP0127 from the U.S. Department of the Treasury to the State of Michigan. The total project area is approximately 9.4 acres, with a composite runoff coefficient of 0.36. The design includes stormwater management calculations for channel protection, volume control, and 100-year detention, with a designed pump station and wetland system to reduce non-point source pollution. The project aims to improve water quality by collecting stormwater runoff, facilitating infiltration, and providing vegetative treatment. The site will feature native landscaping, including trees, shrubs, and ground cover, with specific attention to soil preparation, planting techniques, and long-term maintenance considerations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20250730 - Perry Park Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PREPARED FOR: PREPARED BY:
VICINITY MAP
JOSEPH JONES DRAIN DRAINAGE DISTRICT
PERRY PARK GREEN INFRASTRUCTURE IMPROVEMENTS
PONTIAC, MICHIGAN
GEOSYNTEC PROJECT NO. CSWR3013
2100 COMMONWEALTH BLVD, SUITE 100
ANN ARBOR, MICHIGAN 48105
TELEPHONE: 734.332.8004
OAKLAND COUNTY WATER
RESOURCES COMMISSIONER
ONE PUBLIC WORKS DRIVE 95 WEST
WATERFORD, MICHIGAN 48328
N
PROJECT
LOCATION
COVER SHEET
NOT FOR CONSTRUCTION
3057 NORTH ROCKWELL STREET
CHICAGO, ILLINOIS 60618
312.809.9707 MKSKSTUDIOS.COM
INDEX OF SHEETS
Sheet Number Sheet Title
FUNDED BY
CLEAN WATER STATE REVOLVING FUND
CW-5963A
SUPPORTED IN WHOLE OR IN PART, BY FEDERAL
AWARD NUMBER SLRFRP0127 AWARDED O THE
STATE OF MICHIGAN BY THE U.S. DEPARTMENT
OF THE TREASURY
F
E
D
C
2 3
B
A
1 2 3
4 5 6 7 8
54 6 7 8
F
E
D
C
B
A
PERRY PARK GREEN INFRASTRUCTURE IMPROVEMENTS
301 EDISON ST, PONTIAC MI 48342-1425
PROJECT:
SITE:
TITLE:
APPROVED BY:
REVIEWED BY: DRAWING NO.:
OF
DRAWN BY:
DESIGN BY:
CHECKED BY: FILE:
PROJECT NO.:
DATE: May 9, 2025
CSWR3013
DATEREV APPDESCRIPTION DRN
3057 NORTH ROCKWELL STREET
CHICAGO, IL 60618
TELEPHONE: 312.809.9707
MKSKSTUDIOS.COM
THIS DRAWING MAY NOT BE ISSUED
FOR PROJECT TENDER OR
CONSTRUCTION, UNLESS SEALED.
DATE
CJH
WF
RH
RH
EC
R
Know what's below.
Call before you dig.
2100 COMMONWEALTH BLVD, SUITE 100
ANN ARBOR, MI 48105
TELEPHONE: 586.744.9003
05/09/2025 ISSUED FOR BID ECCJH
07/29/2025 ISSUED FOR RE-BID ECCJH
.\(2025)0729 Seal.tif
LEGEND
FOUND IRON PIPE
FOUND MONUMENT
TREE OR BRUSH LIMIT
FOUND IRON ROD
C/L OF DITCH
EXIST. SANITARY SEWER
EXIST. SPOT ELEVATION
EXIST. OVERHEAD UTILITY LINE
EXIST. UTILITY POLE
EXIST. CONTOUR
EXIST. LIGHT POLE
BASSWOOD
BOX ELDER
CEDAR
WALNUT
SPRUCE
MAPLE
LOCUST
ASH
BIRCH
HAWTHORNE
EXIST. CATCH BASIN OR INLET
EXIST. STORM SEWER
EXIST. WATER MAIN
EXIST. BEEHIVE INLET
TREE LEGEND
OAK
PROPERTY LINE
0 20 40
SCALE IN FEET
N
NOTES
1. SURVEY INFORMATION SHOWN FROM MIDWESTERN CONSULTING
LLC. (DATED APRIL 19, 2024). GEOSYNTEC MAKES NO GUARANTEE
NOR ASSUMES ANY LIABILITY AS TO THE COMPLETENESS OR
ACCURACY OF THE SURVEY.
2. SUPPLEMENTAL EXISTING CONDITIONS INFORMATION HAS BEEN
ADDED TO SURVEY BACKGROUND BASED ON GEOSYNTEC'S SITE
VISIT.
3. ALL DIMENSIONS ARE GIVEN IN FEET.
4. ALL BEARINGS AND DISTANCES ARE BASED ON NAD83 MICHIGAN
STATE PLANES, SOUTH ZONE, INTERNATIONAL FOOT (2011
ADJUSTMENT), GPS DERIVED.
5. ALL ELEVATIONS SHOWN ARE REFERENCED TO NAVD83, GPS
DERIVED.
LEGAL DESCRIPTION
(PER NOWAK AND FRAUS ENGINEERS CERTIFIED SURVEY, JOB
#H295, PLS. CHAD FINDLEY #55108, DATED: 2/15/2013) LOT 635 AND
ALL OF VACATED NELSON STREET (50' WIDE) BETWEEN E. RUNDELL
STREET (60' WIDE) AND MARQUETTE STREET (60' WIDE) PER CITY OF
PONTIAC RESOLUTION 870, DATED 10-07-1975, OF THE PLAT OF
'MODERN HOUSING CORPORATION ADDITION" BEING A PART OF THE
SOUTHWEST 1/4 OF SECTION 21, T3N, R10E, CITY OF PONTIAC,
OAKLAND COUNTY, MICHIGAN AS RECORDED IN LIBER 20 OF PLATS,
ON PAGE 22 OF THE OAKLAND COUNTY RECORDS, EXCEPT THAT
PART BEING DESCRIBED AS: BEGINNING AT A POINT ON THE
SOUTHERLY LINE OF SAID LOT 635 BEING 476.14 FEET ALONG THE
ARC OF A CURVE TO THE LEFT, RADIUS OF 1402.69 FEET, CENTRAL
ANGLE OF 19°26'56" AND A CHORD BEARING OF S79°10'06"E, 473.86
FEET FROM THE SOUTHWEST CORNER OF SAID LOT 635; THENCE
N01°06'26"E, 106.47 FEET; THENCE N53°57'01"E, 180.00 FEET TO A
POINT ON THE NORTHERLY LINE OF SAID LOT 635 TO AN
ON-TANGENT CURVE; THENCE 176.74 FEET ALONG THE ARC OF A
CURVE TO THE LEFT, RADIUS OF 956.92 FEET, CENTRAL ANGLE OF
10°34'57", CHORD BEARING S67°42'50"E, 176.49 FEET TO A REVERSE
CURVE; THENCE 39.11 FEET ALONG THE ARC OF A CURVE TO THE
RIGHT, RADIUS OF 20.00 FEET, CENTRAL ANGLE OF 112°02'31",
CHORD BEARING S16°59'03"E, 33.17 FEET; THENCE S39°02'12"W, 79.70
FEET TO A TANGENT CURVE; THENCE 93.00 FEET ALONG THE ARC OF
A CURVE TO THE RIGHT, RADIUS OF 125.30 FEET, CENTRAL ANGLE
OF 42°31'34", CHORD BEARING S.62°03'51"W., 90.88 FEET TO A
COMPOUND CURVE; THENCE 190.47 FEET ALONG THE ARC OF A
CURVE TO THE RIGHT, RADIUS OF 1402.69 FEET, CENTRAL ANGLE OF
07°46'48", CHORD BEARING S87°13'02"W, 190.32 FEET TO THE POINT
OF BEGINNING.
BENCHMARKS
SET SPIKE IN E. SIDE OF UTILITY POLE LOCATED WEST OF
BITUMINOUS PARKING ALONG THE WEST SIDE OF PERRY PARK ±260
FEET SOUTH OF MARQUETTE STREET. ELEVATION=944.88 (NAVD88)
F
E
D
C
2 3
B
A
1 2 3
4 5 6 7 8
54 6 7 8
F
E
D
C
B
A
PERRY PARK GREEN INFRASTRUCTURE IMPROVEMENTS
301 EDISON ST, PONTIAC MI 48342-1425
PROJECT:
SITE:
TITLE:
APPROVED BY:
REVIEWED BY: DRAWING NO.:
OF
DRAWN BY:
DESIGN BY:
CHECKED BY: FILE:
PROJECT NO.:
DATE: JULY 29, 2025
CSWR3013
DATEREV APPDESCRIPTION DRN
3057 NORTH ROCKWELL STREET
CHICAGO, IL 60618
TELEPHONE: 312.809.9707
MKSKSTUDIOS.COM
THIS DRAWING MAY NOT BE ISSUED
FOR PROJECT TENDER OR
CONSTRUCTION, UNLESS SEALED.
DATE
CJH
WF
RH
RH
EC
R
Know what's below.
Call before you dig.
2100 COMMONWEALTH BLVD, SUITE 100
ANN ARBOR, MI 48105
TELEPHONE: 586.744.9003
05/09/2025 ISSUED FOR BID ECCJH
07/29/2025 ISSUED FOR RE-BID ECCJH
EXISTING CONDITIONS
EXISTING VIEW A
MATCHLINE - EXISTING VIEW A
MATCHLINE - EXISTING VIEW A
LIMITS OF WORK
EXISTING GROUND MAJOR CONTOUR (5')
EXISTING GROUND MINOR CONTOUR (1')
RIGHT-OF-WAY
TREE PROTECTION FENCE
REMOVE CONCRETE
STABILIZED CONST. ENTRANCE (SEE SHEET 7)
TOPSOIL STOCKPILE AND STAGING AREA
PROTECT
REMOVE
SALVAGE
CONSTRUCTION FENCE
LEGEND
X
SF
SF
PERFORATED RISER
WITH ROCK JACKET
LOW
SF SILT FENCE
REMOVE PICNIC
TABLE AND
BARBEQUE GRILL
TREE PROTECTION FENCE (TYP)
REMOVE PICNIC
TABLE AND
BARBEQUE GRILL
REMOVE CONC. PAD
REMOVE CONCRETE PAD
PROPERTY LINE
TREE PROTECTION FENCE (TYP)
TREE PROTECTION FENCE (TYP)
PROTECT EX SIGN
PROTECT EXISTING BOLLARDS,
PUMP STATION, AND
ASSOCIATED ELECTRICAL
INFRASTRUCTURE
REMOVE EX
LIGHT POLE
CONTRACTOR TO REMOVE
BUILT UP SOIL AND
VEGETATION ON TOP OF THE
EXISTING ASPHALT AND IN
BETWEEN CURB STOPS ALONG
THE EAST EDGE OF THE
PARKING AREA IN ORDER TO
MAINTAIN POSITIVE DRAINAGE
(484 LF)
REMOVE 37 LF OF 12"
STORM DRAIN SEE UTILITY
PLAN FOR PROPOSED
CONNECTION
REMOVE EXISTING CATCH BASIN
SF
SF
SF
SF
SF
SF
SF
SF
TOPSOIL STOCKPILE
AND STAGING AREA
6' x 12' SEDIMENT TRAP
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
PERFORATED RISER WITH ROCK JACKET
EXISTING CATCH BASIN TO BE
CONVERTED INTO PERFORATED RISER
AND REMAIN IN PLACE UNTIL CB 101 IS
INSTALLED. SEE SESC PHASE II
SEQUENCE
EXISTING STORM DRAIN TO REMAIN IN
PLACE UNTIL CB 101 IS INSTALLED.
