About this file
This is a comprehensive bid specification and contract document for the Perry Park Green Infrastructure Improvements Project, issued by the Oakland County Water Resources Commissioner and the Joseph Jones Drain Drainage District in Pontiac, Michigan. The project involves constructing stormwater wetlands to collect and treat runoff, reduce non-point source pollution, and improve water quality through infiltration and vegetative treatment. The bid will be received electronically on September 4, 2025, at 10:00 am via a Microsoft Teams virtual meeting, with a pre-bid conference scheduled for August 12, 2025. The project will transform Perry Park, which currently accumulates standing water, by installing stormwater infrastructure, planting native vegetation, and creating maintenance paths and amenities.
The project is fully funded by the Clean Water State Revolving Fund (CWSRF) and will be completed by the City of Pontiac, which is designated as a significantly overburdened community. The total contract will be awarded to the highest-scoring, responsive, and responsible bidder, with evaluation based on a 100-point system covering professional qualifications (40 points), work plan (20 points), schedule (5 points), and cost proposal (35 points). Bidders must submit comprehensive documentation including experience statements, proposed work plans, schedules, and cost proposals. The contract includes specific requirements for performance bonds, insurance, wage rates, and compliance with Davis-Bacon Act provisions, with a maintenance and guarantee period of one year following project completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Perry Park GI Improvements Issued for Bid.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
FOR
JOSEPH JONES DRAIN DRAINAGE DISTRICT
PERRY PARK GREEN INFRASTRUCTURE IMPROVEMENTS PROJECT
OAKLAND COUNTY WATER RESOURCES
1200 N. TELEGRAPH
PONTIAC, MI 48341
AUGUST 2025
GEOSYNTEC#CSWR3013
Geosyntec Consultants
2100 Commonwealth Blvd, Suite 100
Ann Arbor, MI 48105
PERRY PARK
GREEN INFRASTRUCTURE PROJECT
TABLE OF CONTENTS
00 00 10 / 1
GEOSYNTEC
JOB # CSWR3013
JOSEPH JONES DRAIN DRAINAGE DISTRICT
SECTION 00 00 10 – TABLE OF CONTENTS
DIVISION 00 BIDDING AND CONTRACT REQUIREMENTS
00 00 10 TABLE OF CONTENTS
00 01 16 ADVERTISEMENT
00 01 19 INFORMATION FOR BIDDERS
00 01 23 BID FORM
00 01 18 EXPERIENCE AND QUALIFICATIONS
00 01 62 NON-COLLUSION AFFIDAVIT
00 00 29 CONTRACT ADDENDUM AND CERTIFICATION OF SAFETY COMPLIANCE
00 01 32 LABOR AND MATERIAL BOND
00 01 33 MAINTENANCE AND GUARANTEE BOND
00 01 34 PERFORMANCE BOND
00 01 17 AGREEMENT
00 45 14 IRAN LINKED BUSINESS CERTIFICATION
00 06 74 GENERAL CONDITIONS
00 06 75 SUPPLEMENTARY CONDITIONS
00 06 80 GENERAL SPECIFICATIONS
00 73 46 WAGE DETERMINATION SCHEDULE
DIVISION 01
01 10 00 SUMMARY
01 22 00 MEASUREMENT AND PAYMENT
01 23 00 ALTERNATES
01 26 00 CONTRACT MODIFICATION PROCEDURES
01 29 00 PAYMENT PROCEDURES
01 31 00 PROJECT MANAGEMENT AND COORDINATION
01 33 00 SUBMITTAL PROCEDURES
01 40 00 QUALITY REQUIREMENTS
01 15 00 TEMPORARY FACILITIES AND CONTROLS
01 60 00 MAINTAINING TRAFFIC
01 73 00 EXECUTION
01 77 00 CLOSEOUT PROCEDURES
DIVISION 31
31 10 00 SITE CLEARING
31 20 00 EARTH MOVING
31 22 19 FINISH GRADING
31 23 00 DEWATERING
31 25 50 EROSION AND SEDIMENT CONTROLS
DIVISION 32
32 13 13 CONCRETE PAVING
32 15 40 STABILIZED AGGREGATE SURFACING
32 33 00 SITE FURNISHINGS
32 91 00 AMEND-IN-PLACE SOILS
32 92 00 TURF GRASS AND LAWN RENOVATION
32 92 19.19 NATIVE PRAIRIE AND WETLAND PLANTINGS
32 93 00 PLANTS
DIVISION 33
33 42 00 STORMWATER CONVEYANCE
33 46 00 SUBDRAINAGE
APPENDICES
APPENDIX A: PERRY PARK GEOTECHNICAL INVESTIGATION REPORT
This page intentionally left blank.
SECTION 00 01 16
Form DC-116 ADVERTISEMENT
JIM NASH
OAKLAND COUNTY WATER RESOURCES COMMISSIONER
Page ADV-1 of ADV-2 4-23-2024
PERRY PARK GREEN INFRASTRUCTURE IMPROVEMENTS
Electronic sealed Bids will be received by the Owner for the construction of the following project:
The Perry Park project creates stormwater wetlands to collect runoff and reduce non-point source pollution. Perry Park, located in the City of Pontiac, regularly accumulates standing water after rainfall events from the surrounding areas, which are lower than the adjacent pavement. Currently at the project site, water carries non-point source pollution and is pumped into the local storm sewer system, which is at a higher elevation than the park area. This project will include the construction of stormwater wetlands that will reduce nonpoint source pollution in the storm sewer system by collecting stormwater and improve water quality by facilitating infiltration of runoff and vegetative treatment. Perry Park falls within the Joseph Jones Drainage District, a Chapter 20 Drain that is funded 100% by the City of Pontiac, a significantly overburdened community. This project is funded by the Clean Water State Revolving Fund (CWSRF).
