This Performance Work Statement (PWS) outlines a contract for lease/rental of shower mobile station services at Fort Irwin & the National Training Center. The government requires the contractor to deliver three shower trailers, three generators, and three 5,000-gallon gray water tanks to YERMO for two performance periods: 14 SEP 25 – 02 OCT 25 and 17 OCT 25 – 04 NOV 25. Each shower trailer must have 16 shower stalls, heated water, air conditioning, and be able to withstand desert terrain wind gusts up to 70 mph. The contractor is responsible for daily cleaning, disinfecting shower surfaces, emptying gray water tanks, refilling fresh water tanks, and ensuring all equipment is 100% functional according to the operator's manual upon delivery.
The contract is a Fixed-Firm-Price type with specific requirements for equipment condition, regulatory compliance, and operational readiness. Contractors must provide a Quality Control Program, submit various documentation within five days of award, and comply with security requirements including AT Level I training and background checks. The government reserves the right to vary quantities by +/- 30% and adjust performance periods based on mission requirements. Emergency services must be available 24/7, with the contractor required to respond to maintenance calls within 4 hours and correct deficiencies within 6 hours of notification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Shower Trailers Q and A.docx | DOCX document | |
| Solicitation Amendment W911SG25QA0570001 SF 30.pdf | ||
| Solicitation Amendment - W911SG25QA0570001.pdf | ||
| Solicitation - W911SG25QA057.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
Lease/Rental for Shower Station Services
JULY 22 2025
1. General. This is a non-personal services contract to provide lease/rental of shower mobile station services with maintenance and cleaning services, primary location shall be Fort Irwin & the National Training Center as prescribed per Coordination. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1. Description of Services/Introduction. The Contractor shall deliver the type and quantity of three (3) shower trailers, three (3) generators for shower trailers, and three
(3) 5,000 gallon gray water tanks for shower trailers to YERMO. All additional components of the trailer must be operational in accordance with the trailer-manual. The Government reserves the right to extend or curtail the lease/rental for the shower trailers and the Contracting Officer Representative (COR) will notify the Contractor within 24 hours if such a requirement is needed.
1.2. Background. Fort Irwin & the National Training Center is a world class training center for America's Military, known for its excellent desert training, vast recreational opportunities, and history. The mission of the NTC is to provide tough, realistic, joint and combined arms training in multi-national venues across the full spectrum of conflict set in a contemporary operating environment to assist Commanders in developing trained, competent leaders and Soldiers by presenting them with current problem sets to improve the force and prepare for success in the Global War on Terrorism and future joint battlefields.
1.3. Scope. The Contractor shall ensure shower trailers are delivered with all necessary original equipment parts IAW the operator’s manual and this PWS. All parts must be fully functional IAW the operator’s manual. The Government reserves the right to vary quantities by +/- 30% due to operational requirements and to make multiple awards to meet said requirements. All shower trailers are to be delivered to designated locations inside training areas. The COR will provide the contractor each location.
Locations for shower trailers and gray water tanks include:
YERMO
Grid: NU 112 618
14 SEP 25 – 02 OCT 25 Shower Trailer x3 trailers with generators and 5,000 gray water tanks
17 OCT 25 – 04 NOV 25 Shower Trailer x3 trailers with generators and 5,000 gray water tanks
Total Shower Trailers Required
Shower Trailers
3 Each Timeframe
1.4. Period of Performances. The period of performance will be from 14 SEP 25 – 02 OCT 25 and 17 OCT 25 – 04 NOV 25 (YERMO). The Government also reserves the right to increase or decrease the Period of Performance (POP) dates due to mission requirements. In the event changes occur, the Contracting Officer (KO) will notify the Contractor within 24 hours to make adjustments accordingly. The Government will not be charged for decreasing quantities or POPs due to mission changes. Any changes will be prorated at the calculated daily amount to adjust for increasing or decreasing requirements.
1.5 On Post Access
1.6. General Information.
1.6.1. Quality Control. The contractor shall maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract.
1.6.2. Quality Assurance. The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. Each location will contain a COR (Contracting Officer Representative) who will evaluate and inspect the quality of each item under their direct control.
