Performance Work Statement rev 8 May 2025.pdf
PDF 200 KB Posted
- Attached to
- Boeing 737-400 Aircraft Heavy Maintenance Check
- Solicitation number
- 15M30025QA3700002
About this file
This Performance Work Statement (PWS) details a Heavy Maintenance Check for a U.S. Marshals Service Boeing 737-400 aircraft (Registration N279AD, MSN 26279). The contract requires a comprehensive maintenance service including multiple check levels (Service Check, 1A, 2A, 1C, 2C, 3C, and 6C) to be performed at a Title 14 CFR Part 145 Certificated Repair Station within the contiguous United States. The maintenance period is 45 calendar days, with an induction date of February 10, 2026, and a targeted return to service date of March 23, 2026.
Key requirements include performing extensive maintenance tasks such as aircraft washing, safety inspections, engine gas path cleaning, lubrication, structural inspections, and addressing multiple Airworthiness Directives. The contract will be awarded as a firm-fixed price with provisions for time and materials for unforeseen or non-routine maintenance. Performance standards are stringent, with 100% compliance expected for maintenance requirements, record documentation, and airworthiness directives, and a 95% acceptable quality level for aircraft cleanliness and delivery schedule. The U.S. Marshals Service Justice Prisoner Air Transportation System (JPATS) will provide oversight through an onsite Contracting Officer's Representative (COR) and periodic documentation reviews.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Marshals Service (USMS) Justice Prisoner Air Transportation System (JPATS) Boeing 737- 400 Aircraft Heavy Maintenance Check
Performance Work Statement
Original Revision
May 8, 2025
Table of Contents
1. General
1.1. Required Induction Date
2. Contract Type
3. JPATS Responsibilities
4. Contractor Responsibilities
5. Place of Performance
6. Period of Performance
7. Warranty
8. Contract Administration Data
9. Right to Inspect / Audit
10. Deliverables
10.1. Aircraft Status Report
10.2. Accruals
10.3. Invoice
10.4. Aircraft Records
10.5. Aircraft Parts
11. Heavy Maintenance Check Requirements
12. Performance Standards
12.1. Assessing Performance
1. General
The United States Marshal Service, Justice Prisoner Air Transportation System (JPATS) has a requirement for the accomplishment of a Heavy Maintenance Check (Service Check, 1A, 2A, 1C, 2C, 3C, and 6C) on a U.S. Marshals Service owned Boeing 737-400 aircraft. These checks are detailed within a government owned MSG-3 Low Utilization Maintenance Program as derived from the Original Equipment Manufacturer (OEM) Maintenance Planning Document (MPD) and administered through CAMP Systems.
General requirements are as follows:
Boeing 737-4Q8 series aircraft; MSN 26279; Line Number 2221; Variable Number PW261, Registration Number N279AD, ACTT 64,148.5, ACTC 33,189. Reference Section 11 for the list of heavy maintenance requirements
The aircraft maintenance and logistics efforts associated with this work must be adequately planned, staffed, and supervised by the Contractor to ensure all work schedules and maintenance activities are optimized.
1.1.Required Induction Date
The required induction date for this aircraft is February 10, 2026.
2. Contract Type
The Government anticipates awarding a firm-fixed price for the tasks listed in Section 11, Items 1 – 38. Unforeseen or non-routine maintenance be repaired utilizing a time and materials basis.
3. JPATS Responsibilities
JPATS will deliver the aircraft to the Contractor’s facility on February 9, 2026.
JPATS will make available to the Contractor all applicable CAMP Systems task cards with associated Aircraft Maintenance Manual (AMM) references required for the accomplishment of the identified checks and inspections.
JPATS will make the following manuals available to the Contractor: Aircraft Maintenance Manual (AMM), Boeing issued Component Maintenance Manuals (CMM), Illustrated Parts Catalog (IPC), Wiring Diagram (WD), and Structural Repair Manual (SRM).
JPATS will provide GMM familiarization training, Required Inspection Item (RII) procedures training, Airworthiness Release procedure training, Logbook documentation training, and CAMP Task Card documentation training.
A JPATS Contracting Officer’s Representative (COR) will be onsite for the duration of the scheduled heavy maintenance check to ensure compliance with contractual requirements and to evaluate non-routine discrepancies.
4. Contractor Responsibilities
The Contractor will perform all maintenance and inspection items as well as complete all maintenance records documentation in accordance with JPATS GMM and the Contractor’s FAA Approved Repair Station Quality Control Manual.
The Contractor will appoint a point of contact (POC) for the JPATS Contracting Officer (CO) and Contracting Officer’s Representative (COR).
The Contractor will provide written notification to the JPATS CO prior to subcontracting any portion of the maintenance effort to outside organizations or individuals.
