Performance Work Statement-Draft.pdf

PDF 672 KB Posted

Attached to
Troubleshooting, Calibration and Repair of Proof Test Machines
Solicitation number
N32253-26-740-0002
Issued by

About this file

This is a Performance Work Statement (PWS) for calibration services of proof test machines at Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility (PHNSY & IMF).

The Government requires annual on-site troubleshooting, repair, and calibration services for three Roberts Testing proof test machines: a Vertical Proof Test Hoist Stand (Model 80,000 lbf), a Horizontal Proof Test Bed Machine (Model 225,000/50,000 lbf), and a Horizontal Proof Test Bed Machine (Model 1,200,000/45,000 lbf). All work must be completed by Close of Business on January 28th of each year, with the Government retaining the right to modify the completion date with 14 days' notice. The Contractor must provide all labor, materials, supplies, and tools necessary to perform services on-site at the Controlled Industrial Area (CIA) at Pearl Harbor Naval Shipyard. Services include utilizing existing Vishay Indicators and LCp-200 Proof Testing System Software supplied by the Government, calibrating units per ASTM specification E4, and providing certification within 16 days of completion. The Contractor must submit a detailed report on services performed within 10 working days after calibration completion.

The Contractor must be and remain accredited by a NAVSEA 04-approved body in compliance with NAVSEAINST 4734.1B throughout contract performance, with accreditation scope covering all measurement parameters and ranges required. All personnel require background checks, U.S. citizenship, Defense Biometric Identification System registration, and "green" unescorted badges for CIA access. Normal work hours are 6:30 a.m. through 3:00 p.m., Monday through Friday, excluding Federal Holidays. The Contractor must develop and maintain a Quality Control Plan, comply with applicable safety, health, and environmental guidelines, and adhere to all security requirements and Navy rules and regulations. Travel costs including airfare, lodging, rental car, and per diem are included and must comply with Department of Defense Joint Travel Regulations and FAR 31.204-46.

View the file

Other files

File Type Posted
APPENDIX II-6-OCT-2019.pdf PDF
APPENDIX I-JUL 2024.pdf PDF
APPENDIX III-FEB 2026.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Pearl Harbor Naval Shipyard

& Intermediate Maintenance Facility (PHNSY & IMF) Calibration Of Proof Test Machines

1.0 BACKGROUND

1.1 Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility (PHNSY & IMF) is a US Navy regional industrial center that maintains, overhauls and repairs various vessels of the U.S. Navy. Its industrial operations provide the U.S. naval forces with a wide range of services and resources located on the island of Oahu, Hawaii, with direct and indirect support to submarines, surface vessels and shore-based activities in the Pacific.

2.0 OBJECTIVE & SCOPE

2.1 Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility (PHNSY & IMF) requires annual services for Government-owned equipment critical to its industrial operations. To ensure operational readiness and safety, this equipment must be maintained to manufacturer specifications through expert troubleshooting, repair, and calibration. The objective of this contract is to procure the comprehensive services required to troubleshoot, repair, and calibrate three (3) Government-owned Roberts Testing Proof Test Machines to ensure their accuracy, reliability, and safe operation. The Contractor shall provide all necessary labor, materials, and expertise to perform comprehensive troubleshooting, repair, and calibration services on the Government-owned equipment specified below.

Equipment: Proof Test Machines

Manufacturer: Roberts Testing

Quantity: Three (3)

1. Vertical Proof Test Hoist Stand, Model 80,000 lbf.

2. Horizontal Proof Test Bed Machine, Model 225,000/50,000 lbf.

3. Horizontal Proof Test Bed Machine, Model 1,200,000/45,000 lbf.

Location: Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility (PHNSY & IMF), Controlled Industrial Area (CIA).

Services shall be completed by Close of Business (COB) on January 28th of each year for the duration of the contract. The Government reserves the right to change the required date of service completion with a minimum of fourteen (14) calendar days' advance notice to the Contractor.

3.0 PERFORMANCE REQUIREMENTS

3.1 The contractor shall provide all management, parts, labor, materials, supplies and tools required to perform on-site troubleshooting, repairs and calibration of all equipment in paragraph 2.1.

3.2 The contractor must utilize the existing Vishay Indicators and LCp- 200 Proof Testing System Software on the PHNSY & IMF supplied laptop computers to do the necessary calibrations to all machines including the calibration after the new Load Cell installation on the 80,000 lbf machine.

3.3 The Contractor shall calibrate the units in accordance with ASTM specifications E4 and provide certification attesting to the calibration performed. This certification may be provided in person or

DRAFT

sent to the Technical Point of Contact in electronic format within 16 days of completion of calibration.

3.4 Reports: The contractor shall provide a report detailing the nature of the services performed; upgrade modifications and other pertinent information concerning the condition of the equipment to the TPOC. The contractor shall submit the report no later than 10 working days after Calibration.

3.5 Prior to the award of Contract, the Contractor must provide proof it meets the requirements set forth in NAVSEAINST 4734.1B, “Commercial calibration activities, including Original Equipment Manufacturers (OEM), that calibrate NAVSEA TMDE will be certified or accredited by an accrediting body approved NAVSEA 04 to be in compliance with references (p), (r) and/or (s), and the scope of accreditation must cover the appropriate measurement parameters and ranges of the calibrations performed.” The Contractor must, for the entire period of performance, maintain a certification or accreditation in compliance with NAVSEAINST 4734.1B. The Contractor's accreditation body must be approved by NAVSEA 04, and the scope of accreditation must encompass all measurement parameters and ranges for the NAVSEA Test, Measurement, and Diagnostic Equipment (TMDE) calibrated under this contract. The Contractor shall make proof of current certification available for Government inspection upon request.

3.6 Removal and disposal of replacement parts and materials. Contractor shall transfer replacement parts and materials, to PHNSY & IMF for proper disposal.

3.7 Hazardous Waste and scrap metals shall be transferred to PHNSY & IMF. For specific guidelines, and procedures governing the use and disposal of hazardous material or waste, direct all questions to the government. For specific guidance, guidelines, and procedures governing the use and disposal of hazardous material or hazardous waste at PHNSY & IMF, direct all questions to the TPOC.

3.8 Contractor shall comply with Safety and Health work practices specified in Appendix I of 12.0

Attachments.

3.9 Contractor shall comply with environmental guidelines specified in Appendix II of 12.0 Attachments.

3.10 Labor, airfare, lodging, rental car, per diem, shall be included. Travel shall be in accordance with current Department of Defense (DoD), Joint Travel Regulations and Federal Acquisition Regulations (FAR) 31.204-46. Travel receipts shall be provided upon request.

4.0 SERVICE DELIVERY SUMMARY

Performance Requirement Reference Performance Threshold

1. Perform Calibration Services as required. Paragraph 3.1, 3.2, and 3.3

100% delivery and compliance.

2. Provide report on services performed to the Government.

Paragraph 3.4 100% delivery and compliance.

3. Provide proof of requirements set forth in

NAVSEAINST 4734.1B.

Paragraph 3.5 100% delivery and compliance.

5.0 QUALITY ASSURANCE

5.1 The contractor shall develop a Quality Control Plan (QCP) and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor's QCP is the means by which the contractor assures that work complies with the requirement of the contract.

5.2 The contractor shall maintain records of reviews and actions taken per the QCP and shall make such records available to the government upon request.

6.0 GOVERNMENT FURNISHED PROPERTY AND SERVICES

6.1 FACILITIES: The Government will provide access to the affected work areas.

6.2 EQUIPMENT SERVICES: The Government will furnish the necessary rigging to connect the calibration equipment to the test bed machines.

7.0 CONTRACTOR QUALIFICATIONS

7.1 For the entire period of performance, the Contractor shall be and remain accredited by a NAVSEA

04-approved body in accordance with NAVSEAINST 4734.1B. The Contractor's scope of accreditation shall be sufficient to cover all measurement parameters and ranges required for the calibration services performed under this contract.

7.2 The Contractor shall provide a current accreditation certificate with submission of proposal.

7.3 The Contractor shall comply with Safety and Health work practices specified in APPENDIX I.

7.4 Contractor shall comply with environmental guidelines specified in APPENDIX II.

8.0 SECURITY REQUIREMENTS

8.1 Prior to the start of work, the contractor shall provide the COR (on company letterhead) a request for access to PHNSY & IMF and include the following information – full name of all personnel working on this contract; Social Security number; date of birth, place of birth, and citizenship. The contractor shall state that information has been verified and shall have supporting records on file if required for examination.

8.2 The contractor shall pass a background check to gain access into PHNSY & IMF. The contractor’s employees must be U.S. Citizens and registered with the Defense Biometric Identification System (DBIDS). The contractor shall coordinate with the TPOC or COR to obtain a gate pass at Building 3455 Pass Office. Only those individuals with favorable investigations shall be utilized on this contract. Contractor will coordinate with building 3455 Pass Office or government designee in the completion of current form SECNAV 5512/1.

8.3 Contractor personnel must meet the requirements for a “green” unescorted badge for access to areas requiring services related to this contract. Contractor will coordinate with PHNSY Security Office or government designee at building 207 in the completion of Visit Request for Pearl Harbor Naval Shipyard current form PH-SYD 5512/28.

8.4 Security Requirements: This contract does not require a security clearance level and clearance granted by the Defense Security Service (DSS). Contractor shall comply with Security requirements specified in Appendix III.

8.5 Should contractor personnel receive or suspect they have learned classified information beyond their level of clearance, the contractor shall identify and immediately report suspicions to the COR.

9.0 CONTRACTOR PERSONNEL

9.1 The Contractor shall furnish sufficient personnel to perform all work specified within this performance work statement. Contractor is required to comply with Public Law 105-270, Section 5(2) (A). This law states that contractors will not perform inherently governmental functions. Section 5(2)(A) of this Public Law defines the term “inherently governmental function” as “a function that is so intimately related to the public interest as to require performance by Federal Government employees.” Per Section 5(2) (B), inherently governmental functions include management of Government programs requiring value judgments, conduct of foreign relations, selection of program priorities, and the direction of intelligence and counter-intelligence operations. Per Section 5(2) (C), inherent governmental functions DO NOT include, (i) gathering information for or providing advice, opinions, recommendations, or ideas to Federal Government officials; or (ii) any function that is primarily ministerial and internal in nature.”

9.2 The Contractor personnel shall not establish an employee-employer relationship with Government personnel under this contract.

9.3 The Contractor shall not provide personal services.

9.4 The Contractor personnel shall make clear to all individuals they engage with that they are contractor employees and not Government employees. When participating and introducing themselves during official events wherein Government, non-Government, or foreign personnel are present, contractor personnel shall identify themselves as employees of the contractor. Contractor personnel must be clearly identified (i.e. company shirt, pin, visible company ID, etc.) in a visible location as to who their employer is.

9.5 The Contractor personnel shall not manage, supervise, or task Government employees or military personnel. Contractor personnel may not make any commitment to non-Government personnel, including a foreign official, which commits the expenditure of U.S. Government resources.

9.6 The Contractor performing services shall be required to comply with all US Navy rules, regulations, and training that is applicable to conduct, safety, security, and procedures governing site entry and exit.

9.7 Facilities may close due to local or national emergencies, administrative closings, or other Government directed facility closings. Contractor access to Government facilities during closures is not permitted.

9.8 Portable Electronic Devices (PEDs), including pagers, mobile/cellular, telephones (with/without cameras), personal digital assistants/job performance aids, laptops, notebook/handheld computers, digital imagery (still video) devices, analog/digital sound records(e.g. iPods), video game devices, USB devices and devices of similar capability, functionality or design. The Contractor and Contractor’s personnel shall strictly comply with PHNSY & IMF procedures and policies concerning the use and possession of PEDs while working in the Controlled Industrial Area (CIA).

10.0 PLACE OF PERFORMANCE

10.1 The place of performance is on-site at the Pearl Harbor Naval Shipyard, within the Controlled

Industrial Area (CIA).

11.0 HOURS OF OPERATION

11.1 Normal business hours of operation are 6:30 a.m. through 3:00 p.m. with a 30-minute lunch break, Monday through Friday, excluding Federal Holidays. Any work beyond normal business hours, the Contractor must request authorization from the POC before performing work.

11.2 Alternative working hours may be requested by the Government to complete contract work.

11.3 If the Federal holiday falls on a Saturday, the holiday is observed on the preceding Friday. If the Federal holiday falls on a Sunday, the holiday is observed on the following Monday.

12.0 ATTACHMENTS – APPENDICES

APPENDIX I Safety and Health Work Practices for Contractors Working With Pearl Harbor Naval

Shipyard and Intermediate Maintenance Facility (PHNSY & IMF) (Rev. July 2024)

APPENDIX II Environmental Protection Guidelines for Contractors on Facilities Projects at Pearl

Harbor Naval Shipyard & Intermediate Maintenance Facility (Rev. October 2019)

APPENDIX III Contractor Security Requirements for PHNSY&IMF’s Controlled Industrial Area, Security Islands, Controlled Nuclear Information Areas, Nuclear Work Areas, and/or

Other Sensitive Areas (Rev. FEB 2026)

File details come from the government source that posted it. Updated .