SEE SESC PHASE II SEQUENCE
230 LF SILT FENCE
CONTRACTOR TO CLEAR AND
GRUB ENTIRE AREA WITHIN
LIMITS OF WORK
CONTRACTOR TO CLEAR AND
GRUB ENTIRE AREA WITHIN
LIMITS OF WORK
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LO
W
LOW
LO
W
LO
W
LOW
LOW
LO
W
LOW
LO
W
LO
W
LO
W
LO
W
LO
W
LO
W
CONSTRUCTION ENTRANCE
X
X X
X
X
SF
PROTECT EX SIGN
X
X
X
X
X
X X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
TREE PROTECTION FENCE (TYP)
GATE
CONTRACTOR TO CLEAR AND
GRUB ENTIRE AREA WITHIN
LIMITS OF WORK
LOW
LOW
LO
WLOW
LOW
LO
W
0 20 40
SCALE IN FEET
N
NOTES
1. NOTIFY THE ENGINEER IN WRITING OF ANY IDENTIFIED DISCREPANCIES WITHIN
THE CONSTRUCTION DOCUMENTS PRIOR TO THE START OF WORK.
2. PRIOR TO THE COMMENCEMENT OF WORK, VERIFY LOCATIONS AND DEPTHS OF
ALL UNDERGROUND UTILITIES THAT MAY BE AFFECTED BY CONSTRUCTION AND
TAKE RESPONSIBILITY FOR DAMAGES TO SUCH UTILITIES CAUSED AS A RESULT
OF CONSTRUCTION.
3. TAKE ALL NECESSARY PRECAUTIONARY MEASURES TO PROTECT THE PUBLIC AND
ADJACENT PROPERTIES FROM DAMAGE THROUGHOUT CONSTRUCTION,
INCLUDING DAMAGES TO UTILITIES, WALKS, WALLS, DRIVES, AND CURBS.
4. PROTECT ALL EXISTING FEATURES NOT MARKED FOR REMOVAL.
5. SECURE ALL NECESSARY PERMITS AND NOTIFY ALL UTILITY COMPANIES WITH
UTILITIES ON THE SITE PRIOR TO THE CONSTRUCTION OF THE PROJECT. ADHERE
TO ALL APPLICABLE LOCAL, STATE AND FEDERAL LAWS OR REGULATIONS
PERTAINING TO THE PROJECT.
6. ESTABLISH AND MAINTAIN SITE SECURITY UNTIL PROJECT ACCEPTANCE.
7. USE DIMENSIONS SHOWN ON DRAWINGS FOR LAYOUT OF THE WORK. DO NOT
USE SCALE DIMENSIONS FROM PLANS, SECTIONS OR DETAILS ON THE DRAWINGS.
8. DETAILS NOTED AS TYPICAL SHALL APPLY IN ALL CASES UNLESS SPECIFICALLY
SHOWN OR NOTED OTHERWISE. WHERE NO SPECIFIC DETAIL IS SHOWN, THE
CONSTRUCTION SHALL BE IDENTICAL OR SIMILAR TO THAT INDICATED FOR LIKE
CASES OF CONSTRUCTION ON THIS PROJECT.
9. TAKE NOTE OF ALL GRADING AND DRAINAGE WAYS AND MAINTAIN THESE DRAIN
WAYS FLOWS FREE OF OBSTRUCTIONS.
10. ALL CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE CODES, REGULATIONS,
AND ORDINANCES PER CITY OF PONTIAC, MICHIGAN PUBLIC WORKS STANDARDS
AND SPECIFICATIONS.
11. ALL SOIL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED
PRIOR TO STARTING REMOVALS AND DEMOLITION.
12. EXISTING TREES TO REMAIN SHOULD BE PROTECTED WITH TEMPORARY FENCING
TO THE DRIP LINE. NO WORK SHALL OCCUR WITHIN THE DRIP LINE.
13. PRIOR TO CONSTRUCTION, ALL FENCING AND BARRICADES SHALL BE INSTALLED.
14. CONTRACTOR TO CLEAR AN D GRUB ENTIRE AREA WITHIN LIMITS OF WORK
F
E
D
C
2 3
B
A
1 2 3
4 5 6 7 8
54 6 7 8
F
E
D
C
B
A
PERRY PARK GREEN INFRASTRUCTURE IMPROVEMENTS
301 EDISON ST, PONTIAC MI 48342-1425
PROJECT:
SITE:
TITLE:
APPROVED BY:
REVIEWED BY: DRAWING NO.:
OF
DRAWN BY:
DESIGN BY:
CHECKED BY: FILE:
PROJECT NO.:
DATE: JULY 29, 2025
CSWR3013
DATEREV APPDESCRIPTION DRN
3057 NORTH ROCKWELL STREET
CHICAGO, IL 60618
TELEPHONE: 312.809.9707
MKSKSTUDIOS.COM
THIS DRAWING MAY NOT BE ISSUED
FOR PROJECT TENDER OR
CONSTRUCTION, UNLESS SEALED.
DATE
CJH
WF
RH
RH
EC
R
Know what's below.
Call before you dig.
2100 COMMONWEALTH BLVD, SUITE 100
ANN ARBOR, MI 48105
TELEPHONE: 586.744.9003
05/09/2025 ISSUED FOR BID ECCJH
07/29/2025 ISSUED FOR RE-BID ECCJH
SITE DEMOLITION AND EROSION CONTROL PLAN
MATCHLINE - SITE AND DEMOLITION VIEW A
SITE AND DEMOLITION VIEW A
BEST MANAGEMENT PRACTICE (BMP) IMPLEMENTATION SEQUENCE
PHASE 1
1. POST SESC PERMIT AT CONSTRUCTION ENTRANCE.
2. STAKE THE PROJECT LIMITS OF DISTURBANCE AS SHOWN ON THE SESC DRAWING.
3. BEGIN CLEARING AND GRUBBING ONLY THE MINIMUM AREA NECESSARY FOR
INSTALLATION BMPS. CLEAR AREAS REQUIRED FOR BMPS AS EACH BMP IS BEING
INSTALLED.
4. INSTALL STABILIZED CONSTRUCTION ENTRANCES.
5. INSTALL INLET PROTECTION IN EXISTING INLETS.
6. INSTALL PERFORATED RISER AND ROCK JACKET AT EXISTING CB (BEEHIVE).
7. INSTALL TEMPORARY SEDIMENT TRAPS. STABILIZE IMMEDIATELY UPON
COMPLETION OF SEDIMENT TRAP CONSTRUCTION.
8. INSTALL TREE PROTECTION.
9. REMOVE EXISTING LIGHT POLE, BARBEQUE GRILLS, PICNIC TABLES AND
ASSOCIATED CONCRETE PADS.
10. CONTRACTOR TO COORDINATE AND CONDUCT SWPPP PHASE 1 IMPLEMENTATION
REVIEW MEETING PRIOR TO BEGINNING PHASE 2.
MATCHLINE - SITE AND DEMOLITION VIEW A
SEE LANDSCAPING DETAILS
X
X X
X
X
SF
PROTECT EX SIGN
X
X
X
X
X
X X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
TREE PROTECTION FENCE (TYP)
LOW
LOW
LO
WLOW
LOW
LO
W
ST
ST
D
D
947948
941942
940941942
94194
PROPERTY LINE
SF
SF
SF
SF
SF
SF
SF
SF
TOPSOIL STOCKPILE
AND STAGING AREA
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LO
W
LOW
LO
W
LO
W
LOW
LOW
LO
W
LOW
LO
W
LO
W
LO
W
LO
W
LO
W
LO
W
SURFACE ROUGHENING ON
SLOPES > 5%
970 LF FIBER LOG AROUND ROCK
INLET PROTECTION
INLET PROTECTION
CONTRACTOR MAY EXPAND OR
RELOCATE SEDIMENT TRAPS TO
CAPTURE AND DIRECT WATER TO
PERFORATED RISER
ROCK DONUT
PROTECTION
345 LF FIBER LOG AROUND ROCK
LEGEND
LIMIT OF WORK
EXISTING MAJOR CONTOUR (5')
EXISTING MINOR CONTOUR (1')
PROPOSED MAJOR CONTOUR (5')
PROPOSED MINOR CONTOUR (1')
WETLAND ELEVATION INDICATOR
FIBER LOG
SEDIMENT TRAP
INLET PROTECTION (SEE SHEET 7)
ROCK DONUT FES PROTECTION
TEMPORARY SEEDING AND STABILIZAITON
LOW
0 20 40
SCALE IN FEET
N
NOTES
F
E
D
C
2 3
B
A
1 2 3
4 5 6 7 8
54 6 7 8
F
E
D
C
B
A
PERRY PARK GREEN INFRASTRUCTURE IMPROVEMENTS
301 EDISON ST, PONTIAC MI 48342-1425
PROJECT:
SITE:
TITLE:
APPROVED BY:
REVIEWED BY: DRAWING NO.:
OF
DRAWN BY:
DESIGN BY:
CHECKED BY: FILE:
PROJECT NO.:
DATE: JULY 29, 2025
CSWR3013
DATEREV APPDESCRIPTION DRN
3057 NORTH ROCKWELL STREET
CHICAGO, IL 60618
TELEPHONE: 312.809.9707
MKSKSTUDIOS.COM
THIS DRAWING MAY NOT BE ISSUED
FOR PROJECT TENDER OR
CONSTRUCTION, UNLESS SEALED.
DATE
CJH
WF
RH
RH
EC
R
Know what's below.
Call before you dig.
2100 COMMONWEALTH BLVD, SUITE 100
ANN ARBOR, MI 48105
TELEPHONE: 586.744.9003
05/09/2025 ISSUED FOR BID ECCJH
07/29/2025 ISSUED FOR RE-BID ECCJH
PROPOSED EROSION CONTROL PLAN
MATCHLINE - EROSION CONTROL VIEW A
MATCHLINE - EROSION CONTROL VIEW A
EROSION CONTROL VIEW A
BEST MANAGEMENT PRACTICE (BMP) IMPLEMENTATION SEQUENCE
PHASE 2
1. BEGIN CLEARING AND GRUBBING THE SITE (PHASE CLEARING AND
GRUBBING TO THE EXTENT PRACTICAL TO MINIMIZE THE AMOUNT OF AREA
DISTURBED AT ANY GIVEN TIME).
2. STRIP AND STOCKPILE TOPSOIL. SOIL STOCKPILE MUST BE STABILIZED
WITH TEMPORARY SEED AND PROVIDED PERIMETER CONTROLS IN
ACCORDANCE WITH THE SESC DETAIL.
2. BEGIN GRADING THE SITE.
3. IMPLEMENT TEMPORARY STABILIZATION MEASURES ON ANY DISTURBED
AREAS WHERE CONSTRUCTION ACTIVITIES WILL NOT RESUME FOR 14
DAYS OR MORE. IMPLEMENTATION OF TEMPORARY STABILIZATION
MEASURES MUST BE INITIATED IMMEDIATELY AND COMPLETED WITHIN
SEVEN (7) DAYS FROM WHEN CONSTRUCTION ACTIVITIES TEMPORARILY
CEASED ON ANY PORTION OF THE SITE.