The Contractor will notify the on-site JPATS COR if a discrepancy (non-routine) is discovered during the performance of these checks and inspections. The Contractor will provide the CO with an estimated cost for the repair(s) and an estimated timeline for the repair(s) on daily basis, utilizing a status sheet (contractor format). After approval is obtained to correct or repair the discrepancy, the Contractor will purchase any materials, supplies, and / or parts from an FAA approved vendor (all parts must be accompanied with an appropriately completed FAA Form 8130-3).
Note: JPATS reserves the right to utilize JPATS owned spare parts or procure the required parts through the normal JPATS’ procurement process.
The Contractor will adhere to applicable statutes and regulations as prescribed by the Occupational Safety and Health Administration (OSHA), the Federal, State and Local Environmental Protection Agency (EPA), the National Fire Protection Agency (NFPA), and the Federal Aviation Administration (FAA).
The Contractor will provide all common tools, special tools, test sets and equipment, ground support equipment, “consumables”, and “free stock” such as grease, lubricants, rags, common hardware, etc.
The Contractor will purchase, store, use, and dispose of all hazardous materials (HAZMAT) associated with the maintenance of aircraft, support equipment, and facilities in accordance with federal, state, and local statutes.
The Contractor will perform typical logistics tasks associated with the specified checks and inspections such as material and parts receiving, receiving inspections, identifying and reporting suspected unapproved parts (SUP), packing, crating, shipping, materials handling and storage, and shelf-life management.
The Contractor will perform all maintenance documentation to include JPATS historical logbooks for the airframe, engines, auxiliary power units (APU) and appliances as applicable as well as the FAA Form 337 for major repairs / alterations.
The Contractor is required to ensure all CAMP Task Cards, Required Inspection Items (RII), Logbook documentation, and Airworthiness Release procedures are properly completed as instructed in the JPATS training outlined in Section 3.
The Contractor will be responsible for the repair or replacement of any JPATS equipment that is damaged or destroyed by acts of negligence by the Contractor.
The Contractor will ensure the aircraft’s airstairs are not used for maintenance personnel to enter the aircraft or exit the aircraft.
The Contractor will permit the JPATS designated engine borescope technicians’ entrance into their Repair Station for performing borescope inspections.
The Contractor will complete and return Section 11 to the JPATS Contracting Officer.
5. Place of Performance
All work will be performed at the Contractor’s Title 14 CFR Part 145 Certificated Repair Station located within the contiguous United States.
6. Period of Performance
The induction date is February 10, 2026. JPATS anticipates a 45-calendar day performance period with a return to service date of March 23, 2026.
7. Warranty
The Contractor will provide the Government a copy of their standard commercial warranty.
8. Contract Administration Data
Only warranted Contracting Officers are authorized to issue and modify Government contracts, approve changes in any terms and conditions in a contract, or obligate funding. If the Contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made to the contract to cover any increase in costs that may result.
9. Right to Inspect / Audit
The Government reserves the right to inspect / audit the Contractor’s facility along with their current maintenance processes and procedures prior to delivering the aircraft for services. The Government must ensure the Contractor is providing services in accordance with their Title 14 CFR Part 145 Repair Station Certification.
The Government may terminate the contract if it has reason to believe the Contractor is not providing services in accordance with their certificate.
10.Deliverables
10.1. Aircraft Status Report
The Contractor is required to provide a daily Aircraft Status Report. The Aircraft Status Report must include, but not limited to, a comprehensive list of the following:
Number of personnel assigned to the aircraft, The previous day’s maintenance activities, The current day’s planned maintenance activities, Outstanding parts, Repairs that require engineering assistance, and Any anticipated delivery delays.
10.2. Accruals
The Contractor must provide JPATS with a twice weekly accrual of all costs incurred as part of the maintenance visit.
The Contractor must provide written justification of any anticipated increases in funding required to complete the maintenance visit to the JPATS CO and COR.
10.3. Invoice
The Contractor must submit all invoices to the address designated in the contract to receive invoices and provide a copy to the COR and the CO, within thirty (30) days after the completion of the heavy maintenance visit.
10.4. Aircraft Records
The Contractor must ensure all aircraft records and all original aircraft parts certification documentation are mailed to JPATS within thirty (30) days after the completion of the heavy maintenance check.
The Contractor must provide all FAA required maintenance records to include JPATS historical logbooks for the airframe, engines, auxiliary power units (APU) and appliances as applicable as well as the FAA Form 337 for Major Repairs and Alterations.
The Contractor must provide an electronic copy (PDF Format) of all maintenance records completed during the heavy maintenance check.
Maintenance records are required to be separated and titled as outlined in Section 11.