THE BIDS RECEIVED WILL BE PUBLICLY OPENED VIA MICROSOFT TEAMS AND READ AT THE
FOLLOWING DATE AND TIME:
September 4, 2025, 10:00 am
The virtual meeting link is shown below:
Join the meeting now Meeting ID: 218 963 285 855 5 Passcode: Uo2gT3F9
Dial in by phone +1 248-333-6396,,993015216# United States, Pontiac Find a local number Phone conference ID: 993 015 216#
Bidders shall review and comply with the Information for Bidders, which is incorporated by reference, and carefully review all Bidding Documents. Bids submitted after the exact time specified for receipt will not be considered.
Bidding Documents will be available on the BidNet Direct website. The proposed Contract Documents under which the work will be performed are included in the Bidding Documents. For questions about BidNet Direct, refer to https://www.oakgov.com/government/purchasing/bidder-registration/bid-solicitation-public-search.
A pre-bid meeting will occur on August 12, 2025, at 10:00 am virtually via Microsoft Teams. The virtual meeting link is shown below:
Join the meeting now Meeting ID: 263 516 643 852 2 Passcode: fr3mM2gm https://teams.microsoft.com/l/meetup-join/19%3ameeting_MmEyODQ5OGItNjQ1Zi00YzU3LWIxYzItYjYzNTM1OGViNmQz%40thread.v2/0?context=%7b%22Tid%22%3a%226dd9592c-fa62-4c52-920e-c6981494a443%22%2c%22Oid%22%3a%22003bb110-7919-4c3c-9c5c-90ebe858d816%22%7d tel:+12483336396,,993015216 https://dialin.teams.microsoft.com/c0e630d0-e794-43a9-b711-4afc5a466a5b?id=993015216 https://www.oakgov.com/government/purchasing/bidder-registration/bid-solicitation-public-search https://www.oakgov.com/government/purchasing/bidder-registration/bid-solicitation-public-search https://teams.microsoft.com/l/meetup-join/19%3ameeting_MGMyZTM0MTgtZTM3NC00YjgyLWJjNDItNTM4MWNhYWMzNTA5%40thread.v2/0?context=%7b%22Tid%22%3a%226dd9592c-fa62-4c52-920e-c6981494a443%22%2c%22Oid%22%3a%22003bb110-7919-4c3c-9c5c-90ebe858d816%22%7d
SECTION 00 01 16
Form DC-116 ADVERTISEMENT
Page ADV-2 of ADV-2 4-23-2024
Dial in by phone +1 248-333-6396,,809599125# United States, Pontiac Find a local number Phone conference ID: 809 599 125#
Questions, comments, or concerns of any Bidder regarding the Bidding Documents or the project, must be submitted in writing via the BidNet Direct website by August 28, 2025. No questions received after this time will be given consideration. Questions will be reviewed and formal responses will be disseminated via addenda on BidNet Direct.
Addenda issued to Bidders prior to the date of receipt of Bids shall become a part of the Contract Documents and all Bids shall include the work described in each and every addendum issued.
Failure to attend the pre-bid meeting shall not relieve the Bidder from compliance with all applicable federal and state laws and regulations, including without limitation the Equal Employment and Minority, Small, and Women's Business Regulations.
P.L. 111-88 requires compliance with the Davis Bacon Act and adherence to the current U.S.
Department of Labor Wage Decision. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract Documents (see Wage Decision included in the Bidding Documents) must be paid on this Project. The Wage Decision, including modifications, must be posted by the Contractor on the job site. A copy of the Federal Labor Standards Provisions is also included and will hereby be a part of the Contract.
A certified check, cashier's check, or Bid Bond for a sum not less than five percent (5%) of the amount of the proposal will be required for each proposal.
Owner reserves the right to accept any proposal, to reject any proposal and to waive irregularities in the proposals.
tel:+12483336396,,809599125 https://dialin.teams.microsoft.com/c0e630d0-e794-43a9-b711-4afc5a466a5b?id=809599125
Section 00 01 19 Form DC–119 INFORMATION FOR BIDDERS
Page IB-1 of IB-13 4-23-2024
1. SCOPE OF WORK
The work under this Contract shall consist of the items listed in the Bidding Documents, including all incidentals necessary to fully complete the project in accordance with the proposed Contract Documents.
2. RECEIPT AND OPENING OF BIDS
A. The Bid shall be submitted as one combined electronic pdf file to the BidNet Direct website as indicated in the Advertisement.
B. The Bids must be submitted only on the forms provided by Owner. All blank spaces for bid prices must be filled in, in ink and scanned as a pdf or typewritten, and the Bid Form must be fully executed when submitted and not modified in any way.
C. The Bids shall be made in full conformity with all the instructions, requirements and conditions set forth in the Bidding Documents. Bids are firm, and no bid may be withdrawn for a period of 120 days after opening of bids. Withdrawal of the Bid will result in the forfeiture of the Bidder’s Bid Bond.
D. Any Bids received after the exact time specified in the Advertisement will not be considered. This material requirement is not subject to waiver by Owner.
3. BID PROPOSAL EVALUATION
A. MINIMUM INFORMATION REQUIRED
1) The Owner will use a qualification-based selection process to review and award the project. The bidders are required to include the following information with their bid proposals:
a. Professional Qualifications and Past Involvement with Similar Projects
b. Proposed Work Plan
c. Schedule
d. Cost Proposal
B. The following describes the elements that should be included in each of the bid proposal sections and the weighted point system that will be used for evaluation of the proposals:
1) Professional Qualifications and Past involvement with Similar Projects - 40 points
a. State the full name and address of your organization and, if applicable, the branch office, and Major Sub-contractors that will perform, or assist in performing, the work hereunder.
b. Complete the attached Experience and Qualifications Statement for the prime Contractor and each of the Major Sub-contractors and submit them with the bid.
c. Provide a list of specific experience and indicate proven ability in
Page IB-2 of IB-13 4-23-2024 implementing similar projects for the firm to be involved in the project.