4. BEGIN INSTALLATION OF ROCK DRAINAGE LAYER AND UNDERDRAIN.
INSTALL FIBER ROLL ALONG EDGE OF ROCK LAYER AS IT IS INSTALLED.
5. CONTRACTOR MAY EXTEND OR RELOCATE SEDIMENT TRAPS AS
NECESSARY TO MANAGE STORMWATER ONSITE. ALL STORMWATER
SHOULD BE DIRECTED THROUGH SEDIMENT TRAPS AND THE PERFORATED
PIPE WITH ROCK JACKET UNTIL CB 101 AND FES 101 ARE INSTALLED WITH
ROCK DONUT. CONTRACTOR MAY USE SOLID-WALLED PIPE AS NECESSARY
TO DIRECT STORM WATER FROM OR THROUGH ROCK DRAINAGE LAYER. IF
PIPE IS USED TO DIRECT WATER, IT MUST BE REMOVED OR PROPERLY
ABANDONED (INCLUDING CAPS FOR TEMPORARY LATERALS FROM
UNDERDRAIN SYSTEM).
6. INSTALL STORM PIPE AND STRUCTURES. INSTALL INLET PROTECTION
MEASURES AT STORM SEWER INLETS AS EACH INLET STRUCTURE IS
INSTALLED. INSTALL ROCK DONUT AT FES 101 AS SOON AS THE
STRUCTURE IS INSTALLED.
7. CONTRACTOR MAY PUMP FROM THE FILTERED WATER WITHIN
PERFORATED RISER INTO CB 101 DURING THE TRANSITION. ROCK DONUT,
ROCK DRAINAGE LAYER, AND INLET PROTECTION MUST BE INSTALLED AT
CB 101 PRIOR TO RECEIVING STORMWATER BY GRAVITY FLOW.
8. ONCE CB 101 AND ASSOCIATED CONTROLS (ROCK DONUT, FIBER ROLL,
AND INLET PROTECTION) ARE INSTALLED AND FUNCTIONAL, EXISITNG CB,
EXISTING PIPE, AND SEDIMENT TRAPS MAY BE REMOVED.
9. INSTALL GRASSED SWALE. IMMEDIATELY STABILIZE SWALE UPON
COMPLETION.
10. COMPLETE GRADING, MAINTENANCE PATHS, BOULDER STONES,
PROPOSED PICNIC AREAS, AND INSTALLATION OF PERMANENT
STABILIZATION MEASURES ON ALL DISTURBED AREAS. FINAL
STABILIZATION OF DISTURBED AREAS MUST BE INITIATED IMMEDIATELY
AND COMPLETED WITH FIVE (5) CALENDAR DAYS FROM WHEN CLEARING,
GRADING, EXCAVATING, OR OTHER EARTH-DISTURBING ACTIVITIES HAVE
CEASED ON ANY PORTION OF THE SITE.
11. REMOVE ALL REMAINING TEMPORARY BMPS UPON APPROVAL OF
OAKLAND COUNTY WRC, OR ITS DESIGNATED REPRESENTATIVE.
12. PERMANENTLY STABILIZE ANY AREAS DISTURBED BY THE REMOVAL OF
TEMPORARY BMPS.
13. JET UNDERDRAIN PIPES TO ENSURE THE PIPES ARE CLEARED OF
BLOCKAGES. REMOVE ANY SEDIMENT ACCUMULATION IN CB 101.
14. NOTIFY OAKLAND COUNTY WRC, OR ITS DESIGNATED REPRESENTATIVE,
OF FINAL SITE STABILIZATION. THE SITE IS CONSIDERED TO HAVE
REACHED FINAL STABILIZATION WHEN EVERY SQUARE FOOT OF GROUND
DISTURBANCE IS VEGETATED WITH A DENSITY OF 90% AND AT LEAST 1
INCH IN HEIGHT.
15. OAKLAND COUNTY WRC, OR ITS DESIGNATED REPRESENTATIVE, TO
SUBMIT NOTICE OF TERMINATION TO THE PERMITTING AGENCY.
NOTE:THE CONTRACTOR MAY COMPLETE CONSTRUCTION ACTIVITIES
CONCURRENTLY PROVIDED ALL PRECEDING BMPS AND STABILIZATION
ACTIVITIES HAVE BEEN COMPLETELY INSTALLED.
* DORMANT SEEDING IS FOR USE IN THE LATE FALL AFTER THE SOIL TEMPERATURE REMAINS
CONSISTENTLY BELOW 50 F, PRIOR TO THE GROUND FREEZING. THIS PRACTICE IS
APPROPRIATE IF CONSTRUCTION ON A SITE IS COMPLETED IN THE FALL BUT THE SEED WAS NOT
PLANTED PRIOR TO RECOMMENDED SEEDING DATES. NO SEED GERMINATION WILL TAKE PLACE
UNTIL SPRING. A COOL SEASON ANNUAL GRASS MAY BE ADDED IN AN ATTEMPT TO HAVE SOME
FALL GROWTH.
· MULCH MUST BE USED WITH DORMANT SEED.
· DO NOT SEED WHEN THE GROUND IS FROZEN OR SNOW COVERED.
PLANTING ZONES:
SEEDING WINDOW
ZONE 1 ZONE 3ZONE 2
5/1 - 10/1
SOURCE: ADAPTED FROM MDOT INTERIM 2003 STANDARD SPECIFICATIONS FOR
CONSTRUCTION
4/15 - 10/10 5/1 - 9/20
LOWER PENINSULA
(NORTH OF T20N)
LOWER PENINSULA
(SOUTH OF T20N)
UPPER PENINSULA
LOWER PENINSULA
(SOUTH OF U.S. 10)
SOURCE: ADAPTED FROM USDA NRCS TECHNICAL GUIDE #342 (1999)
11/1 - FREEZE
4/1 - 8/1
SEEDING DATES
(WITH IRRIGATION
OR MULCH)
10/25 - FREEZE10/25 - FREEZE
UPPER
PENINSULA
ZONE 3
5/1 - 9/10
Lower PENINSULA
(NORTH OF U.S. 10)
ZONE 2
5/1 - 9/20
ZONE 1
DORMANT
SEEDING
DATES*
o
SEEDING DATES
(W/O IRRIGATION
OR MULCH)
4/1 - 5/20 5/1 - 6/10 5/1 - 6/15
8/10 - 10/1 8/1 - 9/20 8/1 - 9/20 or or or
SEEDING WINDOW 11/15 - Freeze 11/01 - Freeze
PERMANENT SEEDING
DORMANT SEEDING*
11/01 - Freeze
INSTALLATION
1. REVIEW SESC PLAN AND CONSTRUCTION PHASING TO IDENTIFY AREAS IN NEED OF PERMANENT
VEGETATIVE STABILIZATION.
2. PREPARE SEEDBED AND APPLY SEED IN ACCORDANCE WITH LANDSCAPE PLAN AND RELATED
DETAILS AND SPECIFICATIONS.
3. MULCH IMMEDIATELY AFTER SEEDING.
4. DORMANT SEED MIXES ARE FOR USE AFTER THE GROWING SEASON, USING SEED WHICH LIES
DORMANT IN THE WINTER AND BEGINS GROWING AS SOON AS SITE CONDITIONS BECOME
FAVORABLE.
5. PROTECT SEEDED AREAS FROM PEDESTRIAN OR VEHICULAR TRAFFIC.
6. DIVERT CONCENTRATED FLOWS AWAY FROM THE SEEDED AREA UNTIL VEGETATION IS
ESTABLISHED.
MAINTENANCE
· INSPECT WEEKLY AND WITHIN 24 HOURS FOLLOWING EACH RAIN EVENT IN THE FIRST FEW
MONTHS FOLLOWING INSTALLATION TO BE SURE SEED HAS GERMINATED AND PERMANENT
VEGETATIVE COVER IS BEING ESTABLISHED.
· ADD SUPPLEMENTAL SEED AS NECESSARY.
· SEEDS NEED ADEQUATE TIME TO ESTABLISH.
· MAY NOT BE APPROPRIATE IN AREAS WITH FREQUENT TRAFFIC.
· SEEDED AREAS MAY REQUIRE IRRIGATION DURING DRY PERIODS.
· SEEDING SUCCESS IS SITE SPECIFIC, CONSIDER MULCHING OR SODDING WHEN NECESSARY.
SEED TYPE
OATS, BARLEY
ANNUAL RYE
WHEAT
SOURCE: ADAPTED FROM USDA NRCS TECHNICAL GUIDE #342 (1999)
BUCKWHEAT
PERENNIAL
RYEGRASS
INSTALLATION
1. REVIEW CONSTRUCTION PHASING AND SOIL EROSION CONTROL PLAN TO IDENTIFY
AREAS REQUIRING TEMPORARY SEEDING.
2. SELECT ANNUAL GRASS SEED FOR TEMPORARY COVER AREAS.
3. SEED MIXES MAY VARY, SHOULD ONLY CONTAIN ANNUAL, NON-AGGRESSIVE SPECIES,
AND GENERALLY INCLUDE RYE, WHEAT, OR OAT SPECIES. SEED MIXES SHOULD BE
OBTAINED FROM A SEED SUPPLIER AS SEED MIXES ARE DEPENDENT ON SOIL TYPE,
LIGHT, MOISTURE, AND USE APPLICATION.
4. PREPARE SEEDBED BY REMOVAL OF CONSTRUCTION/WOODY DEBRIS. THEN SCARIFY
OR RAKE SEEDBED.
5. SLOPES STEEPER THAN 1:3 SHOULD BE ROUGHENED.
6. APPLY SEED AS SOON AS POSSIBLE AFTER SEEDBED PREPARATION. MULCH
IMMEDIATELY AFTER SEEDING ALL SLOPES, UNSTABLE SOILS, HEAVY CLAY SOILS, AND
ALL AREAS ADJACENT TO WETLANDS, WATERCOURSES, OR SENSITIVE AREAS.
7. THE TIME TO SEED IS DEPENDENT ON THE CLIMATE OF THE AREA. MICHIGAN HAS
THREE CLIMATIC ZONES.
8. PROTECT SEEDED AREAS FROM PEDESTRIAN/VEHICULAR TRAFFIC.
9. DIVERT CONCENTRATED FLOWS AWAY FROM SEEDED AREA UNTIL VEGETATION IS
ESTABLISHED.
10. INSPECT TEMPORARY SEEDED AREAS WEEKLY AND FOLLOWING EACH RAIN EVENT
UNTIL FINAL GRADING AND STABILIZATION ACTIVITIES ARE COMPLETED.
11. MUST BE FOLLOWED BY PERMANENT SEEDING.
MAINTENANCE
· SEEDS NEED ADEQUATE TIME TO ESTABLISH.
· MAY NOT BE APPROPRIATE IN AREAS WITH FREQUENT TRAFFIC.
· SEEDED AREA MAY REQUIRE IRRIGATION IN DRY PERIODS.
4/1 - 9/15 per 1,000 sq.ft.
8/1 - 10/15
9/20 - 10/15
4/15 - 8/1
8/1 - 10/10
9/10 - 10/10
5/1 - 8/1
8/1 - 11/1
9/10 - 10/1
2 lbs.
per acre
96 lbs.
AMOUNT
3 lbs. 120 lbs.
3 lbs. 120 lbs.