10.5. Aircraft Parts
The Contractor must provide JPATS with all aircraft parts / materials removed from the aircraft as part of the maintenance visit and ensure all removed parts / materials are appropriately stored to avoid damage or misuse. The JPATS COR will provide an appropriate disposition for all aircraft parts and materials.
11.Heavy Maintenance Check Requirements
Task Number
Sub- Task
Maintenance Requirements Firm Fixed
Price 1 Perform Service Check 2 Perform Monthly Safety Inspection (MSI)
Note: The Monthly Safety Inspection (MSI) must not be performed earlier than seven days prior to departure
3 Perform 1A Check 4 Perform 2A Check 5 Perform 1C Check 6 Perform 2C Check 7 Perform 3C Check 8 Perform 6C Check 9 Perform Complete Aircraft Wash
10 Perform Task 25-010-01 Operationally Check the Passenger Seat Break-Over Feature on all Seats Adjacent (Forward and Aft) to all of the Emergency Exits
11 Perform Task 28-AWL-01 Detailed Inspection External Wires Over Center Fuel Tank using Boeing Task Card 28-011-00-01
12 Perform Task 28-AWL-27 Review AC Fuel Boost Pump Installation
13 Perform Task 32-040-01 Operationally Check the Brake Accumulator Isolation Valve
14 Perform Task 72-001-17 #1 and #2 Engine Gas Path Cleaning with Detergent IAW AMM Task 72-00-00-117- C00
15 Perform Task 72-018-01 Lubricate the Left Engine Fan Blade Dovetail Per Manufacturer’s Instructions
16 Perform Task 72-018-02 Lubricate the Right Engine Fan Blade Dovetail Per Manufacturer’s Instructions
17 Perform Task EMTQ-012-CAW Structural Inspection of the Dual GPS Antenna Installation
18 Perform AD 1999-10-12 Paragraph (b)(c) 18 a Perform SB 737-32A1314, dated April 15, 1999, Accomplishment Instructions N/A
19 Perform AD 2004-06-18 Paragraph (a)(1)(i) 20 Perform AD 2006-12-23 Paragraph (i) 20 a Perform Service Bulletin 737-55A1070 Revision 2, Accomplishment Instructions 3.B. Part 10, Followed by:
N279AD (PW261) is a Group 10 Aircraft
N/A
20 b Perform Service Bulletin 737-55A1070 Revision 2 Accomplishment Instructions 3.B. Part 1
N/A
20 c Perform Service Bulletin 737-55A1070 Revision 2 Accomplishment Instructions 3.B. Part 2
N/A
Task Number
Sub- Task
Maintenance Requirements Firm Fixed
Price 21 Perform AD 2012-18-13 R1 Paragraph (g)(1)(h)(i) 21 a Perform a LFEC inspection from the aft side of the aft pressure bulkhead to detect discrepancies (including cracking, misdrilled fastener holes, and corrosion) of the web of the upper section of the aft pressure bulkhead at BS 1016 at the aft fastener row attachment to the ''Y'' chord, from S-15L to S-15R IAW NDT Manual D6- 37239, Part 6 Section 53-10-54
N/A
22 Perform AD 2012-18-13 R1 Paragraph (k) 22 a Perform Service Bulletin 737-53A1214 Revision 4
Accomplishment Instructions 3.B. Part 1 Step 1 N279AD (PW261) is a Group 1 Aircraft
N/A
23 Perform AD 2014-18-02 Paragraph (k)(l) 23 a Perform Service Bulletin 737-53A1075 Revision 3, Accomplishment Instructions 3. Work Instructions Step C N279AD (PW261) is a Group 1 Aircraft
N/A
24 Perform AD 2016-11-04 Paragraph (m) 24 a Perform Service Bulletin 737-53A1279 Revision 2, Accomplishment Instructions 3.B. Part 4 N279AD (PW261) is a Group 2 Configuration 3 Aircraft
N/A
25 Perform AD 2016-23-08 Paragraph (g) 25 a Perform Service Bulletin 737-53A1347, dated December
09, 2015, Accomplishment Instructions 3.B. Work Instructions Part 2 N279AD (PW261) is a Group 1 Aircraft
N/A
26 Perform AD 2017-02-05 Paragraph (h) 26 a Perform Service Bulletin 737-53A1350, dated May 06, 2016, Accomplishment Instructions 3.B. Group 3-8 Part 2 Step 3.a and Group 3-8 Part 6 step 2.a N279AD (PW261) is a Group 5 Aircraft
N/A
27 Perform AD 2017-02-12 Paragraph (g)(1) 27 a Perform Service Bulletin 737-55A1092, dated August 07, 2015, Accomplishment Instructions 3.B. Work Instructions Part 1 N279AD (PW261) is a Group 1 Aircraft
N/A
28 Perform AD 2017-02-12 Paragraph (g)(2) 28 a Perform Service Bulletin 737-55A1092, dated August 07, 2015, Accomplishment Instructions 3.B. Work Instructions Part 2 N279AD (PW261) is a Group 1 Aircraft
N/A
29 Perform AD 2017-25-10 Paragraph (h)(5) 29 a Perform Service Bulletin 737-55A1099 Revision 1, Accomplishment Instructions 3.B. Work Package 3 N279AD (PW261) is a Group 3 Aircraft
N/A
30 Perform AD 2017-25-10 Paragraph (h)(6) 30 a Perform Service Bulletin 737-55A1099 Revision 1, Accomplishment Instructions 3.B. Work Package 4 N279AD (PW261) is a Group 3 Aircraft
N/A
Task Number
Sub- Task
Maintenance Requirements Firm Fixed
Price 31 Perform AD 2017-25-10 Paragraph (h)(7) 31 a Perform Service Bulletin 737-55A1099 Revision 1, Accomplishment Instructions 3.B. Work Package 5 N279AD (PW261) is a Group 3 Aircraft
N/A
32 Perform AD 2018-18-13 Paragraph (h) 32 a Perform Service Bulletin 737-57A1338, dated
September 25, 2017, Accomplishment Instructions 3.B.
Table 1 Inspection 1 N279AD (PW261) is a Group 3 Configuration 1 Aircraft
N/A
32 b Perform Service Bulletin 737-57A1338, dated September 25, 2017, Accomplishment Instructions 3.B.
Table 3 Inspection 5 and Inspection 6 N279AD (PW261) is a Group 3 Configuration 1 Aircraft
N/A
33 Perform AD 2019-10-03 Paragraph (h) 33 a Perform Service Bulletin 737-53-1246 Revision 1, Accomplishment Instructions 3.B. Group 4-5 Part 17 N279AD (PW261) is a Group 5 Aircraft
N/A
33 b Perform Service Bulletin 737-53-1246 Revision 1, Accomplishment Instructions 3.B Group 4-5 Part 18 N279AD (PW261) is a Group 5 Aircraft
N/A
34 Perform AD 2020-16-51 Paragraph (h) Note: AD 2020-16-51 Paragraph (h) must not be performed earlier than two days prior to departure
35 Perform AD 2024-18-08 Paragraph (g)(1) 35 a Perform Service Bulletin 737-25A1873, dated August 25, 2023, Accomplishment Instructions 3.B. Table 2 Condition 3.1 Part 1 JPATS will provide Top Kits P/N’s:
SB560101069-11
SB560101018-11
SB560101095-11
N279AD (PW261) is a Group 2 Aircraft
N/A
36 Perform AD 2024-23-03 Paragraph (g) 36 a Perform Service Bulletin 737-22A1399, dated April 13, 2023, Accomplishment Instructions 3.B. Group 4 Table 1 Action 1, Action 2, Action 3, Action 4, and Condition 1 JPATS will provide Top Kit P/N: 65C37849-60 N279AD (PW261) is a Group 4 Aircraft
N/A
37 Non-routine work cards for discrepancies identified in accomplishing above checks and inspections. Hourly Labor Rate:
38 Administrative fee for the procurement of aircraft parts and materials:
12.Performance Standards
JPATS will primarily utilize the Contractor’s existing Quality Assurance System under Federal Acquisition Regulation (FAR) 12.208, Contract Quality Assurance, but will also assess the Contractor’s performance using the onsite COR and the Performance Standards referenced in Section 12.1.
12.1. Assessing Performance
JPATS will utilize the table below for assessing performance of the Contractor.
The table includes the PWS Section Number, Performance Standard, Acceptable Quality Level, and Monitoring Method.
PWS Number Performance
Standard Acceptable
Quality Level Monitoring
Method
Aircraft Maintenance
Requirements in Section 11 Completed
100%
Periodic review of documentation and spot-check adherence to policies.
Aircraft Unscheduled (non-routine) Maintenance Requirements
Completed
100%
Periodic review of documentation and spot-check adherence to policies.
Appropriate Maintenance
Record Documentation
100%
Periodic review of aircraft maintenance record documentation.
Airworthiness
Directives Completed
100%
Periodic review of documentation and spot-check adherence to policies.
Following Logistics Support Activities for the
Acquisition of Aircraft Parts and
Materials
100%
Periodic review of documentation and spot-check adherence to policies.
PWS Number Performance
Standard Acceptable
Quality Level Monitoring
Method
Aircraft
Cleanliness 95%
Review of aircraft and aircraft documentation after the approval for return to service.
Aircraft Delivery
Schedule 95%
Return to Service Date of the Aircraft
File details come from the government source that posted it. Updated .