Performance Work Statement.pdf
PDF 184 KB Posted
- Solicitation number
- W911QX21Q0129
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Redacted DnF.pdf | ||
| Provisions and Clauses Laser Service.pdf | ||
| Combo Solicitation Laser Service.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS)
C.1 Background
The Army Research Laboratory (ARL) Center for Agile Materials Manufacturing Sciences currently owns six (6) Direct Metal Printing machines located at Aberdeen Proving Ground
(APG). This equipment requires routine maintenance and periodic service visits from the original equipment manufacturer to continue to operate at an optimal level, and to follow in accordance with the warranty.
C.2 Objective
The Government requires subject matter expertise (SME) to examine the Government owned
RPMI 222 laser system and perform yearly preventive maintenance when required. The contractor shall supply required parts, preventive maintenance kits, unlimited phone support and conduct software/firmware updates as needed.
C.3 Requirement
C.3.1 The contractor shall contact the Government technical point of contact (TPOC), Mr. John
Brown (410-306-0830, john.r.brown252.civ@mail.mil) to schedule an appropriate date and time for the visit within 30 days after award.
C.3.2 The contractor shall supply remote technical question support for one (1) year for the
RPMI 222 Laser System that includes the following
C.3.2.1 General Support for questions pertaining to troubleshooting the RPMI 222 Laser
System.
C.3.2.2 General Support for questions pertaining to the operation of the RPMI 222 Laser
System.
C.3.3 The contractor shall supply remote system support for one (1) year for the RPMI 222 Laser
System that includes the following
C.3.3.1 Technical application support supplied for assistance in using the RPMI 222
Laser System.
C.3.4 The contractor shall supply one (1) onsite Maintenance Service for the RPMI 222 Laser
System that includes the following.
C.3.4.1 Inspect powder feeders
C.3.4.2 Replace all powder feeder poly-lines
C.3.4.3 Replace powder feeder discs and orifices
C.3.4.4 Inspect RPMI deposition heads mailto:john.r.brown252.civ@mail.mil
C.3.4.5 Perform maintenance to vacuum pump
C.3.4.6 Inspect and clean all optics in RPMI optics box
C.3.4.7 Inspect and clean powder distribution manifold
C.3.4.8 Test/update the laser power calibration
C.3.4.9 Perform Primes laser beam profile analysis
C.3.4.10 Perform maintenance to laser chiller
C.3.4.11 Inspection/maintenance to ball screw stages
C.3.4.12 Perform system motion qualification
C.3.4.13 Perform electrical cabinet filter maintenance
C.3.4.14 Supply one (1) Maintenance Kit
C.3.4.15 Travel, lodging, and required equipment included in price for one (1) three day on-site visit within
United States.
C.3.5 The contractor shall provide all qualified trained personnel, tools and parts required to accomplish the task.
C.3.6 The contractor shall follow all installation and facility access procedures.
C.4 Deliverables
C.4.3 The contractor shall supply a maintenance report detailing all work accomplished after each maintenance service is completed on the machine.
C.5. SECURITY CONSIDERATIONS
C.5.1. All Contractor employees and all associated sub-Contractor employees with an area of performance within Army controlled installation, facility, or area shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office.
Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.
C.5.2. Contractor employees and all associated sub-Contractor employees that do not require
CAC, but require access to a DoD facility or installation shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification
Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-
13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
C.6 Contractor Hours of Operation:
C.6.1 The Contractor personnel shall work Monday through Friday, eight (8)-hour days covering core work hours of 0900-1500 excluding Federal holidays. Contractor employees shall not be permitted to work on Saturdays, Sundays or legal holidays (or hours/days on which the installation is officially opening late, closing early, or is closed entirely, for any reason), unless otherwise authorized by the
COR in writing. The following legal holidays will be observed:
January 1st
3rd Monday of January
3rd Monday of February
Last Monday of May
July 4th
1st Monday of September
2nd Monday of October
November 11th
4th Thursday of November
December 25th
When one of the above designated legal holidays falls on a Sunday, the following Monday will be observed as a legal holiday. When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday by U.S. Government Agencies
MEMO -
Implementation of Enhanced Security Protections for Contractor Information Systems.pdf
Contracting Officer:
4/22/2021
X Ashley Eaker
Contracting Officer (KO)
Signed by: EAKER.ASHLEY.ELIZABETH.1439530371
File details come from the government source that posted it. Updated .