ZONE 1
LOWER PENINSULA
(SOUTH OF U.S. 10)
ZONE 2
LOWER PENINSULA
(NORTH OF U.S. 10)
ZONE 3
UPPER PENINSULA
6/1 - 7/15 6/1 - 7/15 6/15 - 7/15 2 lbs. 75 lbs.
8/1 - 10/15 6/1 - 8/1 8/1 - 10/1 0.5 lbs. 20 lbs.
GENERAL NOTES:
1. THE CONTRACTOR SHALL MAINTAIN A COPY OF THE SESC PERMIT AND PLAN ON THE SITE FOR THE DURATION
OF CONSTRUCTION.
2. THE CONTRACTOR SHALL ADHERE TO THE SESC PLAN DURING CONSTRUCTION OPERATIONS.
3. THE SESC PLAN INCLUDES RELEVANT SPECIFICATIONS, A NARRATIVE PLAN AND ASSOCIATED APPENDICES, AND THE SESC DRAWINGS AND ASSOCIATED DETAIL SHEETS.
4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN AND REPAIR ALL BMPS DURING CONSTRUCTION.
5. ALL EARTH-DISTURBING CONSTRUCTION ACTIVITIES SHALL BE PERFORMED WITHIN THE LIMITS OF
DISTURBANCE AS INDICATED ON THE SESC DRAWINGS.
6. THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING THE LIMITS OF DISTURBANCE SHOWN ON THE DRAWINGS AND FIELD-STAKING THE LIMITS OF DISTURBANCE LINE PRIOR TO THE START OF CONSTRUCTION.
7. BMPS DEPICTED ON THE PHASE 1 SESC DRAWING ARE TO BE INSTALLED PRIOR TO THE START OF ANY LAND
CLEARING OR GRADING ACTIVITIES.
8. THE CONTRACTOR SHALL APPLY TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES WHEN REQUIRED BY THESE PLAN DRAWINGS AND IMPLEMENT ADDITIONAL MEASURES AS DICTATED BY SITE
CONDITIONS.
9. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY SEDIMENTATION RESULTING FROM WORK ON THIS SITE IS CONTAINED ON THE SITE AND NOT ALLOWED TO COLLECT ON ANY OFF-SITE AREAS OR IN
WATERWAYS.
10. SLOPES ARE TO BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFF
VELOCITIES AND EROSION.
11. CONTRACTOR LAYDOWN, STAGING AND STOCKPILE AREAS ARE TO BE LOCATED WITHIN THE PERMITTED
LIMITS OF DISTURBANCE.
12. SILT FENCE IS TO BE INSTALLED AROUND THE PERIMETER OF ON-SITE SOIL STOCKPILE AREAS AS DICTATED BY SITE CONDITIONS. ADDITIONALLY, INACTIVE PORTIONS OF THE STOCKPILE AREAS ARE TO BE STABILIZED
AS REQUIRED HEREIN.
13. THE CONTRACTOR IS RESPONSIBLE FOR REGULARLY CHECKING SEEDED AREAS TO SEE THAT A GOOD STAND OF VEGETATION IS ESTABLISHED. AREAS SHOULD BE FERTILIZED, WATERED, AND RESEEDED AS NEEDED.
THE CONTRACTOR IS RESPONSIBLE TO ENSURE VEGETATION IS ESTABLISHED FOR A WARRANTY PERIOD OF
TWO FULL GROWING SEASONS.
14. TRACKING OF SOIL AND SEDIMENT ONTO OFF-SITE ROADWAYS SHALL BE MINIMIZED THROUGH THE USE OF APPROPRIATE MEASURES. THE CONTRACTOR SHALL IMMEDIATELY REMOVE ANY SOIL OR SEDIMENT TRACKED
ONTO THE ROADWAYS.
15. THE CONTRACTOR SHALL BRING TO THE SITE AND USE ONLY EQUIPMENT THAT IS WELL-MAINTAINED AND
WITHOUT LEAKS.
16. THE SOIL EROSION AND SEDIMENT CONTROLS WILL BE MAINTAINED WEEKLY AND AFTER EVERY STORM
EVENT BY THE CONTRACTOR
DEWATERING
DISCHARGES FROM DEWATERING ACTIVITIES, INCLUDING DISCHARGES FROM DEWATERING OF TRENCHES AND EXCAVATIONS, ARE PROHIBITED UNLESS MANAGED BY APPROPRIATE CONTROLS. IN NO CASE IS WATER FROM
DEWATERING ACTIVITIES TO BE PUMPED OFF-SITE WITHOUT BEING PROPERLY TREATED.
DEWATERING THAT HAS SEDIMENT-LADEN WATER MUST DISCHARGE TO A SEDIMENT BASIN OR EQUIVALENT SETTLING, FILTERING, OR ENERGY DISSIPATION MEASURES TO REMOVE SUSPENDED SOLIDS BEFORE DISCHARGE.
SEDIMENT BAGS, INFILTRATION TRENCHES, VEGETATED SWALES, OR FILTER BERMS MAY ALSO BE USED.
SECONDARY CONTAINMENT SHOULD BE USED TO PREVENT THE POTENTIAL LEAK OF CHEMICALS USED DURING
DEWATERING, SUCH AS CHEMICALS FOR FLOCCULATION.
CONCRETE WASHOUT
DISCHARGE OF EXCESS OR WASTE CONCRETE AND/OR WASH WATER FROM CONCRETE TRUCKS WILL BE ALLOWED ON THE CONSTRUCTION SITE, BUT ONLY IN DESIGNATED LINED AND DIKED AREAS TO PREVENT CONTACT BETWEEN THE CONCRETE AND/OR WASH WATER AND STORMWATER THAT WILL BE DISCHARGED FROM
THE SITE. THE DESIGNATED CONCRETE WASHOUT SHALL BE INDICATED WITH SIGNAGE.
ANY DISCHARGE FOR WASHING AND/OR RINSING WATERS FROM CONCRETE MIXING EQUIPMENT INCLUDING READY MIX TRUCKS IS PROHIBITED. SUCH POLLUTANTS SHALL BE ADEQUATELY TREATED AND CANNOT BE DISCHARGED TO WATERS OF THE STATE. ANY SPILLS SHALL BE CLEANED IMMEDIATELY UPON DISCOVERY.
DUST CONTROL
LARGE AREAS OF SOIL THAT ARE DENUDED OF VEGETATION AND HAVE NO PROTECTION FROM PARTICLES BEING PICKED UP AND CARRIED BY WIND SHOULD BE PROTECTED WITH A TEMPORARY COVER OR KEPT UNDER CONTROL WITH WATER OR OTHER SOIL ADHERING PRODUCTS TO LIMIT WIND TRANSPORTED PARTICLES EXITING
THE SITE PERIMETER.
WATER TRUCKS OR OTHER DUST CONTROL AGENTS ARE TO BE USED AS NEEDED DURING CONSTRUCTION TO MINIMIZE DUST GENERATED ON THE SITE. TACKIFIERS MAY BE USED TO HOLD SOIL IN PLACE AND PREVENT DUST.
MANUFACTURER RECOMMENDATIONS FOR APPLICATION RATES MUST BE USED FOR DUST CONTROL
APPLICATIONS. DUST CONTROL MUST BE PROVIDED BY THE CONTRACTOR TO A DEGREE THAT IS IN COMPLIANCE
WITH APPLICABLE LOCAL AND STATE DUST CONTROL REGULATIONS.
EQUIPMENT/VEHICLE MAINTENANCE
DISCHARGE FROM WASHING AND MAINTENANCE OF EQUIPMENT OR VEHICLES WILL BE ALLOWED ON THE CONSTRUCTION SITE, BUT ONLY IN DESIGNATED LINED AND DIKED AREAS TO PREVENT CONTACT BETWEEN THE
WASH WATER AND STORMWATER THAT WILL BE DISCHARGED FROM THE SITE.
DISCHARGES OF CONTAMINATED WATERS FROM WASHING AND MAINTAINING VEHICLES OR EQUIPMENT, INCLUDING WASHING AND/OR RINSING WATERS FROM CONTAINERS OR APPLICATORS INVOLVED WITH THE USE OF PAINT, CONCRETE, OR OTHER SUCH MATERIALS, IS PROHIBITED. SUCH POLLUTANTS SHALL BE ADEQUATELY
TREATED AND CANNOT BE DISCHARGED TO WATERS OF THE STATE.
SOLID WASTE
NO SOLID MATERIALS, INCLUDING CONSTRUCTION MATERIALS, ARE ALLOWED TO BE DISCHARGED FROM THE SITE WITH STORMWATER. ALL SOLID WASTE, INCLUDING DISPOSABLE MATERIALS INCIDENTAL TO THE MAJOR CONSTRUCTION ACTIVITIES, MUST BE COLLECTED AND PLACED IN CONTAINERS. THE CONTAINERS SHALL BE EMPTIED WHEN 95% FULL, OR AS NECESSARY, BY A CERTIFIED TRASH DISPOSAL SERVICE AND HAULED AWAY FROM THE SITE. COVERS FOR THE CONTAINERS SHALL BE PROVIDED AS NECESSARY TO MEET STATE AND LOCAL
REQUIREMENTS. CONSTRUCT COVERS AS PRACTICABLE, OR REQUIRED, TO PREVENT STORMWATER CONTACT
AND POLLUTANT DISCHARGES FROM SOLID WASTE RECEPTACLES.
SANITARY FACILIITIES
ALL PERSONNEL INVOLVED WITH CONSTRUCTION ACTIVITIES MUST COMPLY WITH STATE AND LOCAL SANITARY OR SEPTIC SYSTEM REGULATIONS. TEMPORARY SANITARY FACILITIES WILL BE PROVIDED AT THE SITE THROUGHOUT THE CONSTRUCTION PHASE. PORTABLE TOILETS MUST BE KEPT AWAY FROM DRAINAGE COURSES AND LOW AREAS AND SECURELY ANCHORED SUCH THAT THEY WILL NOT BE TIPPED OR KNOCKED OVER.
SECONDARY CONTAINMENT FOR EACH PORTABLE TOILET SHALL BE PROVIDED TO PREVENT THE DISCHARGE OF
SEWAGE ON-SITE.
STOCKPILE MANAGEMENT
MATERIALS RESULTING FROM CLEARING AND GRUBBING EXCAVATION OPERATIONS AND OTHER SUCH SOIL STOCKPILES SHALL BE CONSOLIDATED UP SLOPE FROM ADEQUATE SEDIMENTATION CONTROLS. DIVERSIONS, BERMS, DITCHES, STORAGE BASINS, ETC. WILL BE USED IN ORDER TO DIVERT, RETAIN, OR DETAIN FLOWS OR OTHERWISE LIMIT EXPOSURE TO AND DISCHARGE FROM STOCKPILES. INACTIVE STOCKPILES SHALL BE STABILIZED IN ACCORDANCE WITH THE SPECIFICATION INDICATE IN THE GENERAL PERMIT OR AS SPECIFIED
HEREIN, WHICHEVER IS MORE STRINGENT.
SOIL EROSION AND SEDIMENT CONTROL NOTES TEMPORARY SEEDING
PERMENANT SEEDING
F
E
D
C
2 3
B
A
1 2 3
4 5 6 7 8
54 6 7 8
F
E
D
C
B
A
PERRY PARK GREEN INFRASTRUCTURE IMPROVEMENTS
301 EDISON ST, PONTIAC MI 48342-1425
PROJECT:
SITE:
TITLE:
APPROVED BY:
REVIEWED BY: DRAWING NO.:
OF
DRAWN BY:
DESIGN BY:
CHECKED BY: FILE:
PROJECT NO.:
DATE: JULY 29, 2025
CSWR3013
DATEREV APPDESCRIPTION DRN
3057 NORTH ROCKWELL STREET
CHICAGO, IL 60618
TELEPHONE: 312.809.9707
MKSKSTUDIOS.COM
THIS DRAWING MAY NOT BE ISSUED
FOR PROJECT TENDER OR
CONSTRUCTION, UNLESS SEALED.