At a minimum, Prime Contractor and the firm installing the work should each provide a minimum of three projects of similar size and type (of the selected installation option) completed in the past 10 years. A complete list of client references must be provided for similar projects recently completed. It shall include the firm/agency name, address, telephone number, project title, and contact person. In addition to the information requested on the form, provide detailed explanations of the previous projects as part of the written proposal and any additional information that would be helpful for the Owner to determine the most appropriate Respondent to be used.
d. Provide any additional information on your qualifications or those of the Major Sub-contractors that would be helpful for the Owner to determine the most appropriate Bidder to be used.
2) Proposed Work Plan – 20 points
a. Provide a detailed and comprehensive description of how the Bidder intends to complete the services requested in the Drawings, Specifications and other Contract Documents. The Bidder is to provide detailed information on site access, site disturbance, reducing site compaction, catch basin retrofit to perforated riser, maintenance path construction, soil removal and stockpile, soil amendments and bioretention seeding and planting.
b. Respondents will be evaluated on the clarity, thoroughness, and content of their responses to the above items.
3) Schedule – 5 points
a. Each Bidder shall submit with the Bid Documents a preliminary resource-loaded schedule demonstrating the Bidder’s plan to complete the construction work within the time allowed in the Contract and to achieve the completion of any milestones identified in the Contract Documents.
b. The Bidder’s Preliminary Schedule will provide an orderly progression of the work to completion within the Contract Times. The Preliminary Schedule will outline major project milestones including completion dates. This will be a detailed incremental, logic driven CPM (Critical Path Method) Progress Schedule for the work of the Contract, and will reflect the Contract dates and include all construction activities such as detailing, shop fabrication, intervals from purchase to delivery of purchased items, crew and other resource loading, field activity durations, etc., and will be sufficiently detailed to enable the Owner and Engineer to evaluate the Contractor’s plan and ability to complete all aspects of the work within the Contract Time periods. The preliminary schedule shall include all activity by others that Contractor requires to successfully complete the project, and its scheduled activities within the times set forth in the Schedule. The Schedule shall show all critical path activities regardless of duration. The Schedule shall include at least 15 activities and no single activity shall
Page IB-3 of IB-13 4-23-2024 have a duration greater than four weeks, unless actively working longer than that duration (i.e., active bypass pumping). The Preliminary Schedule shall form the basis for the Baseline Project Schedule required by the Contract Documents.
c. The Bidder’s Preliminary Schedule shall be prepared using the current version of Microsoft Project or Excel, and shall be submitted with the Bid. Failure to provide the requested schedule including all the above provisions may result in the Contractor being declared non-responsive.
d. The Bidder’s Preliminary Schedule (and associated work plan and related costs) shall be based on a Notice to Proceed date identified in these specifications.
4) Cost Proposal – 35 points
a. Cost Proposal shall be submitted as part of the bid proposal using the
Proposal Format included in this bid package. Bidder is strongly encouraged provide alternatives for cost savings that still meet the intent and aesthetic of the project.
C. EVALUATION
1) A selection committee composed of OCWRC staff will evaluate each bid proposal by the above-described criteria and point system to select a short list of Bidders for further consideration. The Owner reserves the right to not consider any proposal which it determines to be unresponsive and/or deficient in any of the information requested for evaluation. A proposal with all the requested information does not guarantee the proposing firm to be a candidate for further consideration. The Owner may contact references to verify material submitted by the Bidders.
2) Interviews with the short-listed Bidders will be scheduled if deemed necessary by the Owner. At the interviews, the short-listed Bidders will be given the opportunity to discuss in more detail their qualifications, past experience, proposed work plan, and cost proposal. The interview must include the project team members (including sub- contractors) expected to complete a majority of work on the project. The interview shall consist of a presentation of up to fifteen (15) minutes by the Proposer, including the person who will be the project manager on this Contract, as well as Site Supervisor, followed by up to thirty (30) minutes of questions and answers. Audiovisual aids may be used during the oral interviews. The oral interviews may be recorded on tape by the Evaluation Team.
3) The Bidders interviewed will then be re-evaluated by the above criteria, and adjustments to scoring will be made as appropriate.
4. DEFINITIONS
Certain terms used in the Contract Documents shall have the meanings indicated in the General Conditions and Supplementary Conditions which are part of the Contract Documents.
Page IB-4 of IB-13 4-23-2024
5. INSPECTION OF SITE, INSPECTION OF CONTRACT DOCUMENTS, PLANNING, AND
ANALYSIS
A. Before submitting a Bid, each Bidder is responsible for inspecting the site of the proposed work, and the surrounding premises, to arrive at a clear understanding of the conditions under which the work is to be performed.
B. Before delivery of its Bid, each Bidder is held to have compared the conditions of the site where work is to be performed with the Contract Documents and to have satisfied itself as to the conditions of the site and surrounding premises, including any obstructions, all excavating, filling in, and quantities, and any other conditions affecting the work, including the weather conditions of the project area. Each Bidder must obtain first-hand information concerning the available facilities for receiving, transporting, handling, and storing construction equipment and materials and concerning other local conditions that may affect its work. Each Bidder must acquaint itself with the character and extent of the operations of Owner and any other contractors in the area of the work, so that the Bidder can plan its work accordingly.
C. Bidders must estimate the quantity of materials, labor and equipment required for the work by examination of the site and a review of the Contract Documents including Addenda, and by carefully considering all other relevant factors. Bidder warrants that by submitting its Bid, it had no misunderstanding concerning the quantities or nature of the work to be performed, and the Bidder will assert no such claim asserting such a misunderstanding.
D. No allowances or extra payment will be made to Contractor because of costs or expenses occasioned by Contractor’s failure to comply with the provisions of this Article, or by reason of error or oversight on the part of the Bidder, or on account of interference by the activities of Owner or any other contractor where those activities are apparent or are made known to the Bidders during the bidding process.
E. For bidding purposes, the Bidder is responsible for evaluating the compatibility of proposed construction methods with the Contract Documents, and soil and site information. Bidders must carefully study and compare all portions of the Contract Documents and must notify the Engineer, in writing, prior to the deadline for pre-bid questions, of any concerns, questions, apparent ambiguities, conflicts, incompatibilities, apparent errors, or other discrepancies evident in the Contract Documents.
F. The successful Bidder must complete the work under whatever conditions it may create by its own actions or inactions, sequence of construction, construction means and methods, or other conditions it may create or cause to be created at no additional cost to Owner.
6. UNDERGROUND CONDITIONS
A. The Engineer performed investigations and issued reports which are available to the Contractor.
Page IB-5 of IB-13 4-23-2024
B. Bidders may only rely on technical data contained in such reports except were indicated otherwise in the Contract Documents. Evaluations, analyses, recommendations, or conclusions contained in such reports shall not be relied upon in formulating any Bid for the work. This data is offered to the Bidders as information about underground and site conditions only at the locations at which any soil borings, sampling, or other data collection were made. Owner does not represent or warrant that the underground conditions encountered at or near the site during construction will generally or specifically conform to underground conditions described in the data in these borings or any accompanying descriptive report.
C. Each Bidder and the Contractor awarded the project shall draw their own conclusions as to site, underground or soil conditions from their own experience, independent knowledge, and investigation of the site, and they should each secure such other and additional information and data as they consider necessary or desirable to check and supplement the provided underground data for specific locations. The Contractor is required to complete the work under any job or field condition which was present and/or ascertainable prior to Bidding.
D. All Bidders that seek to conduct any additional underground or site exploration or testing must do so at their own expense as necessary. Such Bidders must contact Owner and obtain its written permission before proceeding.
E. Any additional exploration conducted by Bidders must be performed in a manner which precludes unnecessary disruption of the soils, or which impedes construction operations and must be performed in compliance with the Mineral Well Act, Act No. 315 of the Public Acts of 1969, as amended, MCL 319.211, et seq. Any Bidder performing exploration work must restore all areas of exploration to their original condition. By entering the site to conduct such investigation and testing, the Bidder agrees to indemnify, defend, and hold harmless all the persons identified in the indemnity provisions of the General and Supplementary Conditions to the full extent of the indemnity obligation set forth in those Contract Documents.
7. AWARD OF CONTRACT
A. The Contract, if awarded, will be awarded to the highest scoring, responsive, and responsible bidder, subject to the final approval by the Drain Board of the Joseph Jones Drain Drainage District. The Contract will be awarded subject to receipt of funds to finance the project and acquisition of easements, during which time the Bids of the highest scoring three responsive, responsible Bidders will be held.
B. The party to whom the Contract is awarded will be required to execute the Agreement and obtain the Performance Bond, Labor and Material Bond and Maintenance and Guarantee Bond and shall provide proofs of insurance coverage in accordance with the Contract Documents within ten (10) calendar days of the delivery date of the Notice of Award to the successful Bidder. The necessary Agreement and Bond forms shall accompany the Notice of Award. If the Contractor awarded the project fails to execute the Agreement, submit the Performance Bond, Labor and Material Bond and Maintenance and Guarantee Bond and provide proof of insurance coverage in
Page IB-6 of IB-13 4-23-2024 accordance with the Contract Documents within ten (10) calendar days of the delivery date of the Notice of Award, Owner may declare the Contractor in default, in which case the Bid Bond accompanying the Bid will be forfeited to Owner.
8. INTERPRETATION OF CONTRACT DOCUMENTS
A. Neither Owner nor the Engineer will give verbal instructions prior to the award of the Contract. Any verbal statements regarding the Contract by any person are not authorized and do not constitute representations, warranties, modifications, agreements, or promises, express or implied, and may not be relied upon by Bidders.
B. Bidders seeking explanations regarding the project, or the Contract Documents must submit written requests to the Engineer, and if explanations are necessary, a reply will be made in the form of an Addendum, a copy of which will be forwarded to all parties that have taken out Contract Documents. The determination of the necessity of explanations will be in the sole discretion of the Engineer and Owner and no obligation to provide a reply or addendum will be implied.
C. Questions, comments, or concerns of any Bidder regarding bidding or the Contract
Documents or the project, must be submitted in writing on the Bidnet Direct website and in advance of the opening of bids per the time specified in the Advertisement
D. Addenda issued to Bidders prior to the date of receipt of Bids shall become a part of the
Contract Documents and all Bids shall include the work described in each and every Addendum issued.
9. NAME AND STATUS OF BIDDER
A. The name and legal status of the Bidder, that is, as a corporation, limited liability company, partnership, limited partnership or individual, must be stated in the Bid form.
B. The place of residence of Bidder, or the office address in the case of a firm or company must be stated in the Bid Form.
C. Unless the legal status of the Bidder is an Individual, the signature(s) of the signing official(s) must be accompanied by the appropriate Resolution or Certificate Form found at the end of the Bid Form, properly executed, authorizing the official(s) to sign both the Bid Form and the Contract. Failure to submit this form is basis for rejecting the Bid.
10. QUALIFICATION OF BIDDERS AND SUBCONTRACTORS
A. Except as otherwise reserved herein, Owner will only award the Contract to a responsible Bidder. A finding that the Contractor is not responsible in connection with the project shall not necessarily preclude the Bidder from bidding and performing work on other projects for Owner.
B. Factors to be considered in determining whether Owner’s standard of responsibility has been met shall include, but not be limited to, whether the Contractor has:
Page IB-7 of IB-13 4-23-2024
a. The appropriate financial, material, equipment, facilities, and personnel resources and expertise available, or the ability to obtain them, necessary to indicate it can meet all contractual requirements;
b. A satisfactory record of performance;
c. A satisfactory record of integrity;
d. Qualified legally to contract with Owner and has supplied all necessary information in connection with the inquiry concerning responsibility.
e. If Contractor has been deemed non-responsible in the past, provided a detailed explanation of its remedial actions after the determination to address any concerns expressed by the authority making the declaration such that the authority would consider awarding a contract to the Contractor, notwithstanding past concerns about Contractor’s performance.