1.6.3. Recognized Federal Holidays. The contractor shall be required to perform services on holidays.
New Year's Day 1 January Martin Luther King Jr. Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
1.6.4. Hours of Operation. The contractor is responsible for conducting business, 24 hours and 7 days a week for emergency situations. Contractor shall be available to respond to work order calls within 4 hours of initial contact. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.5. Place of Performance. The work to be performed under this contract will be performed at Ft. Irwin, CA and the National Training Center (NTC) and surrounding training locations that are within the NTC location. Grid: NU 112 618.
1.6.6. Type of Contract. The government will award a Fixed-Firm-Price contract.
1.6.7. Security Requirements: Contractor personnel performing work under this contract will need to have access to the National Training Center at the time of delivery/services.
1.6.7.1. AT Level I training. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete Level I AT Awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 5 calendar days after completion of training by all employees and subcontractor personnel. Training will be conducted annually thereafter, if applicable. AT Level I awareness training is available at the following website: http://jko.jten.mil.
1.6.7.2. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center http://jko.jten.mil/
Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.6.7.3. Per AR 530-1 Operations Security, contract employees must complete the initial OPSEC Level I Awareness training and annually thereafter. OPSEC training is available at: https://securityawareness.usalearning.gov/opsec/index.htm
1.6.7.4. Physical Security. The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use.
1.6.7.5. Contractor and all associated sub-contractor's employees shall provide all information required for background checks to meet the installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.6.8. Key Control. N/A
1.6.9. Post Award Conference/Periodic Progress Meetings. The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5.
The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will appraise the contractor of how the government views the contractor's performance and the contractor will appraise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. Minutes shall be taken by the contractor these meetings shall be at no additional cost to the government.
1.6.10. Contracting Officer Representative (COR). The (COR) will be identified by a separate memorandum. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance:
maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor https://securityawareness.usalearning.gov/opsec/index.htm personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.11. Key Personnel. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available 24 hour a day and 7 days a week.
1.6.12. Identification of Contractor Employees. All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
1.6.13. Contractor Travel: Contractor will be required to travel throughout Fort Irwin, CA during the performance of this contract to load and unload equipment. The contractor is not required to travel to off-site locations.
1.6.14. Other Direct Costs: N/A
1.6.15. Data Rights: N/A
1.6.16. Organizational Conflict of Interest. Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.17. PHASE IN /PHASE OUT PERIOD. N/A
PART 2
DEFINITIONS & ACRONYMS
2. Definitions and Acronyms.
2.1. Definitions.
2.1.1. Contractor. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. Contracting Officer. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. Contracting Officer Representative (COR). An employee of the U.S.
Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations.
This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. Defective System. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. Deliverable. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6. Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. Physical Security. Actions that prevent the loss or damage of Government property.
2.1.8. Quality Assurance. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9. Quality Assurance Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10. Quality Control. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11. Subcontractor. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12. Work Day. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.12. Work Week. Monday through Friday, unless specified otherwise.
2.2. Acronyms.
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. Government Furnished Items and Services.
3.1. Services: N/A
3.2. Facilities: The Government will not provide any facilities to the contractor.
3.3. Utilities: The Government will provide Ultra Low Sulfur Diesel (ULSD) for the generators.
3.4. Equipment N/A
3.5. Materials N/A
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1. Contractor Furnished Items. Everything included in this paragraph and its subparagraphs is basic to the contract and should be included in the overhead of the Contractor.
4.1.1. The Contractor shall provide all labor, supervision, transportation, vehicles, supplies, equipment, materials, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2. Materials. 5,000 gallon Gray water disposal tanks.
4.3. Equipment. The Contractor shall provide all equipment necessary to meet the performance of this contract.
4.4. Responsibilities of the Contractor.
4.4.1. The Contractor shall provide a safe working environment for key consultants and all persons in his/her employ as prescribed by 29 CFR 1910 “Occupational Health and
Safety”. The Contractor shall be responsible for all damages to persons and property that occur in connection with the work and service under this contract, without recourse again the government.
4.4.2. Contractor shall exercise extreme caution to protect building finishes, private property military property, etc., from damage during the performance of these contract requirements. Contractor shall be responsible for all loss or damage or whatever kind and nature to all government property, while in the performance of these contract requirements, which results in whole or in part from the negligence or missions of contractor, any of his subcontractors or any employee, agent or any representative of the contractor or subcontractor(s).
4.4.3. The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, 50 State, and municipal laws, codes, and regulations applicable to the performance of the work.
PART 5
SPECIFIC TASKS
5. Specific Tasks.
5.1. Equipment. The Contractor shall ensure equipment is delivered with all necessary original equipment parts IAW the operator’s manual and have a full tank of diesel fuel, if required. The equipment shall be 100% fully functional IAW the operator’s manual upon delivery.
5.2. Shower Trailers w/ Generator & Lights and 5,000 gallon Gray water tank Requirement: The equipment shall be able to operate in the high desert terrain of Ft.
Irwin and be able to withstand wind gusts up to 70mph in locations throughout the training area. Each piece of equipment shall have a minimum of one (1) 5lb fire extinguisher. The equipment shall operate on Ultra Low Sulfur Diesel (ULSD), as a fuel source. The Contractor shall label all equipment near the fuel tank with the invalidate contractor claims regarding use of incorrect fuel. Shower trailers will consist of 16 shower stalls, with 16 shower heads, a freshwater tank for storage, a 5,000 gallon gray water collection tank, on-demand heated water capacity, benches for service members to change clothing, air conditioning, and the generators to power the equipment efficiently. The shower stalls shall be free standing structures large enough for a single standing occupant. The shower trailer shall contain a portable water holding tank, lockable doors, and ventilation. The shower units shall be made of non-porous material and consist of a single shower head. The shower units shall be constructed in such a fashion that water flows through the shower head at a pressure to ensure adequate dispersion. This method must be mechanical (pump driven). Each shower stall shall be equipped with shower curtains or door to ensure privacy. The contractor shall clean and disinfect all shower surfaces daily. Gray water (dirty water) shall be emptied from the dirty water holding tank as necessary. Fresh water tank shall be filled daily. The contractor shall place showers at locations designated by the COR CPT Christopher Campbell 901-240-0405. The contractor shall correct ALL deficiencies within 6 hours of notification from the Contracting Officer or COR. The contractor is responsible for gray water disposal and freshwater refill.
5.2.1. The equipment shall be able to operate in the high desert terrain of Ft. Irwin and be able to withstand wind gusts up to 70mph in locations throughout the training area.
Each piece of equipment shall have a minimum of one (1) 5lb fire extinguisher. The equipment shall operate on Ultra Low Sulfur Diesel (ULSD), as a fuel source. The Contractor shall label all equipment near the fuel tank with the wording “Diesel Fuel Only”. Failure to label accordingly will invalidate contractor claims regarding use of incorrect fuel.
5.2.2. Regulatory Markings. Each piece of equipment shall have stenciled on the side an Air Resources Board (ARB) number. The vendor shall produce a certificate bearing the ARB number. No diesel-powered equipment is allowed on post without a decal from the State of California Air Resources Board.
5.2.3. Equipment Condition. Each item of equipment or property furnished under this contract shall be in safe operational condition and shall comply with the Federal Safety Standards, the American National Standards and State Safety Regulations applicable to this equipment or property. The shower trailers shall also have its’ service logs and calibration test to indicate it has passed inspection for load testing. If the Contracting Officer or their representative determines that any item of equipment or property furnished is not suitable for performance under this contract, the Contracting Officer shall promptly inform the contractor in writing.
5.3. Quantity. The Government reserves the right to vary quantities by +/- 30% due to operational requirements and to make multiple awards to meet said requirements. The Government also reserves the right to increase or decrease the POP dates due to mission requirements. In the event changes occur, the Contracting Officer (KO) will notify the Contractor within 24 hours to make adjustments accordingly. The Government shall not be charged for decreasing quantities or POPs due to mission changes. Any changes shall be prorated at the calculated daily amount to adjust for increasing or decreasing requirements.
5.4. Familiarization Training. The contractor shall provide familiarization training on the delivered equipment. Soldiers to be trained will be licensed operators of similar equipment, but not necessarily the same equipment.
5.5. Delivery Instructions. All equipment shall be delivered to the specified Ft. Irwin locations no later than 1000PST on the first day of the POP. Delivery of equipment must be coordinated with the COR prior to delivery to confirm delivery times and location. The
Contractor shall allow adequate time for a joint visual inspection. All set up must be complete and equipment ready for use at time of delivery.
NOTE: Increased installation security may delay Contractors’ delivery time. It is the Contractors’ responsibility to plan and prepare prior to the beginning of the POP to gain access to the post.
5.6. Pre-Inspection Requirements. The Contractor shall coordinate with the COR to assure all delivery confirmations prior to arrival. At time of delivery, the Contractor shall complete a joint pre-inspection with the COR verifying that items delivered are in the correct location and are operational in accordance with the contract requirements.
Contractor must be present until these joint inspections are complete.
5.7. Post-Inspections Requirements. The Contractor shall complete a joint post-inspection with the COR verifying that items have been returned in as-delivered condition with only normal wear and tear. The Government will not be responsible for returning the equipment with full fuel tanks or paying to refuel the equipment at the end of the POP.
5.8. POP or Quantity Change Inspections. In the event that the Contractor is not available for a joint inspection within 24 hours of being notified of a decrease change to the POP, the Government will conduct its inspection unilaterally and submit the inspection to the contractor as evidence that the Government’s POP is complete. The contractor shall adjust the invoice in accordance with the adjusted POP.
5.9. Inspection Sheets. All pre and post-inspection/acceptance sheets must be provided to the KO and COR after joint completion by the COR and Contractor. Inspection sheets must be signed and dated. Both parties’ names must be printed legibly and signed. Pre & Post-Inspection Sheets shall be hard copies only and not by Portable Electronic Device or Portable Hand Held Device. The COR is not authorized to sign any electronic device that the vendor uses.
5.10. Emergency Services. The Contractor shall be available by phone to provide 24 hour emergency repair and/or replacement services for the leased equipment, including all weekends and holidays, at the Contractor’s expense. The Contractor shall provide emergency services upon notification from the KO and have repaired or replaced the equipment within six (6) hours. All repairs, replacement, delivery and pick-up costs not due to Government negligence shall be at no additional cost to the Government.
Repairs shall be on-site at the equipment’s location.
5.11. Removal of Equipment. The Contractor shall coordinate with the COR for removal of equipment at the end of the POP. The Government will not be responsible for returning the equipment with full fuel tanks or paying to refuel the equipment at the end of the POP. The Contractor shall remove all contracted/leased equipment from the installation within 48 hours after the POP. Should equipment remain in place beyond 48 hours, the Government is not liable for usage, theft, loss, damage or replacement costs due to the Contractor's negligence to take possession of owned items. If for any reason the Contractor is unable to pick-up equipment, notify the KO in writing 24 hours prior to scheduled pick-up date. The government is not required to refuel generators prior to pick up.
5.12. Contractor’s Representatives or Supervisors. Contractor shall have a company representative on call to respond to maintenance requests with full telephone coverage and authority to make decisions on behalf of the company on a 24 hour basis. The time for a required maintenance call starts when the Government calls the company representative. The Contractor shall have functioning voicemail. Lack of receiving capabilities by the Contractor does not relieve the Contractor of liability for the required service call timeframe to repair or replace equipment.
5.13 Foreign Objects: During rotations, there are occasional incidences of foreign objects being left in the tents. The contractor shall inspect tents to ensure that cans, bottles, rags, cloth or any foreign objects are not in the tents upon retrieval. The contractor shall provide documentation with photos to the KO and COR of the tents that foreign objects were found in. CAUTION: If any type of ordnance is discovered, the contractor shall stop work immediately and notify the emergency ordinance disposal squad at 760-380-4092 and or Range Operations at 760-380-3878. (24 hours a day.)
5.14. The Contractor agrees to comply with federal, state, and local public health regulations and also will comply with DoD and Army Public Health Regulations and guidance.
PART 6
APPLICABLE PUBLICATIONS AND FORMS
6.0. CONTRACTOR MANAGEMENT REPORTING (CMR). The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including subcontractor manpower) required for performance of this contract. The Contractor shall completely fill in all the information in the format using the following web address https://Contractormanpower.army.pentagon.mil. The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative (COTR) or also known as the Contracting Officer’s Representative (COR); (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data; (5) Estimated direct labor hours (including sub-Contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-Contractors); (7) Total payments (including sub-
Contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information); (11) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year.
Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a Contractor’s system to the secure website without the need for separate data entries for each required data element at the website. The specific formats for the XML direct transfer may be downloaded from the website.
6.1 APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
6.1.1 The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
PART 7
ATTACHMENT/TECHNICAL EXHIBIT LISTING
7. Attachment/Technical Exhibit List:
7.1. Technical Exhibit 1 – Performance Requirements Summary
7.2. Technical Exhibit 2 – Deliverables Schedule
7.3 Technical Exhibit 3 – Estimated Workload Data
7.4 Technical Exhibit 4 – Equipment Decal Examples
TECHNICAL EXHIBIT 1
Performance Requirements Summary
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective
(The Service required— usually a shall statement)
Standard Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)
Incentive/Disincen tive
PRS # 1.
The Contractor shall ensure equipment is delivered with all necessary original equipment parts IAW the operator’s manual and have a full tank of diesel fuel, if require PWS. 5.1
The equipment shall be 100% fully functional IAW the operator’s manual upon delivery.
100% First failure will result in the issuance of a Contractor Deficiency Report (CDR) Continuance of not meeting performance standard (2 or more) a corrective action plan will be developed at the discretion of the KO
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
DELIVERABLE FREQUENCY
# OF COPIES
MEDIUM/
FORMAT SUBMIT TO
Shower Trailers w/ lights, gen and 5,000 gallon gray water tanks
One time delivery.
3 Shower Trailers
Truck Delivery
COR
FORMAT SUBMIT TO
250 gallon Gray water tanks
One time delivery.
2 Gray water tanks
Truck delivery COR
Contractor Quality Control Program
(QCP). PWS
Para, 1.6.1.
Due Five (5) days after award of contract
One (1) original copy.
The QCP shall be submitted by digital format.
KO and identified COR.
Point of Contact (POC).
PWS Para, 1.6.11.
Due Five (5) days after award of contract
One (1) original copy.
POC shall be submitted by digital format.
KO and identified COR.
Vehicles/Equip ment: A list of all vehicles that will be utilized in the training area for the service of latrines and hand wash stations. PWS Para, 4.4.3 and 4.4.7.
To be submitted at time of proposal one (1) original digital copy, one (1) redacted digital copy, one original (1) hard copy and three
(3) redacted hard copies.
The vehicle and equipment list shall be submitted by paper (hard copy) and by digital format.
Submitted to KO at time of proposal.
Safety Plan.
PWS Para, 5.10.2.
Due Five (5) days after award
One (1) original copy.
Safety Plan shall be submitted by digital format.
KO and identified COR.
Use of Chemicals Para, 5.10.4.
Due Five (5) days after award
One (1) original copy.
Use of Chemicals shall be submitted by digital format.
KO and identified COR
FORMAT SUBMIT TO
Identification of Employee PWS Para, 5.10.6
Due Five (5) days after award.
One (1) original copy.
The employee list shall be submitted by digital format.
KO and identified COR.
Service Schedule
250 gal Gray water Tanks Empty daily 5000 gal Gray water tanks Empty every other day Shower Trailer Service and clean everyday
TECHNICAL EXHIBIT 3
ESTIMATED WORKLOAD DATA
ITEM
NAME
ESTIMATED QUANTITY
1 Shower Trailer 12 Hours per evening
TECHNICAL EXHIBIT 4
| TECHNICAL EXHIBIT 1 |
| Standard |
| TECHNICAL EXHIBIT 2 |
| TECHNICAL EXHIBIT 3 |
| ITEM |
| TECHNICAL EXHIBIT 4 |
File details come from the government source that posted it. Updated .