Performance Work Statement - PWS - FA460024Q0007.docx

DOCX document 74 KB Posted

Attached to
Vertical Transportation and Equipment (VTE) Inspections and Maintenance
Solicitation number
FA460024Q0007_Revision01
Issued by

About this file

This document is a Performance Work Statement (PWS) for Vertical Transportation Equipment (VTE) maintenance, repair, and inspection services at Offutt Air Force Base in Nebraska. The Contractor shall provide all management, tools, supplies, equipment, parts, and labor necessary to maintain, repair, and inspect the real property VTE in a manner that will ensure continuous and safe operation. This includes freight elevators, passenger elevators, service elevators, glide lifts, wheelchair lifts, and stair lifts. The Contractor shall develop and submit an annual written Maintenance Control Program, perform required inspections and tests, respond to routine and emergency service calls, and provide detailed reporting. The Government will evaluate the Contractor's performance based on criteria such as service availability, response times, repair quality, and inspection adherence. The contract includes a list of 49 VTE units across 36 buildings. The period of performance is 12 months with four 12-month option periods.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

VERTICAL TRANSPORTATION EQUIPMENT

MAINTENANCE, REPAIR, & INSPECTION SERVICES

12 Dec 2023

OFFUTT AIR FORCE BASE

NEBRASKA

Modifications

Mod #
Change
Date

Contents

1. DESCRIPTION OF SERVICES.5
1.1 BASIC SERVICES5
1.2. Work Conducted5
2. EXCLUDED SERVICES5
The following are not covered in the full maintenance service arrangement and are considered over and above services:5
2.1. Alterations5
2.2. Damage not included5
2.3. Additional Items5
2.4. Routine cleaning6
2.5. Work included and not included6
3. DEFINITIONS:6
3.1. Maintenance, Repair, and Replacement6
3.2. Alteration6
4. MAINTENANCE AND INSPECTION SERVICES:6
4.1. VTE Inspections6
4.2. Maintenance Control Program7
4.3. Perform Maintenance7
4.4. Cleaning7
4.5. Inspections and Test7
4.6. Government Inspections7
4.7. Written Report7
4.8. VTE Inspection Documentation8
5. REPAIR SERVICE CALLS.8
5.1. Routine Calls.8
5.1.1. CO/COR Notify Contractor8
5.1.2. Contractor Shall Respond8
5.1.3. Contractor Shall Report to Location8
5.2. Emergency Calls.9
5.2.1. Notification9
5.2.2. Respond in Person9
5.2.3. Provide Estimate9
6. SERVICES SUMMARY10
7. GOVERNMENT FURNISHED PROPERTY AND SERVICES10
8. GENERAL INFORMATION.11
8.1. QUALITY CONTROL.11
8.2. QUALITY ASSURANCE.11
8.3. HOURS OF OPERATION.11
8.3.1. Federal Holidays.11
8.4. SECURITY REQUIREMENTS.12
8.4.1. Restricted Areas12
8.4.2. Terminating Employees12
8.5. Continuation of Work during Crisis12
8.6. SPECIAL QUALIFICATIONS.13
8.7. SCHEDULE COORDINATION.13
8.8. ENVIRONMENTAL CONTROL.13
8.9. ASBESTOS.14
APPENDIX A: VTE Equipment Listing14

1. DESCRIPTION OF SERVICES.

The Contractor shall provide all management, tools, supplies, equipment, parts, and labor necessary to maintain, repair, and inspect the real property vertical transportation equipment (VTE) at Offutt Air Force Base in a manner that will ensure continuous and safe operation. This PWS includes VTE listed in Appendix A, such as freight elevators, passenger elevators, service elevators, glide lifts, wheelchair lifts, and stair lifts.

1.1 BASIC SERVICES

This full maintenance contract signifies a VTE service provider (Contractor) takes total service responsibility for the equipment identified in the contract. Except those services covered in paragraph 2 below, the monthly fixed price includes all inspections, maintenance, repairs, replacements, and routine and emergency service calls. This contract allows the Government to budget total yearly costs and eliminates concerns relating to individual parts repair or replacement invoicing. The Contractor assumes all responsibility and determines the amount of service visits and types of service required to keep the VTE operating safely and within the performance objectives of paragraph 6.