DATE
CJH
WF
RH
RH
EC
2100 COMMONWEALTH BLVD, SUITE 100
ANN ARBOR, MI 48105
TELEPHONE: 586.744.9003
05/09/2025 ISSUED FOR BID ECCJH
07/29/2025 ISSUED FOR RE-BID ECCJH
SESC NOTES
4"-8" ROCK
1' THICK LAYER 3/4"
TO 1-1/2" CRUSHED
AGGREGATE
(WASHED)
8 X 2" DIA HOLES
CORED INTO EXISTING
STRUCTURE SPACED 8"
ON CENTER
EX. CATCHBASIN
RIM ELEV: 938.46
937.6'
935.6'
934.6' 933.6'
935.2'
NON-WOVEN
GEOTEXTILE
SECTION B-B
PLAN VIEW
CROSS SECTION
HALF PLAN VIEW
CENTERLINE CROSS SECTION
FLOW
FLOW
2'
1'
2'
2:1
2:1
NOTES:
1. SEDIMENT SHALL BE REMOVED WHEN THE SEDIMENT HAS
ACCUMULATED TO ONE-HALF THE
HEIGHT OF THE STONE BERM.
HEIGHT=
0.9' MAX.
END STONE
1' MIN ABOVE
STONE BERM
DESIGN ELEVATION
RIPRAP
COARSE AGGREGATE
WETLAND SLOPE
FES
CENTERLINE
RIPRAP COARSE AGGREGATE
2:1
2:1
FES
ELEV. 939.9
6' x 12' SEDIMENT TRAP
6' x 12' SEDIMENT TRAP
EXPOSE 3' OF EX.
CATCHBASIN TO CONVERT
TO PERFORATED RISER
WITH ROCK JACKET
B
A A
B
PLAN VIEW
4"-8" ROCK
1' THICK LAYER 3/4"
TO 1-1/2" CRUSHED
AGGREGATE
(WASHED)
8 X 2" DIA HOLES
CORED INTO EXISTING
STRUCTURE SPACED 8"
ON CENTER
EX. CATCHBASIN
RIM ELEV: 938.46
937.6'
933.6'
935.2'
NON-WOVEN
GEOTEXTILE
935.6'
934.6'
SECTION A-A
NOTES:
1. TREES SHALL BE IRRIGATED TO PROVIDE AT
LEAST 1 INCH OF WATER APPLIED ONCE A WEEK
USING A SLOW DELIVERY METHOD.
2. NO PRUNING SHALL BE PERFORMED EXCEPT BY
APPROVED ARBORIST.
3. NO EQUIPMENT SHALL OPERATE INSIDE THE
PROTECTIVE FENCING INCLUDING DURING
FENCE INSTALLATION AND REMOVAL.
KEEP OUT
TREE
PROTECTION
AREA
F
E
D
C
2 3
B
A
1 2 3
4 5 6 7 8
54 6 7 8
F
E
D
C
B
A
PERRY PARK GREEN INFRASTRUCTURE IMPROVEMENTS
301 EDISON ST, PONTIAC MI 48342-1425
PROJECT:
SITE:
TITLE:
APPROVED BY:
REVIEWED BY: DRAWING NO.:
OF
DRAWN BY:
DESIGN BY:
CHECKED BY: FILE:
PROJECT NO.:
DATE: JULY 29, 2025
CSWR3013
DATEREV APPDESCRIPTION DRN
3057 NORTH ROCKWELL STREET
CHICAGO, IL 60618
TELEPHONE: 312.809.9707
MKSKSTUDIOS.COM
THIS DRAWING MAY NOT BE ISSUED
FOR PROJECT TENDER OR
CONSTRUCTION, UNLESS SEALED.
DATE
CJH
WF
RH
RH
EC
2100 COMMONWEALTH BLVD, SUITE 100
ANN ARBOR, MI 48105
TELEPHONE: 586.744.9003
05/09/2025 ISSUED FOR BID ECCJH
07/29/2025 ISSUED FOR RE-BID ECCJH
SESC DETAILS
NTS
SEDIMENT TRAPS
DETAIL6
NTS
FIBER ROLL
DETAIL6
NTS
ROCK DONUT FES PROTECTION
DETAIL6
NOTES
1. SEDIMENT SHALL BE REMOVED AND TRAP RESTORED TO ITS
ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS
ACCUMULATED TO 1/2 THE DESIGN DEPTH OF THE TRAP.
REMOVED SEDIMENT SHALL BE DEPOSITED IN AN UPLAND AREA
IN SUCH A MANNER THAT IT WILL NOT ERODE
2. THE STRUCTURE SHALL BE INSPECTED AFTER EACH RAIN EVENT
AND REPAIRS MADE AS NEEDED
3. THE SEDIMENT TRAP SHALL BE REMOVED AND THE AREA
STABILIZED WHEN THE CONTRIBUTORY DRAINAGE AREA HAS
BEEN PROPERLY STABILIZED. THE SWALE SEDIMENT TRAP WILL
BE PROPERLY BACKFILLED AND THE SWALE OR DITCH
RECONSTRUCTED
NTS
PERFORATED RISER WITH ROCK JACKET
DETAIL6
FIBER ROLLS ARE USED TO TRAP SEDIMENT BY FILTERING WATER PASSING THROUGH THE BERM AND ALLOWING WATER TO POND. THEY USE COMPOST INSERTED INTO FLEXIBLE, PERMEABLE TUBE WITH A PNEUMATIC BLOWER
DEVICE OR EQUIVALENT.
MATERIALS SHALL HAVE A PH BETWEEN 5.0-8.0; 100% PASSING A 2" SIEVE AND A MINIMUM OF 70% GREATER THAN THE 3/8" SIEVE; MOISTURE CONTENT IS LESS THAN 60%; MATERIAL SHALL BE RELATIVELY FREE OF INERT OR FOREIGN
MAN-MADE MATERIALS
FIBER ROLLS SHALL BE LAID ON LEVEL CONTOUR. 9” FILTER SOCKS SHALL BE USED ON 20% TO 33% SLOPES. THE
MAXIMUM SLOPE LENGTH ABOVE FILTER SOCK SHOULD BE LIMITED TO 50FT.
INSTALLATION
1. PLACE FIBER ROLL ON A LEVEL LINE ACROSS SLOPES, GENERALLY PARALLEL TO THE BASE OF THE SLOPE.
2. STAKE FIBER ROLL WITH WOODEN STAKES AS SHOWN IN THE PROFILE. STAKES SHOULD BE BURIED 12” MIN IN
SOIL.
3. FIBER ROLLS INTENDED TO BE LEFT AS PERMANENT FILTER OR PART OF THE NATURAL LANDSCAPE, SHALL BE
SEEDED AT THE TIME OF INSTALLATION.
MAINTENANCE
1. INSPECT FIBER ROLLS AFTER EACH SIGNIFICANT RAIN.
2. REMOVE SEDIMENTS COLLECTED AT THE BASE OF THE FIBER ROLL WHEN THEY REACH 1/3 OF THE EXPOSED
HEIGHT OF THE PRACTICE.
3. REPLACE OR REPAIR WITH MORE EFFECTIVE ALTERNATIVE WHERE THE FILTER SOCK DETERIORATES OR FAILS.
4. FOR REMOVAL, DISPERSE THE FIBER ROLL ON SITE WHEN NO LONGER REQUIRED IN SUCH A WAY AS TO
FACILITATE AND NOT OBSTRUCT SEEDINGS.
NOTE:
1. ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN SEDIMENT REACHES
HALF THE OVERALL HEIGHT OF THE FIBER ROLL.
2. HARDWOOD STAKE SPACING SHALL BE PER MANUFACTURER'S
SPECIFICATIONS.
INSTALLATION
1. SEDIMENT TRAPS SHALL BE PLACED ADJACENT TO
THE EXISTING CATCH BASIN
2. EXPOSE 3’ OF THE FACE OF THE EXISTING CATCH
BASIN
3. CORE 8 2-INCH DIAMETER HOLES, 2 VERTICAL ROWS
OF 4 SPACED 8” ON CENTER
4. ROCK SHALL BE PLACED ON NON-WOVEN
GEOTEXTILE FABRIC
5. THE CORE OF THE ROCK JACKET SHALL BE
CONSTRUCTED OF 4”-8” STONE. THE STONE SHALL
BE PLACED TO COMPLETELY COVER THE CORED
HOLES BY AT LEAST 1’ IN ALL DIRECTIONS
6. ¾” TO 1-1/2” CRUSHED AGGREGATE (WASHED)
SHALL BE PLACED ON THE FACE OF THE ROCK
JACKET 12” THICK
7. THE SLOPE OF THE ROCK JACKET SHOULD BE 1:2
OR FLATTER
8.
MAINTENANCE
1. PERFORATED RISER WITH ROCK JACKET SHOULD
BE INSPECTED AFTER EACH RUNOFF EVENT
2. CLOGGED STONE SHOULD BE PERIODICALLY
CLEANED
3. NEEDED REPAIRS SHOULD BE INITIATED
IMMEDIATELY AFTER INSPECTION
4. ACCUMULATED SEDIMENT SHOULD BE
PERIODICALLY REMOVED
NTS
TREE PROTECTION FENCE
DETAIL6
1 REFER TO LANDSCAPING DETAILS FOR TREE PROTECTION
F
E
D
C
2 3
B
A
1 2 3
4 5 6 7 8
54 6 7 8
F
E
D
C
B
A
PERRY PARK GREEN INFRASTRUCTURE IMPROVEMENTS
301 EDISON ST, PONTIAC MI 48342-1425
PROJECT:
SITE:
TITLE:
APPROVED BY:
REVIEWED BY: DRAWING NO.:
OF
DRAWN BY:
DESIGN BY:
CHECKED BY: FILE:
PROJECT NO.:
DATE: JULY 29, 2025
CSWR3013
DATEREV APPDESCRIPTION DRN
3057 NORTH ROCKWELL STREET
CHICAGO, IL 60618
TELEPHONE: 312.809.9707
MKSKSTUDIOS.COM
THIS DRAWING MAY NOT BE ISSUED
FOR PROJECT TENDER OR
CONSTRUCTION, UNLESS SEALED.
DATE
CJH
WF
RH
RH
EC
2100 COMMONWEALTH BLVD, SUITE 100
ANN ARBOR, MI 48105
TELEPHONE: 586.744.9003
05/09/2025 ISSUED FOR BID ECCJH
07/29/2025 ISSUED FOR RE-BID ECCJH
WRC SESC DETAILS
NOTE:
INLET FILTERS TO INCLUDE
AREA FOR OVERFLOW
E
D
C
2 3
B
A
1 2 3
4 5 6 7 8
54 6 7 8
F
E
D
C
B
A
PERRY PARK GREEN INFRASTRUCTURE IMPROVEMENTS
301 EDISON ST, PONTIAC MI 48342-1425
PROJECT:
SITE:
TITLE:
APPROVED BY:
REVIEWED BY: DRAWING NO.:
OF
DRAWN BY:
DESIGN BY:
CHECKED BY: FILE:
PROJECT NO.:
DATE: JULY 29, 2025
CSWR3013
DATEREV APPDESCRIPTION DRN
3057 NORTH ROCKWELL STREET
CHICAGO, IL 60618
TELEPHONE: 312.809.9707
MKSKSTUDIOS.COM
THIS DRAWING MAY NOT BE ISSUED
FOR PROJECT TENDER OR
CONSTRUCTION, UNLESS SEALED.
