Performance Work Statement - Stoage Draft.pdf
PDF 83 KB Posted
- Solicitation number
- FA481926Q0025
About this file
This is a Performance Work Statement (PWS) for secure, climate-controlled storage services at Naval Support Activity Panama City, Florida. The contractor must provide and maintain a storage facility of minimum 500 square feet (configurable as two 10' x 25' units or five 10' x 10' units) for mission-essential United States Air Force property, including outboard engines, inflatable watercraft, and operator tactical gear.
The facility must maintain temperature control between 55°F and 75°F with relative humidity not exceeding 50% at all times, operate 24 hours a day, 7 days a week, and be fully enclosed with weather-resistant construction, sealed concrete flooring, and complete protection against pests, mold, and water intrusion. Security requirements include a perimeter fence with electronic access gate, 24/7 video surveillance monitoring all access points and the exterior of storage units, and Government-controlled electronic gate codes with 24/7 unrestricted access. The Government will place its own locks on individual units, and the contractor shall not retain keys or access methods. The facility must be located within five miles of Naval Support Activity Panama City and accessible by standard commercial and government vehicles. The contractor must report any security breaches, theft, loss, or damage to the Contracting Officer's Representative within two hours of discovery with formal written reports within 24 hours, and notify the COR within one hour of any failure or scheduled maintenance of climate control, security, or access control systems. The contractor shall provide a point of contact during standard business hours (Monday-Friday, 0800-1700 local time) and maintain commercial insurance covering the value of stored items against loss or damage due to facility failure, fire, theft, or other insurable events, with property valuation to be provided upon contract award. All property management and inventory functions will be performed by Government personnel.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
Panama City Beach NSA, FL
Storage Services
Secure, Climate-Controlled Storage Services
1. SCOPE
This Performance Work Statement (PWS) establishes the requirements for a contractor to provide secure, climate-controlled, and continuously accessible storage services for mission-essential United States Air Force property. The contractor shall furnish all personnel, supervision, facilities, and management required to securely store, safeguard, and provide access to Government-owned assets. The required services are critical to preventing the loss and environmental degradation of sensitive, high-value equipment, thereby supporting operational readiness and asset preservation.
2. APPLICABLE DOCUMENTS
The following documents are incorporated by reference and form a part of this PWS:
• Federal Acquisition Regulation (FAR)
• Defense Federal Acquisition Regulation Supplement (DFARS)
3. DEFINITIONS
• Storage Facility: The contractor-owned or leased physical location where Government property is stored.
• Contracting Officer (CO): The sole Government official authorized to administer and/or change the terms of the contract.
• Contracting Officer’s Representative (COR): The Government official designated by the CO to perform specific technical oversight and contract monitoring functions.
• Mission-Essential Equipment: The specific Government property identified for storage under this contract, including outboard engines, inflatable watercraft, and operator tactical gear.
• Discrepancy: Any loss, damage, theft, or environmental degradation (e.g., mold, corrosion) discovered on Government property.
4. PERFORMANCE REQUIREMENTS
4.1. General Requirements
The contractor shall provide storage services that ensure all Government property is secure, protected from environmental damage, fully accountable, and accessible to authorized personnel without delay.
4.2. Storage Unit and Facility Requirements
The contractor shall provide storage unit(s) that meet the following mandatory standards:
• 4.2.1. Space Requirement: A minimum of 500 square feet of clean, dry, and secure storage space. This may be configured as two (2) 10' x 25' units or five (5) 10' x 10' units.
• 4.2.2. Climate Control: The storage unit(s) shall be equipped with a dedicated climate control system, maintaining a temperature between 55°F and 75°F and a relative humidity level not to exceed 50% at all times (24 hours a day, 7 days a week).
• 4.2.3. Structural Integrity: Units shall be fully enclosed, constructed of durable materials, and be completely weather-resistant, preventing any intrusion of water, dust, or pests. Floors must be sealed concrete or a similar non-porous surface.
• 4.2.4. Condition: Units must be free from pests, mold, mildew, standing water, and any structural hazards prior to and throughout the period of performance.
4.3. Security and Access Requirements
• 4.3.1. 24/7 Access: The Government requires unrestricted, 24-hour-a-day, 7-day-a-week access to the storage units via a unique, Government-controlled electronic gate code and physical keys/locks for the individual units.
• 4.3.2. Facility Security: The storage facility must be secured by a perimeter fence and an electronic access gate.
• 4.3.3. Video Surveillance: The facility must have a continuously recording (24/7) video surveillance system with cameras that monitor all access gates and the exterior of the specific storage unit(s) housing Government property.
• 4.3.4. Unit Security: The Government will place its own locks on the individual units.
The contractor shall not retain a key or access method to the locked units.
• 4.3.5. Discrepancy Reporting: The contractor shall report any suspected security breaches, theft, loss, or damage to the COR within two (2) hours of discovery. A formal written report detailing the incident must follow within 24 hours.
4.4. Property and Inventory Management
• 4.4.1. Government Control: All property management and inventory functions will be performed by Government personnel. The contractor is not responsible for handling or documenting individual items within the locked storage units.
• 4.4.2. Government-Led Inspections: The contractor shall allow and support periodic inventories and inspections of the storage units by the COR or other authorized Government personnel.
5. HOURS OF OPERATION AND ACCESS
• 5.1. Standard Access: 24 hours a day, 7 days a week, 365 days a year.
• 5.2. Contractor Support: The contractor shall provide a point of contact available during standard business hours (Monday-Friday, 0800-1700 local time) to address any facility or access issues.
6. REPORTING REQUIREMENTS
The contractor shall provide the following reports to the COR:
• 6.1. Incident Reports: Required for any security breach, loss, damage, or failure of climate control systems, as detailed in section 4.3.5.
• 6.2. System Outage Reports: The contractor must notify the COR of any failure or scheduled maintenance of climate control, security, or access control systems within one (1) hour of detection.
7. PLACE OF PERFORMANCE
The contractor's storage facility shall be located within five 5 miles of Naval Support Activity Panama City, FL. The facility must be accessible by standard commercial and government vehicles.
8. SAFETY AND INSURANCE
• 8.1. Safety Compliance: The contractor shall comply with all applicable local, state, and federal safety and fire codes.
• 8.2. Insurance: The contractor shall provide evidence of a commercial insurance policy that covers the value of stored items against loss or damage due to facility failure, fire, theft, or other insurable events. The Government will provide the total valuation of the property upon contract award.
File details come from the government source that posted it. Updated .