C. The Contractor must supply information requested by Owner concerning the responsibility of the Bidder. If the Bidder fails to supply the requested information, Owner must base the determination of responsibility upon any available information or may find the Bidder non-responsible if such failure is unreasonable. A finding that the Bidder has failed to make a required disclosure or submitted false information may result in immediate disqualification of the Bidder.
D. Within 10 days after bids are received by Owner, the Contractor who has submitted the low bid must, upon request of Owner, complete and submit to Owner the following:
1) MIOSHA Form 300 – “Log of Work-Related Injuries” for the last three (3) years.
2) MIOSHA Form 300A - “Summary of Work-Related Injuries & Illnesses” for the last three (3) years.
E. In addition to meeting the criteria set forth in this Article, and the submission of the required information requested herein, the ability of the Contractor and its identified Subcontractors to proficiently handle technical issues, safety, scheduling, and administrative issues as demonstrated by its past performance on projects for Owner, as well as projects for other public agencies, will be considered in determining whether a Contractor is a responsible contractor for this project. Past performance issues to be considered include, but are not limited to, the following:
a. Failure to adhere to and/or comply with Contractor’s obligations in the Contract
Documents;
b. Failure to follow administrative procedures and provisions in the Contact Documents;
c. Submission of false claims or falsely inflated claims;
Page IB-8 of IB-13 4-23-2024
d. Failure to prosecute the work in accordance with the Plans and Specifications included in the Contract Documents; and
e. Failure to follow bidding instructions.
F. The Bidder shall promptly submit upon request by Owner any additional information necessary to satisfy Owner that the Bidder is adequately prepared to fulfill the Contract.
G. The existence of any judgment, citation, default, finding of non-responsibility or other negative information disclosed by Contactor in its Experience and Qualification Statement or independently discovered by Owner, or Contractor’s failure to provide the certifications required by this Article, will be considered, among all other factors, in determining whether a Contractor is a responsible Bidder for this project. As part of its response, Contractor may submit an explanation of the facts giving rise to the judgment, citation, default, or negative finding, or reasons why the required certifications cannot be provided, and ask Owner to deem the Contractor both responsive and responsible notwithstanding such facts or omissions.
H. The requirements identified above are not an exhaustive or exclusive list of all qualifications required of the Contractor, its Subcontractors, or personnel. The minimum requirements indicated above are in addition to any other requirements contained elsewhere in the Contract Documents and/or typically considered under state or federal procurement law.
I. Owner may, when circumstances warrant, accept any Bidder as a responsible Bidder despite its failure to meet all the minimum standards set out herein. To the extent that special circumstances exist which a Bidder believes render the Bidder a qualified and responsible Bidder for this project, despite the failure to meet one or more of the standards for qualification set out herein, the Bidder may submit a notarized sworn statement explaining the special circumstances and requesting consideration of its Bid.
Notwithstanding the foregoing, Owner has no obligation to consider such special circumstances, or to disregard the requirements set forth in this Article and elsewhere in the Contract Documents and deem the Bidder responsible.
J. Bidder must attend a pre-award conference to satisfy Owner that the Bidder is adequately prepared to fulfill the Contract.
K. If a Bidder who otherwise would have been awarded a contract is found non-responsible, a written determination of non-responsibility setting forth the basis of the finding will be prepared by Owner upon request. A copy of the determination will be sent promptly to the non-responsible Bidder. The final determination will be made part of the bid file.
L. The Contractor must self-perform at least 30% of the construction trade work as determined by dollar value. This does not include General Conditions.
11. CONTRACTOR AND SUBCONTRACTOR INFORMATION AND LISTING
Page IB-9 of IB-13 4-23-2024
A. Bidder must provide a completed Experience and Qualification Statement (DC-118) with its bid. Additional qualification information as requested by Owner shall be submitted within ten (10) calendar days after bids are received by Owner including but not limited to a completed Experience and Qualification Statement (DC-118) for each Subcontractor who will work on the project.
B. Bidders shall submit with their bid a list by name, trade, and scope of work each Subcontractor who will perform Work with a value more than ten percent (10%) of Bid Total.
12. PRELIMINARY SCHEDULE
A. Each Bidder shall submit with its bid a Preliminary Schedule demonstrating the Bidder’s plan to complete the construction work within the time allowed in the Agreement and to achieve the completion of any milestones identified in the Contract Documents. The requirements of the Preliminary Schedule are described in the General Specifications.
B. Failure to provide the requested schedule may result in the Contractor being declared non-responsive.
C. The Bidder’s Preliminary Schedule shall be based on the proposed Notice to Proceed date identified in the Bidding Documents by Owner.
13. ADDITIONAL BIDDING INFORMATION
The Advertisement, which precedes the "Information for Bidders" and the Contract Documents as defined in the General Conditions may contain additional bidding information and is considered a part of these instructions.
14. EQUALS AND SUBSTITUTIONS
Anticipated proposed Equals and Substitutions shall not be the basis for any bid pricing. For bidding, Bidders shall base their bid on the design and any specified products. Equals or Substitutions may be submitted for consideration after the award of the Contract. Approval of proposed Equals or Substitutions are discretionary, and Contractor waives the right to make a claim on that basis. Bidders shall not assume that any contemplated Equal or Substitutions will be approved. The Contractor will be responsible for Engineer Fees for review, analysis, tests and/or all other costs necessary to review, analyze and/or implement a proposed Substitution regardless of whether the Bid is approved.
15. BID BOND
A. Each shall be accompanied by a Bid deposit in the form of a certified check, a cashier's check or Bid Bond executed by the Bidder and a qualified, acceptable Surety Company, payable to the Owner, in the amount of five percent (5%) of the accompanying Bid, as guarantee on the part of the Bidder that it will, if called upon to do so, enter into a Contract in the form of the Contract Documents, perform the work required by the
Page IB-10 of IB-13 4-23-2024
Contract Documents, at the prices stated, and furnish acceptable surety for its faithful and entire fulfillment. All cashier’s and certified checks will need to be mailed or hand delivered to the Oakland County Water Resource Commissioner’s office located at One Public Works Drive, Building 95 West, Waterford, MI 48328.
B. The Bid deposits of all, except the three (3) highest scoring Bidders, will be returned within forty-eight (48) hours after the Bids are opened. The Bid deposits of the apparent second and third highest scoring Bidders that Owner has retained will be returned after the signed Contract has been delivered and the required bonds and insurance of the Contractor have been finally approved by Owner, or after rejection of all Bids.
16. GUARANTEE BONDS
A. In addition to the Bid Bond, the Contractor shall furnish Owner the following bonds prior to the Contract being executed:
a. A Performance Bond in an amount at least equal to one hundred percent (100%) of the Contract Price as security for faithful performance on the Contract.
b. A separate Labor and Material Payment Bond in an amount at least equal to one hundred percent (100%) of the Contract Price as security for payment of all persons performing labor and furnishing materials in connection with the Contract.
c. A Maintenance and Guarantee Bond in an amount at least equal to one hundred percent (100%) of the Contract Price.
17. BOND REQUIREMENTS
A. All bonds required of Bidder or Contractor shall meet the following requirements:
a. The Bidder or Contractor shall pay the premiums.
b. The form of the bonds shall be as appended herewith (NOTE: the form of Bid
Bond is NOT incorporated in the Contract Documents).
c. The surety on the bonds shall be a corporate bonding company named on the current list of Surety Companies acceptable on Federal Bonds as published in the U.S. Treasury Department Circular Number 570. If the surety is ever delisted on the cited Circular, Owner may, in Owner’s sole discretion, demand and Contractor shall provide replacement Bonds from a then-listed surety at no additional cost to Owner.
d. The surety shall be a corporate bonding company authorized and admitted to transact business in Michigan and subject to service of process and personal jurisdiction in Michigan. A copy of the certificate issued by the State of Michigan evidencing such authorization shall be furnished to Owner.
Page IB-11 of IB-13 4-23-2024
e. The surety shall be a corporate bonding company, which is otherwise satisfactory to Owner. Without limiting the other factors upon which Owner may determine the acceptability of a surety, Owner specifically reserves the right to reject any surety which has denied, delayed, or obstructed payment or discharge of the sureties’ obligations under a prior bond in favor of Owner.
f. Attorneys-in-Fact who sign bonds must file with each bond a certified copy of a currently effective and dated Power of Attorney.
g. Owner may, but is not obligated to, require the substitution of any of the bonds by
Bidder or Contractor upon the occurrence of any of the events referred to herein and in the General Conditions or Supplementary Conditions.
h. Providing the bonds required hereunder shall not establish that a Bidder is qualified, responsive, or responsible, and shall not limit Owner’s right to review Bidder's qualifications and reject any Bid.
18. PRE-BID MEETING
Bidders may attend a pre-bid meeting. Bidders shall refer to the Advertisement (DC-116) found elsewhere in these specifications for pre-bid meeting details. A transcript of the pre-bid meeting will be posted to BidNet.
19. REJECTION OF BIDS
Owner reserves the right to reject any or all Bids. Owner further reserves the right to waive any non-material irregularity or informality in the Bids. Owner reserves the right to reject any Bid submitted by any Bidder that Owner determines is not a responsive or responsible Bidder based on information supplied by the Bidder or on any other information that Owner receives or acquires on its own, including the experience of Owner and/or any other public agency owner with the Bidder. Owner’s rights in this regard may be exercised in Owner’s sole discretion and Owner shall not have any obligation to exercise or refrain from exercising these rights.
20. OVERTIME COMPENSATION
Refer to the Labor Standards Provisions, EPA Form 5720-4 and the U.S. Department of Labor Memorandum No. 143 for further information. Labor compensation, including Overtime shall be governed by applicable local, federal, and state law and regulations.
21. WORK WITHIN VARIOUS MUNICIPALITIES, CONSTRUCTION PERMITS, ROAD PERMITS,
ETC.
A. The Contractor shall conform to the various requirements of the municipality within which work is being performed and shall obtain, at its own expense, all permits required.
B. In addition, certain public highways and subdivision roads are under the jurisdiction of the Michigan Department of Transportation, the Road Commission for Oakland County, and/or the local municipality. Contractor shall obtain, at Contractor’s own expense, all
Page IB-12 of IB-13 4-23-2024 permits required by these organizations to use the roads under their jurisdiction.
C. If the scope of the work requires work to be performed within other private properties/easements, Contractor shall comply with the conditions of these easements at its own expense. Applicable easement documents will be made available before work begins.
22. CONTRACT DOCUMENTS
Each Bidder is obligated to carefully review all materials included or referenced in the Contract Documents including, without limitation, the General and Supplementary Conditions. The Contract Documents are defined in the General and Supplementary Conditions and the Bidder must familiarize itself with all provisions, terms, and conditions of all Contract Documents.
23. OWNER’S RESERVATION OF RIGHTS
A. In addition to Owner’s rights in Article 19 – Rejection of Bids above, Owner reserves the following rights in connection with this Advertisement:
a. Withdraw the Advertisement at any time, in Owner’s sole discretion.
b. Make an award under the Advertisement in whole or in part.
c. Disqualify any Bidder whose conduct and/or Bid fails to conform to the requirements of the Advertisement.
d. Seek clarifications and revisions of Bids.
e. Use Bid information obtained through site visits, management interviews and
Owner’s investigation of a Bidder’s qualifications, experience, ability or financial standing, and any material or information submitted by the Bidder in response to the Owner’s request for clarifying information during evaluation and/or selection under the Advertisement.
f. Prior to the bid opening, direct Bidders to modify their Bid addressing all addenda, including addenda that may modify the Bidding Documents.
g. Change any of the scheduled dates.
h. Eliminate any mandatory, non-material specifications that cannot be complied with by all the prospective Bidders.
i. Waive any requirements that are not material.
j. Negotiate with the successful Bidder within the scope of the Bidding Documents in the best interests of the Owner.
Page IB-13 of IB-13 4-23-2024
k. Conduct contract negotiations with the next responsible Bidder, should the Owner be unsuccessful in negotiating with the highest scoring, responsive, responsible Bidder.
l. Utilize all ideas submitted in the Bids received.
m. Require clarification at any time during the procurement process and/or require correction of arithmetic or other apparent errors for the purpose of assuring a full and complete understanding of a Bidder’s Bid and/or to determine a Bidder’s compliance with the requirements of the solicitation.
SECTION 00 01 23
Form DC-123 BID FORM
JIM NASH
OAKLAND COUNTY WATER RESOURCES COMMISSIONER
Page B-1 of B-10 4-23-2024
PERRY PARK GREEN INFRASTRUCTURE IMPROVEMENTS
NAME OF BIDDER:
CONTRACTOR NAME:
ADDRESS:
TELEPHONE NO.:
CONTRACT NAME EMAIL:
The undersigned, as Bidder, hereby declares this Bid is made in good faith without fraud or collusion with any persons bidding or proposing to supply materials or labor, and that it has examined the Bidding Documents, all of which it understands and accepts as sufficient for purposes of constructing the Project, and is familiar with the location of the work described herein and is fully informed as to the nature of the work and the conditions relating to its performance. Further, the undersigned certifies that its proposed construction methods will be compatible with the site conditions described in the above-listed information provided for bidding, as well as its own independent investigation of the field conditions.
The Bidder acknowledges that it has not received or relied upon any representations or warranties of any nature whatsoever from the Owner, its agents, representatives, or employees, as to any conditions to be encountered in accomplishing the work specifically, but not exclusively, including underground conditions, and that its bid is based solely upon the Bidder's own independent judgment.
The following documents listed below shall be compiled into one PDF in the order designated below.
The PDF document shall have the Bidder’s name and the document description in the file name.
Item No. Description
1. Bid Form, completed and signed acknowledging all addenda
2. Certified check/Cashier’s check /Bid Bond (5%)
3. Preliminary Schedule based on the Time noted in the Agreement and an anticipated Notice to Proceed date of: September 30, 2025
4. Proposed Work Plan
5. Completed Form DC-118 Experience and Qualification Statement
6. Non-Collusion Affidavit
7. Signed Vendor Certification that it is not an “Iran Linked Business”
8. Certificate of Safety Compliance
The Bidder declares that it has familiarized itself with the location of the proposed work and the conditions under which it must be constructed. The Bidder shall complete the work under any job or field condition which was present and/or ascertainable prior to bidding. In addition, it shall also complete the work under whatever conditions it may create by its own sequence of construction, construction methods, or other conditions it may create, at no additional cost to the Owner.
JIM NASH
OAKLAND COUNTY WATER RESOURCES COMMISSIONER
Page B-2 of B-10 4-23-2024
The Bidder agrees that it will contract with the Owner to furnish all labor, material, tools, and equipment necessary to do all the work specified and prescribed for the completion of the above-mentioned Contract for the following named unit prices:
BID SHEET
No. Description Quantity Unit Unit
Price Amount
Site Prep 1 ROW Permit Allowance 1 DLR $ 3,000 $ 3,000 2 Mobilization (Max 5%) 1 LSUM $ $ 3 Traffic Control 1 LSUM 4 Tree Clearing 4 inch to 8 inch Diameter 3 EA $ $ 5 Tree Clearing 8 inch to 14 inch Diameter 8 EA $ $
6 Tree Clearing 14 inch to 24 inch Diameter 5 EA $ $
7 Tree Clearing 24 inch to 36 inch Diameter 2 EA $ $
8 Tree Protection Fencing 25 EA $ $ 9 Temporary Construction Fencing 1,750 LF $ $
10 Construction Entrance 1 EA $ $ 11 Retrofit Catch Basin to Perforated Riser 1 EA 12 Removal of Picnic Tables 2 EA $ $ 13 Remove Light Pole 1 EA $ $ 14 Removal of Barbeque Grills 2 EA $ $ 15 Concrete Pad Removal 105 SF $ $ 16 Remove 12” RCP Storm Drain 37 LF $ $
17 Remove 4’ Diameter Concrete Catch Basin 1 EA $ $
18 Sign Protection 4 EA $ $ 19 Remove Parking Lot Sediment 484 LF $ $
20 Clearing & Grubbing - Clearing of Medium Brush, to 4" Diameter 3 AC $ $
SESC
21 Fiber Roll 1,315 LF $ $ 22 Inlet Protection 2 EA $ $
23 Rock Donut Flared End Section (FES) Protection 1 EA $ $
24 Silt Fence 260 LF $ $ 25 Sediment Traps 2 EA $ $ 26 Temporary Seeding 2,825 SF $ $
Proposed Earthwork
27 Earth Excavation with Hydraulic Excavator 2,680 CY $ $
JIM NASH
OAKLAND COUNTY WATER RESOURCES COMMISSIONER
Page B-3 of B-10 4-23-2024
Testing and Mixing Soil for Wetland Plantings W/ Amendments/Compost as Needed
1,700 CY $ $
29 Fine Grading - Slopes, Gentle, Finish Grading 15,000 SY $ $
Site Drainage 30 6" Perforated PVC Underdrain 700 LF $ $ 31 Underdrain Cleanouts 3 EA $ $ 32 4' Diameter Catch Basin 2 EA $ $ 33 12" Storm Line (RCP) 90 LF $ $ 34 12" Flared End Section (FES) 4 EA $ $ 35 Rip Rap 5 SY $ $ 36 Drainage Stone (ASTM No. 57 Stone) 500 CY $ $
Hardscaping 37 Walking/Maintenance Path (Gravel 4") 150 SY $ $
38 Aluminum Edging – Bed Edges and Pathways 850 LF $ $
39 Concrete Paving (4" Thick at Picnic Tables) 36 SY $ $
40 Charcoal Grill 2 EA $ $ 41 Picnic Table 2 EA $ $
Landscaping 42 Deciduous Trees (7 Gal.)
42a Acer rubrum / Red Maple 3 EA $ $
42b Amelanchier laevis / Allegheny Serviceberry 5 EA $ $
42c Betula nigra / River Birch 3 EA $ $ 42d Nyssa sylvatica / Black Gum 2 EA $ $ 42e Quercus bicolor / Swamp White Oak 2 EA $ $ 42f Quercus macrocarpa / Burr Oak 4 EA $ $ 43 Wetland Plantings/Seeding 33,410 SF $ $ 44 Prairie Plantings/Seeding 11,376 SF $ $ 45 Seeded Lawn 6,031 SY $ $ 46 Lawn Restoration 2,100 SY $ $
47 Topsoil Strip (7'' Depth), Stockpile, and Respread 2,222 CY $ $
48 Mulch 2 CY $ $ 49 Basin Stone - Type 1 2,900 SF $ $ 50 Basin Stone - Type 2 2,460 SF $ $ 51 Erosion Control Blanket 450 SY $ $
52 One-year Vegetation and Maintenance Guarantee 1 LSUM $ $
TOTAL CONTRACT PRICE $____________________________________ (Items 1 thru 52)
JIM NASH
OAKLAND COUNTY WATER RESOURCES COMMISSIONER
Page B-4 of B-10 4-23-2024
Note: In case of discrepancy, unit prices shall be used to determine the total amount of this bid.
ALTERNATIVES
Voluntary Alternates proposed by the Bidder will not be considered. The Bidder shall submit a bid based on the information shown on the Drawings and Specifications. Alternates listed below are for the Owner’s convenience and shall be priced as indicated by the work description. All Alternates which are quoted shall be complete and the price shall include all Bidder mark-ups. Each Alternate shall be clearly marked if it represents an Add or a Deduct from the Base Bid Price. The Owner reserves the right to award the Base Bid or the Base Bid plus any or individual Alternate or combination of Alternates, depending upon the availability of funds.
ALTERNATIVE NO. 1 – SHRUB PLANTING
Alternative No. 1, if selected, shall be for the addition of Shrub Plantings (1 gal. container), shown on Sheet 17 of the Project Drawings.
No.
Description Quantity Unit Unit Price Amount
AB1-1 Shrub Planting (1 gal. container) 242 EA $ $
SUBTOTAL ALTERNATIVE NO. 1: $ ___________________
TAXES
The foregoing unit prices include all applicable Federal, State and Local taxes.
ADDENDA
This Bid is based on the following Addenda in the table below:
Addendum Number Date Issued
SUBCONTRACTORS AND MAJOR EQUIPMENT MANUFACTURERS/SUPPLIERS
The Bidder agrees, in accordance with the Information for Bidders, that it is concurrently with this Bid, furnishing the Owner the required information relative to the qualifications of Bidder and Subcontractors required to be identified pursuant to the Information for Bidders. Bidder also agrees that Bidder will provide all other information as required with this Bid and/or within the times specified in the Information for Bidders or other Bidding Documents. Bidder acknowledges that this bid may be rejected if Bidder fails to provide any of the required information with this bid and/or within the times outlined in the Information for Bidders or other Contract Documents.
JIM NASH
OAKLAND COUNTY WATER RESOURCES COMMISSIONER
Page B-5 of B-10 4-23-2024
BID GUARANTEE
The Bidder encloses a certified or cashier’s check or Bid Bond in the amount of Five Percent (5%) of the accompanying total bid.
_____ Certified Check _____ Cashier's Check _____ Bid Bond
The Bidder hereby declares that this Bid was prepared by qualified personnel of its employ who inspected the Drawings and Specifications, read, and interpreted the Geotechnical Data and other information furnished by the Owner, and developed the Bidder's intended construction methods.
If this Proposal is accepted by the Owner and the undersigned shall fail to contract as aforesaid and to furnish the required surety bonds within ten (10) calendar days of the delivery date of the Notice of Award to the successful Bidder, then the undersigned shall be considered to have abandoned the Contract, and the Certified Check, Cashier’s Check, or Bid Bond accompanying this Bid shall be forfeited to the Oakland County Water Resources Commissioner and/or the Drainage District.
If the Bidder enters into the Contract in accordance with this Bid, or if its Bid is rejected, then the accompanying bid guarantee shall be returned to the Bidder.
By submission of the Bid, each Bidder certifies, and in the case of a joint Bid each party thereto certifies as to its own organization, that this Bid has been arrived at independently, without consultation, communication, or agreement as to any matter relating to this Bid with any other Bidder or with any competitor.
In submitting this Bid it is understood that the right is reserved by the Owner to reject any and all bids, to waive non-material irregularities and/or informalities, and to evaluate the responsiveness and responsibility of each Bidder. The Owner reserves the right to reject any Bid submitted by any Bidder that the Owner determines is not a responsive and responsible Bidder based on information supplied by the Bidder or on any other information that the Owner receives or acquires on its own, including the Owner's experience with the Bidder. The Owner further reserves the right to reject any bid submitted by any bidder in its sole discretion and to exercise any further rights reserved to Owner in the Information for Bidders.
The Bidder shall indicate its legal status as provided herein.
JIM NASH
OAKLAND COUNTY WATER RESOURCES COMMISSIONER
Page B-6 of B-10 4-23-2024
LEGAL STATUS OF BIDDER
The Bidder shall complete the appropriate form below and complete the appropriate Resolution or Certificate.
A Corporation duly organized and doing business under the laws of the State of _________________ for whom ______________________________________ whose signature is affixed to this Bid, is duly authorized to execute Contracts.
A Limited Liability Company duly organized and doing business under the laws of the State of Michigan for whom _______________________________ whose signature(s) is (are) affixed to this Bid, is (are) duly authorized to execute Contracts.
A Partnership or Joint Venture, all members of which, with addresses, are:
An Individual, whose signature is affixed to this Bid.
Signed and sealed this _____…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .