Performance Work Statement.pdf
PDF 299 KB Posted
- Solicitation number
- FA8119-24-R-0001_Solicitation
About this file
This performance work statement outlines requirements for the remanufacture of Air Launched Cruise Missile air cycle machines. The contractor shall inspect, repair, and return the units to a like-new serviceable condition. Work includes teardown, bearing remanufacture, reassembly, testing, and delivery of the machines to a government facility by the specified schedule. The contractor must establish quality control and reporting programs, manage parts and address obsolescence issues. The contractor shall also handle special tooling and equipment needs, precious metals recovery, and engineering support requests. The performance work statement provides detailed requirements for configuration management, counterfeit parts prevention, supply chain risk management, and other technical and administrative aspects of the remanufacturing work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA811924R0001_______0001.pdf | ||
| DI-SESS-80639E.pdf | ||
| FA8119-24-R-0001.pdf | ||
| DI-MISC-81832.pdf | ||
| DI-PSSS-81995A.pdf | ||
| DI-MGMT-81838.pdf | ||
| DI-MGMT-80441D.pdf | ||
| DI-MGMT-80368A.pdf | ||
| DI-NDTI-80809B.pdf | ||
| AFMC 158_Packaging_Requirements.pdf | ||
| DI-MGMT-82256A.pdf | ||
| DI-MISC-80711A.pdf | ||
| DD 1653_Transportation_Data.pdf | ||
| DI-ADMN-81373.pdf | ||
| DI-QCIC-80798C.pdf | ||
| DI-ADMN-81249C.pdf | ||
| DI-PSSS-81656B.pdf | ||
| DI-ADMN-81250C.pdf | ||
| DI-MGMT-80501.pdf | ||
| Contract Data Requirements List (CDRLS).pdf | ||
| Wage Determination.pdf | ||
| Quality Assurance Surveillance Plan (QASP).pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX A
PERFORMANCE WORK STATEMENT
(PWS)
For
Remanufacture of Air Launched Cruise Missile (ALCM) Air
Cycle Machine (ACM)
Input NSN: 1420‐01‐098‐7555MW
Output NSN: 1420‐01‐576‐5265MW
FD2030‐23‐00472
PREPARATION DATE: 7 NOV 2022
APPENDIX A
PREPARING ORGANIZATION: AFSC/448 SCMW/848 SCMG/424 SCMS TINKER AFB OK 73145
Table of Contents
1. DESCRIPTION OF SERVICES/GENERAL INFORMATION
1.1. Purpose
1.2. General Information
1.3. Work Requirements
1.4. Reporting Requirements
1.5. Quality Program and Inspection System Requirements
1.6. Supply Chain Risk Management
1.7. Foreign Influence
1.8. Cybersecurity
1.9. Condemnation Candidates/End items beyond economical repair
1.10. Special Tools (ST) and Support Equipment
1.11. Precious Metals Recovery Program
1.12. Nuclear Hardness Requirement
1.13. Parts Control Program
1.14. Counterfit Prevention Plan
1.15. Engineering Support
1.16. Cannibalization of Parts (Module Swap)
1.17. Lead (Pb) Free Electronics
1.18. Ozone Depleting Substances (ODS)
1.19. Delivery Schedule
1.20. Customer Service Requirements
1.21. Safety and Health
1.22. Manpower Reporting Language for Contract Performance Work Statements
2. SERVICE SUMMARY
2.1. Service Summary
2.2. Service Table
3. GOVERNMENT PROPERTY
3.1. Government Property
3.2. Disposition of Government Property
3.3. Discrepancies Incident to Shipment
3.4. Other
ATTACHMENT A – END ITEMS
ATTACHMENT B ‐ DEFINITIONS…………………………………………………………………………………………………….24
ATTACHMENT C – APPLICABLE DOCUMENTS
1. DESCRIPTION OF SERVICES/GENERAL INFORMATION
1.1. Purpose
1.1.1. The purpose of the Performance Work Statement (PWS) is to define the requirements to remanufacture the Air Launched Cruise Missile (ALCM) Air Cycle Machine (ACM) specified in Attachment A of this PWS. The work encompasses the requirements to return the end items to a serviceable “like new” condition.
The contractor is responsible for having the remanufacture capabilities to include appropriate technical data, repair documents, and license agreements, required to accomplish this remanufacture. The Contractor is responsible for the scheduled delivery of a quality product.
1.2. General Information
1.2.1. Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.
1.3. Work Requirements
General Requirements:
Item Unique Identification (IUID) A system of establishing unique item identifiers (UII) within the DoD by assigning a machine‐readable character string or number to a discrete item, which serves to distinguish it from other like and unlike items. UIIs are stored in the IUID registry, along with pedigree data associated with item. The registry is maintained by the Defense Logistics Agency Logistics Information Service (DLIS) (see http://www.acq.osd.mil/dpap/pdi/uid/)
Over and Above Work “Over and above work” means work discovered during the course of performing this remanufacture effort that is—
(i) Within the general scope of the contract;
(ii) Not covered by the line item(s) for the basic work under the contract; and
(iii) Necessary in order to satisfactorily complete the contract.
Upon discovery of the need for Over and Above work, the Contractor shall prepare and furnish to the Procurement Contracting Officer (PCO) a work request in accordance with the agreed‐to procedure.
The Contractor and PCO shall mutually agree to procedures for Government administration and Contractor performance of Over and Above work requests. If the parties cannot agree upon the procedures, the Administrative Contracting Officer (ACO) has the unilateral right to direct the over and above work procedures to be followed.
These procedures shall, as a minimum, cover— format, content, and submission of work requests by the Contractor. Work requests shall contain data on the type of discrepancy disclosed, the specific location of the discrepancy, and the estimated labor hours and material required to correct the discrepancy. Data shall be sufficient to satisfy contract requirements and obtain the authorization of the PCO to perform the proposed work;
Government review, verification, and authorization of the work and proposal pricing, submission, negotiation, and definitization.
The Government will review the work request and provide a response to the contractor within 15 calendar days if the Over and Above work request is approved by the Government. Approved work requests will result in contract modifications to definitize all Over and Above work.
Failure to agree on the price of over and above work shall be a dispute within the meaning of the Disputes clause of this contract.
Data (CDRLs) Data provided through Contract Data Requirements List (CDRLs). See paragraph 1.4.1 for data listings.
Obsolescence Reports
The contractor shall report all diminishing manufacturing sources/material shortages and obsolescence issues to the Government.
‐ DID: DI‐PSSS‐81656B
‐ DID: DI‐MGMT‐80368A
Obsolescence Resolving The contractor shall provide a detailed report to the Government on how the contractor plans to resolve shortages and obsolescence issues. Contractor must provide itemized quote and receive approval from the PCO, after Government evaluation is complete, before moving forward.
‐ DID: DI‐MISC‐80711A
‐ DID: DI‐MGMT‐80368A
‐ DID: DI‐SESS‐80639E
As part of the process, the Contractor shall, on a continuing basis, monitor and analyze the Bill of Material (BOM), engineering data, suppliers and other resources to ensure component parts are available, to prevent costly redesigns. The goal being prevention, as opposed to reaction to obsolescence. Piece part monitoring is a continual process of analysis and it is important that preventative actions are taken in a timely manner.
When current obsolescence is discovered or future obsolescence is anticipated, the contractor shall consider the following:
1. Life of time buys, when vendors no longer support their product line.
2. Substitutions, when components are no longer procurable and a substitute item is available.
3. Development of new sources, when original sources no longer support the product.
4. Use of parts brokers, which shall be in accordance with the Counterfeit Prevention
Plan (CPP).
5. Other technical solutions, such as device emulation.
6. Component redesign, when all else fails.
All parts replacement shall be in accordance with the parts control program (paragraph 1.13) of this PWS. If additional funding is required, the contractor shall make that request through the ACO and PCO and Logistics Management Specialist (LMS). Being the sole supplier, the contractor shall consider life of weapon system needs and shall work with the Government in anticipation of future requirements.
Repair and Calibration of Special Test Equipment (STE) The contractor shall provide all routine and preventative maintenance, repair, and necessary calibration of all STE as a part of the funded effort included in this PWS. The contractor must provide a quote and receive approval from PCO before moving forward with unscheduled/uncommon/non‐routine maintenance, repairs, and calibration.
‐ DID: DI‐QCIC‐80798C
Specific Work Requirements:
1.3.1. The Contractor shall perform the remanufacture of the items specified in
Attachment A of this PWS. The work encompasses the following:
Teardown and inspection of the ACM IAW Tech Order 15M1‐7‐3, Electronic Equipment Cooling Unit, DEU‐19/A (Sections 1‐5.7).
Remanufacture the bearings IAW Pacific Aviation Services (PAS) Technical Specification PAS‐INSBRG‐REFB‐1, except:
That the Bearing Lubricant shall be MIL‐PRF‐81322 in lieu of MIL‐L‐6085; IAW TO 15M1‐7‐3; Table 2‐2 and Hamilton Sunstrand drawing 769209.
Note that the Drawing Note 6 on 769209 should read “15% OF INTERNAL
FREE VOLUME TO BE FILLED WITH MOBIL 28 GREASE PER MIL‐PRF‐81322”.
Complete remanufacture and assemble ACM. Perform leakage test of each ACM IAW TO 15M1‐7‐3., Electronic Equipment Cooling Unit, DEU‐19/A (Sections 5.8 – 7.3) and PAS EECU Repair and Overhaul Qualifications Report. Once assets have been tested, the contractor shall provide a Test and Inspection report to the Government. – DID: DI‐NDTI‐80809B/T
Remove existing nameplate and replace with new nameplate specified by the 424 SCMS Cognizant Engineer.
Ship the serviceable ACMs to the destination specified on each delivery order in “B” (bravo) condition. The End Items will go through final inspection by the Government at destination. Once all testing is successfully completed at the Government facility, the End Items “Inspection” will be approved and the units “Accepted”.
The PCO will coordinate with the LMS for review and approval prior to negotiation for remanufacture. The work shall be accomplished IAW the Contractor’s latest remanufacture instructions and the instructions provided above. In the event that a situation develops where the instructions conflict with the pertinent manual, this PWS shall take precedence. Return unit to a serviceable “like new” condition.
1.3.2. The Contractor shall replace any component parts that do not meet specified inspection requirements, or if there is any doubt as to its serviceability or longevity at the Contractor’s expense. This includes any part requiring replacement due to catastrophic failure, fatigue failure, or normal deterioration.
The Contractor is advised to include the cost of replacing a percentage of each recoverable part in their repair cost proposal.
1.3.2.1. If the Contractor is not a Government Engineer approved source of repair for a recoverable part, this part shall be replaced with a new part per paragraph 1.13 or repaired by a Government Engineer approved source. The Contractor may propose their repair procedure along with substantiating documents for evaluation and possible approval for repair of the recoverable part. The Contractor shall submit the request for evaluation to the the PCO, who will forward to the cognizant engineer, for approval. The Government will not be responsible for any costs associated with development of any repair procedures unless it has been, reviewed, negotiated and approved by the PCO.
1.3.2.2. The Contractor is authorized, at their own discretion, to skip the skim measurement and replacement steps in Sections 6.3 (Compressor Rotor), 6.4 (Turbine Rotor), and 6.8 (Turbine Outlet) out of Tech Order 15M1‐7‐3. This means that the following find numbers in Figure 8‐1 may be reused during the remanufactured air cycle machine reassembly:
a. FN7 (P/N 732081 and variants)
b. FN26 (P/N 732025 and variants)
Note, by reusing these parts, the contractor assumes the risk that these parts are not the correct size or otherwise insufficient; hence there will be increased risk that an air cycle machine will fail its Government acceptance checks. The resposibility and cost in reworking the deficient end item still lies with the Contactor.
1.3.2.3. Identification of missing and/or externally damaged
components must be revealed within five (5) business days after the asset is removed from the shipping container and reported to the PCO through the ACO in the form of a Discrepancy Report. Failure of the Contractor to identify missing and/or externally damaged components within five (5) business days may result in failure of the missing/damaged components to be covered under over and above.
1.3.3. End Item Identification and Marking:
1.3.3.1. Permanently and legibly mark each repaired end item with the
Contractor's identification. This identification shall include the Contractor's CAGE and the date of repair. The identification shall be permanently affixed to the end item by stamp, stencil, or similar means.
1.3.3.2. Item Unique Identification (IUID) will be added to the end item in accordance with the following:
a. Specification requirements for IUID marking will be contained in the Technical Order (TO) 00‐25‐260, approved engineering drawing, or a Government provided Engineering Order (EO) (AF Forms 3925, 3926 and 3927) as applicable.
b. IUID markings are required for the end‐item only. IUID for subcomponents is only required if specifically identified in the TO 00‐25‐260, approved engineering drawing, or a Government provided EO.
c. For items that do not have IUID marking specifications as stated in paragraph b., the Contractor shall develop the marking specifications in accordance with the current revision of MIL‐STD‐130. Location and marking method shall be determined by the contractor.
d. IUID markings currently in place on items undergoing repair shall be protected from damage or removal during repair. Verify 2‐D matrix IUID markings are readable per TO 00‐25‐260. Should IUID marking be rendered unreadable during repair, the Contractor shall replace the IUID mark.
e. The Contractor shall submit the required and applicable contingent data for Legacy items to the IUID Registry per the data submission procedures at https://dodprocurementtoolbox.com/site‐ pages/overview‐data‐submission.
f. The Contractor shall submit IUID data for new manufactured items that require IUID based on the DFARS clause 252.211‐7003, Item Unique Identification and Valuation, as prescribed in DFARS Subpart 211.274‐6
1.3.4. Quality Acceptance and Processing:
1.3.4.1. The Contractor shall support quality acceptance inspections of each end item IAW DCMA’s latest approved procedure. Quality acceptance will be performed by DCMA at the repair site. Quality acceptance documentation for each end‐item shall be maintained by the Contractor as part of the item document package.
1.3.4.2. Each end item identified as serviceable shall be delivered to the
Government defect free.
1.3.4.3. Following quality acceptance by DCMA, the Contractor shall enter the appropriate data into the CAVAF reporting system reporting and attach the required documentation to each end item. The contract will provide ship‐to addresses/instructions to the Contractor for each item produced. Within one business day of shipment, the Contractor shall provide proof of shipment through delivery of an accepted WAWF Receiving Report. The Receiving Report shall include the carrier, tracking number, and other end item applicable information. (DID: DI‐MGMT‐81838)
1.3.5. Shipping Documentation:
1.3.5.1. The Contractor shall insure that the appropriate tag is attached to each serviceable end‐item generated.
a. Tested OK (Serviceable) tag is DD Form 1574/1574‐1 (or contractor equivalent) (Yellow).
b. Unserviceable (repairable) tag is DD Form 1577‐2/1577‐3 (or contractor equivalent) (Green).
c. Unserviceable (condemned) tag is DD Form 1577/1577‐1 (or contractor equivalent) (Red).
d. Suspended tags/ labels are DD 1575/1575‐1 (Brown)
1.3.5.2. Shipments under this contract shall be by Commercial Bill of
Lading (CBL) by routine shipping. The Contractor has the discretion to use carriers such as UPS, FedEx, or equivalent.
1.3.6. Mission Essential Contractor Services:
1.3.6.1. The contractor shall prepare for the continuation of essential contractor services during crisis IAW DFARS 252.237‐7023. The contractor shall establish and provide a written plan to ensure continued support during a crisis IAW DFARS 252.237‐7023.
1.4. Reporting Requirements
1.4.1. Data requirements are specified below and in the Contract Data Requirements List (CDRL DD Form 1423) found in Part 1, Section B, The Schedule of the Basic contract.
1.4.2. The contractor is required to comply with all CAVAF requirements identified in the CDRLS and attachments to the contract. Additionally, upon completion of repair, the contractor is required to print the DD1348‐1 (in triplicate) from CAVAF.
Description CDRL Paragraph Reference
DID Delivery Schedule
Program Status Reports A002 1.3., 1.13.4.;
1.13.5.;
1.15.1;
1.16.1.
DI‐MGMT‐80368A As Required
Bill of Materials (BOM) A003 1.3.; 1.13.4. DI‐PSSS‐81656B As Required
Scientific & Technical Report DMSMS Plan
A004 1.3.; 1.13.4. DI‐MISC‐80711A As required
Engineering Change Proposal
A005 1.3.; 1.13.2.;
1.15.1.
DI‐SESS‐80639E As Required
Calibration Certification Report
A006 1.3.; 1.10.7. DI‐QCIC‐80798C As Required
Test/Inspection Report A007 1.3.1 DI‐NDTI‐80809B As Required
CAVAF Report A008 1.3.; 1.3.4.3.;
1.4.2.; 1.9.1.
DI‐MGMT‐81838 As Required
Government Property Annual Inventory Report
A009 DI‐MGMT‐80441D As Required
Contractor’s Corrective Action Plan
A010 1.4.4. DI‐MGMT‐80501 As Required
Meetings and Conferences
A011 A012 A013
1.4.5. DI‐ADMN‐81249C
DI‐ADMN‐81373
DI‐ADMN‐81250C
As Required
Counterfeit Prevention Plan
A014 1.14.1. DI‐MISC‐81832 As Required
CDM Production Report A015 DI‐PSSS‐81995A Monthly
Supply Chain Risk Management
A016 DI‐MGMT‐82256 Monthly
One copy is to be placed in the box with the returnable repair asset, one outside the box, and one copy will be electronically uploaded to the WAWF as part of the Receiving Report (DD250). (DID: DI‐MGMT‐81838)
1.4.3. In addition, the Contractor shall maintain a document package, in the Contractor’s format, containing the following documentation for each item produced for the contract period:
a. Quality Acceptance Documentation
b. Test Data Sheet
c. Quality Acceptance Review Documentation
d. Parts replaced listed by each serial numbered end item repaired
e. Engineering Change Proposals
f. Government Furnished Material Report
1.4.4. The Contractor shall develop and provide a corrective action plan with regard to breached or anticipated to be breached contractual requirements. (DID: DI‐
MGMT‐80501).
1.4.5. Meetings and Conferences The Contractor shall support meetings (e.g., teleconferences, Program Management Reviews (PMR), Technical Interchange Meetings (TIM), etc.) with the Government. The Contractor shall provide meeting facilities. (DID(s): DI‐ADMN‐81249C, DI‐ADMN‐81373 and DI‐ADMN‐ 81250C.
1.5. Quality Program and Inspection System Requirements
1.5.1. The Contractor shall establish, document and maintain a quality system as a means of ensuring that the end item conforms to specified requirements. The quality system shall be in accordance with the contract requirements.
1.5.2. When a Deficiency Report (PQDR) is received for an end item repaired under the terms of this contract, the Contractor shall comply with the ACO directions.
Guidance is provided in TO 00‐35D‐54, USAF Deficiency Reporting, Investigation, and Resolution.
1.5.3. The Contractor shall support quality audits as required by the ACO. These audits could require that one or more end items be removed from the production line and subjected to any combination of inspection, testing, disassembly, or assembly, to determine that the standards of performance and technical conformance meet the requirements of this PWS. The Contractor shall be required to correct a deficient process to eliminate the cause(s) of any defects as directed by the ACO before production of the next end item.
1.5.4. The Contractor shall allow quality assurance reviews to be conducted at the site of repair at the request of the Defense Contract Management Agency (DCMA) throughout the contract period.
1.5.5. The Contractor shall allow a quality acceptance review by the DCMA representative at the site of repair for each end item generated under the terms of this contract.
1.5.6. The Contractor shall submit requests for deviation / waiver to the PCO through the ACO. Work shall not be initiated on assemblies / components affected by deviation / waiver pending approval / disapproval. Requests shall include the contract number, NSN, P/N, and Serial number of end item and lowest part / assembly affected, effect on cost / price and delivery schedule, description of deviation / waiver, justification for deviation / waiver, and proposed corrective action taken.
1.6. SUPPLY CHAIN RISK MANAGEMENT
1.6.1 The contractor shall identify, assess, plan for, and mitigate actual or potential threats, vulnerabilities, and disruptions to the Air Force's supply chain throughout the lifecycle to ensure mission effectiveness. The contractor shall inform and include the Government in any mitigations or alterations to the program.
1.6.2 The SCRM plan shall address the broad spectrum of supply chain risks that have the potential to: jeopardize the integrity of products, services, people, and technologies; compromise intellectual property; disrupt the flow of product, materiel, information, and finances needed for continued Air Force operations;
and drive materiel cost increases to the program.
1.6.3 The contractor shall develop and execute processes for identifying supply chain risks as early as possible; the persistent and comprehensive tracking, monitoring, and re‐evaluation of supply chain risks and their corresponding mitigation actions; and communicating supply chain risks to affected stakeholders and the Government. The contractor shall notify in writing the identified actual and potential supply chain risks.
1.6.4 The contractor's SCRM program and processes shall apply to the prime and their suppliers, subcontractors, associated integrators, and vendors, spanning the entirety of the supply chain, from raw material stage to delivery of a finished product and/or service. As part of the overall SCRM approach, the Contractor shall establish, document and maintain documentation about subcontractors/vendors for all parts that will be used for Government contracts.
The contractor shall continuously monitor their sources of supply for unknown, unauthorized, non‐certified, or unqualified sources providing parts or services from any sub‐tier supplier within the contractor's supply chain. The contractor shall investigate and submit findings to include root causes, impacts and a corrective action.
1.7. FOREIGN INFLUENCE
1.7.1 The contractor shall disclose any Foreign Ownership, Control or Influence (FOCI) for the purpose of initial or continued facility clearance eligibility. A Standard Form 328 Certificate Pertaining to Foreign Interest shall be submitted to the Government cognizant security office specified in each DD254.
1.7.2 The contractor shall provide information regarding FOCI. If the contract requires access to classified information, DD254, Contract Security Classification Specification, shall be required. Contractor shall provide an update on its financial health and potential FOCI when a merger or acquisition occurs.
1.7.3 Foreign contractor participation is excluded at the prime and subcontractor level, unless authorized through a current approved National Interest Determination (NID). It is solely the responsibility of the contractor to obtain necessary certification from the U.S. Department of State and to comply with the federal laws and regulations. Question must be directed to the U. S. Department of State’s Directive of Defense Trade Controls.
1.7.4 Subcontract Management. The contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. Contractors may add subcontractors to their team only after notification to the PCO and Contracting Officer Representative (COR).
1.8. CYBERSECURITY
1.8.1. The contractor shall develop and implement a cybersecurity protection of supply chain information plan and provide a copy to the U. S. Government. The contractor shall conduct early and continuous monitoring throughout the contract to prevent or reduce impacts of cyber vulnerabilities where adversaries are able to exploit, steal, alter, manipulate, interrupt, or destroy system functionality, information, or technology.
1.8.2. The contractor's plan shall:
a) make specific reference to those aspects of the National Institute of Standards and Technology Special Publication (NIST SP) 800‐161, “Supply Chain Risk Management Practices for Federal Information Systems and Organizations” that represent the contractor's implemented processes and practices;
b) include a description of how the contractor shall protect the supply chain from exploitation due to the insertion of counterfeits/malware, unauthorized production, tampering, theft, insertion of malicious software and hardware, functionality alteration, and any other elements that would allow adversaries to gain unauthorized access to data, alter data, interrupt communications, or otherwise disrupt operations;
c) inform the U. S. Government of any instances of unauthorized access and/or compromise, such as those listed in item “b” to contractor’s digital information and parts and components and
d) make specific reference to those aspects of NIST SP 800‐53 that represent the processes and practices the contractor will implement. The plan and processes shall apply to the prime and their suppliers, subcontractors, associated integrators, and vendors, spanning the entirety of the supply chain, from raw material stage to delivery of a finished product.
1.8.3. The Contractor and any subcontractors shall provide to the government a system security plan (or extract thereof) and any associated plans of action developed to satisfy the adequate security requirements of DFARS 252.204‐7012, and in accordance with NIST Special Publication (SP) 800‐171, “Protecting Controlled Unclassified Information in Nonfederal Systems and Organizations” in effect at the time the solicitation is issued or as authorized by the contracting officer, to describe the contractor’s unclassified information system(s)/network(s) where covered defense information associated with the execution and performance of this contract is processed, is stored, or transmits.
1.8.4. The contractor shall {develop, update} an incident‐handling capability plan that utilizes guidance provided in NIST SP 800‐61 revision 2, Computer Security Incident Handling Guide, consisting of
1) incident response policy and plan,
2) procedures for performing incident handling and reporting,
3) guidelines for communicating with outside parties regarding incidents,
4) incident team structure and staffing model,
5) relationships and lines of communication between the incident response team and other groups, both internal and external,
6) services the incident response team should provide, and
7) staffing and training the incident response team. Any incident reported to
Defense Industrial Base Cybersecurity Program (https:\\dibnet.dod.mil) shall also be reported to the responsible contracting officer within 48 hours/days.
{time period determined by acquisition team}
1.9 Condemnation Candidates/End items beyond economical repair
1.9.1 Beyond Economical Repair (BER) items are end items in which the repair cost will exceed 75% of the contracted repair cost or have obsolescence or repair issues that cannot be overcome by either the contractor or the Government. Upon determination of BER, the Contractor shall prepare and furnish to the Government a work request in accordance with the Contractors approved procedure. The Contractor shall report BER candidates to the PCO within 30 calendar days of discovery. The Contractor shall also report approved BER in the approved Governmental reporting system. (DID: DI‐MGMT‐81838)
1.9.2 The Contractor shall not condemn reparable or recoverable items without prior approval of the PCO or ACO. The Contractor shall ensure non‐repairable items are demilitarized and disposed according to the Contractor‐developed, Government‐approved property procedures.
1.9.3 As specified in the Contractor‐developed, Government‐approved property procedures, the disposition of condemned items will be determined on a case‐ by‐case basis by the ACO.
1.9.4 On units approved to be condemned by the Government, the Contractor is authorized to retain serviceable parts salvaged from the condemned unit. The salvaged parts shall be retained by the Contractor for further use in repair of all NSNs listed within this PWS. These parts will not be replenished when used up.
The non‐useable, scrapped parts shall be condemned IAW the Contractor‐ developed, Government‐approved property procedures.
1.10. Special Tools (ST) and Support Equipment (SE)
1.10.1. The SE required to accomplish the scope of work to be completed on end‐items under this contract is contained in the contractors latest repair instructions. If the equipment specified in the repair procedures is not designated as Government furnished in this contract, the Contractor shall furnish identical or substitute SE from commercial sources.
1.10.2 If the Contractor intends to substitute SE the Contractor shall demonstrate that substitute SE can be acquired and meets the standards stipulated in the technical data by the following actions:
1.10.3 Displaying drawings, schematics, or specifications which illustrate that the
Contractor understands the exact nature of the work to be performed and the SE required to perform the tasks.
1.10.4 Explaining the capabilities of substitute SE to ensure that it is adequate to perform the specified testing requirements.
1.10.5 Defining how substitute SE will be designed, built, and calibrated without assistance from the Government, by an internal engineering capability, or the services of a recognized outside engineering agency.
1.10.6 The Contractor shall show certification documents of all calibrated SE to the ACO prior to work performed as outlined in the PWS.
1.10.7 Support Equipment Calibration Requirements. The Contractor shall ensure documentation certifying the accuracy of all calibrated SE is made available to the ACO prior to work performed. The Contractor shall ensure SE calibration is maintained throughout performance of this contract. Upon request, the
Contractor shall provide certification documents (DID: DI‐QCIC‐80798C) to the ACO for each SE item as follows:
a. SE part number and serial number
b. Date calibrated
c. Calibration due date
d. Calibration source
e. Calibration procedure used
f. Calibration data
g. Facsimile of the current stamped calibration sticker affixed to SE item
h. Verification of full performance compliance IAW this PWS for SE items not requiring calibration.
i. Traceability to the National Institute of Standards and Technology
1.11. Precious Metals Recovery Program
1.11.1. The handling and control of precious metals shall be IAW AFI 23‐101, Air Force
Materiel Management.
1.12. Nuclear Hardness Requirement
1.12.1. The Contractor shall establish, document, and maintain nuclear hardness requirement program for the work associated with this PWS as applicable.
If nuclear hardness requirement is or will be compromised through the work associated with this PWS, the Contractor shall notify the PCO within 15 business days of discovery, and wait for written instructions from the
PCO.
1.13. Parts Control Program
1.13.1. The Contractor shall establish, document, and maintain a parts control program for the work associated with this PWS. Parts or material used shall be equal to or exceed the original requirements technical data.
The current item configuration, as described in the applicable Approved OEM parts list, shall serve as the baseline and Program Parts Selection List (PPSL) for required parts.
1.13.2. The Contractor shall maintain configuration of items worked under the scope of this contract as identified in the applicable end‐item or system parts list.
The Contractor shall notify the PCO via e‐mail of any configuration discrepancies noted between the parts list, engineering drawings, and the current configuration of the end‐item. The Contractor shall obtain written authorization from cognizant engineering activity via the PCO for deviations from the parts list prior to implementation for parts that are not Class II changes. The contractors engineering department shall have the authority to prepare and approve Class II engineering change orders and minor deviations as defined by MIL‐HDBK‐61 concerning workload. The contractor shall submit all Class I and Class II ECOs to DCMA for concurrence with classifications.
Copies of all Class I and Class II ECOs or minor deviations, shall be forwarded to the PCO through the ACO using contractor’s internal form in accordance with the contractor’s internal procedures (DID: DI‐SESS‐80639E).
1.13.3. The Contractor shall keep records of the sourcing of replacement parts for each end item repaired per their approved Parts Management Plan (PMP) and shall furnish these records for inspection upon Government request.
1.13.4. Diminishing Manufacturing Sources/Material Shortage and Obsolescence.
The Contractor shall report all diminishing manufacturing sources/material shortages and obsolescence issues to the Government. (DID: DI‐PSSS‐81656B, DI‐MISC‐80711A, DI‐MGMT‐80368A)
1.13.5. Government‐Industry Data Exchange Program (GIDEP). The contractor shall submit all appropriate data requirements to the Government Industry Data Exchange Program (GIDEP) as it is generated. The contractor shall screen each Alert or Safe received from GIDEP to determine if the device or process for which the Alert is issued, is used in the manufacture of the unit and take appropriate action. If appropriate action requires a stock purge that negatively impacts production, the contractor shall perform a risk analysis and provide recommendations to the cognizant engineering office. Contractor shall adhere to the policies and directives of GIDEP. (DID: DI‐MGMT‐80368A)
1.14. Counterfeit Prevention Plan
1.14.1. Counterfeit Prevention Plan (CPP). Contractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and disposition counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain. These policies and procedures shall be documented in a CPP for submission and approval in accordance with Data Item Description (DID) DI‐MISC‐81832 and accomplished for all specified contract items. DI‐MISC‐81832 is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI‐MISC‐ 81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD‐adopted SAE AS5553, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply.
1.14.2. At a minimum, the CPP shall address:
1.14.2.1. Applicability. The Contractor shall identify all Business locations and programs to which the CPP applies. The CPP shall address (as applicable) materials, hardware, electronic parts, and procured assemblies.
1.14.2.2. Definitions. The Contractor shall utilize definitions per AS5553 to ensure consistency. Any contractor‐derived definitions must be included in an appropriate CPP appendix or annex. (Ref. AS5553, paragraph 3, 3.1, 3.2, 3.3, appendix H)
1.14.2.3. Parts Availability and Use of Parts Brokers. The Contractor shall not procure materials, systems, assemblies, subassemblies or parts from parts Brokers when available from Original Manufacturers (OM) or their Authorized Distributors. In cases where materials, systems, assemblies, subassemblies or parts are no longer available from the OM or their Authorized Distributors, procurement from Brokers may be authorized as defined by the Contractor’s policy and their CPP.
(Ref. AS5553, paragraph 4.1.1, 4.1.2.e., appendix A)
1.14.2.4. Procurement Policies. The Contractor shall provide and implement policy directing development and implementation of business practices and procedures, and processes to prevent procurement of Counterfeit materials and parts. The Contractor shall identify the appropriate office(s), business units, functional organizations, and programs, who shall have responsibility for development, maintenance and implementation of the CPP. The CPP shall identify the specific roles and responsibility for each. (Ref. AS5553, paragraph 4.1.2, 4.1.3, appendix B, C, D)
1.14.2.5. Risk Assessment. Assessment. The contract shall address the risk of using unknown sources and or unauthorized suppliers in the CPP.
Application or technical risk assessments shall establish the effect that counterfeit parts may have on performance. Vendor or source of supply risk assessments shall establish the potential for obtaining counterfeit parts. Using any risk analysis tool acceptable to the Government, the Contractor shall conduct a risk assessment based upon item characteristics and how likely it is that a counterfeit part will be received. The contractor shall identify and describe in the CPP how parts are selected for assessment and what risk is acceptable based upon the parts design, construction, material and functional requirements. As a minimum, analysis shall be completed for flagging high risk items, such as items that are obsolete, discontinued, rare, etc. The contractor shall require completion of a trade study, documented within the CPP, that shall facilitate determining whether 100% testing of parts procured from after‐market sources is more cost effective than qualification or requalification of a manufacturer. (Ref. AS5553, paragraph 4.1.2, 4.1.3, appendix B, C, D)
1.14.2.6. Detection and Avoidance Responsibilities. The Contractor shall establish processes for the review and approval of contractor and applicable subcontractor systems for the detection and avoidance of counterfeit electronic parts and suspect counterfeit electronic parts, which processes shall be comparable to the processes established for contractor business systems under section 893 of the Ike Skelton National Defense Authorization Act for Fiscal Year 2011 (Public Law 111–383; 124 Stat. 4311; 10 U.S.C. 2302 note). The Contractor shall flow down such requirements and processes to their subcontractors per ODASD Memo titled “Overarching DoD Counterfeit Prevention Guidance”, dated 16 March 2012. (Ref.
AS5553, paragraph 4.1.4, 4.1.5, appendix E)
1.14.2.7. Testing and Verification. The Contractor shall establish and accomplish testing and verification processes for items not received from an original equipment manufacturer, original component manufacturer, or authorized distributor that are identified as having high risk for counterfeit potential. These processes apply to prime contracts, and to subcontracts or suppliers below the prime contracts. The Contractor shall provide a list of acceptable test facilities if the subcontractor or supplier does not have the capability to perform required testing.
Submittal of Certificates of Compliance indicating the parts are not counterfeit shall be acceptable for verification of testing. (Ref.
AS5553, paragraph 4.1.4, appendix E)
1.14.3. Configuration Identification and Traceability. The Contractor shall identify and control the configurations of all systems, assemblies, subassemblies and parts, and enable mechanisms to provide traceability of parts. The Contractor shall report to the Government when control of the configurations of all systems, assemblies, subassemblies and parts, and mechanisms to provide traceability of parts are not possible. The Contractor shall identify the specific systems, assemblies, subassemblies and parts beyond the Contractors’ control. The Contractor shall be responsible for detecting and avoiding the use or inclusion of counterfeit materials and parts, to include procured assemblies and subassemblies, in such products and shall be responsible for the rework or corrective action that may be required to resolve the use or inclusion of counterfeit materials and parts. The cost of counterfeit electronic parts and suspect counterfeit electronic parts and the cost of rework or corrective action that may be required to remedy the use or inclusion of such parts are not allowable costs under Department contracts , unless: a) the contractor has established a counterfeit avoidance/detection system approved by the DoD, b) the counterfeit parts were procured from a DoD‐accredited trusted supplier or provided as Government property, and c) the contractor has provide timely notification to the Government. (Ref. AS5553, paragraph 4.1.6, appendix F)
1.14.3.1. Counterfeit Notification and Reporting. The Contractor shall report in writing to the Procuring Activity within 30 calendar days of determining any end item, component, part, or material contained in supplies purchased by the Department of Defense, or purchased by a contractor or subcontractor for delivery to, or on behalf of, the Department, contains counterfeit electronic parts or suspect counterfeit electronic parts for the purpose of investigation and notification of the Air Force Office of Special Investigations (AFOSI).
The PCO shall coordinate reporting to the appropriate Program Management/Item Management, System Engineering Management, the AFMC Discrepant Materiel Reporting Program (DMRP) Office in 406 SCMS/GULAB, and the AFOSI. Additionally, the Contractor shall within the same 30 calendar day period ensure all suspected or confirmed counterfeit items are entered into the Government‐Industry Data Exchange Program (GIDEP) system, which will serve as the DoD central reporting repository. (Ref.
AS5553, paragraph 4.1.7, appendix G)
1.14.4. Counterfeit Prevention Training. The Contractor shall provide appropriate training and shall require all personnel working procurement within their company, to include at a minimum their supply chain management specialists, receiving inspectors, and engineers, to complete said training. The Contractor shall determine the appropriate training required. Training may be developed in‐house or may be other Industry accepted training. The CPP shall describe and list the training provided by the contractor to their personnel.
1.14.5. The Contractor’s Counterfeit Parts Program shall be in accordance SAE
AS5553 and AS6174 and/or DFARS 252.246‐7007.
1.15. Engineering Support
1.15.1. Engineering Support shall be provided as requested by the PCO. Engineering support shall be funded as unprogrammed workload and is not considered part of an item’s repair price. These engineering assignments may include such tasks as First Article Inspections, obsolescence resolution, reverse engineering studies on hardware or software, etc. which are depot type activities in support of the assigned workloads. The contractor and the Government shall mutually agree‐upon task descriptions, level of effort (LOE) and the cost of the work to be performed. Expected outputs from this requirement shall be reported in Engineering Change Proposal (ECPs) in accordance with (DID) DI‐ SESS‐80639E and Status Reports in accordance with (DID) DI‐MGMT‐80368A.
1.16. Cannibalization of Parts (Module Swap)
1.16.1. The Contractor is authorized to cannibalize subassemblies or parts between inducted unserviceable assets in order to expedite repair when a particular repair is constrained for lack of materials that are not, and will not be immediately available. Cannibalization requests shall be subject to the review and subsequent approval or disapproval of the Government Equipment Specialist, 424 SCMS/GUMA. Such cannibalization actions should only be considered upon exhaustion of all other sources of materials. The Contractor shall not initiate any cannibalization action unless such action shall satisfy all material requirements for the item in question. The Contractor shall ensure the contract delivery schedule is not negatively affected by the removal of any subassemblies or parts from any inducted end item. (DID – DI‐MGMT‐80368A)
1.17. Lead (Pb) Free Electronics
1.17.1. The use of lead (Pb) solder and/or components/assemblies in the repair of the subject items is considered a potential safety risk as described by the Reduction of Hazardous Substance (ROHS) requirements. Therefore, if lead (Pb) solder and/or components/assemblies are used in the repair of the subject items, the contractor shall ensure the affected items are marked in accordance with IPC J‐STD‐609, "Marking and Labeling of Components, PCBs and PCBAs to Identify Lead (Pb), Pb‐Free and Other Attributes.”
1.17.2. Mixing of incompatible metals can reduce the reliability and can possibly lead to the formation of Tin‐Whiskers in electronic assemblies. Therefore, all touch‐up, rework, or repair of printed circuit assemblies shall be performed with the solder and component finish composition used to manufacture the original assembly. The vendor shall refer to the fabrication drawings to determine the material alloy and rosin type to be used in the repair process.
Any deviation requests must be approved by the PCO. The use of Lead Free in lieu of Tin Lead solder is prohibited in the repair process, use TO 00‐25‐259 as a guide.
1.18. Ozone Depleting Substances (ODS)
1.18.1. This PWS is not requiring the use of a Class 1 ozone depleting substance (ODS) in the performance of the contract. The Contractor is authorized to use a suitable substitute for any Class 1 ODS which may be required by the specifications or Technical Data of this PWS. The Contractor shall immediately identify the substitute by written notification to the PCO.
1.19. Delivery Schedule
1.19.1. The Contractor shall meet the contractual delivery schedule.
1.20. Customer Service Requirements
1.21.1. Information Requests: The Contractor shall ensure responses to requests for information and data are only provided to customers authorized by the PCO in the performance of official duties. All requests between the Government and the Contractor shall go through the PCO.
1.21.1.1. Information requests shall contain a subject line, nature of the request and an expected/requested response date and time.
The request must be identified as “EMERGENCY”, “URGENT” or “ROUTINE” so that a response is provided within the specified timeframes. A log will be maintained by the PCO or an appointed Government Representative. The log will be used to track all requests and evaluate response times.
1.21.1.2. Contractor requests for engineering and/or technical related problems or issues shall be submitted on an AFMC Form 202, Nonconforming Technical Assistance Request and Reply or through the PCO by E‐ mail. All AFMC Form 202s submitted shall be sent directly to 424 SCMS Cognizant Engineer with an information copy to the ACO and PCO.
1.21.2. Response Times for Information Requests: All requests for information initiated by the Government or Contractor shall be in writing and submitted electronically via e‐mail. Requests for information shall be answered within the following timeframes:
a. Emergency Respond within two (2) business days.
b. Urgent‐ Respond within five (5) business days.
c. Routine‐ Respond within ten (10) business days.
1.21. Safety and Health
1.21.1. While performing work under this contract the Contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. By safety and health standards, the Contractor shall notify the PCO, within eight (2) business days of any damage to Government property where the dollar value exceeds $500,000.00 and within two (5) business days, for any damage to Government property less than $500,000.00 during the execution of the contract. Mishap notifications shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (Events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective actions (taken or proposed)
h. Other pertinent information
If requested by the designated PCO, the Contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the CO.
1.22. Manpower Reporting Language for Contract Performance Work Statements
1.22.1. The Contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the United States Air Force via a secure data collection site. The Contractor is required to completely fill in all required data fields at https://www.sam.gov. Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year. Contractors may direct questions to the CMRA help desk.
*Reporting Period: Contractors are required to input data by 31 October of each year.
Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the Contractor name and contract number associated with the data.
2. SERVICE SUMMARY
2.1. Service Summary
2.1.1. Contractor performance shall be measured and assessed, using the Performance Requirements listed in Table 2‐1. The Contractor service requirements are summarized into performance requirements that relate directly to the mission essential items. The performance threshold requirements describe the minimum acceptable levels of service for each requirement. In the event the performance requirement is not met, the Contractor shall be given time after notification to correct the unacceptable performance, if such correction is possible. The Contractor shall immediately take corrective action in accordance with the performance threshold(s).