1.2. Work Conducted

Work conducted on VTE will be in accordance with the American Society of Mechanical Engineers (ASME) A17.1-2022 (or applicable code for year VTE put in service) Safety Code for Elevators and Escalators (ASME A17.1ANSI)/ASME A17.2-2021, Guide for Inspection of Elevators, Escalators, and Moving Walks (applicable to equipment); A17.3-2020, Safety Code for Existing Elevators and Escalators (applicable to equipment), National Fire Protection Association Standards (NFPA); Unified Facilities Criteria (UFC) 3-600-01; with Change 6, Fire Protection Engineering for Facilities, Occupational Safety and Health Administration (OSHA) Standards and the recommendations of the original equipment manufacturer (OEM).

2. EXCLUDED SERVICES

The following are not covered in the full maintenance service arrangement and are considered over and above services:

2.1. Alterations

Alterations (modernizations) are not covered in the full maintenance service arrangement. (See Paragraph 3.2 for definition)

2.2. Damage not included

Acts by parties other than the Contractor of vandalism, abuse, negligence, damage resulting from rescue and recovery operations, acts of God (including damage resulting from emergency power generator power spikes and low quality) are not included in the contract.

2.3. Additional Items

Additional items excluded in the full maintenance coverage are cosmetic, construction, ancillary components of the VTE system including the finishing, repairing, or replacement of the cab enclosure, ceiling frames, hoistway door panels, door frames, sills, car flooring, floor covering, main line power switches, main power breaker(s), hydraulic elevator jack outer housing, buried piping, smoke and fire sensors, fire service reports, main communication feeders to controller, security systems, batteries for emergency lighting and lowering that are not solely dedicated to the VTE, air conditioners, and heaters.

2.4. Routine cleaning

Routine cleaning and refinishing of the interior of cars and the exterior of the hoistway doors and frames is not included in the basic full maintenance service.

2.5. Work included and not included

In the event that the Contractor encounters an item of work included in paragraph 2.1 through 2.4, the Contractor will report the situation to the Contracting Officer’s Representative (COR). The report will include the work location, a detailed scope of the required work, justification for Contractor determination that the work was not included in the contract, and an itemized cost estimate (including time to repair, all required parts and a breakdown of labor hours). NOTE: Any part, component, or assembly unavailable from the manufacturer due to obsolescence remains the Contractor’s responsibility to obtain an engineered equivalent product from a commercial source.

3. DEFINITIONS:

3.1. Maintenance, Repair, and Replacement

Maintenance, repair, and replacement are on existing VTE and included in the contract scope of services. All maintenance, repair, and replacement of damaged, broken, or worn parts are to be done in a manner that ensures that the equipment may be operated safely. Maintenance, repair, and replacement are actions to restore equipment to a state in which it may safely perform its required operations as installed in accordance with the manufacturer’s recommendations. See ASME A17.1 for requirements.

3.2. Alteration

An alteration is also on existing VTE but is not included under the full maintenance service arrangement. Alteration/modernization will be covered on an over and above Contract Line Item or it may result in a modification to the contract. The typical alteration results in a betterment to the safe operation of the equipment. In the case of elevators, when an alteration is made, all affected safety requirements must be complied with. All work as part of an alteration is required to comply with specific requirements of the current ASME A17.1 Code edition. See ASME A17.1 for requirements.

4. MAINTENANCE AND INSPECTION SERVICES:

4.1. VTE Inspections

The Contractor with the CO/COR (or representative) shall determine the working order and condition of all VTE listed in Appendix A within thirty (30) calendar days of contract award. The Government will either replace missing items or repair all items not in working order or serviceable condition, or the CO will direct the Contractor to replace the missing items, accomplish the repair, and reimburse the Contractor in accordance with the contract. The CO will give instructions for situations where a unit requires a level of repair potentially constituting alteration as described by paragraph 3.2. The Contractor and the CO shall certify their agreement as to the working order of the equipment. All repair work shall be in accordance with standard commercial practices using only new parts of equal quality specified by the VTE manufacturer in effecting repairs (substitution of a different component is only permitted where it is equivalent to that which was tested, as determined by the certifying agency).

4.2. Maintenance Control Program

The Contractor shall develop and submit to the Government an annual written Maintenance Control Program (MCP) for each VTE within thirty (30) calendar days after contract award to cover the basic contract and any option periods. The MCP shall, at a minimum, include required inspections, timelines for inspections and maintenance to be performed. The Contractor shall perform inspections and maintenance of all VTE in accordance with the MCP. The MCP shall ensure compliance with all minimum code requirements. The Contractor shall provide a State of Nebraska or similar Federal annual conveyance inspection certificate for all applicable VTE. The certificates shall be digitally mailed to the COR no later than thirty (30) days after inspections. The COR will keep on file and will post the certificates in the elevator cars.

4.3. Perform Maintenance

The Contractor shall perform maintenance in accordance with the MCP to ensure reliable and continuous safe operation. The maintenance work shall be in accordance with commercial practices or manufacturer’s specifications, if available, and shall be intended to maintain the VTE in safe and reliable operating condition. The MCP is required to specify appropriate intervals for specific maintenance items.

4.4. Cleaning

Cleaning of equipment spaces and daily cleanup of job sites in conjunction with maintenance, inspections, tests, and repairs are required.

4.5. Inspections and Test

The Contractor shall perform necessary inspections and tests as required under ASME A17.1 Appendix N, using a Qualified Elevator Inspector (QEI). The first annual test shall include the five-(5)-year test for all traction and roped hydraulic elevators regardless of due date. The three- (3) - year test shall be scheduled in conjunction with the annual test two years later from the first annual test. Inspections must take place one month prior to certificate expiration.

4.6. Government Inspections

The Government may perform inspections of the VTE at no cost to the Contractor for purposes of capital asset management and quality assurance. If discrepancies are discovered during these inspections, the Contractor will be notified in writing of any determination and may be responsible for the corrective actions.

4.7. Written Report

The Contractor shall prepare and submit a written report within two (2) business days of work. The report shall identify each VTE, the location, maintenance work performed, repairs needed, date of inspection, name of inspector, and overall condition of the VTE.

4.8. VTE Inspection Documentation

The Contractor shall maintain a copy of all current VTE inspection documentation, along with an index indicating the location, date inspected, and date of the next required inspection having provided the original to the CO/COR. The index and copies of certificates shall be delivered to the CO/COR upon request; however, no later than one (1) business day of a request to review.

5. REPAIR SERVICE CALLS.

Contractor shall provide service calls (routine and emergency) under the full maintenance service agreement at no additional charge. The CO/COR shall determine if the service call is a routine call or emergency call. All repair work shall be done in accordance with standard commercial practices. Contractor shall repair and replace components of the VTE at no additional cost to the Government. When a component in a labeled product is replaced, it must be replaced with an identical component manufactured under the original labeling service (certifying agency). Substitution of a different component is only permitted where it is equivalent to that which was tested, as determined by the certifying agency. The parts used for replacement are required to comply with all the requirements that the old parts originally complied with. The Unified Facilities Guide Specifications (UFGS) and the UFC will be used to benchmark acceptable replacement components. See UFGS 14 21 13 Electric Traction Freight Elevators, UFGS 14 21 23 Electric Traction Passenger Elevators, UFGS 14 24 13 Hydraulic Freight Elevators and UFGS 14 24 23 Hydraulic Passenger Elevators.

5.1. Routine Calls.

Service calls will be classified as routine when the work or adjustments do not qualify as an emergency call.

5.1.1. CO/COR Notify Contractor

The CO/COR will notify the contractor of repairs to be made from the inspection report or for a service call.

5.1.2. Contractor Shall Respond

The Contractor shall respond in-person to the VTE and begin work on routine service calls at no additional cost to the Government within four hours after receipt of the call on regular scheduled workdays/hours.

5.1.3. Contractor Shall Report to Location

The Contractor shall report to the work location, survey the repair, and provide the CO/COR an estimate of time and cost of repairs not covered in the full maintenance service contract, but necessary to bring the VTE back to operation. The Contractor shall commence repair work after notification from the CO/COR. The Contractor shall prepare and submit to the CO/COR a written report within two business days after the repair. The report shall include the date and time of the service call, the location of the VTE, the repairs performed, and the name of the technician performing the repairs.

5.2. Emergency Calls.

Emergency calls are defined as calls made for services when a VTE system fails and constitutes a danger to personnel, threatens to damage properties, or threatens to disrupt activity, operations, and/or training missions.

5.2.1. Notification

The CO/COR will notify the contractor of repairs to be made from the inspection report or for a service call.

5.2.2. Respond in Person

The Contractor shall respond in person to the VTE and begin work on emergency service calls within one hour during normal business hours and two hours during other than normal business hours after receipt of the call.

5.2.3. Provide Estimate

The Contractor shall report to the work location, survey the repair, and provide the CO/COR an estimate of time and cost of repairs not covered in the full maintenance service contract, but necessary to bring the VTE back to operation. The Contractor shall commence repair work after notification from the CO/COR. The Contractor shall prepare and submit to the CO/COR a written report within two business days after the emergency repair. The report shall include the date and time of the service call, the location of the VTE, the repairs performed, and the name of the technician performing the repairs.

6. SERVICES SUMMARY

The Government will evaluate the Contractor performance in accordance with the following criteria. Performance evaluations will be rendered in one or more Government databases for that purpose.

Performance Objective
PWS Para
Performance Threshold

1. Written Maintenance Control Program (MCP) for each VTE for all equipment.

MCP identifies all maintenance intervals to include safety inspections.

4
MCP in accordance with ASME A17.1 delivered to CO in 30 calendar days of contract award.
2. VTE Service Availability
4
VTE availability is 95%. Calculation = ((sum of all VTE * # days in service during the selected month for each VTE) / (# VTE * # days in the selected month)).

3. Repair Service Call Routine – Response Time.

Response to routine calls within time specified in paragraph 5.1.2.

5
Response to routine service calls are on-time 100% of the time on a monthly basis.

4. Repair Service Call Emergency – Response Time.

Response to emergency calls within time specified in paragraph 5.2.2.

5
Response to emergency service calls are on-time 100% of the time on a monthly basis.

5. Service Call Repairs – Repair Quality.

Repairs are of high quality resulting in reduced call backs.

5
Only two call backs of the same problem (same instance) each month.

6. Inspection – MCP Adherence

Inspection to MCP 100%

7. Preventative Maintenance - MCP Adherence

4.7., 5.1.3, 5.2.3.
Preventative maintenance performed to MCP 100% of time.
8. Reporting
2, 4, 5
Submit reports in a manner consistent with PWS 100% of the time.

7. GOVERNMENT FURNISHED PROPERTY AND SERVICES

The Government will provide a laptop at which the Contractor may use to service and maintain the Thyssenkrupp elevators in Building 1000. The Contractor shall furnish and install the Thyssenkrupp software on the government furnished laptop. Due to the level of security, the laptop shall be stored in the facility manager’s office and shall not leave the facility. The laptop shall only be used by authorized contractor personnel for servicing and troubleshooting purposes. Once the contract has ended or terminated, the Thyssenkrupp software provided by the Contractor shall be deleted from the laptop. If the new contract is awarded to the incumbent Contractor, the Contractor may continue to use the software. Contractor shall provide a quote for updated software when available. Contractor shall provide specifications for hardware required to run Thyssenkrupp software.

8. GENERAL INFORMATION.

8.1. QUALITY CONTROL.

Contractor shall develop and maintain a quality control program (QCP) to ensure maintenance and repair services are performed in accordance with ANSI/ASME A17 and other applicable standards and codes. The Contractor shall develop and implement procedures to eliminate reoccurrence of once identified/repaired defects. As a minimum, the Contractor shall develop quality control procedures that address the areas identified in Paragraph 6, Service Summary. The QCP shall demonstrate how the Contractor ensures quality performance during the contract period of performance. The Contractor shall maintain the QCP throughout the period of performance of the contract. The CO will be provided updates to the QCP as they occur during the period of performance. The QCP will identify the procedures in writing for inspections, individual responsible, VTE MCP, and the location of all inspection records and key control logs which will always be available to the government upon request. The QCP will have the inspection forms and records which will be used for the service. The Contractor will identify to the CO/COR the responsible quality control inspector to notify in case of customer complaints.

8.2. QUALITY ASSURANCE.

The Government will periodically evaluate the Contractor’s performance in accordance with the Quality Assurance Surveillance Plan.

8.3. HOURS OF OPERATION.

The Contractor shall perform normal preventative services required under this contract, Monday thru Friday from 0700 to 1630. Contractor may be required to respond to emergency calls outside of normal duty hours.

8.3.1. Federal Holidays.

The Contractor is not required to provide normal preventative service on Federal holidays that are outlined on the wage determination, which is incorporated into this contract. In the event of a holiday, all scheduled work will be accomplished the day after the holiday.

The following are federal holidays.

New Year’s Day – 1 January Martin Luther King Day – 3rd Monday in January Washington’s Birthday – 3rd Monday in February Memorial Day – last Monday in May Juneteenth – 19 June Independence Day – 4 July Labor Day – 1st Monday in September Columbus Day – 2nd Monday in October Veteran’s Day – 11 November Thanksgiving Day – 4th Thursday in November Christmas Day – 25 December

8.4. SECURITY REQUIREMENTS.

Contractor personnel shall obtain and possess at all times while on Offutt AFB, an authorized identification (ID) card (AF Form 75). Each contractor employee will be required to provide personal background information (e.g., full name, date of birth, and Driver’s License/ID #) for the 55 SFS CONTRACTOR/VENDOR/DV PASS REQUEST SPREADSHEET which will be filled out, signed, and submitted to the 55 SFS Pass and ID Office by authorized 55 CES personnel. When the contractor employee information is confirmed by 55 SFS, the contractor employee’s authorized identification (ID) card (AF Form 75) will be available at the USSTRATCOM Gate Visitor Control Center for pick up.

8.4.1. Restricted Areas

For contractor employees needing access to Offutt AFB restricted areas for work reasons, they will need to request a United States Air Force (USAF) Restricted Area Badge (RAB) for the duration of the contract. This will require a “favorable” National Agency Check (NACI) investigation which will take approximately 45 days duration for the following actions: 1) Contractor employee to fill out the security investigation paperwork (i.e., eQIP application) and submit to the Air Force (including fingerprints); 2) Air Force to complete the security investigation and issue a final determination as to suitability of contract employee to receive a “Favorable” investigation result; and 3) 55 CES to finalize the paperwork (Form 2586) and issue to contractor employee so they can get their RAB. The 55 CES (Security Manager) will do the paperwork needed to submit the contractor for the NACI. The need for a NACI investigation (i.e., access to the Offutt AFB restricted areas) must be noted in the contract. If not, Offutt AFB will not assume responsibility for the cost of the investigation. While paperwork for badges is being processed, escorts will be provided by the Unit Area Functional Manager (UAFM) on an interim basis for areas that requires access. The Contractor will wait no longer than twenty (20) minutes after initial notification for an escort to gain access into the restricted area. It is the Contractor’s responsibility to fully document all cases where entry to restricted areas was not granted. The Contractor’s personnel shall have proper identification prior to entry into restricted areas. It is the responsibility of each UAFM to brief all contractor personnel working in their area on procedures and policies of their particular restricted area and document the briefing for their files.

8.4.2. Terminating Employees

The Contractor is responsible for controlling and accounting for all identification cards and restricted area badges. When employee(s) leave the employment of the Contractor, the Contractor is responsible to recover the ID cards and all the entry/security documents from the terminated employee and immediately (within one duty day) deliver these items to the Contracting Officer. When restricted area badges are involved, notify the 55th CES/CEC Security Officer. If loss or failure to turn in these items within ten (10) calendar days, the Government shall deduct the amount of $25.00 per item, per employee from the next applicable invoice. The fee is to cover the Government’s administrative and inventory cost.

8.5. Continuation of Work during Crisis

CONTINUATION OF ESSENTIAL DEPARTMENT OF DEFENSE SERVICES DURING CRISIS DECLARED BY THE NATIONAL COMMAND AUTHORITY OR OVERSEAS COMBATANT COMMANDER. All services to be performed under this contract have been determined to be essential for performance during crisis and, according to Department or Defense Instruction (DODI) 3020.37 and Air Force implementation thereof, it is determined that the Contractor will be required to perform during a crisis, as stated in Para 1 above, unless otherwise directed by an authorized government representative.

8.6. SPECIAL QUALIFICATIONS.

The Contractor will be licensed by the State in which the work is conducted to provide the services specified in this contract. All work will be performed by personnel who are trained and qualified for the systems and equipment. Contractor personnel shall be certified by appropriate federal and state regulatory agencies to meet federal and local certification requirements (documentation provided to CO/COR upon request) in maintenance of VTE.

8.7. SCHEDULE COORDINATION.

The Contractor shall be responsible for coordinating all phases of his/her operations with the appropriate base personnel through the CO/COR. The facilities shall remain in operation while the Contractor is working, and it is up to the Contractor to coordinate around the normal activities of the facility.

8.8. ENVIRONMENTAL CONTROL.

The Contractor shall comply with, and ensure that all subcontractor employees comply with, any and all applicable federal, state, and local rules and regulations, ordinance, laws, policies, and instruction. The Contractor shall use environmentally safe products whenever feasible, throughout the course of all projects. In addition, the Contractor shall maintain complete and updated Material Safety Data Sheets (MSDS) listings, covering every chemical used on the job. A copy of the MSDS Binder shall be kept in the Contractor vehicles at all times, ensuring availability at remote sites if needed. Another copy of the MSDS binder must be provided at any primary worksite or shop. The MSDS binder must be visibly displayed and available at all times. Contractors and sub-contractors must be provided at least an awareness level training of the MSDS function and use. All MSDS related requirements outlined here are subject to compliance inspection and random checks by government authority. The Contractor shall maintain, and provide on demand, an updated and complete inventory of materials being brought to and/or stored within the Government facility. The Contractor shall complete, and have available for inspection, monthly inventories of all HAZMAT used and disposed of, including but not limited to: solvents, paints, degreasers, greases, Ozone Depleting Substances, and oils brought on to the Government facility. If the Contractor spills or releases any HAZMAT or other substance contained in 40 CFR 302 into the environment, the Contractor shall immediately notify the CO/COR and appropriate emergency responders. Refer to the clean-up procedures section of the spilled chemical’s MSDS during response. The Contractor is responsible for all costs associated with any clean-up and/or restoration, including any applicable fines and/or penalties that results from a spill. To help mitigate the risk of such events, the Contractor shall maintain a Spill Plan in accordance with federal, state, and local rules and regulations. Coordinate with the base Environmental Compliance office for Spill Plan review; this will help ensure the plan is both comprehensive and effective.

8.9. ASBESTOS.

The Contractor shall comply with Section 29 CFR 1910.1001(j)(7)(iv). VTE may be located in facilities that may contain ACM or PACM. The Contractor (not the Government) shall determine if any exposure to ACM may result in performing work under the contract.