DATE
CJH
WF
RH
RH
EC
2100 COMMONWEALTH BLVD, SUITE 100
ANN ARBOR, MI 48105
TELEPHONE: 586.744.9003
05/09/2025 ISSUED FOR BID ECCJH
07/29/2025 ISSUED FOR RE-BID ECCJH
MAINTENANCE NOTES
PHASE 1 CONTRACTOR'S MAINTENANCE
RESPONSIBILITIES
WRC MAINTENANCE
RESPONSIBILITIES
PHASE 2 CONTRACTOR'S
MAINTENANCE RESPONSIBILITIES
PHASE 2 CONTRACTOR'S
MAINTENANCE SCHEDULE
During Construction - Contractor's Maintenance Responsibilities Vegetation and Maintenance Guarantee Period - Contractor's
Maintenance Responsibilities
LIMIT OF WORK
EXISTING MAJOR CONTOUR (5')
EXISTING MINOR CONTOUR (1')
PROPOSED MAJOR CONTOUR (5')
PROPOSED MINOR CONTOUR (1')
WETLAND ELEVATION INDICATOR
PROPOSED MAINTENANCE PATH
RIP RAP
UNDERDRAIN CLEANOUT
PROPOSED FLARED END SECTION (FES)
PROPOSED SPOT ELEVATION
APPROX. SPOT ELEVATION: MATCH EXISTING
GRADE
SIDEWALK DRAINAGE TRENCH
861.50
861.50 M.E.
PROPOSED PERFORATED UNDERDRAIN
UUU 4
PROPOSED STORM SEWER))
CATCH BASIN
PROPOSED SOLID UNDERDRAIN
GRASS SWALE
LOW
(SEE HARDSCAPE PLAN)
NEW JOSEPH JONES DRAIN ROW EASMENT
ST
ST
D
D
947948
941942
940941942
94194
943.42 M.E.
943.34 M.E.
942.66 942.66
942.60 942.57
942.35 942.26
942.15
942.14
942.71
942.00
943.17 943.08
943.58943.55
941.83
941.91 942.30
942.37
942.36 942.29
942.19 942.11
942.14
942.10
942.20
942.27
942.42 942.45
942.31 942.34
942.51 942.54
942.44 942.47
942.38 942.41
946.00
941.31 942.09 942.12
942.30 942.33
942.15 942.12
942.16 942.13
942.10 942.15
941.84 941.88
941.29 941.38
941.29 941.36
941.48
941.56
942.27 942.19
942.43 942.36
943.42 943.35
943.00 942.97
942.01 941.98
942.04 942.01
943.59 943.51
946.86
946.78
945.60
945.52
944.40
944.32
941.34 941.45
939.91
939.91
940.00 939.97
939.95
939.95
939.98
939.95
939.95
939.95
939.95
939.95
939.99 939.95943.18
943.25
941.54
942.07 942.14
941.95
942.02
942.08
942.41
941.45
941.86
942.71 M.E.
942.60 M.E.
942.94 M.E.
943.20 M.E.
943.63 M.E.
943.40 M.E.
943.99 M.E.
942.17 942.09
938.99939.00
939.00
941.38
941.28
947.04
947.00
944.99
945.00
949.50
949.91
949.19
942.10
942.74
942.46
PROP. WETLAND
BOTTOM ELEV. = 939.0'
TOP OF WETLAND. = 940.50'
TOP OF BASIN = 941.25'
PROP MAINTENANCE PATH -
SEE HARDSCAPE PLAN
PROPERTY LINE
PROPERTY LINE
TOP OF BASIN ELEVATION = 941.25
TOP OF WETLAND LIMITS: 940.5'
TOP OF WETLAND ELEVATION = 940.40
TOP OF BASIN ELEVATION = 941.25
FES 103
FES 104
939.9
939.9
CB 101 (4' DIA. BEEHIVE)
RIM: 941.25'
CB 102 (4' DIA. BEEHIVE)
RIM: 942.00'
UUUU
UUUU UU
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U U
U
UU
U
UUUU
U
U
U
U
U
U
U
>>UUUUUU
11.25° BEND
45° BEND
45° BEND
11.25° BEND
22.5° BEND
22.5° WYE
11.25° BEND
22.5° BEND
45° BEND
45° BEND
45° BEND
22.5° BEND
CO 301
RIM: 941.75
CO 302
RIM: 941.75
CO 303
RIM: 941.75
UUUUU
U
U
U
45° BEND
45° BEND
11.25° BEND
33 LF 6" D
IA
SO
LID
PVC
0.0%
55 LF 6" D
IA
PER
F PVC
0.0%
28 LF 6" DIA
SOLID PVC @ 0.0%
47 LF 6" DIA
PERF PVC @ 0.0%
30 LF 6" DIA
PERF PVC @ 0.0%
35 LF 6" DIA
PERF PVC @ 0.0%
15 LF 6" DIA
PERF PVC @ 0.0%
20 LF 6" DIA
PERF PVC @ 0.0%
2 X 34 LF 6" DIA
PERF PVC @ 0.0%15 LF 6" DIA
PERF PVC @ 0.0%
8 LF 6" DIA
PERF PVC @ 0.0%
29 LF 6" DIA
SOLID PVC @ 0.0%
25 LF 6" DIA
SOLID PVC @ 0.0%
38 LF 6" DIA
PERF PVC @ 0.0%
30 LF 6" DIA
PERF PVC @ 0.0%
15 LF 6" DIA
PERF PVC @ 0.0%
15 LF 6" DIA
PERF PVC @ 0.0%
15 LF 6" DIA
PERF PVC @ 0.0%
35 LF 6" DIA
SOLID PVC @ 0.0%
26 LF 6" DIA
SOLID PVC @ 0.0%
13 LF 6" DIA
SOLID PVC @ 0.0%
20 LF 6" DIA
PERF PVC @ 0.0%
6" UNDERDRAIN @ 0.0%
PERFORATED
WITHIN LIMITS OF
ROCK ONLY
ROCK DRAINAGE
TO WETLAND
SEE SIDEWALK TRENCH DETAIL
SIDEWALK TRENCH DRAIN
FL: 941.28'
FES 101
FES 102
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LO
W
LOW
LO
W
LO
W
LOW
LOW
LO
W
LOW
LO
W
LO
W
LO
W
LO
W
LO
W
LO
W
NEW JOSEPH JONES DRAIN
RIGHT-OF-WAY ESMT.
NEW JOSEPH JONES DRAIN
RIGHT-OF-WAY ESMT.
NEW JOSEPH JONES DRAIN
RIGHT-OF-WAY ESMT.
ADJUST PUMP FLOATS
HIGH LEVEL ON = 941.00'
LOW LEVEL ON = 940.50'
CONTRACTOR TO REMOVE SOIL
AND DEBRIS FROM EDGE OF
PAVEMENT TO PROMOTE POSITIVE
DRAINAGE TO TRENCH DRAIN
FINISH TURF ELEVATIONS ALONG EXISTING
PAVEMENT SHALL BE HELD TO MINUS 1/2 INCH
BELOW EXISTING PAVEMENT ELEVATION. SLOPE
GRADE TO DIRECT WATER AWARE FROM THE
STREET TO PREVENT PONDING
950.00
944.95 M.E.
946.81 M.E.
947.90 M.E.
950.06 M.E.
950.00
949.91
950.05
953.50 M.E.
953.50 M.E.
LOW
LOW
LO
WLOW
LOW
LO
W
CONTRACTOR TO VERIFY EX. ELEV. IN FIELD
FINISH TURF ELEVATIONS ALONG EXISTING
PAVEMENT SHALL BE HELD TO MINUS 1/2 INCH
BELOW EXISTING PAVEMENT ELEVATION. SLOPE
GRADE TO DIRECT WATER AWARE FROM THE
STREET TO PREVENT PONDING
0 20 40
SCALE IN FEET
N
F
E
D
C
2 3
B
A
1 2 3
4 5 6 7 8
54 6 7 8
F
E
D
C
B
A
PERRY PARK GREEN INFRASTRUCTURE IMPROVEMENTS
301 EDISON ST, PONTIAC MI 48342-1425
PROJECT:
SITE:
TITLE:
APPROVED BY:
REVIEWED BY: DRAWING NO.:
OF
DRAWN BY:
DESIGN BY:
CHECKED BY: FILE:
PROJECT NO.:
DATE: JULY 29, 2025
CSWR3013
DATEREV APPDESCRIPTION DRN
3057 NORTH ROCKWELL STREET
CHICAGO, IL 60618
TELEPHONE: 312.809.9707
MKSKSTUDIOS.COM
THIS DRAWING MAY NOT BE ISSUED
FOR PROJECT TENDER OR
CONSTRUCTION, UNLESS SEALED.
DATE
CJH
WF
RH
RH
EC
R
Know what's below.
Call before you dig.
2100 COMMONWEALTH BLVD, SUITE 100
ANN ARBOR, MI 48105
TELEPHONE: 586.744.9003
05/09/2025 ISSUED FOR BID ECCJH
07/29/2025 ISSUED FOR RE-BID ECCJH
GRADING AND UTILITY PLAN
NOTES
1. NOTIFY THE ENGINEER IN WRITING OF ANY IDENTIFIED
DISCREPANCIES WITHIN THE CONSTRUCTION DOCUMENTS PRIOR
TO THE START OF WORK. CONTRACTOR SHALL VERIFY ALL SITE
CONDITIONS PRIOR TO STARTING WORK. IN ALL CASES WHERE A
CONFLICT MAY OCCUR, THE ENGINEER SHALL BE NOTIFIED AND
WILL INTERPRET THE INTENT OF THE CONTRACT DOCUMENTS.
2. PRIOR TO THE COMMENCEMENT OF WORK, VERIFY LOCATIONS AND
DEPTHS OF ALL UNDERGROUND UTILITIES THAT MAY BE AFFECTED
BY CONSTRUCTION AND TAKE RESPONSIBILITY FOR DAMAGES TO
SUCH UTILITIES CAUSED AS A RESULT OF CONSTRUCTION.
3. SECURE ALL NECESSARY PERMITS AND NOTIFY ALL UTILITY
COMPANIES WITH UTILITIES ON THE SITE PRIOR TO THE
CONSTRUCTION OF THE PROJECT. ADHERE TO ALL APPLICABLE
LOCAL, STATE AND FEDERAL LAWS OR REGULATIONS PERTAINING
TO THE PROJECT.
4. USE DIMENSIONS SHOWN ON DRAWINGS FOR LAYOUT OF THE
WORK. DO NOT USE SCALE DIMENSIONS FROM PLANS, SECTIONS
OR DETAILS ON THE DRAWINGS.
5. TAKE NOTE OF ALL GRADING AND DRAINAGE WAYS AND MAINTAIN
THESE DRAIN WAYS FLOWS FREE OF OBSTRUCTIONS.
6. ALL CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE CODES,
REGULATIONS, AND ORDINANCES PER CITY OF PONTIAC, MICHIGAN
PUBLIC WORKS STANDARDS AND SPECIFICATIONS.
7. CONTRACTOR TO MAINTAIN POSITIVE DRAINAGE TO WETLAND
FROM EXISTING PAVEMENT AREA AFTER REMOVING EXCESS
SEDIMENT AND VEGETATION
8. FINISH TURF ELEVATIONS ALONG EXISTING PAVEMENT SHALL BE
HELD TO MINUS 1/2 INCH BELOW EXISTING PAVEMENT ELEVATION.
SLOPE GRADE TO DIRECT WATER AWARE FROM THE STREET TO
PREVENT PONDING
9. SEE SHEET 10: INFRASTRUCTURE PROFILES FOR STORM SEWER
PROFILES.
10. SEE SHEET 12 FOR ADDITIONAL UTILITY AND GRADING NOTES.
11. CONTRACTOR TO REMOVE SOIL AND DEBRIS FROM EDGE OF
PAVEMENT TO PROMOTE POSITIVE DRAINAGE TO THE TRENCH
TRAIN
GRADING VIEW A
MATCHLINE - GRADING VIEW A
MATCHLINE - GRADING VIEW A
FUTURE WORK - NOT IN CONTRACT
1FUTURE WORK - NOT IN CONTRACT
EL
EV
AT
IO
N (F
EE
T)
EL
EV
AT
IO
N (F
EE
T)
DISTANCE (FEET)
0+00 0+78
FE
S
IN
V
EL
.0
15' OF 12" DIA RCP @ 3.14%
PROPOSED GRADE
EXISTING GRADE
C B
4' D
IA
E
.J .I.
W C
O
VE
R C
AT
C
H B
AS
IN
R
IM
E
LE
V
1.
EX
. 1 2"
W
IN
V O
U T
±9
.9
2' V
.I.
F.
"R
C P
N
IN
V
IN
.6
0' 6"
P
VC
N E
IN
V
IN
.5 0'
6" P
VC
N
E
IN
V
IN
.5
0'
2 X 6" DIA PVC UNDERDRAIN
XINV EL: 937.50'
EX 12" DIA RCP
EX
. P
U M
P
ST
AT
IO
N W
ET
W
EL
L
R
IM
E
LE
V
2.
SU
M P
EL
EV
.8
" E
IN
V
IN
.2
9' 7"
S W
IN
V
O U
T
0.
EX 6" DIA FOREMAIN
6" MIN. BEDDING (SEE DETAIL)
EG = 940.70
CONNECT TO EXISTING
STORM DRAIN. INVERT
ELEVATION TO BE VERIFIED
IN FIELD (V.I.F)
SEE DETAIL 6 ON SHEET 12 FOR
FLARED END SECTION AND
LIMITS OF RIP-RAP ROCK
4:1
EL
EV
AT
IO
N (F
EE
T)
EL
EV
AT
IO
N (F
EE
T)
DISTANCE (FEET)
0+00 0+55
C B
4' D
IA
E
.J .I.
W C
O
VE
R C
AT
C
H
BA
SI
N
R
IM
E
LE
V
2.
" E
IN
V O
U T
9.
45' OF 12" DIA RCP @ 1.0%
FE
S
IN
V
EL
.0
0PROPOSED GRADE
EXISTING GRADE
EG = 942.95
6" MIN. BEDDING (SEE DETAIL)
SEE DETAIL 6 ON SHEET 12 FOR
FLARED END SECTION AND
LIMITS OF RIP-RAP ROCK
4:1
EL
EV
AT
IO
N (F
EE
T)
EL
EV
AT
IO
N (F
EE
T)
DISTANCE (FEET)
0+00 0+40
30' OF 12" DIA RCP @ 0.0%
FE
S
IN
V
EL
.0
FE
S
IN
V
EL
.0
PROPOSED GRADE
EXISTING GRADE
6" MIN. BEDDING (SEE DETAIL)
SEE DETAIL 6 ON SHEET 12 FOR
FLARED END SECTION AND
LIMITS OF RIP-RAP ROCK
SEE DETAIL 6 ON SHEET 12 FOR
FLARED END SECTION AND
LIMITS OF RIP-RAP ROCK
4:14:1
0 5 10
SCALE IN FEET
N
F
E
D
C
2 3
B
A
1 2 3
4 5 6 7 8
54 6 7 8
F
E
D
C
B
A
PERRY PARK GREEN INFRASTRUCTURE IMPROVEMENTS
301 EDISON ST, PONTIAC MI 48342-1425
PROJECT:
SITE:
TITLE:
APPROVED BY:
REVIEWED BY: DRAWING NO.:
OF
DRAWN BY:
DESIGN BY:
CHECKED BY: FILE:
PROJECT NO.:
DATE: JULY 29, 2025
CSWR3013
DATEREV APPDESCRIPTION DRN
3057 NORTH ROCKWELL STREET
CHICAGO, IL 60618
TELEPHONE: 312.809.9707
MKSKSTUDIOS.COM
THIS DRAWING MAY NOT BE ISSUED
FOR PROJECT TENDER OR
CONSTRUCTION, UNLESS SEALED.
DATE
CJH
WF
RH
RH
EC
R
Know what's below.
Call before you dig.
2100 COMMONWEALTH BLVD, SUITE 100
ANN ARBOR, MI 48105
TELEPHONE: 586.744.9003
05/09/2025 ISSUED FOR BID ECCJH
07/29/2025 ISSUED FOR RE-BID ECCJH
INFRASTRUCTURE PROFILES
FES 101 TO EX. PUMP STATION
HORIZONTAL SCALE: 1" = 5'
VERTICAL SCALE: 1" = 5'
FES 103 TO FES 104
HORIZONTAL SCALE: 1" = 5'
VERTICAL SCALE: 1" = 5'
CB 102 TO FES 102
HORIZONTAL SCALE: 1" = 5'
VERTICAL SCALE: 1" = 5'
CB 101 SECTION VIEW
LIMITS OF DISTURBANCE
DRAINAGE AREA BOUNDARY
HYDRAULIC SOIL GROUP (HSG) C
HYDRAULIC SOIL GROUP (HSG) A/D
LOW
PROP. STORMWATER TREATMENT
WETLAND
LOW
LOW
LOW
LO
W
LO
W
LOW
LO
W
LOW
LOW
LO
W
LO
W
LO
W
ST
947948
941942 943944
941942
940941942
94194
0 20 40
SCALE IN FEET
N
NOTES
F
E
D
C
2 3
B
A
1 2 3
4 5 6 7 8
54 6 7 8
F
E
D
C
B
A
PERRY PARK GREEN INFRASTRUCTURE IMPROVEMENTS
301 EDISON ST, PONTIAC MI 48342-1425
PROJECT:
SITE:
TITLE:
APPROVED BY:
REVIEWED BY: DRAWING NO.:
OF
DRAWN BY:
DESIGN BY:
CHECKED BY: FILE:
PROJECT NO.:
DATE: JULY 29, 2025
CSWR3013
DATEREV APPDESCRIPTION DRN
3057 NORTH ROCKWELL STREET
CHICAGO, IL 60618
TELEPHONE: 312.809.9707
MKSKSTUDIOS.COM
THIS DRAWING MAY NOT BE ISSUED
FOR PROJECT TENDER OR
CONSTRUCTION, UNLESS SEALED.
DATE
CJH
WF
RH
RH
EC
R
Know what's below.
Call before you dig.
2100 COMMONWEALTH BLVD, SUITE 100
ANN ARBOR, MI 48105
TELEPHONE: 586.744.9003
05/09/2025 ISSUED FOR BID ECCJH
07/29/2025 ISSUED FOR RE-BID ECCJH
SITE LAYOUT AND DRAINAGE MAP
STORMWATER MANAGEMENT SUMMARY
DRAINAGE AREA AND RUNOFF COEFFICIENT
IMPERVIOUS AREA
HSG C AREA = 2.6 ACRES C VALUE = 0.25
HSG A/D = 5.8 ACRES C VALUE = 0.30
IMPERVIOUS AREA = 1.0 ACRES C VALUE = 0.95
TOTAL AREA = 9.4 ACRES COMPOSITE C VALUE = 0.36
WRC VOLUME CALCULATIONS
CHANNEL PROTECTION VOLUME CONTROL (CPVC)
EQUATION: VCPR = 4,716 X C X A
WHERE
C = POST-DEVELOPMENT RUN-OFF COEFFICIENT
A = TOTAL SITE AREA
CALCULATION
VCPR = 4,716 X 0.36 X 9.4 = 15,969 CUBIC FEET
CHANNEL PROTECTION RATE CONTROL (CPRC)
EQUATION: VED = 6,897 X C X A
WHERE
C = POST-DEVELOPMENT RUN-OFF COEFFICIENT
A = TOTAL SITE AREA
CALCULATION
VED = 6,897 X 0.36 X 9.4 = 23,339 CUBIC FEET
100-YEAR DETENTION VOLUME
EQUATION: V100D = (V100R X R) - VCPR
WHERE
V100R = POST-DEVELOPMENT 100-YEAR RUNOFF = 18,985 x C X A
18,985 X 0.36 X 9.4 = 62,245 CUBIC FEET
VCPR = CHANNEL PROTECTION VOLUME CONTROL
R = STORAGE CURVE FACTOR = (0.206 - 0.15x ln(Q100P / Q100IN)
WHERE
Q100P = ALLOWABLE 100-YEAR POST DEVELOPMENT PEAK FLOW = QVR X A
WHERE
QVR = VARIABLE RELEASE RATE (CFS/ACRE) = 1.1055 - 0.206 x ln (A)
QVR = 1.1055 - 0.206 X ln (9.4) = 0.644 CFS/ACRE
Q100P = 0.644 X 9.4 = 6.05 CUBIC FEET PER SECOND (CFS)
Q100IN = 100-YEAR POST DEVELOPMENT PEAK INFLOW RATE = I100 X C X A
WHERE I100 = 100-YEAR PEAK RAINFALL INTENSITY = 12.73 IN/HR
12.73 X 0.36 X 9.4 = 43.07 CFS
R = (0.206 - 0.15x ln(6.05 / 43.07) = 0.50
V100D = (62,245 X 0.5) - 15,969 = 16,175 CUBIC FEET < VED
V100D = (62,245 x 0.5) = 32,144 CUBIC FEET
100-YEAR DETENTION VOLUME DRAWDOWN
CALCULATION
DESIGN PUMP RATE = 460 GPM = 1.025 CFS
DRAWDOWN TIME = 32,144 CF / 1.025 CFS =
31,360 SECONDS = 8.71 HOURS
STAGE STORAGE TABLE
NATIVE SOIL
WETLAND LIMITS = 940.50'
EX 6" PRESSURE PIPE TO EX 12"
SEWER ALONG E. RUNDELL ST.
EXISTING PUMP STATION
ADJUST PUMP FLOATS
HIGH LEVEL ON = 941.00'
LOW LEVEL ON = 940.50'
4:1
MAX. BOTTOM = 939.00'
TOP OF ROCK = 939.9'
18" SOIL MEDIA MIX EX 12" SEWER EX 6" SEWER
CB 101
RIM ELEV. = 941.25'
WOVEN GEOTEXTILE FABRIC
WETLAND PLANTING ZONE
6" PERF UNDERDRAIN @ 0.0%
COURSE AGGREGATE
ASTM NO.57
TOP OF BASIN = 941.25'4:1
MAX.
FES 101
12" RCP SEWER
(2) 6" x 6" PVC CLEANOUT TEE W/ 6" SCREW CAP
TOP ELEV. = 938.5'
1.5% MAX
PEDESTRIAN AND MAINTENANCE PATHS
(SEE HARDSPACING PLAN)
CONNECT TO EX. 12 SEWER
3" BASIN STONE
(SEE LANDSCAPING PLANS)
SECTION B-B
1.
5"
6" MDOT CLASS II
GRAVEL DRAINAGE
SLOPED TO DRAIN
TO WETLAND2% MIN.
STREET
DRAINAGE GRAVEL
M
IN
6"
CONCRETE PAD
18" MIN.
M
AT
C H
E
XI
ST
IN
G C
U R
B
AN
D G
U
TT
ER
FRAME
6" SUBBASE, TYP. EACH
SIDE OF TRENCH DRAIN
6" CONCRETE
EXPANSION
JOINT TYP.,
IF ABUTTING
PAVEMENT
PLAN VIEW
ST
R
EE
T
TOP OF INLET WALL
FLOW
METAL TRENCH
DRAIN COVER
6" TY
P.
AGGREGATE OR CONC. PATH
STORMWATER
FACILITY
METAL TRENCH DRAIN
GRATE TO MATCH SLOPE
OF ADJACENT SIDEWALK
SECTION A-A
" M
IN
6" M
IN
TOP OF INLET WALL
6" MDOT CLASS II
6"
FLOW FLOW
6"
6"
3" O.C., TYP.
A
A
B
6"
6"TY
P.
941.28 941.38
6" MIN.
GRAVEL DRAINAGE
SLOPED TO DRAIN
TO WETLAND
ASTM NO. 57 STONE
B
GENERAL NOTES
1. TYPE AND CLASS OF PIPE SHALL BE AS SPECIFIED ON PLANS.
2. CLASS '"B'" BEDDING SHALL BE USED THROUGHOUT, UNLESS OTHERWISE SPECIFIED ON THE
PLAN.
3. ALL END SECTIONS 18" AND LARGER SHALL BE PROVIDED WITH A BAR SCREEN UNLESS
OTHERWISE APPROVED.
4. STANDARD RIP-RAP SHALL BE 8"-15" FRAGMENTED ROCK, HEAVY RIP-RAP SHALL BE 16"-24"
FRAGMENTED ROCK. (NO BROKEN CONCRETE)
5. MANHOLE REQUIREMENTS:
5.1. ALL NEW CATCH BASINS, INLETS, AND MANHOLES ARE TO BE MANUFACTURED TO ASTM
C-478 SPECIFICATIONS.
5.2. ALL NEW CATCH BASINS, INLETS, AND MANHOLES SHALL HAVE WRC APPROVED
FLEXIBLE, WATERTIGHT SEALS WHERE PIPES PASS THROUGH WALLS. MANHOLES SHALL
BE OF PRECAST SECTIONS WITH MODIFIED GROOVE TONGUE AND RUBBER GASKET
TYPE JOINTS SECTIONS SHALL BE WRC APPROVED MODIFIED ECCENTRIC CONE TYPE.
5.3. TAPS THROUGH MANHOLE JOINTS OR CONE SECTIONS ARE PROHIBITED UNLESS
OTHERWISE APPROVED.
5.4. MANHOLE STEPS TO BE PLASTIC COATED STEEL MEETING THE REQUIREMENTS IN ASTM
D 2146, TYPE II, GRADE 49108, MA. INDUSTRIES P.S.I. POLYPROPYLENE, (OR APPROVED
EQUAL). STEPS TO BE INSTALLED DURING MANHOLE MANUFACTURE. PLACE AT 16
CENTERS 45 FROM CENTERLINE OF SEWER.
5.5. CONE SECTION WITH MODIFIED GROOVE TONGUE JOINTS AND WITH STUD INSERTS
CAST IN PLACE. TOP TO HAVE FLUSH SURFACE.
5.6. ASTM C-478 RISER SECTION WITH MODIFIED GROOVE TONGUE JOINTS.
5.7. RES-SEAL, LINK-SEAL, PRESS WEDGE LI, OR KOR-N-SEAL BOOT (WITH STAINLESS STEEL
KORBAND) FLEXIBLE RUBBER MANHOLE JOINTS. (OR APPROVED EQUAL).
5.8. THE INSIDE JOINTS OF MANHOLES, CATCH BASINS, AND PIPE SIZES OVER 42" AND
LARGER IN DIAMETER SHALL BE POINTED UP WITH MORTAR UPON COMPLETION OF
BACKFILLING.
6. CONCRETE PIPE REINFORCEMENTS:
6.1. CONCRETE PIPE TO BE PER ASTM C76 STANDARDS.
6.2. IT WILL BE REQUIRED TO TV ALL PIPE 30 DAYS AFTER INSTALLATION
6.3. THE CONTRACTOR SHALL PROVIDE REINFORCED CONCRETE PIPE AS SPECIFIED ON THE
PLANS.
6.4. ALL REINFORCED CONCRETE PIPE SHALL HAVE MODIFIED GROOVED TONGUE JOINTS
WITH O-RING TYPE RUBBER GASKET, PER ASTM SPECIFICATIONS C443.
6.5. THE INSIDE JOINTS OF MANHOLES, CATCH BASINS, AND PIPE SIZES OVER 42" AND
LARGER IN DIAMETER SHALL BE POINTED UP WITH MORTAR UPON COMPLETION OF
BACKFILLING.
7. RESTORATION REQUIREMENTS:
7.1. ALL DISTURBED AREA WITHIN THE COUNTY DRAIN RIGHT-OF-WAY SHALL BE RESTORED
AS FOLLOWS:
7.2. UNDER ROADS, SIDEWALKS, DRIVEWAYS AND PARKING AREAS, BACKFILL MATERIAL
SHALL BE PLACED LOOSELY INTO TRENCHES IN SIX (6) INCH LAYERS WITH EACH LAYER
COMPACTED TO NOT LESS THAN 95% OF MAXIMUM DRY DENSITY AS DETERMINED BY
THE ASTM D 1557 COMPACTION STANDARD (MODIFIED PROCTOR COMPACTION TEST).
ALL OTHER AREAS SHALL HAVE EACH LAYER COMPACTED TO NOT LESS THAN 90% OF
MAXIMUM DRY DENSITY.
7.3. FINISH SUBGRADE
7.4. TOPSOIL ACCEPTABLE TO THE ENGINEER TO ATTAIN FINISHED GRADE. TOPSOIL MUST
NOT BE CONTAMINATED AND MAY NOT BE A MIXTURE OF NATURAL UNDERLYING SOILS,
SUBBASE MATERIALS, OR OTHER MATERIALS. IT MUST CONSIST OF NATURAL LOAM,
SANDY LOAM, SILTY LOAM OR CLAY LOAM HUMUS-BEARING SOIL ADAPTED TO THE
SUSTENANCE OF PLANT LIFE. TOPSOIL MUST BE NEITHER EXCESSIVELY ACIDIC NOR
EXCESSIVELY ALKALINE. IT MUST BE OF MINERAL ORIGIN, EXCLUSIVE OF ANY PEAT OR
MUCK.
7.5. APPLY SEED AND FERTILIZER AS FOLLOWS:*
* SOD IS REQUIRED IN MAINTAINED LAWN AREAS. REFER TO WRC GENERAL
SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS AND INFORMATION.
- APPLY STRAW OR MARSH HAY MULCH IN AN AIR-DRY CONDITION TO ALL SEEDED
AREAS OVER THE SURFACE TO A UNIFORM THICKNESS AT 2 TONS/ACRE.
- MULCH SHALL BE ANCHORED IN PLACE WITH BIODEGRADABLE NETTING, NOT
LARGER THAN 1½" BY 2" NOR SMALLER THAN ½" BY ½".
- THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THE GROWTH OF ALL
SEEDED AREAS, AND SHALL RE-SEED AS NECESSARY TO ACCOMPLISH THIS.
8. THE STORM DRAIN NOTES AND DETAILS SHEET SHALL BE A SUPPLEMENT TO WRC
STANDARDS AND SPECIFICATIONS, WHICH ARE AVAILABLE ON THE WRC WEBSITE
(WWW.OAKGOV.COM/WATER).
LOCATION SEEDING REQUIREMENTS FERTILIZER REQUIREMENT
SLOPE AND DITCH, BANKS,
ETC.
M.D.O.T. "ROADSIDE MIX"
TURF SEED MIXTURE TGM
(10% KENTUCKY BLUE, 20%
PERENNIAL RYE, 30% HARD
FESCUE, 40% CREEPING
RED FESCUE APPLIED AT
220 LB/ACRE
M.D.O.T. SEEDING AND
SODDING FERTILIZERS,
CLASS A
OTHER AREAS M.D.O.T. "ROADSIDE MIX"
TURF SEED MIXTURE THM
(30% KENTUCKY BLUE, 20%
PERENNIAL RYE, 50%
CREEPING RED FESCUE)
APPLIED AT 220 LB/ACRE
M.D.O.T. SEEDING AND
SODDING FERTILIZERS,
CLASS A
6" 3/8" DIA PERFORATIONS 6" CENTER TO CENTER
120°
PIPE DETAIL PERFORATION PATTERN
(ALTERNATING)
GRASS
SWALE
3"
8" MIN. COVER
4" MIN.
15" MIN.
CROSS SECTION
3" MIN.
CLEANOUT DETAIL
6" SOLID PVC
UNDERDRAIN
6" SOLID PVC
UNDERDRAIN
1'
12" RCP TO FES 101
12" RCP TO PUMP
STATION
6" X 6" TEE
WITH SCREW CAP
6" X 6" TEE
WITH SCREW CAP
6"
6"
CB 101 TOP
DOWN VIEW
6" X 6" TEE WITH SCREWCAP
SCREW CAP
NTS
TYPICAL WETLAND SECTION
DETAIL12
F
E
D
C
2 3
B
A
1 2 3
4 5 6 7 8
54 6 7 8
F
E
D
C
B
A
PERRY PARK GREEN INFRASTRUCTURE IMPROVEMENTS
301 EDISON ST, PONTIAC MI 48342-1425
PROJECT:
SITE:
TITLE:
APPROVED BY:
REVIEWED BY: DRAWING NO.:
OF
DRAWN BY:
DESIGN BY:
CHECKED BY: FILE:
PROJECT NO.:
DATE: JULY 29, 2025
CSWR3013
DATEREV APPDESCRIPTION DRN
3057 NORTH ROCKWELL STREET
CHICAGO, IL 60618
TELEPHONE: 312.809.9707
MKSKSTUDIOS.COM
THIS DRAWING MAY NOT BE ISSUED
FOR PROJECT TENDER OR
CONSTRUCTION, UNLESS SEALED.
DATE
CJH
WF
RH
RH
EC
R
Know what's below.
Call before you dig.
2100 COMMONWEALTH BLVD, SUITE 100
ANN ARBOR, MI 48105
TELEPHONE: 586.744.9003
05/09/2025 ISSUED FOR BID ECCJH
07/29/2025 ISSUED FOR RE-BID ECCJH
UTILITY DETAILS
NTS
SIDEWALK TRENCH DRAIN
DETAIL12
N…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .