This is a Performance Work Statement (PWS) for Marine Barracks Washington (MBW) to lease a portable electric vehicle charging system. The contractor must provide a portable 100 kW generator and direct current (DC) EV charger with a minimum capacity of 60 kW that is compatible with MCI J4500E Charge buses. The equipment must meet minimal environmental requirements for operation on Department of Defense installations. All equipment must be fully delivered, installed, commissioned, and operational within 60 days after contract award.
The contractor's responsibilities include covering all logistical requirements including shipment, installation, on-site startup, and commissioning; providing basic operator training; and ensuring that maintenance technicians for routine and emergency maintenance have military base access at Joint Base Anacostia-Bolling (JBAB). The contractor is responsible for all travel and per diem expenses. The delivery address is Joint Base Anacostia-Bolling, 2874 Defense Blvd, Building 400A, Washington, DC 20373. The Government Technical Point of Contact is Captain Tobechukwu Okafor, MBW Motor Transportation Officer, who can be reached at (503) 867-1412 or tobechukwu.okafor@usmc.mil. The PWS includes an attachment with the MCI J4500 Charge brochure for reference.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.1 MBW Salient Characteristics EV Charger.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fiscal Year 2024_Ver.1
Performance Work Statement (PWS) / Statement of Work (SOW) Marine Barracks Washington (MBW) Electric Vehicle (EV) Charger
1. Background The mission of the Motor Transportation Platon at MBW is to plan, coordinate and provide transportation for all high visibility events for the unit to include but not limited to, Evening Parades, Sunset Parades, Funerals and White House events.
2. Scope Many of the events that are supported by the Motor Transportation Platoon require a large quantity of vehicles due to the volume of personnel involved, mainly the Sunset Parades, hosted every Tuesday during the summer months. MBW has 3 MCI J4500E Charge EV buses that can assist with this requirement however due to insufficient infrastructure they have aided in a limited capacity. Utilization of these EV buses has been limited due to the unreliability and ineffectiveness of their designated charger. Leasing of a reliable and efficient mobile Direct Current (DC) EV charger would ensure buses are charged to full capacity in a timely manner and would allow for rapid charging at any location. With a new and improved charging source these EV buses could be used more frequently reducing the burden placed on older buses.
3. Performance Requirements
3.1. Tasks: The Contractor shall…
3.1.1. Provide portable 100 kW generator and direct current electric vehicle charger with minimum
60 kW that fits MCI J4500E Charge bus.
3.1.2. Provide a charger and generator that meets the minimal environmental requirements to be operated on DOD installations.
3.1.3. Cover all logistical requirements to include shipment of equipment, installation, on site start-up and commissioning.
3.1.4. Provide basic operator training.
3.1.5. Maintenance technicians for routine and emergency maintenance must have military base access.
4. Applicable Information and/or Documents
4.1. Government Technical Point of Contact (TPOC): TPOC contact information to be provided to the Contractor at time of award.
Captain Tobechukwu Okafor MBW Motor Transportation Officer (503)- 867-1412 tobechukwu.okafor@usmc.mil
4.2. Period of Performance: All equipment to be fully delivered in accordance with the PWS no later than 60 days after date of contract.
Option Period Period of Performance
4.3. Place of Performance:
Joint Base Anacostia-Bolling (JBAB) 2874 Defense Blvd, Bldg 400A Washington, DC 20373
4.4. List of Deliverables:
Deliverable Name Description Frequency or
Required Date Method of Delivery
Electric Vehicle Charger
Portable 100 kW generator and direct current EV Charger at minimum 60 kW with connectors that fit MCI J4500E Charge bus.
N/A Ship
☐ Not applicable
4.5. Delivery Address:
Joint Base Anacostia-Bolling (JBAB) 2874 Defense Blvd, Bldg 400A Washington, DC 20373
☐ Not applicable
4.6. Hours of Operation:
☒ Not applicable
4.7. Contractor Personnel / Qualifications:
4.8. Travel: The Contractor is responsible for all travel/per diem related expenses required to perform this contract.
4.9. Security Requirements:
4.10. Government Facility Access: Joint Base Anacostia-Bolling (JBAB) contracted routine and emergency maintenance technicians will need to obtain access to the base in order to perform duties.
4.11. Specifications: 100 kW generator and direct charge 60 kW EV charger.
4.12. List of Attachments:
Attachment 1: MCI J4500 Charge Brochure
(End)