APPENDIX A: VTE Equipment Listing

ITEM
BLDG. #
DESCRIPTION
QTY
DRIVE
TYPE
STOPS
MFG
CAPACITY (lbs.)
1
40
55th CONS
1
Hydraulic
Passenger
3
Schindler
2,100
2
41
Comm. HQ
1
Cable
Passenger
3
Upgraded Otis
3,500
3
49
MPF Building
1
Hydraulic
Passenger
3
Schindler
2,100
4
49
MPF Building
1
Hydraulic
Wheelchair Lift
1
Garaventa Lift
750
5
88
Band Center
1
Electric
Stair Lift
1
Garaventa Lift
450
6
88
Band Center
1
Hydraulic
Wheelchair Lift
2
Garaventa Lift
750
7
185
557th Weather Wing
1
Hydraulic
Passenger
3
Schindler
4,500
8
185
557th Weather Wing
1
Hydraulic
Passenger
3
Schindler
4,500
9
301
CES
1
Electric
Wheelchair Lift
1
Savaria Concord
750
10
301
CES
1
Electric
Glide Lift
1
Access Ind
300
11
301
55 IS
1
Hydraulic
Freight
2
Montgomery
4,000
12
301
Storage Area
1
Hydraulic
Passenger
2
Montgomery
2,000
13
302
Legal Office
1
Hydraulic
Passenger
3
Schindler
2,000
14
323
Bldg. C
1
Hydraulic
Passenger
3
Dover
2,100
15
436
VOQ/O'Malley Inn
1
Hydraulic
Passenger
5
Dover
2,500
16
500
C Wing East
1
Cable
Passenger
4
O'Keefe
2,500
17
500
C Wing West
1
Cable
Passenger
4
O'Keefe
2,500
18
500
E Wing East
1
Cable
Passenger
4
O'Keefe
2,500
19
500
E Wing West
1
Cable
Passenger
4
O'Keefe
2,500
20
500
H Wing East
1
Cable
Passenger
4
O'Keefe
2,500
21
500
H Wing West
1
Cable
Passenger
4
O'Keefe
2,500
22
500
Command Section
1
Cable
Passenger
4
O'Keefe
2,500
23
500
F Wing
1
Cable
Service
3
O'Keefe
4,000
24
500
J Wing
1
Hydraulic
Passenger
3
Westinghouse
4,000
25
500
G Wing
1
Hydraulic
Wheelchair Lift
1
Wheel-o-vator
750
26
500
Boiler Room
1
Hydraulic
Service
1
Langley
4,000
27
501
Underground
1
Hydraulic
Service
3
O'Keefe
4,000
28
501
U-116
1
Hydraulic
Passenger
2
Montgomery
2,500
29
501
BG Vault
1
Electric
Wheelchair Lift
1
Wheel-o-vator
750
30
501
Middle Floor
1
Electric
Wheelchair Lift
1
Wheel-o-vator
750
31
504
97th IS
1
Hydraulic
Passenger
2
Schumacher
4,500
32
513
Mail Center
1
Hydraulic
Passenger
2
Schindler
3,000
33
522
Command Center
1
Hydraulic
Passenger
2
Minnesota
4,000
34
522
Lower Floor
1
Electric
Wheelchair Lift
1
Wheel-o-vator
750
35
527
Fairchild Hall
1
Hydraulic
Passenger
3
Schindler
2,000
36
583
Control Tower
1
Gearless
Passenger
9
Schindler
2,500
37
597
3rd Command & Control
1
Hydraulic
Passenger
2
Minnesota
4,000
38
1000
#1
1
Gear Traction
Passenger
2
Thyssenkrupp
5,000
39
1000
#2
1
Hydraulic
Freight
2
Thyssenkrupp
12,000
40
1000
#4
1
Gear Traction
Passenger
5
Thyssenkrupp
4,000
41
1000
#5
1
Gear Traction
Passenger
5
Thyssenkrupp
4,000
42
1000
#6
1
Gear Traction
Passenger
5
Thyssenkrupp
4,000
43
1000
#8
1
Gear Traction
Passenger
4
Thyssenkrupp
4,000
44
1000
#9
1
Gear Traction
Passenger
5
Thyssenkrupp
4,000
45
1000
#10
1
Gear Traction
Passenger
5
Thyssenkrupp
4,000
46
1000
#11
1
Gear Traction
Passenger
6
Thyssenkrupp
4,000
47
1000
#12
1
Electric Traction
Freight
7
Thyssenkrupp
12,000
48
1000
#13
1
Electric Traction
Freight
7
Thyssenkrupp
12,000
49
1000
Operation Center
1
Electric
Wheelchair Lift
2
Savaria Concord
750

File details come from the government source that posted it. Updated .